CN216286391U - Engineering cost management system - Google Patents

Engineering cost management system Download PDF

Info

Publication number
CN216286391U
CN216286391U CN202121941597.1U CN202121941597U CN216286391U CN 216286391 U CN216286391 U CN 216286391U CN 202121941597 U CN202121941597 U CN 202121941597U CN 216286391 U CN216286391 U CN 216286391U
Authority
CN
China
Prior art keywords
frame
management system
box body
box
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121941597.1U
Other languages
Chinese (zh)
Inventor
刘菲
刘庞
刘灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Longfei Engineering Management Consulting Co ltd
Original Assignee
Guangdong Longfei Engineering Management Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Longfei Engineering Management Consulting Co ltd filed Critical Guangdong Longfei Engineering Management Consulting Co ltd
Priority to CN202121941597.1U priority Critical patent/CN216286391U/en
Application granted granted Critical
Publication of CN216286391U publication Critical patent/CN216286391U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • General Factory Administration (AREA)

Abstract

The utility model discloses a project cost management system, which comprises a box body, wherein a cost sheet placing cavity is arranged in the box body, a cover plate is arranged at one side of the box body through a turning hinge, a calculating mechanism is arranged at one side of the box body through a bracket, a pushing mechanism is arranged at the rear side of the box body, a placing frame connected with the pushing mechanism is arranged in the cost sheet placing cavity, clamping frames for placing the cost sheet are adjacently arranged in the placing frame, after the device is started, a swinging motor drives a swinging rod to move, the swinging rod pushes the placing frame out of the cover plate, when a valuation staff lifts each cost sheet in the clamping frames, a gravity sensor at the bottom can transmit signals into a calculator to input unit price, through the structure, the valuation staff does not need to look up each piece of data, the project cost calculation process can be optimized and accelerated, the price can be obtained more efficiently and accurately, and the speed of the whole engineering project is increased.

Description

Engineering cost management system
Technical Field
The utility model relates to the field of engineering cost management equipment, in particular to an engineering cost management system.
Background
At present, for a project, the number of calculation, the data to be referred to and the cost unit price are huge data, and for a constructor, the work is very heavy, so that a project cost management system for optimizing the project cost pricing process and improving the project progress is needed to be provided.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to a construction cost management system to solve the problems set forth in the background art.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides an engineering cost management system, includes the box, the box in be provided with the cost and singly place the chamber, box one side be provided with the apron through turning over the hinge, box one side be provided with calculation mechanism through the support, the box rear side be provided with ejecting mechanism, the cost singly place the intracavity install with ejecting mechanism be connected place the frame, place the frame in the adjacent confession that is provided with the clamp holder that the cost was singly placed.
As a further technical scheme of the utility model, a gravity sensor electrically connected with the computing mechanism is arranged at the bottom of the placing frame corresponding to the position under each clamping frame.
As a further technical scheme, the top plate is arranged at the top of the placing frame, the limiting frame is arranged on the inner side of the placing frame, the limiting plate is arranged at the tail end of the limiting frame, and the limiting plate is vertically arranged with the limiting frame.
As a further technical scheme, the pushing mechanism comprises an installation plate arranged at the rear side of the box body, a swing motor arranged in the installation plate, a swing rod connected with one side of a power output end of the swing motor, and a connecting seat connected with the swing rod, wherein the connecting seat is arranged at the rear of the placing frame.
As a further technical scheme of the utility model, the computing mechanism comprises a rotating seat sleeved with the bracket, a supporting column connected with the rotating seat and a calculator connected with the tail end of the supporting column.
As a further technical scheme of the utility model, the calculator is provided with a key panel and a display panel.
The utility model has the beneficial effects that: after starting through this equipment, swing motor drives the pendulum rod motion after, the pendulum rod will be placed the frame and release outside the apron, when the pricing personnel mentions each cost list in the clamping frame, the gravity inductor of bottom will spread into the signal in the calculator, inputs the unit price, through this structure, realizes that the pricing personnel need not every data and looks up, engineering cost calculation process can optimize and the speeding, more high-efficient and accurately reachs the price, for the propulsion speeding of whole engineering project.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a side view of the present invention.
Wherein: case 1, cover plate 2, hinge 3, support 4, swivel mount 5, support column 6, calculator 7, display panel
8. The key-press panel 9, the manufacture cost list placing cavity 10, the mounting plate 11, the swing motor 12, the swing rod 13, the connecting seat 14, the placing frame 15, the limiting frame 18, the top plate 19 and the limiting plate 20.
Detailed Description
The following describes embodiments of the present invention with reference to the drawings and preferred embodiments.
Referring to fig. 1-2, a construction cost management system includes a box body 1, a construction cost list placing cavity 10 is provided in the box body 1, a cover plate 2 is provided on one side of the box body 1 through a hinge 3, a calculating mechanism is provided on one side of the box body 1 through a bracket 4, a pushing mechanism is provided on the rear side of the box body 1, a placing frame 15 connected with the pushing mechanism is installed in the construction cost list placing cavity 10, clamping frames 16 for placing the construction cost list are adjacently arranged in the placing frame 15, a gravity sensor 17 electrically connected with the calculating mechanism is provided under each clamping frame 16 corresponding to the bottom of the placing frame 15, a top plate 19 is provided on the top of the placing frame 15, a limiting frame 18 is provided on the inner side, a limiting plate 20 is provided at the end of the limiting frame 18, the limiting plate 20 is vertically installed with the limiting frame 18, ejecting mechanism including set up in the mounting panel 11 of 1 rear side of box, install in mounting panel 11 in swing motor 12, with swing motor 12 power take off end one side link pendulum rod 13, with the connecting seat 14 that pendulum rod 13 is connected, connecting seat 14 set up in place frame 15 rear, after starting through this equipment, swing motor 12 drives pendulum rod 12 motion back, pendulum rod 12 will place frame 15 and release apron 2 outside, when the valuator mentions each cost list in the holder 16, the gravity inductor 17 of bottom will transmit the signal into in calculator 7, carry out the unit price input, through this structure, realize that the valuator need not every data and look up, engineering cost calculation process can optimize and the speeding, more high-efficient and accurately reachs the price, for the propulsion speeding of whole engineering project.
Furthermore, the calculating mechanism comprises a rotating seat 5 sleeved with the support 4, a supporting column 6 connected with the rotating seat 5 and a calculator 7 connected with the tail end of the supporting column 6, the cost in the placing frame 15 is sensed to be lifted through a gravity sensor 17, namely the cost is recorded into the unit price A, and the pricing personnel inputs the unit X, and the A X can obtain the cost immediately.
Furthermore, the calculator 7 is provided with a key panel 9 and a display panel 8, so that the taximeters can conveniently input unit numerical values and conveniently display the unit numerical values.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides an engineering cost management system, includes box (1), its characterized in that, box (1) in be provided with the cost and singly place chamber (10), box (1) one side be provided with apron (2) through turning over hinge (3), box (1) one side be provided with calculation mechanism through support (4), box (1) rear side be provided with ejecting mechanism, the cost singly place in chamber (10) install with ejecting mechanism be connected place frame (15), place frame (15) in the adjacent confession that is provided with the cost singly place holder (16).
2. A construction cost management system according to claim 1, wherein a gravity sensor (17) electrically connected to said computing means is provided at the bottom of said placement frame (15) directly below each of said holders (16).
3. A construction cost management system according to claim 1, wherein the top of the placing frame (15) is provided with a top plate (19), the inner side is provided with a limiting frame (18), the tail end of the limiting frame (18) is provided with a limiting plate (20), and the limiting plate (20) is vertically installed with the limiting frame (18).
4. The construction cost management system according to claim 1, wherein the pushing mechanism comprises a mounting plate (11) arranged at the rear side of the box body (1), a swing motor (12) arranged in the mounting plate (11), a swing rod (13) connected with one side of a power output end of the swing motor (12), and a connecting seat (14) connected with the swing rod (13), and the connecting seat (14) is arranged at the rear of the placing frame (15).
5. A construction cost management system according to claim 1, wherein said computing means comprises a swivel mount (5) engaging with said frame (4), a support post (6) connected to said swivel mount (5), and a calculator (7) connected to the end of said support post (6).
6. A construction cost management system according to claim 5, wherein said calculator (7) is provided with a key panel (9) and a display panel (8).
CN202121941597.1U 2021-08-18 2021-08-18 Engineering cost management system Active CN216286391U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121941597.1U CN216286391U (en) 2021-08-18 2021-08-18 Engineering cost management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121941597.1U CN216286391U (en) 2021-08-18 2021-08-18 Engineering cost management system

Publications (1)

Publication Number Publication Date
CN216286391U true CN216286391U (en) 2022-04-12

Family

ID=81060305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121941597.1U Active CN216286391U (en) 2021-08-18 2021-08-18 Engineering cost management system

Country Status (1)

Country Link
CN (1) CN216286391U (en)

Similar Documents

Publication Publication Date Title
CN216286391U (en) Engineering cost management system
CN210743511U (en) Manpower resource performance exhibition stand device
CN215569600U (en) Energy-saving geographic information system display screen
CN215527110U (en) Anti-interference two-sided advertisement machine protects against radiation
CN112951119B (en) Tourism management display propaganda device and use method thereof
CN210822410U (en) Spinning car spinning cake pusher
CN201085353Y (en) Frameless automatic cycle container
CN210198724U (en) Test equipment suitable for automobile seat life and reliability
CN207984914U (en) A kind of device for the distribution cabinet equipment being readily transported
CN215068986U (en) Warning subassembly is used in oil development
CN214824168U (en) Object taking system based on automatic identification of unmanned aerial vehicle
CN212021154U (en) Pipe gallery pouring mold turnover device
CN205038172U (en) Assemble convenient X ray detecting instrument swing arm
CN210335934U (en) Supermarket service robot
CN112348588A (en) Short message marketing method and device for collecting fee based on marketing effect
CN209733267U (en) display device for computer hardware
CN215488556U (en) Comprehensive operation scheduling device for electricity transaction energy management
CN211141005U (en) Storage rack is used in production of combined material protection cloth
CN214702678U (en) Novel vibration analysis of material roof beam device
CN209785170U (en) Multifunctional cash register
CN218521666U (en) Traffic facilities sign convenient to installation
CN219838371U (en) Special electric power two-ticket multifunctional integrated board
CN211139501U (en) Bicycle parking garage
CN220379273U (en) News melt media work display device
CN204688157U (en) A kind of transmitting/receiving file trammer dedicated

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant