CN216345170U - Surveying instrument with solar panel charging structure - Google Patents

Surveying instrument with solar panel charging structure Download PDF

Info

Publication number
CN216345170U
CN216345170U CN202122768262.0U CN202122768262U CN216345170U CN 216345170 U CN216345170 U CN 216345170U CN 202122768262 U CN202122768262 U CN 202122768262U CN 216345170 U CN216345170 U CN 216345170U
Authority
CN
China
Prior art keywords
solar panel
surveying instrument
electricity storage
charging structure
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122768262.0U
Other languages
Chinese (zh)
Inventor
卢西魁
卢林豪
赵盼盼
杜卿
韦党营
校升旗
袁丽朋
安文磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Industrial And Trade School
Henan Yunhe Surveying And Mapping Engineering Co ltd
Original Assignee
Zhengzhou Industrial And Trade School
Henan Yunhe Surveying And Mapping Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Industrial And Trade School, Henan Yunhe Surveying And Mapping Engineering Co ltd filed Critical Zhengzhou Industrial And Trade School
Priority to CN202122768262.0U priority Critical patent/CN216345170U/en
Application granted granted Critical
Publication of CN216345170U publication Critical patent/CN216345170U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model relates to the technical field of surveying instruments, in particular to a surveying instrument with a solar panel charging structure, which comprises an installation pipe, wherein a round pipe is arranged inside the installation pipe, a rotary inserting column is sleeved inside the round pipe in a rotating mode, a fixed circular plate is coaxially connected to the top of the rotary inserting column, connecting blocks are fixedly connected to the left side and the right side of the fixed circular plate, one end of each connecting block is hinged to a connecting frame, an electricity storage box is arranged on the right side of the connecting frame on the right side, and a solar panel is arranged on the top of the electricity storage box. This surveying instrument with solar panel charge structure is through installing a plurality of connection structure that are equipped with on the pipe, to surveying instrument, the barn door, the electricity storage case, solar panel installs, and can carry out the position to it and adjust, it is comparatively convenient to use, it is less to have solved current surveying instrument electricity storage function, lack the power supply measure again, it is not enough to produce the electric quantity easily under long-term the use, influence the work progress, traditional surveying instrument is difficult to adjust, can't carry out the problem of nimble transform according to operating personnel's actual site demand.

Description

Surveying instrument with solar panel charging structure
Technical Field
The utility model relates to the technical field of surveying instruments, in particular to a surveying instrument with a solar panel charging structure.
Background
The work piece is taken into the computer to be processed and amplified by 18 to 230 times by combining the optical, mechanical and electrical integration, the processed work piece is displayed on a screen, the work piece can be directly photographed and filed or surface observation, measurement and drawing can be carried out, the measured data can be subjected to SPC statistics to prepare an EXCEL report, a drawing file can be converted into AUTOCAD application, the AUTOCAD graph can also be called into computer software to be compared with the work piece to prepare data, the data can be stored and printed on the computer, and the data can be transmitted through a network;
when carrying out measurement work, need use surveying instrument, current surveying instrument accumulate function is less, lacks the power supply measure again, and it is not enough to produce the electric quantity easily under long-term the use, influences the work progress, and traditional surveying instrument is difficult to adjust, can't carry out nimble transform according to operating personnel's actual on-the-spot demand, in view of this, we provide a surveying instrument with solar panel charge structure.
SUMMERY OF THE UTILITY MODEL
In order to make up for the above deficiencies, the utility model provides a surveying instrument with a solar panel charging structure.
The technical scheme of the utility model is as follows:
the utility model provides a surveying instrument with solar panel charge structure, includes the installation pipe, the pipe has been seted up to the inside of installation pipe, the inside of pipe is rotated and has been cup jointed and rotate and insert the post, the top coaxial coupling who inserts the post rotates has fixed plectane, the equal fixedly connected with connecting block in the left and right sides of fixed plectane, the connecting block is kept away from the one end of fixed plectane articulates there is link, right side the right side fixedly connected with electricity storage box of link, the top of electricity storage box is provided with solar panel, solar panel's bottom side surface is provided with two jibs.
As a preferred technical scheme, the left side of the bottom of the electricity storage box is fixedly connected with a hanging rod.
As an optimized technical scheme, a support frame is rotatably connected to the left side of the connecting frame on the left side, and a shading plate is rotatably connected to one end, far away from the connecting frame, of the support frame.
As a preferable technical scheme, a surveying instrument is installed on the top surface of the fixed circular plate.
As the preferred technical scheme, the left side and the right side of the installation pipe are fixedly connected with connecting plates, and one ends, far away from the installation pipe, of the tops of the connecting plates are provided with hanging rings.
As preferred technical scheme, the bottom fixed surface of installation pipe is connected with the three fixed block that is equidistant annular distribution, the bottom of fixed block all rotates and is connected with the supporting leg, the regulating plate has been cup jointed in the inside slip of supporting leg.
As the preferred technical scheme, the bottoms of the adjusting plates are rotatably connected with conical ground inserting plates.
Compared with the prior art, the utility model has the beneficial effects that: this surveying instrument with solar panel charge structure is through installing a plurality of connection structure that are equipped with on the pipe, to surveying instrument, the barn door, the electricity storage case, solar panel installs, and can carry out the position to it and adjust, it is comparatively convenient to use, it is less to have solved current surveying instrument electricity storage function, lack the power supply measure again, it is not enough to produce the electric quantity easily under long-term the use, influence the work progress, traditional surveying instrument is difficult to adjust, can't carry out the problem of nimble transform according to operating personnel's actual site demand.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of a support assembly of the present invention;
FIG. 3 is a schematic structural view of a mounting tube assembly of the present invention;
fig. 4 is a schematic structural diagram of the multifunctional adjusting assembly of the present invention.
In the figure: 1. installing a pipe; 10. a circular tube; 11. rotating the inserted column; 12. a connecting plate; 120. hanging a ring; 13. a fixed block; 2. fixing the circular plate; 20. connecting blocks; 21. a connecting frame; 3. an electricity storage box; 30. a hanging rod; 4. a solar panel; 40. a boom; 5. a support frame; 50. a visor; 6. a surveying instrument; 7. supporting legs; 70. an adjusting plate; 71. a conical ground board.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution:
a surveying instrument with a solar panel charging structure comprises an installation tube 1, a round tube 10 is arranged inside the installation tube 1, a rotary inserting column 11 is sleeved inside the round tube 10 in a rotating mode, a fixed circular plate 2 is coaxially connected to the top of the rotary inserting column 11, connecting blocks 20 are fixedly connected to the left side and the right side of the fixed circular plate 2, one end, far away from the fixed circular plate 2, of each connecting block 20 is hinged to a connecting frame 21, a power storage box 3 is fixedly connected to the right side of the right connecting frame 21, a solar panel 4 is arranged on the top of the power storage box 3, two hanging rods 40 are arranged on the bottom side surface of the solar panel 4, when an operator uses the surveying instrument, when the surveying instrument needs to be supplied with auxiliary power, the operator can meet the sun through adjusting the solar panel 4 to supply power and store energy, and hang on a supporting structure through the hanging rods 40 arranged on the back to support the solar panel 4, and when the azimuth change is needed to follow the sun irradiation, the operator accessible rotates to insert post 11 and makes fixed plectane 2 carry out the circumference rotation for solar panel 4 follows the sunshine and shines the position and carry out the position adjustment.
It should be added that the hanging rod 30 is fixedly connected to the left side of the bottom of the electricity storage box 3, and the hanging rod 30 can be hung inside the bottom hanging ring 120 to support when the electricity storage box 3 is unfolded to the parallel state.
As the preferred of this embodiment, the left side of left side link 21 is rotated and is connect support frame 5, and support frame 5 is kept away from the one end rotation of link 21 and is connected with light screen 50, and when meetting overcast and rainy weather or highlight weather, support frame 5 is adjusted to the operating personnel accessible for light screen 50 is arranged in the top of surveying instrument 6 and is protected surveying instrument 6, prevents insolateing or rainwater invasion and attack, has played the guard action to the smooth expansion of survey and drawing work.
Preferably, the top surface of the fixed circular plate 2 is provided with a surveying instrument 6, and an operator can adjust the measurement by rotating the rotary inserting column 11 to match the surveying instrument 6.
Preferably, the left and right sides of the installation tube 1 are fixedly connected with the connecting plates 12, the ends of the top of the connecting plates 12 far away from the installation tube 1 are provided with the hanging rings 120, the connecting plates 12 are in a horizontal parallel state, when the top electricity storage box 3 is unfolded, the electricity storage boxes 3 are parallel to each other corresponding to the connecting plates 12, and at this time, the hanging rods 30 at the bottom of the electricity storage boxes 3 correspond to the hanging rings 120.
It is worth explaining that the fixed surface of the bottom of the installation pipe 1 is fixedly connected with three fixed blocks 13 which are distributed in an equidistant annular mode, the bottom of each fixed block 13 is connected with a supporting leg 7 in a rotating mode, an adjusting plate 70 is sleeved on the supporting leg 7 in a sliding mode, an operator can adjust the supporting area of the device by rotating the supporting leg 7, and the supporting height of the device can be adjusted by matching with the adjusting plate 70 sleeved on the supporting leg 7 in a sliding mode.
Preferably, the bottom of the adjusting plate 70 is rotatably connected with a conical ground inserting plate 71.
Preferably, after the operator adjusts the supporting height and the supporting area of the device, the operator can adjust the bottom tapered ground inserting plate 71 to insert the tapered ground inserting plate 71 into the ground to fix the device as a whole.
When the surveying instrument with the solar panel charging structure is used, an operator firstly fixes the device on the surface, the operator can adjust the supporting area of the device by rotating the supporting legs 7 at the moment, and can adjust the supporting height of the device by matching with the adjusting plate 70 sleeved in the supporting legs 7 in a sliding way, after the adjustment of the supporting height and the supporting area of the device is finished, the operator can insert the conical ground inserting plate 71 into the ground by adjusting the conical ground inserting plate 71 at the bottom to integrally fix the device, the operator performs surveying and mapping work by the surveying instrument 6 at the moment, when auxiliary power supply is needed, the operator caters to the sunlight by adjusting the solar panel 4 to supply power and store energy, and hangs the solar panel 4 on the supporting structure by the suspender 40 arranged at the back to support the solar panel 4, and when needing to follow sunshine and shine and carry out the position transform, operating personnel accessible rotates to insert post 11 and makes fixed plectane 2 carry out the circumference rotation, make solar panel 4 follow sunshine and shine the position and carry out the position adjustment, when meetting rainy weather or highlight weather, operating personnel accessible adjusts support frame 5, make light screen 50 arrange in the top of surveying instrument 6 and protect surveying instrument 6, prevent insolate or rainwater invasion and attack, operating personnel need adjust surveying instrument 6 position, operating personnel accessible rotates to insert post 11 cooperation surveying instrument 6 and measure the adjustment to surveying ground, annotate simultaneously when launching storage box 3, storage box 3 should be parallel to each other in connecting plate 12, the peg 30 of storage box 3 bottom should correspond in link 120 position at this moment.
The foregoing shows and describes the general principles, essential features, and advantages of the utility model. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and the preferred embodiments of the present invention are described in the above embodiments and the description, and are not intended to limit the present invention. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. A surveying instrument with a solar panel charging structure, comprising a mounting tube (1), characterized in that: pipe (10) have been seted up to the inside of installation pipe (1), the inside of pipe (10) is rotated and has been cup jointed and rotate and insert post (11), the top coaxial coupling who inserts post (11) rotates has fixed plectane (2), the equal fixedly connected with connecting block (20) in both sides about fixed plectane (2), keep away from connecting block (20) the one end of fixed plectane (2) articulates there are link (21), right side the right side fixedly connected with electricity storage box (3) of link (21), the top of storing up electricity storage box (3) is provided with solar panel (4), the bottom side surface of solar panel (4) is provided with two jib (40).
2. The surveying instrument with solar panel charging structure according to claim 1, characterized in that: and a hanging rod (30) is fixedly connected to the left side of the bottom of the electricity storage box (3).
3. The surveying instrument with solar panel charging structure according to claim 1, characterized in that: the left side of link (21) is rotated and is connect support frame (5), support frame (5) are kept away from the one end of link (21) is rotated and is connected with light screen (50).
4. The surveying instrument with solar panel charging structure according to claim 1, characterized in that: and a surveying instrument (6) is arranged on the surface of the top of the fixed circular plate (2).
5. The surveying instrument with solar panel charging structure according to claim 1, characterized in that: the left and right sides fixedly connected with connecting plate (12) of installation pipe (1), the top of connecting plate (12) is kept away from the one end of installation pipe (1) all is equipped with link (120).
6. The surveying instrument with solar panel charging structure according to claim 1, characterized in that: the bottom fixed surface of installation pipe (1) is connected with three fixed block (13) that are equidistant annular and distribute, the bottom of fixed block (13) all rotates and is connected with supporting leg (7), regulating plate (70) have been cup jointed in the inside slip of supporting leg (7).
7. The surveying instrument with solar panel charging configuration according to claim 6, characterized in that: the bottoms of the adjusting plates (70) are rotatably connected with conical ground inserting plates (71).
CN202122768262.0U 2021-11-12 2021-11-12 Surveying instrument with solar panel charging structure Expired - Fee Related CN216345170U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122768262.0U CN216345170U (en) 2021-11-12 2021-11-12 Surveying instrument with solar panel charging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122768262.0U CN216345170U (en) 2021-11-12 2021-11-12 Surveying instrument with solar panel charging structure

Publications (1)

Publication Number Publication Date
CN216345170U true CN216345170U (en) 2022-04-19

Family

ID=81148935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122768262.0U Expired - Fee Related CN216345170U (en) 2021-11-12 2021-11-12 Surveying instrument with solar panel charging structure

Country Status (1)

Country Link
CN (1) CN216345170U (en)

Similar Documents

Publication Publication Date Title
CN207123284U (en) A kind of Multifunctional total station instrument
CN206573118U (en) A kind of remote control instrument of surveying and mapping
CN204703588U (en) A kind of outdoor leisure sunshade
CN216345170U (en) Surveying instrument with solar panel charging structure
CN208496938U (en) A kind of fire protection tool box
CN210070899U (en) Distance measuring device for assembling wind power generator
CN110285305A (en) A kind of operation field alarming device
CN208860351U (en) Engineering survey equipment with night work function
CN205304374U (en) Photovoltaic bicycle shed charging station
CN205504856U (en) Scene complementary type view energy tree
CN212988333U (en) On-spot mapping device of building engineering cost
CN210739742U (en) Mapping bracket suitable for field mapping
CN210070944U (en) Open-air portable topography mapping instrument platform
CN213027915U (en) Photovoltaic electricity storage device
CN211574610U (en) Fixing device for land surveying instrument with prevent wind function
CN209447012U (en) A kind of wireless meteorological acquisition device in the field based on Beidou
CN214793180U (en) Multi-functional geographic information mapping device
CN210922697U (en) Wind system state acquisition device
CN109372703B (en) Communication base station based on wind-solar hybrid
CN216483239U (en) Data acquisition and flat-placing device for orchard
CN209560090U (en) A kind of novel geography information positioning device
CN208608945U (en) Photovoltaic module support device and power generator
CN215498378U (en) Outdoor view formula cell-phone fills electric pile
CN211450714U (en) Environment-friendly street lamp for garden lighting
CN210514663U (en) Outdoor distributed hydrogeological information new energy acquisition unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220419