CN216305344U - Hanging bracket for secondary structure masonry - Google Patents

Hanging bracket for secondary structure masonry Download PDF

Info

Publication number
CN216305344U
CN216305344U CN202122239350.1U CN202122239350U CN216305344U CN 216305344 U CN216305344 U CN 216305344U CN 202122239350 U CN202122239350 U CN 202122239350U CN 216305344 U CN216305344 U CN 216305344U
Authority
CN
China
Prior art keywords
length
secondary structure
lifting lugs
bolt
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122239350.1U
Other languages
Chinese (zh)
Inventor
董鑫
纪磊
王丽丽
李博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202122239350.1U priority Critical patent/CN216305344U/en
Application granted granted Critical
Publication of CN216305344U publication Critical patent/CN216305344U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

A hanging bracket for secondary structure masonry belongs to the technical field of frame secondary structure masonry construction. Comprises a cross arm (1), a bolt (2), a vertical rod (3), a clamping rod (4), a chain block (5) and a lifting lug (6); the top of the vertical rod (3) is fixedly connected with one end of the cross arm (1) through a bolt (2), one end of the clamping rod (4) is horizontally welded at the bottom of the vertical rod (3), the two lifting lugs (6) are welded and fixed below the cross arm (1), the distance between the two lifting lugs (6) is 600mm, and the upper ends of the two chain blocks (5) are respectively fixed with the lifting lugs (6). The device has the advantages of being simple in assembly, convenient to operate, capable of avoiding consumption of a large number of materials and manpower, convenient and fast to use and capable of greatly reducing construction cost.

Description

Hanging bracket for secondary structure masonry
Technical Field
The utility model belongs to the technical field of secondary structure building construction of a frame, and particularly provides a hanging bracket for secondary structure building.
Background
When the frame secondary structure is constructed, the secondary structure is generally built by erecting a through long scaffold, and the method has the disadvantages that the scaffold is erected by consuming a large amount of materials such as scaffold tubes and the like; secondly, a large amount of manpower is needed for building and dismantling the scaffold, and the construction cost is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a hanging bracket for secondary structure building, wherein two groups of hanging brackets are placed on a frame beam, are fastened with the frame beam through clamping rods of the hanging brackets, are fixed with a hanging basket through a chain block, an operator stands in the hanging basket to build a secondary structure below the frame beam, and adjusts the height of the hanging basket through pulling the chain block, so that the building height of the secondary structure is met, and the hanging bracket is convenient and quick.
The hanger comprises a cross arm 1, a bolt 2, a vertical rod 3, a clamping rod 4, a chain block 5 and a lifting lug 6 which are used in a combined way; the top of the vertical rod 3 is fixedly connected with one end of the cross arm 1 through the bolt 2, one end of the clamping rod 4 is horizontally welded at the bottom of the vertical rod 3, the two lifting lugs 6 are fixedly welded below the cross arm 1, the distance between the two lifting lugs 6 is 600mm, and the upper ends of the two chain blocks 5 are respectively fixed with the lifting lugs 6. (see FIG. 1 and FIG. 2)
Wherein, the cross arm 1 is formed by processing square tubes with the cross section size (length and width) of 200mm by 200mm, and the length is 1500 mm; the diameter of the bolt 2 is 20mm, the length of the bolt is 350mm, the upright rod 3 is formed by processing a square tube with the cross section size (length and width) of 100mm and 100mm, and the length of the upright rod is 500mm and 800 mm; the clamping rod 4 is formed by processing a square tube with the cross section size (length and width) of 100mm by 100mm, and the length is 300 mm; the maximum hoisting weight of the chain block 5 is 5 t; the lifting lug 6 is machined from a 20mm thick steel plate and has a dimension (length and width) of 150 x 100 mm.
During the use, place two sets of gallows on frame roof beam 8 to fastening through the kelly 4 of gallows and frame roof beam 8, then fixed with hanging flower basket 7 through chain block 5, operating personnel 10 stands in hanging flower basket 7 and builds by laying bricks or stones secondary structure 9 below the frame roof beam 8, through pulling chain block 5 adjustment hanging flower basket 7's height, thereby satisfy secondary structure 9 and build by laying bricks or stones height, convenient and fast (fig. 3, fig. 4).
The utility model has the advantages of simple assembly, convenient operation, simplicity, practicality, convenience, quickness and capability of avoiding consumption of a large amount of materials and manpower and greatly reducing the construction cost.
Drawings
Fig. 1 is a front view of the hanger.
Fig. 2 is a side view of the hanger.
Fig. 3 is a front view of the hanger in use.
Fig. 4 is a side view of the hanger in use.
In the figure, a cross arm 1, a bolt 2, a vertical rod 3, a clamping rod 4, a chain block 5, a lifting lug 6, a hanging basket 7, a frame beam 8, a secondary structure 9 and an operator 10.
Detailed Description
Fig. 1-4 illustrate an embodiment of the present invention. The utility model is further described below with reference to the accompanying drawings.
The hanging bracket comprises a cross arm 1, a bolt 2, an upright rod 3, a clamping rod 4, chain blocks 5 and lifting lugs 6, wherein the hanging bracket is used in a combined mode, the top of the upright rod 3 is fixedly connected with one end of the cross arm 1 through the bolt 2, one end of the clamping rod 4 is horizontally welded at the bottom of the upright rod 3, the two lifting lugs 6 are fixedly welded below the cross arm 1, the distance between the two lifting lugs 6 is 600mm, and the upper ends of the two chain blocks 5 are respectively fixed with the lifting lugs 6. Wherein the cross arm 1 is formed by processing square tubes with the cross section size (length and width) of 200mm by 200mm, and the length is 1500 mm; the diameter of the bolt 2 is 20mm, the length of the bolt is 350mm, the upright rod 3 is formed by processing a square tube with the cross section size (length and width) of 100mm and 100mm, and the length of the upright rod is 500mm and 800 mm; the clamping rod 4 is formed by processing a square tube with the cross section size (length and width) of 100mm by 100mm, and the length is 300 mm; the maximum hoisting weight of the chain block 5 is 5 t; the lifting lug 6 is machined from a 20mm thick steel plate and has a dimension (length and width) of 150 x 100 mm.
During the use, place two sets of gallows on frame roof beam 8 to the kelly 4 through the gallows fastens with frame roof beam 8, then is fixed with hanging flower basket 7 through chain block 5, and operating personnel 10 stands and builds by laying bricks or stones secondary structure 9 below the frame roof beam 8 in hanging flower basket 7, through the height of pulling chain block 5 adjustment hanging flower basket 7, thereby satisfies the height that secondary structure 9 built by laying bricks or stones, convenient and fast.
When the secondary structure masonry construction of the stadium framework is carried out, the hanging bracket for secondary structure masonry is adopted, and a good effect is achieved. The hanging bracket comprises a cross arm, a bolt, a vertical rod, a clamping rod, a chain block and 6 lifting lugs, wherein the cross arm, the bolt, the vertical rod, the clamping rod, the chain block and the lifting lugs are combined for use, the top of the vertical rod is fixedly connected with one end of the cross arm through the bolt, one end of the clamping rod is horizontally welded at the bottom of the vertical rod, the two lifting lugs are welded and fixed below the cross arm, the distance between the two lifting lugs is 600mm, and the upper ends of the two chain blocks are respectively fixed with the lifting lugs. During the use, place two sets of gallows on the frame roof beam to card pole through the gallows and frame roof beam fastening, then fixed through chain block and hanging flower basket, operating personnel stands in the hanging flower basket and builds by laying bricks or stones the secondary structure below the frame roof beam, adjusts the height of hanging flower basket through the pulling chain block, thereby satisfies the height that secondary structure built by laying bricks or stones, convenient and fast.

Claims (2)

1. A hanging bracket for secondary structure masonry is characterized by comprising a cross arm (1), bolts (2), upright rods (3), clamping rods (4), a chain block (5) and lifting lugs (6); the top of the vertical rod (3) is fixedly connected with one end of the cross arm (1) through a bolt (2), one end of the clamping rod (4) is horizontally welded at the bottom of the vertical rod (3), the two lifting lugs (6) are welded and fixed below the cross arm (1), the distance between the two lifting lugs (6) is 600mm, and the upper ends of the two chain blocks (5) are respectively fixed with the lifting lugs (6).
2. The spreader of secondary structural masonry according to claim 1, characterised in that the cross-arm (1) is machined from square tubes of cross-sectional dimension length x width 200 x 200mm, length 1500 mm; the diameter of the bolt (2) is 20mm, the length of the bolt is 350mm, the upright rod (3) is formed by processing a square tube with the cross section size length and width of 100mm and the length of 500mm and 800 mm; the clamping rod (4) is formed by processing a square tube with the cross section size of 100mm by 100mm, and the length of the square tube is 300 mm; the lifting lug (6) is formed by machining a 20mm thick steel plate, and the length and the width of the lifting lug are 150 mm and 100 mm.
CN202122239350.1U 2021-09-15 2021-09-15 Hanging bracket for secondary structure masonry Active CN216305344U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122239350.1U CN216305344U (en) 2021-09-15 2021-09-15 Hanging bracket for secondary structure masonry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122239350.1U CN216305344U (en) 2021-09-15 2021-09-15 Hanging bracket for secondary structure masonry

Publications (1)

Publication Number Publication Date
CN216305344U true CN216305344U (en) 2022-04-15

Family

ID=81113239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122239350.1U Active CN216305344U (en) 2021-09-15 2021-09-15 Hanging bracket for secondary structure masonry

Country Status (1)

Country Link
CN (1) CN216305344U (en)

Similar Documents

Publication Publication Date Title
CN216305344U (en) Hanging bracket for secondary structure masonry
CN210738053U (en) Turnover operation platform suitable for elevator counterweight installation
CN107381376B (en) Device and method for hoisting by utilizing curtain wall embedded part
CN213893292U (en) Platform is deposited to portable reinforcing bar
CN216341066U (en) Horizontal adjusting device for large-section embedded part
CN214658788U (en) Retractable's concrete floor formwork structure
CN211897857U (en) Device for mounting or dismounting longitudinal beam in beam-column type support construction
CN210002915U (en) Mobile mounting device for steel beam sliding support bracket
CN209556318U (en) A bracket formula bearing structure for scaffold frame is set up
CN209323527U (en) A kind of frame-type double-row pile foundation pit enclosure structure
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN216587615U (en) Installation operation support of wall body top decorative cover layer
CN210217036U (en) Construction waste transportation device
CN219689198U (en) Temporary hanging bracket on concrete frame column
CN215593688U (en) Bridge pipeline mounting platform
CN219528465U (en) Support for mounting steel secondary beam
CN215801086U (en) Supporting equipment for bridge construction of bridge engineering
CN214329836U (en) Construction hanging bracket for slip form system
CN218434624U (en) Discharging device on platform
CN219031642U (en) Vertical conveying device for hole pile construction
CN212506291U (en) Hanging plate structure in steel support supporting system
CN211687232U (en) Coupler and motor separation device
CN212076261U (en) Hoisting device convenient to move
CN111438309B (en) Batch beam steel bar inverted binding frame and beam steel bar binding method
CN218581181U (en) Movable formwork for large-channel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant