A water conservancy pipeline supports connection structure for hydraulic engineering Download PDF

Info

Publication number
CN216265741U
CN216265741U CN202122049421.1U CN202122049421U CN216265741U CN 216265741 U CN216265741 U CN 216265741U CN 202122049421 U CN202122049421 U CN 202122049421U CN 216265741 U CN216265741 U CN 216265741U
Authority
CN
China
Prior art keywords
fixedly connected
close
center
adjacent
threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122049421.1U
Other languages
Chinese (zh)
Inventor
杨志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhonger Construction Co ltd
Original Assignee
Zhonger Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhonger Construction Co ltd filed Critical Zhonger Construction Co ltd
Priority to CN202122049421.1U priority Critical patent/CN216265741U/en
Application granted granted Critical
Publication of CN216265741U publication Critical patent/CN216265741U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a water conservancy pipeline supporting and connecting structure for water conservancy projects, which comprises a connecting sleeve and water pipes, wherein the two water pipes are respectively inserted into the left and right open inner cavities of the connecting sleeve, sliding grooves are respectively formed in the top part of the connecting sleeve close to the left and right ends, connecting rods penetrate through the adjacent inner cavities of the sliding grooves, the bottom ends of the adjacent connecting rods are respectively and fixedly connected with a pushing ring, a plurality of clamping mechanisms are arranged in the inner cavity of the pushing ring, a partition plate is fixedly connected to the inner cavity of the connecting sleeve close to the center, through the mutual matching of the components, the equipment has higher stability, the horizontal height of the pipeline can be conveniently adjusted according to actual requirements, the installation process is simpler, the labor intensity of workers is reduced, and the reliability and the convenience of the water conservancy pipeline supporting and connecting are improved, the sealing performance of the connection position of the equipment is high, and the connection mode is simple and convenient.

Description

A water conservancy pipeline supports connection structure for hydraulic engineering
Technical Field
The utility model relates to the technical field of hydraulic engineering, in particular to a hydraulic pipeline supporting and connecting structure for hydraulic engineering.
Background
The hydraulic engineering is a general name of engineering, matching and accessory engineering, such as flood control, waterlogging removal, irrigation, power generation, water supply, reclamation, water and soil conservation, migration, water resource protection and the like. Used for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting. Also known as water engineering.
Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production. Water conservancy pipeline support connection structure often needs to be used in hydraulic engineering, and current water conservancy pipeline supports connection structure operation inconvenient, supports the poor stability of connecting, and its height is generally fixed, can not adjust according to actual need, makes its installation become comparatively complicated, has increased workman's intensity of labour, has reduced water conservancy pipeline and has supported reliability and convenience of connecting.
SUMMERY OF THE UTILITY MODEL
In order to overcome the disadvantages of the prior art, one of the objects of the present invention is to provide a hydraulic pipe support connection structure for hydraulic engineering.
One of the purposes of the utility model is realized by adopting the following technical scheme:
a water conservancy pipeline supporting and connecting structure for water conservancy engineering comprises a connecting sleeve and two water pipes, wherein the two water pipes are respectively inserted into the left and right open inner cavities of the connecting sleeve, the top of the connecting sleeve is provided with a chute near the left and right ends, the adjacent chute inner cavities are penetrated by connecting rods, the bottom ends of the adjacent connecting rods are fixedly connected with a pushing ring, the inner cavity of the pushing ring is provided with a plurality of clamping mechanisms, the inner cavity of the connecting sleeve is fixedly connected with a partition plate near the center, the center of the partition plate is provided with a connecting insertion pipe, the top of the connecting sleeve is provided with an adjusting mechanism, the bottom of the connecting sleeve is fixedly connected with a threaded insertion rod near the center, the bottom of the connecting sleeve is provided with a base, the top of the base is fixedly connected with a first bearing near the center, and the inner cavity of the first bearing is inserted with a threaded sleeve, the top of the threaded sleeve is provided with a first threaded hole close to the center, the threaded insert rod penetrates through an inner cavity of the first threaded hole and is fixedly connected with a limiting block, the outer edge of the threaded sleeve is fixedly connected with a plurality of adjusting rods close to the center, a plurality of second threaded holes are formed in the positions, close to the four corners, of the base, and screws penetrate through the inner cavity of the second threaded holes.
Further, adjustment mechanism includes the protection casing, the bottom fixed connection of protection casing is close to center pin department at adapter sleeve's top, two second bearings of the equal fixedly connected with in the left and right sides of protection casing, adjacent two the second bearing sets up for the longitudinal symmetry, and adjacent two the inner chamber of second bearing has bull stick and threaded rod to run through respectively jointly, the hand wheel of right-hand member fixedly connected with of bull stick.
Furthermore, the outer edge of the rotating rod close to the left end and the outer edge of the threaded rod close to the center are fixedly connected with gears, and two adjacent gears are meshed with each other.
Further, screens mechanism is including location arc pole, and is adjacent the equal fixed connection of one end that the center department of propelling movement ring was kept away from to location arc pole is on the inner chamber lateral wall of propelling movement ring, the inner chamber edge of propelling movement ring articulates there is a plurality of grafting strip, and a plurality of the through-hole has all been seted up near center department to the grafting strip, and is adjacent the one end that location arc pole is close to center department of propelling movement ring all runs through-hole inner chamber and fixedly connected with spacing piece.
Furthermore, a plurality of the inserting strips are arranged in an annular array shape by taking the center of the pushing ring as a central shaft, and springs are fixedly connected between the adjacent inserting strips and the pushing ring together.
Furthermore, a plurality of the screws are arranged in a rectangular array shape by taking the center of the base as a central axis.
Furthermore, a third threaded hole is formed in the position, close to the top end, of each of the two connecting rods, a threaded rod penetrates through the inner cavity of each of the two adjacent third threaded holes, and limit blocks are fixedly connected to the left end and the right end of each threaded rod.
Compared with the prior art, the utility model has the beneficial effects that:
through the mutual cooperation between each part for this equipment has higher stability, and the level of pipeline is convenient for adjust according to actual need to equipment, makes its installation become comparatively simple, has reduced workman's intensity of labour, has improved the reliability and the convenience that water conservancy pipeline supported the connection, and equipment junction leakproofness is higher, and the connected mode is simple and convenient.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical means of the present invention more clearly understood, the present invention may be implemented in accordance with the content of the description, and in order to make the above and other objects, features, and advantages of the present invention more clearly understood, the following preferred embodiments are described in detail with reference to the accompanying drawings.
Drawings
FIG. 1 is a front view of the present embodiment;
FIG. 2 is an enlarged view of FIG. 1 at A;
FIG. 3 is an enlarged view of FIG. 1 at B;
fig. 4 is a partial right sectional view of the component strip of the present embodiment.
In the figure: 1. connecting a sleeve; 2. a water pipe; 3. a base; 4. a threaded bushing; 5. a threaded bayonet; 6. positioning the arc rod; 7. connecting the cannula; 8. a push ring; 9. a connecting rod; 10. a threaded rod; 11. a protective cover; 12. a rotating rod; 13. inserting strips; 14. a clamping mechanism; 15. an adjustment mechanism.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the detailed description, and it should be noted that any combination of the embodiments or technical features described below can be used to form a new embodiment without conflict.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When a component is referred to as being "connected" to another component, it can be directly connected to the other component or intervening components may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the utility model herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1 to 4, a water conservancy pipeline supporting and connecting structure for water conservancy projects comprises a connecting sleeve 1 and water pipes 2, wherein the two water pipes 2 are respectively inserted into the left and right open inner cavities of the connecting sleeve 1, the top of the connecting sleeve 1 is provided with a chute near the left and right ends, the inner cavities of the adjacent chutes are respectively penetrated with a connecting rod 9, the inner cavities of the two connecting rods 9 near the top are respectively provided with a third threaded hole, the inner cavities of the two adjacent third threaded holes are commonly penetrated with a threaded rod 10, the left and right ends of the threaded rod 10 are respectively fixedly connected with a limiting block, the bottom of the adjacent connecting rod 9 is respectively fixedly connected with a push ring 8, the inner cavity of the push ring 8 is provided with a plurality of clamping mechanisms 14, the inner cavity of the connecting sleeve 1 near the center is fixedly connected with a partition plate, the center of the partition plate is provided with a connecting insertion pipe 7, the top of the connecting sleeve 1 is provided with an adjusting mechanism 15, connecting sleeve 1's bottom is close to center department fixedly connected with screw inserted bar 5, connecting sleeve 1's bottom has base 3, base 3's top is close to the first bearing of center department fixedly connected with, the inner chamber of first bearing is pegged graft and is had screw sleeve 4, screw sleeve 4's top is close to center department and has seted up first screw hole, screw inserted bar 5 runs through the inner chamber and the fixedly connected with stopper of first screw hole, screw sleeve 4's outside edge is close to center department fixedly connected with a plurality of regulation pole, base 3 is close to four corners department and has all seted up a plurality of second screw hole, the inner chamber of adjacent second screw hole all runs through there is the screw, a plurality of screw uses base 3's center to be the center pin and is rectangular array form and arranges.
Adjustment mechanism 15 includes protection casing 11, the bottom fixed connection of protection casing 11 is close to center pin department at adapter sleeve 1's top, two second bearings of the equal fixedly connected with in the left and right sides of protection casing 11, two adjacent second bearings set up for longitudinal symmetry, and the inner chamber of two adjacent second bearings runs through bull stick 12 and threaded rod 10 respectively jointly, the outside edge of bull stick 12 is close to the equal fixedly connected with gear of center department near the left end department with the outside edge of threaded rod 10, and intermeshing sets up between two adjacent gears, the hand wheel of right-hand member fixedly connected with of bull stick 12, play and adjust the effect that drives two water pipe 2 and connect, workman's intensity of labour has been reduced.
Screens mechanism 14 is including location arc pole 6, the equal fixed connection of one end that the center department of push ring 8 was kept away from to adjacent location arc pole 6 is on the inner chamber lateral wall of push ring 8, the inner chamber edge of push ring 8 articulates there is a plurality of grafting strip 13, a plurality of grafting strip 13 is the annular array form with the center of push ring 8 to be arranged as the center pin, and common fixedly connected with spring between adjacent grafting strip 13 and the push ring 8, and a plurality of grafting strip 13 is close to center department and all has seted up the through-hole, adjacent location arc pole 6 is close to the one end of push ring 8 center department and all runs through-hole inner chamber and fixedly connected with spacing piece, water conservancy pipeline support connection's reliability and convenience have been improved, equipment junction leakproofness is higher, and the connected mode is simple and convenient. .
The working principle is as follows: firstly, two water pipes 2 are respectively inserted into the inner cavities of the two ends of the connecting sleeve 1, at the moment, the outer edges of the water pipes 2 push the adjacent inserting strips 13 to extrude the spring, then the hand-operated wheel is manually rotated, the adjacent rotating rods 12 are driven to rotate through the rotation of the hand-operated wheel, the adjacent gears are driven through the rotation of the rotating rods 12, the threaded rods 10 are driven to rotate through the mutual meshing arrangement between the adjacent gears, the threaded rods 10 are matched and meshed with the inner cavities of the adjacent third threaded holes through the thread arrangement on the outer edges of the threaded rods 10, so that the connecting rods 9 at two ends are driven to move towards the center of the connecting sleeve 1 in the inner cavities of the sliding grooves when the threaded rods 10 rotate, at the moment, the two sliding grooves arranged at the position close to the center of the bottom of the inner cavity of the connecting sleeve 1 and the connecting rods and the sliding blocks fixedly connected with the bottom of the push ring 8 are matched, make the outside edge that promotes ring 8 and drive adjacent grafting strip 13 and water pipe 2 laminate each other, through the spring action of spring, and plug in the outside edge of adjacent water pipe 2 and form the card dead state, adjacent promotion ring 8 drives the water pipe 2 of both ends department and removes to adapter sleeve 1 center department this moment, and will connect intubate 7 and peg graft in the inner chamber of adjacent water pipe 2, make interconnect and link up each other between two water pipe 2, when needs height-adjusting, make threaded sleeve 4 rotate at the inner chamber of first bearing through manual rotatory regulation pole, and through the interrelationship between threaded insert pole 5 and the first screw hole, make and carry out lifting and reduction to adapter sleeve 1.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are within the protection scope of the present invention.

Claims (7)

1. The utility model provides a water conservancy pipeline supports connection structure for hydraulic engineering, includes adapter sleeve (1) and water pipe (2), and two water pipe (2) are pegged graft respectively in the left and right sides opening inner chamber of adapter sleeve (1), its characterized in that: the top of the connecting sleeve (1) is provided with sliding grooves close to the left end and the right end, the inner cavities of the adjacent sliding grooves are provided with connecting rods (9) in a penetrating manner, the bottom ends of the adjacent connecting rods (9) are fixedly connected with a pushing ring (8), the inner cavity of the pushing ring (8) is provided with a plurality of clamping mechanisms (14), the inner cavity of the connecting sleeve (1) is fixedly connected with a partition plate close to the center, the center of the partition plate is provided with a connecting insertion pipe (7), the top of the connecting sleeve (1) is provided with an adjusting mechanism (15), the bottom of the connecting sleeve (1) is fixedly connected with a threaded insertion rod (5) close to the center, the bottom of the connecting sleeve (1) is provided with a base (3), the top of the base (3) is fixedly connected with a first bearing close to the center, and the inner cavity of the first bearing is inserted with a threaded sleeve (4), the top of the threaded sleeve (4) is close to the center and is provided with a first threaded hole, the threaded inserted rod (5) penetrates through an inner cavity of the first threaded hole and is fixedly connected with a limiting block, the outer edge of the threaded sleeve (4) is close to the center and is fixedly connected with a plurality of adjusting rods, a plurality of second threaded holes are formed in the positions, close to the four corners, of the base (3), and screws penetrate through the inner cavity of the second threaded holes.
2. A hydraulic pipe support connection structure for hydraulic engineering according to claim 1, wherein: adjustment mechanism (15) are including protection casing (11), the bottom fixed connection of protection casing (11) is close to center pin department at the top of connecting sleeve (1), two second bearings of the equal fixedly connected with in the left and right sides of protection casing (11), adjacent two the second bearing sets up for longitudinal symmetry, and adjacent two the inner chamber of second bearing has run through bull stick (12) and threaded rod (10) respectively jointly, the hand wheel of right-hand member fixedly connected with of bull stick (12).
3. A hydraulic pipe support connection structure for hydraulic engineering according to claim 2, wherein: the outer edge of the rotating rod (12) close to the left end and the outer edge of the threaded rod (10) close to the center are fixedly connected with gears, and two adjacent gears are meshed with each other.
4. A hydraulic pipe support connection structure for hydraulic engineering according to claim 1, wherein: screens mechanism (14) are including location arc pole (6), adjacent the equal fixed connection of one end of the center department of propelling movement ring (8) is kept away from in location arc pole (6) is on the inner chamber lateral wall of propelling movement ring (8), the inner chamber edge of propelling movement ring (8) articulates there is a plurality of grafting strip (13), and a plurality of grafting strip (13) are close to center department and all have seted up the through-hole, and are adjacent one end that location arc pole (6) are close to center department all runs through-hole inner chamber and fixedly connected with spacing piece.
5. A hydraulic pipe support connection structure for hydraulic engineering according to claim 4, wherein: the plurality of the inserting strips (13) are arranged in an annular array shape by taking the center of the pushing ring (8) as a central shaft, and springs are fixedly connected between the adjacent inserting strips (13) and the pushing ring (8) together.
6. A hydraulic pipe support connection structure for hydraulic engineering according to claim 1, wherein: the screws are arranged in a rectangular array shape by taking the center of the base (3) as a central shaft.
7. A hydraulic pipe support connection structure for hydraulic engineering according to claim 1, wherein: two third screw holes are formed in the positions, close to the top ends, of the connecting rods (9), two adjacent third screw holes penetrate through the threaded rods (10) together in the inner cavities, and limiting blocks are fixedly connected to the left end and the right end of each threaded rod (10).
CN202122049421.1U 2021-08-29 2021-08-29 A water conservancy pipeline supports connection structure for hydraulic engineering Active CN216265741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122049421.1U CN216265741U (en) 2021-08-29 2021-08-29 A water conservancy pipeline supports connection structure for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122049421.1U CN216265741U (en) 2021-08-29 2021-08-29 A water conservancy pipeline supports connection structure for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN216265741U true CN216265741U (en) 2022-04-12

Family

ID=81061956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122049421.1U Active CN216265741U (en) 2021-08-29 2021-08-29 A water conservancy pipeline supports connection structure for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN216265741U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115163920A (en) * 2022-09-08 2022-10-11 鄄城鑫磊交通工程材料有限公司 Quick-connection grouting pipe device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115163920A (en) * 2022-09-08 2022-10-11 鄄城鑫磊交通工程材料有限公司 Quick-connection grouting pipe device

Similar Documents

Publication Publication Date Title
CN216265741U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN209652924U (en) A kind of ground anchor peg device for power construction
CN205726979U (en) Tree planting digging apparatus
CN110044735A (en) A kind of architecture engineering material shock resistance testing machine
CN105804374B (en) A kind of suction type indoor decoration fixed equipment
CN109404682A (en) A kind of mining heading equipment support frame
CN209277820U (en) A kind of anti-offset hand-held ground drilling machine
CN211691646U (en) Emergency rescue is with sheltering from canopy temporarily
CN210605310U (en) Curtain frame for photography convenient to use
CN209783943U (en) Soil sampling device
CN207685891U (en) A kind of garden layout furrow making dveice
CN208299726U (en) A kind of length adjustable yurt special solar mounting rack
CN207878870U (en) A kind of building rubbish treatment device
CN207632455U (en) A kind of construction of hydro project is ascended a height auxiliary device
CN208309900U (en) A kind of assembly concrete connection structure
CN216867716U (en) Hydraulic engineering is with pipeline strutting arrangement convenient to installation
CN109285480A (en) A kind of construction safety civilization display frames
CN217080517U (en) Tunnel supporting device for civil engineering
CN213508633U (en) Hydraulic engineering mechanized high-efficient desilting equipment
CN213683962U (en) A combination formula perforating device for water conservancy construction
CN210566144U (en) Gear structure convenient to isolation protection
CN214194669U (en) Inspection shaft lid convenient to open
CN216484062U (en) Green gardens construction sampling device
CN214653289U (en) Top support device for forming branch pipe of super pipeline
CN213657948U (en) Ecological environment monitoring device convenient to dismouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant