CN216316992U - Carpet installation node splicing design structure with good water seepage prevention and sealing performance - Google Patents

Carpet installation node splicing design structure with good water seepage prevention and sealing performance Download PDF

Info

Publication number
CN216316992U
CN216316992U CN202123025186.0U CN202123025186U CN216316992U CN 216316992 U CN216316992 U CN 216316992U CN 202123025186 U CN202123025186 U CN 202123025186U CN 216316992 U CN216316992 U CN 216316992U
Authority
CN
China
Prior art keywords
splicing
carpet
block
splicing block
splice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123025186.0U
Other languages
Chinese (zh)
Inventor
陈雪刚
邱雪峰
夏定清
钱曾
王亚南
钦礼军
李壮
金春华
薛丽娟
成科宇
孙静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Merud Building Decoration Co Ltd
Original Assignee
Suzhou Merud Building Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Merud Building Decoration Co Ltd filed Critical Suzhou Merud Building Decoration Co Ltd
Priority to CN202123025186.0U priority Critical patent/CN216316992U/en
Application granted granted Critical
Publication of CN216316992U publication Critical patent/CN216316992U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a carpet installation node splicing design structure with good water seepage prevention and sealing performance, which belongs to the technical field of carpet installation splicing structures, wherein carpet main bodies are spliced and connected through a first splicing block and a second splicing block, the first splicing block is provided with a short positioning insertion block and a long positioning insertion groove, the second splicing block is provided with a short positioning insertion groove and a long positioning insertion block, the carpet main bodies are spliced and connected through a third splicing block and a fourth splicing block, the third splicing block is provided with a main tenon, the fourth splicing block is provided with an auxiliary carpet tenon, the carpet can be accurately positioned and spliced transversely and vertically by different structures, splicing gaps between the carpet main bodies can be effectively reduced, the installation efficiency of the carpet main bodies is effectively improved, and meanwhile, the carpet installation splicing structure is convenient to disassemble, effectively saving the time of splicing and disassembling.

Description

Carpet installation node splicing design structure with good water seepage prevention and sealing performance
Technical Field
The utility model belongs to the technical field of carpet installation splicing structures, and particularly relates to a carpet installation node splicing design structure with good water seepage prevention and sealing performance.
Background
The carpet with good water seepage prevention and sealing performance is a novel light decorative material which is very popular at the present stage, is generally accepted in most cities, is widely used, and is suitable for various places such as families, schools, hospitals, office buildings and the like;
but among the prior art carpet is very inconvenient in the in-process of use installation, because its whole bulky be not convenient for carry out accurate installation location to the carpet, still can cause the concatenation clearance too big between carpet and the carpet in the installation simultaneously, influence subsequent use, seriously influenced the installation concatenation efficiency of carpet, prolonged operating time.
SUMMERY OF THE UTILITY MODEL
The utility model aims to: in order to solve the inconvenience of carpet in the use installation in the prior art, because its whole bulky be not convenient for carry out accurate installation location to the carpet, still can cause the concatenation clearance between carpet and the carpet too big in the installation simultaneously, influence subsequent use, seriously influenced the installation concatenation efficiency of carpet, prolonged operating time's problem, and the carpet installation node concatenation design structure that prevention of seepage water leakproofness is good that provides.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a carpet installation node concatenation project organization that prevention of seepage water leakproofness is good, includes the carpet main part, the carpet main part between splice through the first piece that is provided with and the second splices the piece and splice the connection, first splice on be provided with short location inserted block and long positioning slot, the second splice on be provided with short positioning slot and long location inserted block, the carpet main part between still splice through the third piece that is provided with and the fourth splice and splice the piece and splice the connection, the third splice on be provided with main tenon, the fourth splice on be provided with vice tenon.
As a further description of the above technical solution:
the upper and lower ends of the first splicing block are provided with short positioning insertion blocks which are fixedly connected to the upper and lower ends of the first splicing block, the upper and lower ends of the second splicing block are provided with short positioning slots, and the shape and specification of the short positioning slots are matched with those of the short positioning insertion blocks arranged on the first splicing block.
As a further description of the above technical solution:
the middle part of the first splicing block is provided with a long positioning slot, the middle part of the second splicing block is provided with a long positioning insertion block, the long positioning insertion block is fixedly connected to the second splicing block, and the shape and specification of the long positioning insertion block are matched with those of the long positioning slot arranged on the first splicing block.
As a further description of the above technical solution:
the first splicing block is provided with a first fixing hole, the second splicing block is provided with a second fixing hole, and the first fixing hole and the second fixing hole are the same in shape and size.
As a further description of the above technical solution:
two the carpet main body between use through the cooperation of the short location inserted block that is provided with on first concatenation piece and the second concatenation piece and short positioning slot and long location inserted block and carry out grafting each other to fix in first fixed orifices and second fixed orifices through the fixed bolt grafting that is provided with.
As a further description of the above technical solution:
the third concatenation piece on both sides be provided with main tenon, main tenon fixed connection both sides on the third concatenation piece, two main tenon between be formed with the tongue-and-groove, the fourth concatenation piece on be provided with vice tenon, vice tenon fixed connection on the fourth concatenation piece, shape specification and the third concatenation piece of vice tenon on the tongue-and-groove looks adaptation that forms between two main tenons, just main tenon and vice tenon on all seted up fixed position hole.
As a further description of the above technical solution:
two the carpet main part between use through the cooperation of the vice tenon that is provided with on third splice and the fourth splice and tongue-and-groove and carry out vertical meshing concatenation to fix in the fixed position hole on main tenon and vice tenon through the fastening bolt that is provided with is pegged graft.
In summary, due to the adoption of the technical scheme, the utility model has the beneficial effects that:
1. according to the utility model, the carpet main bodies can be accurately positioned and spliced in the transverse direction by matching the first splicing blocks and the second splicing blocks, splicing gaps among the carpet main bodies can be effectively reduced, and the splicing efficiency of the carpet main bodies is effectively improved.
2. According to the carpet, the third splicing block and the fourth splicing block are matched for use, so that the carpet main bodies can be vertically positioned and spliced, the installation and splicing efficiency of the carpet main bodies is effectively improved, meanwhile, the carpet is convenient to disassemble, and the splicing and disassembling time is effectively saved.
Drawings
FIG. 1 is a structural exploded view of a carpet installation node splicing design structure with good water seepage resistance and sealing performance according to the present invention;
FIG. 2 is a schematic structural view of a first splicing block and a second splicing block of a carpet installation node splicing design structure with good water seepage prevention and sealing performance provided by the utility model;
FIG. 3 is a schematic structural view of a third splicing block and a fourth splicing block of a carpet installation node splicing design structure with good water seepage prevention and sealing performance provided by the utility model;
illustration of the drawings: 1. a carpet main body; 2. a first splice block; 3. a second splice block; 4. short positioning plug blocks; 5. a long positioning slot; 6. a first fixing hole; 7. a short positioning slot; 8. a long positioning insert block; 9. a second fixing hole; 10. fixing the bolt; 11. a third splicing block; 12. a fourth splice block; 13. a main tenon; 14. a secondary tenon; 15. mortises; 16. fixing the positioning hole; 17. and fastening the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1 and 2, the present invention provides a technical solution: the utility model provides a carpet installation node concatenation design structure that prevention of seepage water leakproofness is good includes carpet main part 1, carpet main part 1 between splice through the first splice 2 and the second splice 3 that are provided with and connect, first splice 2 fixed connection in one side of carpet main part 1, second splice 3 fixed connection in one side of another carpet main part 1.
The upper and lower ends of the first splicing block 2 are provided with short positioning insertion blocks 4, the short positioning insertion blocks 4 are fixedly connected to the upper end and the lower end of the first splicing block 2, the upper end and the lower end of the second splicing block 3 are provided with short positioning insertion slots 7, the shape and specification of the short positioning insertion slots 7 are matched with the short positioning insertion blocks 4 arranged on the first splicing block 2, and the short positioning insertion slots are used for being connected between the first splicing block 2 and the second splicing block 3.
The middle part of the first splicing block 2 is provided with a long positioning slot 5, the middle part of the second splicing block 3 is provided with a long positioning insertion block 8, the long positioning insertion block 8 is fixedly connected to the second splicing block 3, the shape and specification of the long positioning insertion block 8 are matched with the long positioning slot 5 arranged on the first splicing block 2, and the long positioning insertion block is also used for connection between the first splicing block 2 and the second splicing block 3.
The first splicing block 2 is provided with a first fixing hole 6, the second splicing block 3 is provided with a second fixing hole 9, and the first fixing hole 6 and the second fixing hole 9 are the same in shape and size and are used for fixing the first splicing block 2 and the second splicing block 3 after being connected.
Two carpet body 1 between use through the cooperation of the short location inserted block 4 that is provided with on first concatenation piece 2 and the second concatenation piece 3 and short positioning slot 7 and long positioning slot 5 and long location inserted block 8 and carry out grafting each other to fix in first fixed orifices 6 and second fixed orifices 9 is pegged graft through the fixed bolt 10 that is provided with.
The working principle is as follows: when the carpet main bodies 1 need to be installed and spliced by using the first splicing block 2 and the second splicing block 3, the first splicing block 2 and the second splicing block 3 are respectively and fixedly connected to one side of the two carpet main bodies 1, then the two carpet main bodies 1 are spliced by matching the short positioning insertion block 4 and the short positioning insertion slot 7 which are arranged on the first splicing block 2 and the second splicing block 3, and the long positioning insertion slot 5 and the long positioning insertion block 8, so that the positioning splicing between the two carpet main bodies 1 can be completed, finally, the two carpet main bodies 1 are fixed after being spliced by inserting the arranged fixing bolt 10 into the first fixing hole 6 and the second fixing hole 9, the structure of the utility model is simple and convenient for disassembly and assembly, the carpet main bodies 1 can be accurately positioned and spliced in the transverse direction by matching the arranged first splicing block 2 and the second splicing block 3, and the splicing gaps between the carpet main bodies 1 can be effectively reduced, and the splicing efficiency of the carpet main bodies 1 can be effectively improved.
Example 2
Referring to fig. 3, the present invention provides another technical solution: the utility model provides a carpet installation node concatenation design structure that prevention of seepage water leakproofness is good includes carpet main part 1, carpet main part 1 between splice the connection through the third concatenation piece 11 and the fourth concatenation piece 12 that are provided with, third concatenation piece 11 fixed connection in one side of carpet main part 1, fourth concatenation piece 12 fixed connection in one side of another carpet main part 1.
Third concatenation piece 11 on both sides be provided with main tenon 13, main tenon 13 fixed connection in the both sides on third concatenation piece 11, two main tenon 13 between be formed with tongue-and-groove 15, fourth concatenation piece 12 on be provided with vice tenon 14, vice tenon 14 fixed connection on fourth concatenation piece 12, shape specification and the third concatenation piece 11 of vice tenon 14 on 15 looks adaptations of tongue-and-groove that form between two main tenons 13, just main tenon 13 and vice tenon 14 on all seted up fixed position hole 16.
The two carpet main bodies 1 are vertically meshed and spliced through the matching use of the auxiliary tenon 14 and the mortise 15 arranged on the third splicing block 11 and the fourth splicing block 12, and are fixed by inserting the fastening bolt 17 into the fixing positioning holes 16 on the main tenon 13 and the auxiliary tenon 14.
The working principle is as follows: when the third splicing block 11 and the fourth splicing block 12 are needed to be used for installing and splicing the carpet main bodies 1, the third splicing block 11 and the fourth splicing block 12 are respectively and fixedly connected to two sides of the two carpet main bodies 1, then the auxiliary tenons 14 and the mortises 15 arranged on the third splicing block 11 and the fourth splicing block 12 are matched for vertical meshing and splicing so as to complete splicing between the two carpet main bodies 1, and finally the fastening bolts 17 are inserted into the fixed positioning holes 16 on the main tenons 13 and the auxiliary tenons 14 for fixing between the two carpet main bodies 1, the carpet fixing device has a simple structure and is convenient to disassemble and assemble, the vertical positioning and splicing between the carpet main bodies 1 can be carried out through the matching of the third splicing block 11 and the fourth splicing block 12, the installing and splicing efficiency of the carpet main bodies 1 is effectively improved, and the disassembly is convenient, effectively saving the time of splicing and disassembling.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (7)

1. The utility model provides a carpet installation node concatenation design structure that prevention of seepage water leakproofness is good, includes carpet main part (1), its characterized in that, carpet main part (1) between splice through the first splice (2) and the second splice (3) that are provided with and splice the connection, first splice (2) on be provided with short location inserted block (4) and long positioning slot (5), second splice (3) on be provided with short positioning slot (7) and long location inserted block (8), carpet main part (1) between still splice through third splice (11) and the fourth splice (12) that are provided with and splice the connection, third splice (11) on be provided with main tenon (13), fourth splice (12) on be provided with vice tenon (14).
2. The carpet installation node splicing design structure with good water seepage prevention and sealing performance according to claim 1, characterized in that short positioning insertion blocks (4) are arranged at the upper end and the lower end of the first splicing block (2), the short positioning insertion blocks (4) are fixedly connected to the upper end and the lower end of the first splicing block (2), short positioning insertion slots (7) are arranged at the upper end and the lower end of the second splicing block (3), and the shape and the specification of the short positioning insertion slots (7) are matched with the short positioning insertion blocks (4) arranged on the first splicing block (2).
3. The carpet installation node splicing design structure with good water seepage prevention and sealing performance according to claim 2, characterized in that a long positioning slot (5) is formed in the middle of the first splicing block (2), a long positioning insertion block (8) is arranged in the middle of the second splicing block (3), the long positioning insertion block (8) is fixedly connected to the second splicing block (3), and the shape and specification of the long positioning insertion block (8) are matched with the long positioning slot (5) formed in the first splicing block (2).
4. The carpet installation node splicing design structure with good water seepage prevention and sealing performance according to claim 3, characterized in that a first fixing hole (6) is formed in the first splicing block (2), a second fixing hole (9) is formed in the second splicing block (3), and the first fixing hole (6) and the second fixing hole (9) are the same in shape and size.
5. The carpet installation node splicing design structure with good water seepage prevention and sealing performance as claimed in claim 4, wherein the two carpet main bodies (1) are spliced with each other through the matching use of the short positioning insert (4) and the short positioning slot (7) arranged on the first splicing block (2) and the second splicing block (3) and the long positioning slot (5) and the long positioning insert (8), and are fixed in the first fixing hole (6) and the second fixing hole (9) through the arranged fixing plug (10).
6. The carpet installation joint splicing design structure with good water seepage prevention and sealing performance according to claim 1, characterized in that main tenons (13) are arranged on two sides of a third splicing block (11), the main tenons (13) are fixedly connected to two sides of the third splicing block (11), a mortise (15) is formed between the two main tenons (13), an auxiliary tenon (14) is arranged on a fourth splicing block (12), the auxiliary tenon (14) is fixedly connected to the fourth splicing block (12), the shape and specification of the auxiliary tenon (14) are matched with the mortise (15) formed between the two main tenons (13) on the third splicing block (11), and fixed positioning holes (16) are formed in the main tenons (13) and the auxiliary tenons (14).
7. The carpet installation joint splicing design structure with good water seepage prevention and sealing performance according to claim 6, characterized in that the two carpet main bodies (1) are vertically engaged and spliced through the matching use of the auxiliary tenon (14) and the mortise (15) arranged on the third splicing block (11) and the fourth splicing block (12), and are fixed by inserting the fastening bolt (17) into the fixing positioning holes (16) on the main tenon (13) and the auxiliary tenon (14).
CN202123025186.0U 2021-12-03 2021-12-03 Carpet installation node splicing design structure with good water seepage prevention and sealing performance Active CN216316992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123025186.0U CN216316992U (en) 2021-12-03 2021-12-03 Carpet installation node splicing design structure with good water seepage prevention and sealing performance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123025186.0U CN216316992U (en) 2021-12-03 2021-12-03 Carpet installation node splicing design structure with good water seepage prevention and sealing performance

Publications (1)

Publication Number Publication Date
CN216316992U true CN216316992U (en) 2022-04-19

Family

ID=81157550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123025186.0U Active CN216316992U (en) 2021-12-03 2021-12-03 Carpet installation node splicing design structure with good water seepage prevention and sealing performance

Country Status (1)

Country Link
CN (1) CN216316992U (en)

Similar Documents

Publication Publication Date Title
CN113235791A (en) Assembled floor that can splice
CN113006340A (en) Modular assembly type partition wall
CN216316992U (en) Carpet installation node splicing design structure with good water seepage prevention and sealing performance
CN211286051U (en) Environment-friendly assembly type building convenient to install
CN205063103U (en) Partition wall
CN210917770U (en) Connecting structure of assembled wallboard
CN220100283U (en) Assembled building wall
CN221001732U (en) Combined panel structure
CN220565511U (en) Curtain wall with mortise and tenon mounting structure
CN210439455U (en) Prefabricated assembled building structure
CN217207169U (en) Novel wooden board connecting structure
CN215829648U (en) Module building connected node that construction used
CN217897108U (en) Flush joint structure of shingle nail
CN219587924U (en) Splicing structure
CN219316081U (en) Partition plate for assembly type building decoration
CN216042341U (en) Assembled GRG embedded type assembling system
CN215483663U (en) Combined light wall board connecting structure
CN215644120U (en) Capacitor mounting base
CN218757964U (en) Assembled building element based on BIM
CN220504219U (en) Assembly type building assembly component
CN217630658U (en) Prefabricated building wall constructs
CN219327235U (en) Assembled stand column structure
CN220133194U (en) T-shaped glass partition connection structure
CN214575106U (en) Assembled light building board