CN216340705U - Green construction equipment that coats with lacquer of building wall - Google Patents

Green construction equipment that coats with lacquer of building wall Download PDF

Info

Publication number
CN216340705U
CN216340705U CN202122530810.6U CN202122530810U CN216340705U CN 216340705 U CN216340705 U CN 216340705U CN 202122530810 U CN202122530810 U CN 202122530810U CN 216340705 U CN216340705 U CN 216340705U
Authority
CN
China
Prior art keywords
spray
building wall
connecting pipe
base
outlet end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122530810.6U
Other languages
Chinese (zh)
Inventor
鞠玉华
邓汉静
李宗彦
张彬
李思威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yixin Great Wall Construction Group Co ltd
Original Assignee
Guangdong Yixin Great Wall Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yixin Great Wall Construction Group Co ltd filed Critical Guangdong Yixin Great Wall Construction Group Co ltd
Priority to CN202122530810.6U priority Critical patent/CN216340705U/en
Application granted granted Critical
Publication of CN216340705U publication Critical patent/CN216340705U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Spray Control Apparatus (AREA)

Abstract

The application discloses a construction device for green coating of building walls, which relates to the technical field of building construction and solves the problem of uneven coating of building wall coatings, and comprises a base, universal wheels, an oil tank, a case, a fixing frame, a screw rod, a stand column and a motor, wherein a spray box is arranged in the middle of the screw rod and the stand column, a second connecting pipe is inserted in the spray box, a pump body is inserted in the outlet end of one side of the second connecting pipe, the outlet end of the bottom of the pump body is connected with a first connecting pipe, a fixing support is arranged on one side of the spray box, a spray head is arranged at one end of the fixing support, the other side of the second connecting pipe is communicated with the spray head through the fixing support, a plurality of spray pipes are inserted in one side of the spray head, the spray pipes are arranged on the wall surface instead of workers to coat, the process is time-saving and labor-saving, the coatings are even, and the working efficiency is high, avoid the workman to operate on the cat ladder, reduce the emergence of potential safety hazard, increased work efficiency.

Description

Green construction equipment that coats with lacquer of building wall
Technical Field
The application relates to the technical field of building construction, in particular to a green coating construction device for a building wall surface.
Background
With the improvement of the quality of life of people, houses with various decoration styles appear, and in the process of decorating building walls, workers can usually paint various coatings, such as a moisture-proof coating, a green environment-friendly coating and other coatings preferred by users, on the indoor walls according to the requirements of the users.
At present, the staff is when paining green paint, generally is paining on the wall through the artifical instrument such as holding brush or brush roll, and this process not only wastes time and energy, and coating paint unevenly, and work efficiency is low, simultaneously, still need often stand and operate on the cat ladder, has carelessly still to have the potential safety hazard a little, remains to improve this.
In view of the above-mentioned related art, the inventor believes that the painting is performed on the wall surface, and the painting process is time-consuming and labor-consuming, and the painting is not uniform.
SUMMERY OF THE UTILITY MODEL
In order to improve the inhomogeneous problem of building wall surface coating paint, this application provides a construction equipment is scribbled to building wall green.
The application provides a construction equipment is covered with paint, lacquer, or the like:
a construction device for green coating of building walls comprises a base, universal wheels are arranged on the periphery of the bottom of the base, an oil tank is arranged on the top of the base, a case and a fixing frame are arranged on one side of the oil tank, the fixing frame is positioned on the top of the case, a screw rod and a stand column are inserted into the bottom of the fixing frame, the screw rod is positioned on one side of the stand column, the outlet end of the bottom of the screw rod is connected with a motor, a spray box is arranged in the middle of the screw rod and the stand column, a second connecting pipe is inserted into the spray box, a pump body is inserted into the outlet end of one side of the second connecting pipe, the outlet end of the bottom of the pump body is connected with a first connecting pipe, a fixing support is arranged on one side of the spray box, a spray head is arranged at one end of the fixing support, the other side of the second connecting pipe is communicated with the spray head through the fixing support, and a spray pipe is inserted into one side of the spray head, the spray pipe is provided with a plurality of.
Optionally, a support is arranged on one side of the oil tank, and an outlet end on one side of the support is provided with a handrail.
Optionally, a support plate is arranged on the inner wall of the oil tank, and the support plate is located at the bottom of the pump body.
Optionally, the inside of spray box is provided with the pillar, the inside of pillar is provided with the internal thread, threaded connection between pillar and the screw rod.
Optionally, a bearing seat is arranged at an outlet end of one side of the fixed support, a connecting seat is arranged at one side of the spray head, and the connecting seat is rotatably connected with the fixed support through the bearing seat.
Optionally, one side of base is provided with the scraper blade, the scraper blade is including the fixed station, the top of fixed station is provided with the set-square, threaded connection between bolt and the base is passed through to the set-square.
Optionally, one side of base is provided with the extension frame, the both ends of extension frame are provided with the gyro wheel relatively.
Optionally, the scraper is located at the top of the extending frame, and an outlet end on one side of the scraper is located on the same horizontal plane with the roller.
In summary, the present application includes at least one of the following benefits:
1. lie in one side of wall body with the base, universal wheel through the base bottom makes the base can lateral shifting, make horizontal migration between base and the wall through extension frame and gyro wheel, first connecting pipe and second connecting pipe are passed through the pump body and are defeated into the shower nozzle and pass through the spray tube spraying with the coating in the oil tank, the motor passes through the height that the screw rod adjustment spouts the case, through mutually supporting between fixed bolster and the connecting seat, the angle of adjustment shower nozzle, such design makes the spray tube replace the workman to paint on the wall, this process is labour saving and time saving not only, and coating paints evenly, high work efficiency, avoid the workman to operate on the cat ladder, reduce the emergence of potential safety hazard, and the work efficiency is increased.
2. The inside of spray box is provided with the pillar, the pillar is located the top of motor, the inside of pillar is provided with the internal thread, threaded connection between pillar and the screw rod, such design has increased the compact degree of structure between spray box and the screw rod, make the lift effect of spray box more firm, the pillar still protects the second connecting pipe simultaneously, avoid the screw rod to wear and tear to the second connecting pipe when rotating as far as possible, the security of the use of first connecting pipe has been increased, one side exit end of fixed bolster is provided with the bearing frame, peg graft each other between the internal diameter of bearing frame and the fixed bolster, one side of shower nozzle is provided with the connecting seat, the inner wall of connecting seat is pegged graft and is had the bearing frame, the connecting seat passes through to rotate between bearing frame and the fixed bolster to be connected, such design makes the shower nozzle can the rotation direction, the practicality of spraying machine has been increased.
Drawings
FIG. 1 is a schematic view of the overall structure of the present embodiment;
FIG. 2 is a schematic sectional view of the fuel tank of the present embodiment;
FIG. 3 is a schematic view of the structure at A in FIG. 2 according to the present embodiment;
fig. 4 is a schematic view of the blade structure of the present embodiment.
Description of reference numerals: 1. a base; 11. a universal wheel; 2. an oil tank; 21. a chassis; 22. a fixed mount; 23. a support; 231. a handrail; 24. a support plate; 3. a motor; 31. a screw; 32. a column; 4. spraying a tank; 41. a pillar; 5. a pump body; 51. a first connecting pipe; 52. a second connecting pipe; 6. fixing a bracket; 61. a bearing seat; 7. a spray head; 71. a nozzle; 72. a connecting seat; 8. a squeegee; 81. a fixed table; 82. a set square; 9. a stretching frame; 91. and a roller.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
Example (b):
the embodiment of the application discloses construction equipment is covered with paint, lacquer, etc. to building wall green. Referring to fig. 1, 2 and 3, the green construction device that coats with lacquer of building wall includes base 1, base 1's bottom is provided with universal wheel 11 all around, base 1 can lateral shifting through the design to universal wheel 11, base 1's top is provided with oil tank 2, one side of oil tank 2 is provided with support 23 relatively, the one end that support 23 deviates from oil tank 2 is provided with handrail 231, the diameter of support 23 is the same with the diameter of handrail 231, the surface of handrail 231 is provided with anti-skidding line, through the design to handrail 231, make personnel control the direction of base 1 through oil tank 2, convenient operation, the inside of oil tank 2 is provided with the coating.
Referring to fig. 1 and 2, a chassis 21 and a fixing frame 22 are arranged on the other side of an oil tank 2, the fixing frame 22 is located at the top of the chassis 21, a screw 31 and an upright column 32 are inserted into the bottom of the fixing frame 22, the screw 31 is located on one side of the upright column 32, a motor 3 is connected to an outlet end of the bottom of the screw 31, a spray box 4 is arranged in the middle of the screw 31 and the upright column 32, the upright column 32 is slidably connected with the spray box 4, the design of the upright column 32 increases the stability of the spray box 4, a support column 41 is arranged inside the spray box 4, the support column 41 is located at the top of the motor 3, internal threads are arranged inside the support column 41, and the support column 41 is in threaded connection with the screw 31.
Referring to fig. 2 and 3, a second connecting pipe 52 is inserted into the spray box 4, a pump body 5 is inserted into an outlet end on one side of the second connecting pipe 52, an outlet end on the bottom of the pump body 5 is connected with a first connecting pipe 51, a support plate 24 is arranged on the inner wall of the oil tank 2, a round hole is arranged in the center of the support plate 24 to facilitate the insertion of the first connecting pipe 51, the support plate 24 is arranged at the bottom of the pump body 5, the pump body 5 is fixed on the top of the oil tank 2 through the design of the support plate 24 and is isolated from the coating, the coating is prevented from shaking to affect the pump body 5 as much as possible, the second connecting pipe 52 and the first connecting pipe 51 are made of hoses, a fixed bracket 6 is arranged on one side of the spray box 4, a spray head 7 is arranged at one end of the fixed bracket 6, a bearing seat 61 is arranged at an outlet end on one side of the fixed bracket 6, the inner diameter of the bearing seat 61 is inserted into the fixed bracket 6, a connecting seat 72 is arranged on one side of the spray head 7, the inner wall of connecting seat 72 is pegged graft and is had bearing frame 61, and connecting seat 72 passes through to rotate between bearing frame 61 and the fixed bolster 6 to be connected, and such design makes shower nozzle 7 can the rotation direction, has increased the practicality of spraying machine, and the opposite side of second connecting pipe 52 is through lining up each other between fixed bolster 6 and the shower nozzle 7, and one side of shower nozzle 7 is pegged graft and is had spray tube 71, and spray tube 71 is provided with a plurality of.
Referring to fig. 1 and 4, one side of the base 1 is provided with the scraper 8, the angle of the scraper 8 is 20 degrees to 40 degrees, the outlet end of one side of the scraper 8 is horizontally vertical to the base 1, through the design of the scraper 8, the scraper 8 blocks the sliding of the coating, the pollution to the ground is reduced, the cleaning is convenient, the scraper 8 comprises a fixed table 81, the top of the fixed table 81 is provided with a triangular plate 82, the triangular plate 82 is connected with the base 1 through a bolt in a threaded manner, through the design of the triangular plate 82, the coating is reduced from entering a gap between the fixed table 81 and the base 1, the clamping between the base 1 and the fixed table 81 is avoided as much as possible, and the disassembly and cleaning of the scraper 8 are facilitated.
Referring to fig. 1 and 2, one side of a base 1 is provided with an extension frame 9, the extension frame 9 is a hollow pipe, the weight of the extension frame 9 is reduced, two ends of the extension frame 9 are oppositely provided with rollers 91, the base 1 can move along the wall surface due to the design of the rollers 91, the uneven spraying caused by the shaking of the base 1 is avoided, the spraying effect is better, a scraper 8 is arranged at the top of the extension frame 9, the design that the scraper 8 is arranged at the top of the extension frame 9 avoids the pollution of the rollers 91 on the spraying surface in the rolling process as much as possible, the outlet end at one side of the scraper 8 is positioned at the same horizontal plane with the rollers 91, the design ensures that the rollers 91 reduce the influence on the scraper 8 in the working process, the working effect of the scraper 8 is better, the design ensures that the spray pipe 71 replaces workers to paint on the wall surface, the process is time-saving and labor-saving, the paint is even, the working efficiency is high, and the operation of the workers on the ladder is avoided, the potential safety hazard is reduced, and the working efficiency is increased.
The implementation principle of the green construction equipment of scribbling of building wall of this application embodiment is:
be located one side of wall body with base 1, universal wheel 11 through base 1 bottom makes base 1 can lateral shifting, make horizontal migration between base 1 and the wall through extension frame 9 and gyro wheel 91, first connecting pipe 51 and second connecting pipe 52 are defeated into shower nozzle 7 and are passed through the spraying of spray tube 71 through the coating in the pump body 5 with oil tank 2, motor 3 passes through the height of screw rod 31 adjustment spray box 4, through mutually supporting between fixed bolster 6 and connecting seat 72, the angle of adjustment shower nozzle 7, such design makes spray tube 71 replace the workman to paint on the wall, this process is labour saving and time saving not only, and coating paints evenly, high work efficiency, avoid the workman to operate on the cat ladder, reduce the emergence of potential safety hazard, and the work efficiency is increased.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a construction equipment is covered with paint, lacquer, etc. to building wall green, includes base (1), its characterized in that: universal wheels (11) are arranged on the periphery of the bottom of the base (1), an oil tank (2) is arranged on the top of the base (1), a case (21) and a fixing frame (22) are arranged on one side of the oil tank (2), the fixing frame (22) is located on the top of the case (21), a screw rod (31) and an upright post (32) are inserted into the bottom of the fixing frame (22), the screw rod (31) is located on one side of the upright post (32), the outlet end of the bottom of the screw rod (31) is connected with a motor (3), a spray box (4) is arranged in the middle of the screw rod (31) and the upright post (32), a second connecting pipe (52) is inserted into the spray box (4), a pump body (5) is inserted into the outlet end of one side of the second connecting pipe (52), a first connecting pipe (51) is connected to the outlet end of the bottom of the pump body (5), a fixing support (6) is arranged on one side of the spray box (4), one end of the fixed support (6) is provided with a spray head (7), the other side of the second connecting pipe (52) is communicated with the spray head (7) through the fixed support (6), one side of the spray head (7) is spliced with a spray pipe (71), and the spray pipe (71) is provided with a plurality of spray pipes.
2. The building wall green coating construction device according to claim 1, characterized in that: one side of the oil tank (2) is relatively provided with a support (23), and an outlet end on one side of the support (23) is provided with a handrail (231).
3. The building wall green coating construction device according to claim 2, characterized in that: and a support plate (24) is arranged on the inner wall of the oil tank (2), and the support plate (24) is positioned at the bottom of the pump body (5).
4. The building wall green coating construction device according to claim 3, wherein: the inner part of the spray box (4) is provided with a support column (41), the inner part of the support column (41) is provided with internal threads, and the support column (41) is in threaded connection with the screw rod (31).
5. The building wall green coating construction device according to claim 3, wherein: the spray nozzle is characterized in that a bearing seat (61) is arranged at the outlet end of one side of the fixed support (6), a connecting seat (72) is arranged at one side of the spray nozzle (7), and the connecting seat (72) is rotatably connected with the fixed support (6) through the bearing seat (61).
6. The building wall green coating construction device according to claim 1, characterized in that: one side of base (1) is provided with scraper blade (8), scraper blade (8) are including fixed station (81), the top of fixed station (81) is provided with set-square (82), threaded connection between bolt and base (1) is passed through in set-square (82).
7. The building wall green coating construction device according to claim 6, wherein: one side of base (1) is provided with extension frame (9), the both ends of extension frame (9) are provided with gyro wheel (91) relatively.
8. The building wall green coating construction device according to claim 7, wherein: the scraper (8) is positioned at the top of the extension frame (9), and the outlet end at one side of the scraper (8) is positioned at the same horizontal plane with the roller (91).
CN202122530810.6U 2021-10-20 2021-10-20 Green construction equipment that coats with lacquer of building wall Active CN216340705U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122530810.6U CN216340705U (en) 2021-10-20 2021-10-20 Green construction equipment that coats with lacquer of building wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122530810.6U CN216340705U (en) 2021-10-20 2021-10-20 Green construction equipment that coats with lacquer of building wall

Publications (1)

Publication Number Publication Date
CN216340705U true CN216340705U (en) 2022-04-19

Family

ID=81178375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122530810.6U Active CN216340705U (en) 2021-10-20 2021-10-20 Green construction equipment that coats with lacquer of building wall

Country Status (1)

Country Link
CN (1) CN216340705U (en)

Similar Documents

Publication Publication Date Title
CN110924641A (en) Building wall whitewashing machine
CN215670826U (en) Flush coater is used in building decoration with adjustable spraying range
CN107362934A (en) A kind of portable wall covering spray equipment
CN111519876B (en) Building outer wall spraying device
CN109909104B (en) Cable spraying device
CN216340705U (en) Green construction equipment that coats with lacquer of building wall
CN208168275U (en) A kind of building water-proof paint spray equipment
CN213683089U (en) A spraying equipment for architectural decoration fitment
CN106996184A (en) A kind of energy-saving and environment-friendly paint rotary broom
CN209303060U (en) A kind of furniture woodwork coating equipment
CN213886781U (en) Even spraying device of anticorrosive paint of crude oil storage jar
CN212397063U (en) Insulator spraying device
CN211816417U (en) Pipe gallery wall body construction equipment
CN215088144U (en) Machine parts spraying device
CN210947602U (en) Floor is decorated and is paintd device for interior decoration
CN214169820U (en) Spraying device for decoration
CN212633165U (en) H-shaped steel spraying device
CN217812158U (en) But height-adjusting's house decoration whitewashes device with interior wall
CN220705049U (en) Wall painting device
CN210263808U (en) Paint spraying machine for building
CN214302721U (en) Liquid coating device
CN211463588U (en) Bridge floor water proof coating spraying device
CN215313488U (en) Simple device for painting bracket steel pipes at different color intervals
CN219491608U (en) Putty knife coater
CN210545999U (en) Coating is with paining device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant