CN216301167U - Material handling device is used in building engineering construction - Google Patents

Material handling device is used in building engineering construction Download PDF

Info

Publication number
CN216301167U
CN216301167U CN202122513829.XU CN202122513829U CN216301167U CN 216301167 U CN216301167 U CN 216301167U CN 202122513829 U CN202122513829 U CN 202122513829U CN 216301167 U CN216301167 U CN 216301167U
Authority
CN
China
Prior art keywords
fixed
shallow
spring
frame
cart
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122513829.XU
Other languages
Chinese (zh)
Inventor
张斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122513829.XU priority Critical patent/CN216301167U/en
Application granted granted Critical
Publication of CN216301167U publication Critical patent/CN216301167U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a material carrying device for building engineering construction, and relates to the technical field of building construction. Comprises a cart and a push handle arranged on the cart, wherein the top of the cart is provided with a charging device and a driven discharging device, the push handle is provided with a through hole, the push handle and the inside of the cart are provided with a limit component, the top of the cart is provided with a chute, the charging device comprises a material placing frame which is arranged at the inner side of a sliding groove at the top of the cart in a sliding way, the feeding frame is fixed with one end of a spring A, the other end of the spring A is fixed at the inner side of a chute at the top of the cart, a driven rod discharging assembly and a limiting assembly are matched through a feeding device, when the bricks need to be unloaded, the sliding plate can be pinched to control the discharging frame to move rightwards, so that the bricks in the discharging frame can be unloaded along the discharging plate without manual carrying by workers, and simultaneously avoids the loss caused by the breakage and damage of the bricks due to expansion caused by directly controlling the dumping of the cart.

Description

Material handling device is used in building engineering construction
Technical Field
The utility model relates to the technical field of building construction, in particular to a material carrying device for building engineering construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The construction site is called a "construction site" or a "construction site", or a construction site, and the construction is a production activity performed by people to construct various building products in a certain space and time according to a specific design blueprint by using various building materials and mechanical equipment.
When current building engineering construction, need carry the brick, nevertheless current carrier when carrying the brick, needs the workman to unload one piece of brick, and work load is very big, if direct control carrier topples over the brick, the brick can lead to the brick to break because of the collision and damage, causes the loss. In view of this, we propose a material handling device for construction engineering.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a material handling device for building engineering construction, which solves the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides a material handling device for building engineering construction, includes the shallow and sets up the handle that pushes away on the shallow, the top of shallow is provided with charging device and driven discharge apparatus, push away and seted up the through-hole on the handle, the inside of pushing away the handle and pushing away the shallow is provided with spacing subassembly, the spout has been seted up at the top of shallow, charging device includes the blowing frame, blowing frame slidable mounting is in the inboard of shallow top spout, the blowing frame is fixed with spring A's one end, spring A's the other end is fixed in the inboard of shallow top spout.
Preferably, the charging device further comprises a partition plate, the partition plate is fixed on the inner wall of the material placing frame, the bottom of the partition plate is fixed to the transverse plate, the transverse plate is fixed to the inner wall of the material placing frame, the bottom of the transverse plate is in sliding connection with the L-shaped baffle, the L-shaped baffle penetrates through the left side of the material placing frame and is in sliding connection with the material placing frame, and the bottom of the L-shaped baffle is fixed to the top of the trolley.
Preferably, the driven discharging device comprises a belt conveying device, the belt conveying device is fixed on the inner wall of the material placing frame, the right side of the material placing frame is hinged to a discharging plate, the discharging plate is fixed to one end of a spiral spring, the other end of the spiral spring is fixed to the material placing frame, and the top of the trolley and the bottom of the material placing frame are penetrated through by a driven rod and hinged to the trolley through the driven rod.
Preferably, spacing subassembly includes the kelly, the kelly runs through the shallow and is articulated with the shallow, the top of kelly is fixed with spring B's one end, spring B's the other end is fixed on the inner wall of shallow.
Preferably, the limiting assembly further comprises a sliding plate, the sliding plate penetrates through the inner side of the upper through hole of the push handle and is in sliding connection with the push handle, one end of the sliding plate is fixed with one end of a spring C, the other end of the spring C is fixed on the inner wall of the push handle, the other end of the sliding plate is fixed with one end of a connecting rod, the connecting rod penetrates through the tops of the push handle and the trolley and is in sliding connection with the push handle and the trolley, the other end of the connecting rod is fixed with one end of a pull rope, and the other end of the pull rope is fixed at the bottom of the clamping rod through a guide wheel.
Preferably, the transverse plate and the L-shaped baffle plate are both provided with through holes.
Preferably, the left side of the material placing frame is provided with a clamping groove.
(III) advantageous effects
The utility model provides a material handling device for construction engineering construction. The method has the following beneficial effects:
(1) this material handling device for building engineering construction, the loading attachment cooperation follower lever subassembly and the spacing subassembly of unloading through setting up, when needs are unloaded the brick, only need pinch the slide and can control the blowing frame and move right for the brick in the blowing frame can be unloaded along the stripper, does not need the manual transport of workman, and has avoided the direct control shallow to empty simultaneously and lead to the brick to cause the damage of breaking to cause the loss because of the inflation.
(2) This material handling device is used in building engineering construction, through the blowing frame cooperation baffle that sets up realize placing the brick in the blowing frame, at the promotion shallow, the problem emergence that produces the collision and cause the damage between brick and the brick can be avoided to the brick in the blowing frame.
Drawings
FIG. 1 is a schematic cross-sectional front view of the present invention;
FIG. 2 is an enlarged view of A in FIG. 1;
FIG. 3 is an enlarged view of B of FIG. 1 according to the present invention;
FIG. 4 is a schematic view of the connecting structure of the discharging frame, the discharging plate and the spiral spring according to the present invention;
FIG. 5 is a schematic view of the top chute of the cart according to the present invention;
FIG. 6 is a schematic top view of the push handle of the present invention.
In the figure: 1. pushing a cart; 2. a push handle; 3. a charging device; 31. a material placing frame; 32. a spring A; 33. a partition plate; 34. a transverse plate; 35. an L-shaped baffle plate; 4. a driven discharge device; 41. a belt conveyor; 42. a stripper plate; 43. a volute spring; 44. a driven lever; 5. a limiting component; 51. a clamping rod; 52. a spring B; 53. a slide plate; 54. a spring C; 55. a connecting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: the utility model provides a material handling device for building engineering construction, including shallow 1 with set up the push away 2 on shallow 1, the top of shallow 1 is provided with charging device 3 and driven discharge apparatus 4, push away and seted up the through-hole on 2, the inside of pushing away 2 and shallow 1 is provided with spacing subassembly 5, the spout has been seted up at the top of shallow 1, charging device 3 includes blowing frame 31, blowing frame 31 slidable mounting is in the inboard of shallow 1 top spout, blowing frame 31 is fixed with the one end of spring A32, the other end of spring A32 is fixed in the inboard of shallow 1 top spout, the draw-in groove has been seted up in the left side of blowing frame 31, realize spacing or relieving the blowing frame 31 spacing through cooperation kelly 51.
In this embodiment, the loading device 3 further includes a partition 33, the partition 33 is fixed on the inner wall of the material placing frame 31, the bottom of the partition 33 is fixed with the horizontal plate 34, the horizontal plate 34 is fixed on the inner wall of the material placing frame 31, the bottom of the horizontal plate 34 is slidably connected with the L-shaped baffle 35, the L-shaped baffle 35 penetrates through the left side of the material placing frame 31 and is slidably connected with the material placing frame 31, the bottom of the L-shaped baffle 35 is fixed with the top of the cart 1, through holes are formed in both the horizontal plate 34 and the L-shaped baffle 35, when the material placing frame 31 moves rightward, because L type baffle 35 is fixed with the top of shallow 1, L type baffle 35 can not remove, and the through-hole on diaphragm 34 and the through-hole coincidence on the L type baffle 35 this moment realize that the brick can drop on belt conveyer 41 from the through-hole on diaphragm 34 and the L type baffle 35, realize unloading the brick through belt conveyer 41 and stripper 42.
In this embodiment, the driven discharging device 4 includes a belt conveying device 41, the belt conveying device 41 is fixed on the inner wall of the material placing frame 31, the right side of the material placing frame 31 is hinged to a discharging plate 42, the discharging plate 42 is fixed to one end of a spiral spring 43, the other end of the spiral spring 43 is fixed to the material placing frame 31, the top of the cart 1 and the bottom of the material placing frame 31 are penetrated by a driven rod 44 and hinged to the cart 1 with the driven rod 44, when blowing frame 31 moved rightwards, blowing frame 31 supported and moved driven lever 44 for driven lever 44 with go up rotating clockwise with shallow 1 articulated position, the through-hole has been seted up to blowing frame 31's bottom, in driven lever 44 can rotate the through-hole to blowing frame 31 bottom, realize no longer supporting stripper 42, stripper 42 under the effect of spiral spring 43 with blowing frame 31 articulated position clockwise rotation, can assist the brick and unload.
In this embodiment, the limiting assembly 5 includes a clamping rod 51, the clamping rod 51 penetrates through the cart 1 and is hinged to the cart 1, the top of the clamping rod 51 is fixed to one end of a spring B52, the other end of a spring B52 is fixed to the inner wall of the cart 1, a sliding plate 53 penetrates through the inner side of a through hole in the handle 2 and is slidably connected to the handle 2, one end of the sliding plate 53 is fixed to one end of a spring C54, the other end of the spring C54 is fixed to the inner wall of the handle 2, the other end of the sliding plate 53 is fixed to one end of a connecting rod 55, the connecting rod 55 penetrates through the tops of the handle 2 and the cart 1 and is slidably connected to the handle 2 and the cart 1, the other end of the connecting rod 55 is fixed to one end of a pull rope, the other end of the pull rope is fixed to the bottom of the clamping rod 51 through a guide wheel, an inclined surface is disposed on the right side of the clamping rod 51, when the discharging rack 31 is pushed to move leftwards and reset, the discharging rack 31 pushes the clamping rod 51 to push the clamping rod 51 to rotate counterclockwise by a certain angle around the center of the cart 1, when blowing frame 31 continued to move left this moment, in jamming rod 51 can insert the left draw-in groove of blowing frame 31, when jamming rod 51 no longer supported, under spring B52's effect, jamming rod 51 uses and cart 1 articulated position clockwise rotation certain angle as the centre of a circle, realizes the card in the left draw-in groove of blowing frame 31, carries on spacingly to blowing frame 31.
When the brick stacking machine works (or is used), bricks are stacked in the material placing frame 31, the cart 1 is pushed to the position needing to be discharged, the sliding plate 53 is pinched, the sliding plate 53 pulls the pull rope through the connecting rod 55 to pull the clamping rod 51, the clamping rod 51 rotates anticlockwise by taking the position hinged with the cart 1 as the circle center, the clamping rod 51 is not clamped in the clamping groove at the left side of the material placing frame 31 any more, the limiting on the material placing frame 31 is released, under the action of the spring A32, when the material placing frame 31 moves rightwards and the material placing frame 31 moves rightwards again, because L type baffle 35 is fixed with the top of shallow 1, L type baffle 35 can not remove, and the through-hole on diaphragm 34 and the through-hole coincidence on the L type baffle 35 this moment realize that the brick can drop on belt conveyer 41 from the through-hole on diaphragm 34 and the L type baffle 35, start to be located and push away the switch start belt conveyer 41 on 2, realize unloading the brick through belt conveyer 41 and stripper 42.
Meanwhile, when the blowing frame 31 moves rightwards, the blowing frame 31 supports the driven rod 44, the driven rod 44 rotates clockwise at the position hinged to the cart 1, the bottom of the blowing frame 31 is provided with a through hole, the driven rod 44 can rotate into the through hole at the bottom of the blowing frame 31, the discharging plate 42 is not supported any more, the discharging plate 42 rotates clockwise at the position hinged to the blowing frame 31 under the action of the spiral spring 43, and the bricks can be discharged in an auxiliary mode.
After the unloading is finished, the discharging frame 31 is manually pushed to move leftwards for resetting, the discharging frame 31 pushes the clamping rod 51 to rotate anticlockwise by a certain angle by taking the position hinged with the cart 1 as the center of a circle against the inclined plane on the right side of the clamping rod 51, and when the discharging frame 31 continues to move leftwards, the clamping rod 51 can be inserted into the clamping groove at the left side of the material placing frame 31, when the clamping rod 51 is not pressed against any more, under the action of the spring B52, the clamping rod 51 rotates clockwise by a certain angle by taking the position hinged with the cart 1 as the center of a circle to be clamped in the clamping groove at the left side of the material placing frame 31, carry out spacingly to blowing frame 31, driven lever 44 is supported and uses and put frame 31 articulated position as centre of a circle anticlockwise rotation and reset, and driven lever 44 supports and moves stripper 42 and uses and put frame 31 articulated position as centre of a circle anticlockwise rotation and reset, and the through-hole on the L type baffle 35 no longer with the through-hole coincidence on the diaphragm 34, realizes that the device is whole to reset.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a material handling device is used in building engineering construction, includes shallow (1) and sets up pushing away on shallow (1) handle (2), its characterized in that: the top of shallow (1) is provided with charging device (3) and driven discharge apparatus (4), the through-hole has been seted up on pushing away handle (2), the inside of pushing away handle (2) and shallow (1) is provided with spacing subassembly (5), the spout has been seted up at the top of shallow (1), charging device (3) are including blowing frame (31), blowing frame (31) slidable mounting is in the inboard of shallow (1) top spout, blowing frame (31) are fixed with the one end of spring A (32), the inboard at shallow (1) top spout is fixed to the other end of spring A (32).
2. The material-handling device for construction work of claim 1, wherein: charging device (3) are still including baffle (33), baffle (33) are fixed on the inner wall of blowing frame (31), the bottom and diaphragm (34) of baffle (33) are fixed, diaphragm (34) are fixed on the inner wall of blowing frame (31), the bottom and the L type baffle (35) sliding connection of diaphragm (34), L type baffle (35) run through the left side of blowing frame (31) and with blowing frame (31) sliding connection, the bottom and the top of shallow (1) of L type baffle (35) are fixed.
3. The material-handling device for construction work of claim 1, wherein: the driven discharging device (4) comprises a belt conveying device (41), the belt conveying device (41) is fixed on the inner wall of the material placing frame (31), the right side of the material placing frame (31) is hinged to a discharging plate (42), the discharging plate (42) is fixed to one end of a spiral spring (43), the other end of the spiral spring (43) is fixed to the material placing frame (31), and the top of the trolley (1) and the bottom of the material placing frame (31) are penetrated through by a driven rod (44) and hinged to the trolley (1) through the driven rod (44).
4. The material-handling device for construction work of claim 1, wherein: spacing subassembly (5) are including kelly (51), kelly (51) run through shallow (1) and are articulated with shallow (1), the top of kelly (51) is fixed with the one end of spring B (52), the other end of spring B (52) is fixed on the inner wall of shallow (1).
5. The material-handling device for construction work of claim 4, wherein: spacing subassembly (5) still including slide (53), slide (53) run through push away the inboard of going up the through-hole in handle (2) and with push away handle (2) sliding connection, the one end of slide (53) is fixed with the one end of spring C (54), the other end of spring C (54) is fixed on the inner wall of pushing away handle (2), the other end of slide (53) is fixed with the one end of connecting rod (55), connecting rod (55) run through push away the top of handle (2) and shallow (1) and with push away handle (2) and shallow (1) sliding connection, the other end of connecting rod (55) is fixed with the one end of stay cord, the other end of stay cord passes through the leading wheel and fixes the bottom at kelly (51).
6. The material-handling device for construction work of claim 2, wherein: through holes are formed in the transverse plate (34) and the L-shaped baffle (35).
7. The material-handling device for construction work of claim 1, wherein: the left side of the material placing frame (31) is provided with a clamping groove.
CN202122513829.XU 2021-10-19 2021-10-19 Material handling device is used in building engineering construction Expired - Fee Related CN216301167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122513829.XU CN216301167U (en) 2021-10-19 2021-10-19 Material handling device is used in building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122513829.XU CN216301167U (en) 2021-10-19 2021-10-19 Material handling device is used in building engineering construction

Publications (1)

Publication Number Publication Date
CN216301167U true CN216301167U (en) 2022-04-15

Family

ID=81114271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122513829.XU Expired - Fee Related CN216301167U (en) 2021-10-19 2021-10-19 Material handling device is used in building engineering construction

Country Status (1)

Country Link
CN (1) CN216301167U (en)

Similar Documents

Publication Publication Date Title
CN210794868U (en) Long bar material feeding machine
CN216301167U (en) Material handling device is used in building engineering construction
CN110006298B (en) Automatic decomposing line for rocket shell
CN106553902A (en) Carbide chip automatic transferring
CN209978740U (en) Rocket shell automation decomposition line
CN108557434A (en) A kind of building construction easy to use is with removing brick device
CN111606026A (en) Automatic stores pylon equipment of cell-phone battery case of unloading on unilateral
CN115432052B (en) Production method of gypsum hollow building block and material loading and conveying equipment thereof
CN207139117U (en) The convertible glue plastering machine of laser
CN210339453U (en) Rock wool board production water line panel turnover mechanism
CN214725379U (en) Full-automatic glass cutting and grinding production line
CN206116529U (en) Automatic upper pole piece device
CN216126122U (en) Intelligent sorting platform for materials
CN211514737U (en) Tilting ball mill
CN212245252U (en) Automatic frame type discharging mechanism
CN212150883U (en) Material lifting device for building engineering
CN212581005U (en) Automatic feeder
CN114030880A (en) Board frame folding and unfolding equipment matched with manipulator
CN211812045U (en) Handle loading attachment
CN212100792U (en) Charging and discharging device for battery
CN111843046A (en) Polishing, paint spraying and drying integrated automatic line for diamond saw blade
CN216836984U (en) Cargo handling elevating gear
CN211193074U (en) Automatic feeding and discharging workbench
CN218015056U (en) Rearmounted transmission receiving device of numerical control veneer reeling machine
CN220785852U (en) Conveying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220415