CN216330154U - Solid-wall pipe - Google Patents
Solid-wall pipe Download PDFInfo
- Publication number
- CN216330154U CN216330154U CN202122636943.1U CN202122636943U CN216330154U CN 216330154 U CN216330154 U CN 216330154U CN 202122636943 U CN202122636943 U CN 202122636943U CN 216330154 U CN216330154 U CN 216330154U
- Authority
- CN
- China
- Prior art keywords
- solid
- wall pipe
- pipe body
- wall
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The application relates to the technical field of pipes, in particular to a solid-wall pipe. It includes the real wall pipe body, the connecting hole has been seted up on the lateral wall of real wall pipe body, fixedly connected with plug block on the lateral wall of real wall pipe body one side, plug block is ring form and cavity, plug block pegs graft in another in the connecting hole of real wall pipe body, it is connected with the go-between to rotate on the lateral wall of real wall pipe body one side, it has the same go-between also to rotate on the opposite side lateral wall of real wall pipe body. This application is through pegging graft this internally in another solid wall pipe with the plug block on the solid wall pipe body to when making to carry out the butt fusion, can make two solid wall pipe bodies when carrying out the butt fusion, be difficult to the direction skew, improve the effect of butt fusion.
Description
Technical Field
The application relates to the technical field of pipes, in particular to a solid-wall pipe.
Background
The solid-wall pipe is a pipe suitable for municipal engineering, public building outdoor, residential district buried pollution discharge, drainage, exhaust and other aspects, and is an important material in living buildings.
The solid-wall pipe among the correlation technique needs to aim at the lateral wall of two solid-wall pipes when installing, holds up the solid-wall pipe at the manual work, passes through hot melt or welding with the part that two solid-wall pipes link to each other afterwards for two solid-wall pipes are connected, thereby realize the installation to the solid-wall pipe.
In view of the above-mentioned related art, the inventor believes that, when the solid-wall pipe in the related art is installed, since the position is manually adjusted, when the solid-wall pipe and the solid-wall pipe are installed, the position is misaligned, so that the sealing performance may be problematic.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem of the solid-wall pipe, the application provides a solid-wall pipe.
The application provides a solid wall pipe adopts following technical scheme:
the utility model provides a solid-wall pipe, includes the solid-wall pipe body, the connecting hole has been seted up on the lateral wall of solid-wall pipe body, fixedly connected with plug block on the lateral wall of solid-wall pipe body one side, plug block is ring form and cavity, plug block pegs graft in another in the connecting hole of solid-wall pipe body, it is connected with the go-between to rotate on the lateral wall of solid-wall pipe body one side, it has the same go-between also to rotate on the opposite side lateral wall of solid-wall pipe body.
By adopting the technical scheme, when welding is carried out, a worker aligns one end of the connecting hole on one side of the solid-wall pipe body with the inserting block on the other side of the other solid-wall pipe body, and then inserts the inserting block into the connecting hole of the solid-wall pipe, so that when the two solid-wall pipes are connected, the hot-melt connection of the two solid-wall pipes is conveniently carried out by the worker, the connection position dislocation caused by misalignment is reduced, and the situation of sealing performance is possibly caused; the go-between can be pressed when carrying out the butt fusion to each position of real wall pipe body, the real wall pipe body rotates afterwards to the convenience is welded each position of real wall pipe body, has improved staff's work efficiency.
Preferably, a sealing ring is arranged in the connecting hole at one side of the solid-wall pipe body, and the sealing ring and the inserting block are mutually abutted.
Through adopting above-mentioned technical scheme, place the sealing washer through the connecting hole at the solid wall pipe to when making to peg graft the piece in the connecting hole, the sealing washer closely pastes tightly with the lateral wall of grafting piece, has reduced the possibility that the infiltration leaks from the leakproofness that has improved the solid wall pipe junction.
Preferably, the connecting ring comprises a first connecting block and a second connecting block, the side walls of the two sides of the solid-wall pipe body are provided with connecting grooves, the first connecting block and the second connecting block are respectively inserted into the two sides of the connecting grooves, and the first connecting block is provided with a positioning piece connected with the second connecting block.
Through adopting above-mentioned technical scheme, when carrying out the installation to the go-between, place first connecting block and second connecting block in the spread groove earlier, place first connecting block and second connecting block in the spread groove, through the mounting, couple together first connecting block and second connecting block, install going at the spread groove of real wall pipe body to the convenient rotation.
Preferably, first constant head tank has all been seted up to the both sides of first connecting block, the second constant head tank has all been seted up to the both sides of second connecting block, first constant head tank and second constant head tank one-to-one, the setting element includes positioning bolt and the set nut of threaded connection on the first constant head tank on positioning bolt tip, positioning bolt passes first constant head tank bottom and second constant head tank bottom and extends to in the second constant head tank, set nut is located in the second constant head tank.
Through adopting above-mentioned technical scheme, when carrying out first connecting block and second connecting block and installing, the staff places first connecting block and second connecting block in the spread groove earlier, passes first constant head tank with positioning bolt after that in, gets into the second constant head tank, twists after that and moves set nut, installs set nut on positioning bolt to the installation of first connecting block and second connecting block has been accomplished.
Preferably, the connection ring is threadedly connected with a plurality of connection bolts, and the ends of the connection bolts penetrate through the side wall of another connection ring to be threadedly connected with connection nuts.
Through adopting above-mentioned technical scheme, when using the solid wall pipe temporarily, can need not get up two solid wall pipes hot melt, can pass the go-between of two solid wall pipes with connecting bolt, pass connecting bolt behind the go-between, twist and move coupling nut for connecting bolt and coupling nut are connected, thereby get up two inseparable connections of solid wall pipe, and the operation such as threading and water-passing can be carried out to the temporary solid wall pipe that can use.
Preferably, the side wall of the first connecting block is fixedly connected with a fixing block through a fixing bolt.
Through adopting above-mentioned technical scheme, through setting up the fixed block on the diapire at first connecting block to make the connecting block can be stable with ground contact, thereby conveniently rotate real wall pipe, make things convenient for the hot melt.
Preferably, an anti-seepage layer is installed in the solid-wall pipe body, and the anti-seepage layer is made of polyethylene polypropylene fiber waterproof materials.
Through adopting above-mentioned technical scheme, through set up the prevention of seepage water layer in solid wall pipe to can improve the ability of solid wall pipe leak protection water and infiltration.
Preferably, a rigid layer is arranged in the solid-wall pipe.
Through adopting above-mentioned technical scheme, through set up the rigidity layer in real wall pipe to the intensity of having improved real wall pipe itself reduces the possibility of damaging.
In summary, the present application includes at least one of the following beneficial technical effects:
1. through pegging graft this internally in another solid-walled pipe with the plug block on the solid-walled pipe body to when making to carry out the butt fusion, can be so that two solid-walled pipe bodies when carrying out the butt fusion, be difficult to the direction skew, improve the welded effect.
2. Through setting up the go-between, make things convenient for solid wall pipe body to rotate.
3. The strength of the solid-wall pipe is improved by arranging the rigid layer.
Drawings
Fig. 1 is a schematic view of the overall structure of the present application.
Fig. 2 is a schematic overall structure view from another perspective of the present application.
Fig. 3 is an enlarged schematic view of portion a of fig. 2 of the present application.
Fig. 4 is a schematic structural view of the inside of the wall tube in the present application.
Reference numerals: 1. a solid-walled pipe body; 21. connecting holes; 22. an insertion block; 23. connecting grooves; 3. a connecting ring; 31. a first connection block; 32. a second connecting block; 41. a first positioning groove; 42. a second positioning groove; 5. a positioning member; 51. positioning the bolt; 52. positioning a nut; 61. a fixed block; 62. fixing the bolt; 63. a connecting bolt; 64. a connecting nut; 71. a rigid layer; 72. and (4) a water seepage prevention layer.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses solid-wall pipe. Referring to fig. 1 and 2, a solid wall pipe includes solid wall pipe body 1, has seted up connecting hole 21 on the solid wall pipe body 1 lateral wall, and connecting hole 21 runs through whole solid wall pipe body 1, and the orientation of seting up of connecting hole 21 is unanimous with the length direction of solid wall pipe body 1, and fixedly connected with inserts piece 22 on the lateral wall of solid wall pipe one side, and it is the ring form and cavity that inserts piece 22, and the grafting piece 22 of one of them solid wall pipe is pegged graft in connecting hole 21 on adjacent solid wall pipe. When carrying out the hot melt, the staff pegs graft in connecting hole 21 on the solid-wall pipe body 1 with the plug block 22 on one of them solid-wall pipe body 1 earlier, carries out the hot melt after that, and plug block 22 through setting up to when carrying out the hot melt, need not hold up the opening hand of two solid-wall pipe bodies 1 and be relative form, thereby reduce staff's work burden.
Referring to fig. 2 and 3, the solid-wall pipe body 1 has connecting grooves 23 formed on the side walls of the two sides thereof, the connecting rings 3 are disposed in the connecting grooves 23, and each connecting ring 3 includes a first connecting block 31 and a second connecting block 32. The appearance of first connecting block 31 is the ring form, and the appearance of second connecting block 32 is the ring form too, has all seted up first constant head tank 41 on the upper and lower both sides wall of first connecting block 31, has all seted up second constant head tank 42 on the upper and lower both sides wall of second connecting block 32, and first constant head tank 41 and second constant head tank 42 one-to-one. The positioning piece 5 is arranged on the first connecting block 31, the positioning piece 5 comprises two positioning bolts 51 and two positioning nuts 52, the two positioning bolts 51 are identical, the positioning bolts 51 correspond to the first positioning grooves 41 one by one, the end portions of the positioning bolts 51 penetrate through the bottoms of the first positioning grooves 41 and the second connecting block 32 and extend into the second positioning grooves 42, the positioning nuts 52 are located in the second positioning grooves 42, and the positioning nuts 52 are in threaded connection with the end portions of the positioning bolts 51. When the connection ring 3 and the solid-wall pipe body 1 are installed, the first connection block 31 is placed in the connection groove 23, another second connection block 32 is placed in the connection groove 23, the first positioning groove 41 is opposite to the second positioning groove 42, the positioning bolt 51 penetrates through the bottom of the first positioning groove 41 and penetrates into the second connection groove 23, and then the positioning nut 52 is screwed, so that the positioning nut 52 is in threaded connection with the end of the positioning bolt 51.
Be provided with fixed block 61 on the diapire of first connecting block 31, be provided with fixing bolt 62 on the fixed block 61, fixing bolt 62's tip passes the diapire threaded connection of fixed block 61 with first connecting block 31, can improve the stability that solid wall pipe body 1 placed through setting up fixed block 61 to when carrying out the hot melt connection, rotation solid wall pipe body 1 that can be better carries out the hot melt connection in a plurality of positions of solid wall pipe.
The side walls of the first connecting block 31 and the second connecting block 32 are both connected with a plurality of connecting bolts 63 in a threaded manner, the end parts of the connecting bolts 63 penetrate through the first connecting block 31 and the second connecting block 32 on the other solid-wall pipe body 1, the end parts of the connecting bolts 63 are connected with connecting nuts 64 in a threaded manner, and the end parts of the connecting nuts 64 and the connecting bolts 63 are respectively abutted against the connecting rings 3 on the two solid-wall pipe bodies 1.
Referring to fig. 4, a water seepage prevention layer 72 is disposed in the inner wall of the solid-wall tube body 1, the water seepage prevention layer 72 is made of a polyethylene polypropylene waterproof material, a rigid layer 71 is further disposed on the inner wall of the solid-wall tube body 1, the rigid layer 71 may be made of a material with a relatively high hardness, and in this embodiment, steel is used as the material.
The implementation principle of the solid-wall pipe in the embodiment of the application is as follows: when connecting two solid-wall pipe bodies 1, the staff places first connecting block 31 and second connecting block 32 in connecting groove 23 earlier, then twists positioning bolt 51 for positioning bolt 51 passes first connecting block 31 and second connecting block 32, then twists positioning nut 52 on positioning bolt 51, makes first connecting block 31 and second connecting block 32 be connected, installs first connecting block 31 to fixed block 61 through fixing bolt 62 at last, starts the hot melt and connects.
The insertion block 22 of the solid-wall pipe body 1 is aligned with the connection hole 21 of the other solid-wall pipe body 1 and then inserted therein, and the hot-melt connection is started.
When the pipe is temporarily used, the connection ring 3 on the solid-wall pipe body 1 side and the connection ring 3 on the other solid-wall pipe side can be connected by the connection bolt 63, thereby achieving the effect of temporary connection.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. A solid wall pipe, comprising a solid wall pipe body (1), characterized in that: connecting hole (21) have been seted up on the lateral wall of real wall pipe body (1), fixedly connected with plug block (22) on the lateral wall of real wall pipe body (1) one side, plug block (22) are ring form and cavity, plug block (22) are pegged graft in another in connecting hole (21) of real wall pipe body (1), it is connected with go-between (3) to rotate on the lateral wall of real wall pipe body (1) one side, it has the same go-between (3) also to rotate on the opposite side lateral wall of real wall pipe body (1).
2. The solid-walled pipe of claim 1, wherein: and a sealing ring is arranged in a connecting hole (21) at one side of the solid-wall pipe body (1), and the sealing ring and the inserting block (22) are mutually abutted.
3. The solid-walled pipe of claim 2, wherein: the connecting ring (3) comprises a first connecting block (31) and a second connecting block (32), the connecting grooves (23) are formed in the side walls of the two sides of the solid-wall pipe body (1), the first connecting block (31) and the second connecting block (32) are respectively inserted into the two sides of the connecting grooves (23), and a positioning piece (5) connected with the second connecting block (32) is arranged on the first connecting block (31).
4. The solid-walled pipe of claim 3, wherein: first constant head tank (41) have all been seted up to the both sides of first connecting block (31), second constant head tank (42) have all been seted up to the both sides of second connecting block (32), first constant head tank (41) and second constant head tank (42) one-to-one, setting element (5) include positioning bolt (51) and threaded connection on positioning bolt (51) tip (52) on threaded connection first constant head tank (41), positioning bolt (51) pass first constant head tank (41) tank bottom and second constant head tank (42) tank bottom extend to in second constant head tank (42), positioning nut (52) are located in second connecting groove (23).
5. The solid-walled pipe of claim 4, wherein: the connecting rings (3) are in threaded connection with a plurality of connecting bolts (63), and the end parts of the connecting bolts (63) penetrate through the side wall of the other connecting ring (3) and are in threaded connection with connecting nuts (64).
6. The solid-walled pipe of claim 3, wherein: the side wall of the first connecting block (31) is fixedly connected with a fixing block (61) through a fixing bolt (62).
7. The solid-walled pipe of claim 1, wherein: an anti-seepage layer (72) is installed in the solid-wall pipe body (1), and the anti-seepage layer (72) is made of polyethylene polypropylene waterproof materials.
8. The solid-walled pipe of claim 7, wherein: a rigid layer (71) is arranged in the solid-wall pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122636943.1U CN216330154U (en) | 2021-11-01 | 2021-11-01 | Solid-wall pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122636943.1U CN216330154U (en) | 2021-11-01 | 2021-11-01 | Solid-wall pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216330154U true CN216330154U (en) | 2022-04-19 |
Family
ID=81133502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122636943.1U Active CN216330154U (en) | 2021-11-01 | 2021-11-01 | Solid-wall pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216330154U (en) |
-
2021
- 2021-11-01 CN CN202122636943.1U patent/CN216330154U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101563159B1 (en) | Pile coupler | |
CN102352630A (en) | Full-thread fiber resin rod body soil nailing wall and construction method thereof | |
CN216330154U (en) | Solid-wall pipe | |
CN210341890U (en) | Tubular pile mechanical connection connects and tubular pile | |
CN214833249U (en) | Sewage drainage pipe for municipal works | |
CN202227350U (en) | Soil nailing wall made of fully-threaded fiber resin rods | |
CN212427205U (en) | Assembled underground pipe gallery is connected to dry-type | |
CN211574446U (en) | Pipeline buried under road | |
CN210830864U (en) | Stereoplasm drain pipe connection clamp | |
CN110424637A (en) | Bar planting and attachment device inside pre-cast concrete walling | |
CN211898548U (en) | Embedded supporting member and bamboo composite pipe gallery | |
CN218818901U (en) | Municipal old pipeline repairing device | |
CN205804559U (en) | Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring | |
CN111139851A (en) | Cofferdam earth material anti-seepage body sealing structure and construction method | |
CN216813299U (en) | Municipal administration water supply and drainage pipeline connection structure | |
CN110364931A (en) | A kind of compression joint type roof lightning band and its installation method | |
CN220470943U (en) | Water collecting well and water collecting pipe screwing type connecting device of concealed pipe drainage system | |
CN215594122U (en) | Waterproof structure of pipe jacking pipe joint and pipe jacking well | |
CN219888982U (en) | Combined pipeline structure for irrigation of hydraulic engineering | |
CN219470948U (en) | Quick-assembly recyclable pipe jacking working well foundation pit supporting structure | |
CN209925808U (en) | Pipeline device for municipal administration water supply and drainage convenient to installation | |
CN216130261U (en) | Tool for supporting water supply and drainage vertical pipe hanging hole template | |
CN208121813U (en) | A kind of assembled steel reinforced concrete pipe | |
CN215674245U (en) | Combined rack and ring type support frame for repairing drainage pipeline of villages and small towns | |
CN214614021U (en) | Energy-saving hollow concrete pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |