CN216304717U - Clar pipe intelligent water meter well - Google Patents

Clar pipe intelligent water meter well Download PDF

Info

Publication number
CN216304717U
CN216304717U CN202123094927.0U CN202123094927U CN216304717U CN 216304717 U CN216304717 U CN 216304717U CN 202123094927 U CN202123094927 U CN 202123094927U CN 216304717 U CN216304717 U CN 216304717U
Authority
CN
China
Prior art keywords
well
water meter
well lid
installation
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123094927.0U
Other languages
Chinese (zh)
Inventor
王辉
许文刚
李海石
史倩
刘世伟
张灿
赵站峰
李泽
李洋
单坤
吕霄云
孙景云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Tongtao Pipe Group Co ltd
Original Assignee
Hebei Tongtao Pipe Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Tongtao Pipe Group Co ltd filed Critical Hebei Tongtao Pipe Group Co ltd
Priority to CN202123094927.0U priority Critical patent/CN216304717U/en
Application granted granted Critical
Publication of CN216304717U publication Critical patent/CN216304717U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model discloses an intelligent water meter well with a Krah pipe, which comprises a well cover, a well cover sealing ring, a well body, an installation through hole sealing ring, a well bottom, a water leakage port and a hot melt wire, wherein the well bottom is integrated with the well body through an electrothermal fusion welding technology of the Krah pipe, zero leakage of a well body and a well bottom interface is realized, the integral sealing effect of the water meter well is ensured, and meanwhile, the construction is convenient and rapid. The well lid passes through well lid seal groove, well lid sealing washer and well body formation dual-seal structure, has saved the well lid base, has fundamentally solved the emergence of the infiltration phenomenon that well lid and well lid base are sealed not tight to cause, has ensured the sealed effect of well head. The bottom of the well is provided with the water leaking port, so that accumulated water remaining in the water meter well can be effectively discharged when the water meter is installed or maintained, the relatively dry working environment in the water meter well is ensured, and the normal work of the intelligent water meter is ensured.

Description

Clar pipe intelligent water meter well
Technical Field
The utility model relates to the field of municipal engineering facilities, in particular to a carat pipe intelligent water meter well.
Background
The water meter well is visible everywhere in people's life, and the usage is extensive, is the essential facility in the water supply and drainage process of town and country municipal administration, industry garden etc.. The existing water meter well generally comprises a well body, a well cover base and a well cover, and is divided into types of concrete materials, brick materials, plastic materials, glass fiber reinforced plastic materials, metals, mixtures and the like according to different materials of the well body. The water meter well with a brick structure has low construction efficiency; the corrosion resistance of the metal material is poor; the water meter well made of plastic has good corrosion resistance and relatively poor ageing resistance, a barrel body with an opening at the bottom needs to be manufactured, the bottom needs to be paved on the bottom surface of a foundation pit by concrete during installation, then the periphery is backfilled after the water meter well is installed, water is easy to permeate or fill into the well during installation or maintenance, the working environment is poor, and the measuring precision and the service life of the intelligent water meter are influenced.
SUMMERY OF THE UTILITY MODEL
Aiming at the technical problems of the existing intelligent water meter well, the utility model aims to provide the carat pipe intelligent water meter well which is convenient to construct and good in sealing performance.
In order to solve the technical problems, the utility model adopts the technical scheme that: the utility model provides a carat pipe intelligence water gauge well, includes well lid, well lid sealing washer, the well body, installation through-hole sealing washer, shaft bottom, leaking mouth, hot melt silk, the well lid with pass through between the well body the well lid sealing washer is sealed fixed, the installation through-hole is located the well body both sides, the shaft bottom is the hot melt and connects, it is located to leak the mouth the shaft bottom, be equipped with in the installation through-hole sealing washer.
Further, the well lid surface is the sclausura design, and the back is equipped with the well lid seal groove, the well lid through install the well lid sealing washer in the well lid seal groove with well body lock joint.
Further, the height of the well lid sealing ring is the same as the depth of the well lid sealing groove.
Furthermore, the well body is a carat pipe, a thermal fuse is arranged at the edge of the well bottom, and the well bottom is welded with the well body into a whole through the thermal fuse.
Furthermore, the number of the installation through holes is 2, and the installation through holes are located on the same horizontal plane on two sides of the well body middle shaft.
Further, the outer diameter of the mounting through hole sealing ring is larger than the diameter of the mounting through hole, the length of the mounting through hole sealing ring is larger than the thickness of the well body, and 2 mounting through hole sealing rings are arranged.
Furthermore, the number of the water leakage openings is 2, the water leakage openings are symmetrically distributed on the bottom shaft central axis, and the distance between the water leakage openings is larger than the bottom shaft radius.
The utility model has the advantages and beneficial effects that:
1. in the utility model, the shaft bottom is integrated with the well body through the electric hot melting welding technology of the Krah pipe, zero leakage of the well body and a shaft bottom interface is realized, the integral sealing effect of the water meter well is ensured, and meanwhile, the construction is convenient and rapid. Simultaneously, the well body adopts the carat pipe structure to strengthen the intensity of water gauge well, has improved shock resistance.
2. According to the well cover, the well cover forms a double-sealing structure with the well body through the well cover sealing groove and the well cover sealing ring, a well cover base is omitted, the water seepage phenomenon caused by poor sealing of the well cover and the well cover base is fundamentally avoided, and the sealing effect of a well mouth is ensured.
3. The bottom of the water meter well is provided with the water leakage port, so that accumulated water remaining in the water meter well during installation or maintenance of the water meter can be effectively discharged, a relatively dry working environment in the water meter well is ensured, and the normal work of the intelligent water meter is ensured.
Drawings
FIG. 1 is a schematic cross-sectional view of the present invention
FIG. 2 is a schematic representation of the bottom hole configuration of the present invention
FIG. 3 is a schematic view of the cross-section of the manhole cover of the present invention
In the figure: 1. well lid, 2, well lid sealing washer, 3, the well body, 4, installation through-hole, 5, installation through-hole sealing washer, 6, shaft bottom, 7, the mouth of a river that leaks, 8, hot melt.
Detailed Description
The following detailed description of specific embodiments of the utility model refers to the accompanying drawings.
As shown in fig. 1-3, a carat pipe intelligence water meter well, including well lid 1, well lid sealing washer 2, the well body 3, installation through-hole 4, installation through-hole sealing washer 5, shaft bottom 6, hourglass mouth of a river 7, hot melt silk 8, well lid 1 with pass through between the well body 3 the well lid sealing washer 2 is sealed fixed, installation through-hole 4 is located 3 both sides of the well body, shaft bottom 6 is the hot melt connection, it is located to leak mouth of a river 7 the shaft bottom 6, be equipped with in the installation through-hole 4 installation through-hole sealing washer 5.
Further, 1 surface of well lid is the sclausura design, and the back is equipped with the well lid seal groove, well lid 1 through install in the well lid seal groove the well lid sealing washer 2 with the well body 3 is sealed fixed.
Further, the height of the well lid sealing ring 2 is the same as the depth of the well lid sealing groove.
Furthermore, 2 installation through holes 4 are arranged and are positioned on the same horizontal plane at two sides of the center shaft of the well body 3.
Further, the outer diameter of the mounting through hole sealing ring 5 is larger than the diameter of the mounting through hole 4, the length of the mounting through hole sealing ring 5 is larger than the thickness of the well body 3, and 2 mounting through hole sealing rings 5 are arranged.
Further, the well body 3 is a krah pipe, a thermal fuse 8 is arranged on the periphery of the well bottom 6, and the well bottom 6 is integrally welded with the well body 3 through the thermal fuse 8.
Furthermore, the number of the water leakage openings 7 is 2, the water leakage openings are symmetrically distributed on the axial line of the shaft bottom 6, and the distance between the water leakage openings 7 is larger than the radius of the shaft bottom 6.
While one embodiment of the present invention has been described in detail, the description is only a preferred embodiment of the present invention and should not be taken as limiting the scope of the utility model. All equivalent changes and modifications made within the scope of the present invention shall fall within the scope of the present invention.

Claims (7)

1. The utility model provides a carat pipe intelligence water gauge well which characterized in that: including well lid (1), well lid sealing washer (2), the well body (3), installation through-hole (4), installation through-hole sealing washer (5), shaft bottom (6), hourglass mouth of a river (7), hot melt silk (8), well lid (1) with pass through between the well body (3) well lid sealing washer (2) are sealed fixed, installation through-hole (4) are located well body (3) both sides, shaft bottom (6) are the hot melt and connect, it is located to leak mouth of a river (7) shaft bottom (6), be equipped with in installation through-hole (4) installation through-hole sealing washer (5).
2. A carat pipe intelligent water meter well as set forth in claim 1, wherein: well lid (1) surface is the sclausura design, and the back is equipped with the well lid seal groove, well lid (1) is through installing in the well lid seal groove well lid sealing washer (2) with the well body (3) lock joint.
3. A carat pipe intelligent water meter well as set forth in claim 1, wherein: the height of the well lid sealing ring (2) is the same as the depth of the well lid sealing groove.
4. A carat pipe intelligent water meter well as set forth in claim 1, wherein: the number of the installation through holes (4) is 2, and the installation through holes are located on the same horizontal plane on two sides of the center shaft of the well body (3).
5. A carat pipe intelligent water meter well as set forth in claim 1, wherein: the outer diameter of the mounting through hole sealing ring (5) is larger than the diameter of the mounting through hole (4), the length of the mounting through hole sealing ring (5) is larger than the thickness of the well body (3), and 2 mounting through hole sealing rings (5) are arranged.
6. A carat pipe intelligent water meter well as set forth in claim 1, wherein: the well body (3) is a Kera pipe, the periphery of the well bottom (6) is provided with a thermal fuse (8), and the well bottom (6) is connected with the well body (3) in a welded mode through the thermal fuse (8).
7. A carat pipe intelligent water meter well as set forth in claim 1, wherein: the number of the water leakage openings (7) is 2, the water leakage openings are symmetrically distributed on the central axis of the well bottom (6), and the distance between the water leakage openings (7) is larger than the radius of the well bottom (6).
CN202123094927.0U 2021-12-10 2021-12-10 Clar pipe intelligent water meter well Active CN216304717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123094927.0U CN216304717U (en) 2021-12-10 2021-12-10 Clar pipe intelligent water meter well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123094927.0U CN216304717U (en) 2021-12-10 2021-12-10 Clar pipe intelligent water meter well

Publications (1)

Publication Number Publication Date
CN216304717U true CN216304717U (en) 2022-04-15

Family

ID=81083810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123094927.0U Active CN216304717U (en) 2021-12-10 2021-12-10 Clar pipe intelligent water meter well

Country Status (1)

Country Link
CN (1) CN216304717U (en)

Similar Documents

Publication Publication Date Title
CN216304717U (en) Clar pipe intelligent water meter well
CN203514482U (en) Novel sealing plastic inspection well
CN112726962B (en) Assembled grout sleeve
CN2769654Y (en) Piepline stabilizer for pipeline acrossed by river
CN207633358U (en) A kind of prefabricated assembled pipe gallery jointing construction
CN215053224U (en) Basement waterproof structure
CN204403606U (en) A kind of Prestressed concrete cylinder pipe with pea gravel concreten protective layer
CN201915417U (en) Sand inclusion glass steel integral well
CN212251495U (en) Concrete pond underwater equipment installation device
CN204403607U (en) A kind of prestress steel cylinder concrete push pipe with pea gravel concreten protective layer
CN2627065Y (en) Combined glass reinforced plastic well
CN217236908U (en) Hole protecting and sealing device for underground water level monitoring
CN220980586U (en) Water conservancy pipeline seam fixing device
CN218346380U (en) Anti-sedimentation buried inspection well
CN216108622U (en) Modularized miniature pipe jacking working well
CN221219037U (en) A draw row device for irregular leakage point of hydraulic building
CN114593279B (en) Novel flexible waterproof sleeve and manufacturing method thereof
CN211145337U (en) Novel mud jacking rubber ring
CN220048022U (en) Join in marriage rotatory blowing device of fluid reservoir
CN214116914U (en) Assembly structure of inspection well
CN218622121U (en) Steel dam gate
CN216590561U (en) Underground pipeline non-excavation prosthetic devices
CN218153021U (en) Water supply pipe network plugging device that leaks
CN203284802U (en) Inspection well body
CN212772713U (en) Inspection well chamber

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant