CN216276802U - Flexible steel cable construction device for large-span structure - Google Patents

Flexible steel cable construction device for large-span structure Download PDF

Info

Publication number
CN216276802U
CN216276802U CN202122533382.2U CN202122533382U CN216276802U CN 216276802 U CN216276802 U CN 216276802U CN 202122533382 U CN202122533382 U CN 202122533382U CN 216276802 U CN216276802 U CN 216276802U
Authority
CN
China
Prior art keywords
rope
construction
span structure
steel cable
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122533382.2U
Other languages
Chinese (zh)
Inventor
郭康康
张晓峰
叶冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Curtain Wall Co Ltd
Original Assignee
CSCEC Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Curtain Wall Co Ltd filed Critical CSCEC Curtain Wall Co Ltd
Priority to CN202122533382.2U priority Critical patent/CN216276802U/en
Application granted granted Critical
Publication of CN216276802U publication Critical patent/CN216276802U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a construction device of a flexible steel cable of a large-span structure, which is arranged between two main structures arranged at intervals to form a construction platform and comprises: at least two coupling assembling, platform subassembly and two at least setting up respectively in the adjusting part who connects the both ends of rope that interval or cross set up, coupling assembling is including connecting the rope, and the platform subassembly sets up between two major structure to be connected in two at least connection ropes, adjusting part include euphroe, and the one end of euphroe can be dismantled and connect in connecting the rope, the other end articulates in major structure, is used for tightening up and connects the rope, so that the platform subassembly rises. The utility model can solve the problem that the installation structure is fixed in the prior art, the lengths of the first rope body and the second rope body need to be tensioned by disassembling and locking the buckle so as to reduce the settlement of the construction height, so that the use is inconvenient.

Description

Flexible steel cable construction device for large-span structure
Technical Field
The utility model relates to the technical field of building construction, in particular to a flexible steel cable construction device for a large-span structure.
Background
Along with the rapid development of the building industry, the form that the hollow daylighting roof is arranged inside a building to meet natural daylighting is more and more common, and at present, the construction of the existing large-span daylighting roof usually adopts a full-space frame body erected on the ground for construction.
For satisfying the requirement that large-span high altitude construction work platform set up fast, not only economical reasonable but also satisfy the below and alternate the construction, avoid setting up the construction methods of full hall support body because of adopting ground, the material that leads to drops into more, the relatively poor problem of economical and practical nature, a large-span construction equipment comes into production by accident, for example application number is: chinese utility model patent CN201720603407.2, entitled: a large-span cable-net type construction device comprising: the rope net is pulled between the first main body structure and the second main body structure of the large span; and the construction platform is laid on the rope net. The rope net is pulled between the first main body structure and the second main body structure to serve as the structural support of the utility model, and the construction platform is laid on the rope net to realize site construction.
Therefore, a flexible steel cable construction device with a large-span structure is needed, and the problem that the existing construction technology needs to reduce the settlement of the construction height by detaching and locking buckles to tension the lengths of the first rope and the second rope, so that the use is inconvenient is solved.
SUMMERY OF THE UTILITY MODEL
In view of this, it is necessary to provide a flexible steel cable construction device for a large-span structure, which solves the technical problem in the prior art that the length of the first rope body and the length of the second rope body need to be tensioned by detaching and locking the buckle to reduce the settlement for realizing the construction height, thereby causing inconvenience in use.
In order to achieve the above technical object, a technical solution of the present invention provides a flexible steel cable construction device for a large-span structure, which is installed between two main structures arranged at an interval to form a construction platform, and includes:
at least two connecting assemblies arranged at intervals or in a cross way, wherein each connecting assembly comprises a connecting rope;
the platform assembly is arranged between the two main structures and is connected to at least two connecting ropes;
at least two set up respectively in the adjusting part who connects the both ends of rope, adjusting part includes the euphroe, the one end of euphroe can dismantle connect in connect rope, the other end articulate in major structure is used for tightening up connect the rope, so that the platform subassembly rises.
Further, connect the both ends of rope to the direction fifty percent discount that is close to the middle part, coupling assembling still includes at least one first rope clip, first rope clip set up in the fifty percent discount department of connecting the rope, and with the fifty percent discount department of connecting the rope forms the fixed orifices that is used for connecting.
Furthermore, in the coupling assembling the quantity of first rope card is a plurality of, and is a plurality of first rope card is along being close to the direction at the middle part of connecting the rope evenly sets up.
Furthermore, the tip of connecting the rope fifty percent discount is to keeping away from the direction of connecting the rope is protruding, coupling assembling still includes the second rope clip, the second rope clip set up in the arch is kept away from one side of first rope clip, and be connected in the fifty percent discount connect the rope.
Furthermore, the connecting rope is made of a steel core steel cable.
Furthermore, two regulating assemblies and a coupling assembling constitute a linkage unit, one regulating assembly's one end is connected in the one end of connecting the rope, the other end connect in one major structure, another regulating assembly's one end is connected in the other end of connecting the rope, the other end connect in another major structure, the flexible cable wire construction equipment of large-span structure includes a plurality of linkage units.
Further, the adjusting part still includes and connects the otic placode, it connects otic placode fixed connection major structure, connect the otic placode with the other end of euphroe is articulated.
Further, the platform assembly comprises a springboard, and the springboard is laid above the connecting rope.
Further, the platform subassembly still includes safety net and safe pocket net, the safety net set up in connect the rope with between the springboard, safe pocket net set up in connect the below of rope.
Furthermore, the platform assembly further comprises at least one iron wire, and the iron wire is bound on the springboard, the safety net and the safety pocket net and used for integrating the springboard, the safety net and the safety pocket net.
Compared with the prior art, the utility model has the beneficial effects that: at least two connecting ropes are arranged between the two main body structures at intervals or in a crossed manner and are used for forming a structure for supporting and connecting a construction platform, a platform assembly is connected with the at least two connecting ropes and is connected between the two main body structures, for forming a construction platform for construction, the adjusting assembly comprises rope tighteners which are respectively arranged at two ends of the connecting rope, one end of the rope tightener is detachably connected with the connecting rope, the other end of the rope tightener is hinged with the main body structure and used for enabling the connecting rope to drive the platform assembly to ascend by tightening the length of the connecting rope, thereby play the effect that reduces the subsidence of platform subassembly, such structure can solve among the prior art because mounting structure is fixed, need come the length of the first rope body of tensioning and the second rope body through dismantling and locking the buckle with the reduction settlement that realizes the construction height to lead to having the inconvenient problem of use.
Drawings
Fig. 1 is a sectional view of a flexible wire rope construction apparatus for a large span structure according to an embodiment of the present invention;
FIG. 2 is an enlarged partial schematic view at A of FIG. 1;
FIG. 3 is a cross-sectional view of a body structure, a connection assembly and an adjustment assembly connection provided by an embodiment of the present invention;
FIG. 4 is an enlarged partial schematic view at B of FIG. 3;
fig. 5 is a schematic top view of a flexible steel cable construction device for a large span structure according to an embodiment of the present invention.
Detailed Description
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate preferred embodiments of the utility model and together with the description, serve to explain the principles of the utility model and not to limit the scope of the utility model.
Referring to fig. 1 to 4, the present invention provides a flexible steel cable construction device for a large-span structure, which is installed between two main structures 1 arranged at an interval to form a construction platform, and comprises: at least two interval or the coupling assembling 2 that sets up alternately, platform component 3 and two at least set up respectively in the adjusting part 4 of connecting the both ends of rope 21, coupling assembling 2 is including connecting rope 21, platform component 3 sets up between two major structure 1 to be connected in at least two and connect rope 21, adjusting part 4 includes euphroe 41, the one end of euphroe 41 can be dismantled and connect in connecting rope 21, the other end articulates in major structure 1, be used for tightening up and connecting rope 21, so that platform component 3 rises.
Further, it can be understood that, at least two connect the rope 21 and set up between two major structure 1, and interval or alternately set up, a structure for forming support and connection construction platform, platform subassembly 3 connects in at least two and connects rope 21, and be connected between two major structure 1, a construction platform for forming and be used for the construction, adjusting part 4 includes euphroe 41, two euphroes 41 set up respectively in the both ends of connecting rope 21, and the one end of euphroe 41 can be dismantled and connect in connecting rope 21, the other end articulates in major structure 1, a length for connecting rope 21 through tightening up, make to connect rope 21 and drive platform subassembly 3 and rise, thereby play the effect that reduces the subsidence of platform subassembly 3.
Further, the rope fastening device 41 in the present invention is a prior art, and the rotating shaft inside the rope fastening device 41 rotates around the rotation axis thereof, so as to wind the connecting rope 21 connected to the rotating shaft, and achieve the purpose of rope fastening, which can be referred to specifically as the following application numbers: the principles of the chinese utility model patent of CN201220280960.4 will not be explained herein too much.
Specifically, in the present invention, at least two connecting strings 21 are crossed between two main structures 1, as shown in fig. 5, at least two connecting strings 21 are crossed with each other and form a circular net structure for supporting and connecting the platform assembly 3.
Further, at least two connecting ropes 21 can be arranged in parallel, and the at least two connecting ropes 21 arranged in parallel jointly form a structure for supporting and connecting the construction platform.
Further, the distribution structure formed by the connecting ropes 21 for supporting and connecting the construction platform may be any one of an oval shape, a quadrilateral shape, or any polygon shape, which will not be described herein.
As shown in fig. 3 and 4, two ends of the connecting rope 21 are folded in half in a direction close to the middle, the connecting assembly 2 further includes at least one first rope clip 22, the first rope clip 22 is disposed at the folded position of the connecting rope 21, and a fixing hole 23 for connection is formed at the folded position of the connecting rope 21.
It can be understood that the end of the connecting rope 21 is folded towards the direction close to the middle part and is fixedly connected with the fastening device 41 through at least one first rope clip 22 to form a fixing hole 23 for being matched and connected with the fastening device 41, and a fastening member such as a bolt passes through the fixing hole 23 and is connected with the joint of the fastening device 41 to form a detachable connecting structure, thereby facilitating the detachment and installation of the connecting rope 21 and the fastening device 41.
Further, in order to lock the connecting rope 21 at the folded position and reduce the potential safety hazard caused by the relative sliding of the connecting rope 21 at the folded position, the number of the first rope clips 22 is multiple.
Specifically, as shown in fig. 4, the number of the first rope clamps 22 is two, and the two first rope clamps 22 are arranged at intervals along a direction close to the middle of the connecting rope 21.
As shown in fig. 4, the folded end of the connecting rope 21 protrudes 25 in a direction away from the connecting rope 21, the connecting assembly 2 further includes a second rope clip 24, and the second rope clip 24 is disposed on one side of the protrusion 25 away from the first rope clip 22 and connected to the folded connecting rope 21.
It can be understood that connecting rope 21 still is formed with protruding 25 to fix through second rope clip 24, protruding 25 can be used to the person of facilitating the use and observe, and the user is through observing whether there is the sign of dwindling protruding 25, and the deformation condition of connecting rope 21 and construction platform is connected in the early warning.
Specifically, the connecting rope 21 of the present invention is made of steel core steel cables.
Further, the material of the connecting rope 21 may be replaced by other nylon ropes with sufficient strength and rigidity, which will not be described herein.
As shown in fig. 1 to 5, two adjusting assemblies 4 and one connecting assembly 2 form a connecting unit, one end of one adjusting assembly 4 is connected to one end of the connecting rope 21, and the other end is connected to one main structure 1, one end of the other adjusting assembly 4 is connected to the other end of the connecting rope 21, and the other end is connected to the other main structure 1, and the flexible steel cable construction device for the large-span structure comprises a plurality of connecting units.
It can be understood that two ends of the connecting rope 21 are respectively provided with one adjusting component 4, and the two adjusting components 4 and one connecting component 2 form a connecting unit, and the utility model comprises at least two connecting units which are arranged at intervals or in a crossed manner.
Specifically, the number of the connecting units is multiple, and the connecting units are arranged in a mutually crossed manner and form a circular supporting structure.
As shown in fig. 2 and 5, the platform assembly 3 includes a springboard 31, and the springboard 31 is laid on the connecting rope 21.
It will be appreciated that a gangway 31 is laid above the connecting rope 21 to form a platform structure for accommodating construction personnel and construction equipment.
As shown in fig. 2 and 5, the platform assembly 3 further includes a safety net 32 and a safety net 33, the safety net 32 is disposed between the connection rope 21 and the gangway 31, and the safety net 33 is disposed below the connection rope 21.
It is understood that the platform assembly 3 further includes a safety net 32 disposed between the gangway 31 and the connection rope 21 for safety of construction, and a safety pocket net 33 disposed below the connection rope 21 for preventing a worker or construction equipment from falling down to cause a safety hazard.
As shown in fig. 5, the platform assembly 3 further includes at least one wire 34, the wire 34 is tied to the springboard 31, the safety net 32 and the safety pocket 33 for integrally forming the springboard 31, the safety net 32 and the safety pocket 33.
It can be understood that the gangboard 31, the safety net 32 and the safety pocket net 33 are tied up and connected together through at least one iron wire 34 to form a construction platform for construction, and the construction platform is low in cost, convenient to detach and install, safe and firm.
Further, the springboard 31, the safety net 32 and the safety pocket 33 may be connected by other means, such as a fastening bolt and a nut, which will not be described herein.
As shown in fig. 1 and 3, the adjusting assembly 4 further includes a connecting ear plate 42, the connecting ear plate 42 is fixedly connected to the main body structure 1, and the connecting ear plate 42 is hinged to the other end of the rope tensioner 41.
It can be understood that the rope tightener 41 is hinged to the main body structure 1 through the connecting lug plate 42, the connecting lug plate 42 is fixedly welded to the main body structure 1, a connecting hole for hinging is formed in the connecting lug plate 42, and a fastening member such as a bolt penetrates through the connecting hole and is connected to the rope tightener 41, so that the purpose that the connecting rope 21 can rotate along the main body structure 1 is achieved, and meanwhile, the connecting lug plate 42 is welded to achieve the reinforcing effect.
According to the specific working process, at least two connecting ropes 21 are arranged between two main body structures 1 and are arranged at intervals or in a crossed mode and are used for forming structures for supporting and connecting construction platforms, the platform assembly 3 is connected to the at least two connecting ropes 21 and between the two main body structures 1 and is used for forming the construction platform for construction, the adjusting assembly 4 comprises rope tighteners 41, the two rope tighteners 41 are respectively arranged at two ends of the connecting ropes 21, one ends of the rope tighteners 41 are detachably connected to the connecting ropes 21, the other ends of the rope tighteners are hinged to the main body structures 1 and are used for enabling the connecting ropes 21 to drive the platform assembly 3 to ascend by tightening the length of the connecting ropes 21, and therefore the function of reducing settlement of the platform assembly 3 is achieved.
User of service when using, at first with this structure fixed connection with install between two main part mechanisms, then can be through observing the arch 25 of connecting rope 21 tip, observe whether it has the sign of dwindling, connect rope 21 and construction platform's deformation condition to the early warning, discover at last to connect rope 21 deformation and platform subassembly 3 and take place to subside the back, can reduce the subsidence of platform subassembly 3 through euphroe 41 locking connection rope 21.
Such structure can solve among the prior art because mounting structure is fixed, needs come the length of tensioning first rope body and second rope body through dismantling and locking the buckle with the reduction settlement that realizes the construction height to lead to having the inconvenient problem of use.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are included in the scope of the present invention.

Claims (10)

1. The utility model provides a flexible cable wire construction equipment of large-span structure, installs and forms construction platform between two major structure that the interval set up, its characterized in that includes:
at least two connecting assemblies arranged at intervals or in a cross way, wherein each connecting assembly comprises a connecting rope;
the platform assembly is arranged between the two main structures and is connected to at least two connecting ropes;
at least two set up respectively in the adjusting part who connects the both ends of rope, adjusting part includes the euphroe, the one end of euphroe can dismantle connect in connect rope, the other end articulate in major structure is used for tightening up connect the rope, so that the platform subassembly rises.
2. The construction device for the flexible steel cable of the large-span structure according to claim 1, wherein both ends of the connection rope are folded in half in a direction close to the middle portion, and the connection assembly further comprises at least one first rope clip, the first rope clip is disposed at the folded portion of the connection rope, and forms a fixing hole for connection with the folded portion of the connection rope.
3. The construction device for the flexible steel cable of the large-span structure according to claim 2, wherein the number of the first rope clips in the connecting assembly is plural, and the plural first rope clips are uniformly arranged in a direction close to the middle of the connecting rope.
4. The construction device of the flexible steel cable of the large span structure according to claim 3, wherein the folded end of the connecting rope protrudes in a direction away from the connecting rope, and the connection assembly further comprises a second rope clip, the second rope clip is disposed on a side of the protrusion away from the first rope clip and connected to the folded connecting rope.
5. The large-span structure flexible steel cable construction device according to claim 4, wherein the connecting rope is made of steel core steel cable.
6. The construction apparatus of flexible steel cable for large span structure according to claim 1, wherein two adjusting members and one connecting member constitute one connecting unit, one of said adjusting members has one end connected to one end of the connecting rope and the other end connected to one of said main structures, the other of said adjusting members has one end connected to the other end of the connecting rope and the other end connected to the other of said main structures, and said construction apparatus of flexible steel cable for large span structure comprises a plurality of connecting units.
7. The construction device of flexible steel cable for large span structure according to claim 6, wherein said adjusting assembly further comprises a connecting ear plate, said connecting ear plate is fixedly connected to said main body structure, and said connecting ear plate is hinged to the other end of said rope tightener.
8. The large span structure flexible wire rope construction installation of claim 1, wherein the platform assembly comprises a gangboard, the gangboard being laid over the connecting rope.
9. The large-span structure flexible steel rope construction device according to claim 8, wherein the platform assembly further comprises a safety net and a safety pocket net, the safety net is disposed between the connection rope and the springboard, and the safety pocket net is disposed below the connection rope.
10. The large span structure flexible wire rope construction installation of claim 9, wherein the platform assembly further comprises at least one wire strapped to the diving board, safety net and safety pocket for integrating the diving board, safety net and safety pocket.
CN202122533382.2U 2021-10-19 2021-10-19 Flexible steel cable construction device for large-span structure Active CN216276802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122533382.2U CN216276802U (en) 2021-10-19 2021-10-19 Flexible steel cable construction device for large-span structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122533382.2U CN216276802U (en) 2021-10-19 2021-10-19 Flexible steel cable construction device for large-span structure

Publications (1)

Publication Number Publication Date
CN216276802U true CN216276802U (en) 2022-04-12

Family

ID=81070354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122533382.2U Active CN216276802U (en) 2021-10-19 2021-10-19 Flexible steel cable construction device for large-span structure

Country Status (1)

Country Link
CN (1) CN216276802U (en)

Similar Documents

Publication Publication Date Title
US4644706A (en) Building structure with transversely tensioned fabric covering
CN102057108B (en) Rigging deck module
CN216276802U (en) Flexible steel cable construction device for large-span structure
CN217840811U (en) Soft platform cable wire anchor structure
US11286629B2 (en) Pipe and a method for stay cable provided with stressing means
US6070371A (en) Large structure enshrouder
CN101210417B (en) Fastener and anchor cable system bidirectional simple supported non-torsion tower top tension anchoring method
JP3140674B2 (en) Construction method of the Obarima frame
CN210316627U (en) Self-balancing device for sun-shading canopy
CN114604786A (en) Tower crane wall attaching structure and construction method thereof
DE10311703A1 (en) Flagpole with hauling device for flag has extension arm rotatably positioned via rotating head on the upper end of support
CN112479073A (en) General hoisting machine of bill-board constructs convenient to carry and equipment
CN219627604U (en) Flexible photovoltaic support end post structure
JP3479666B2 (en) Tensile device and overhead wire work method
CN216739306U (en) Steel cable tensioning device for bridge construction
CN209780324U (en) Pull-up support for floor support plate
CN209958207U (en) Four-line high-speed railway steel truss cable-stayed bridge
CN217714518U (en) Safety protection device for high-altitude amusement facility
CN218147821U (en) Telescopic general operating platform in cable-stayed bridge cable tower
CN218377484U (en) Flexible antidetonation support of fan
CN214059714U (en) General hoisting machine of bill-board constructs convenient to carry and equipment
CN215977255U (en) Anchor pile assembly
JP2620681B2 (en) Temporary roof
CN214626865U (en) Steel cable lap joint structure of photovoltaic support
JP2994225B2 (en) Method and apparatus for reinforcing existing bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant