CN216244870U - Water heating device for winter construction - Google Patents

Water heating device for winter construction Download PDF

Info

Publication number
CN216244870U
CN216244870U CN202122423291.3U CN202122423291U CN216244870U CN 216244870 U CN216244870 U CN 216244870U CN 202122423291 U CN202122423291 U CN 202122423291U CN 216244870 U CN216244870 U CN 216244870U
Authority
CN
China
Prior art keywords
water
barrel
heating
heating water
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122423291.3U
Other languages
Chinese (zh)
Inventor
柴松海
张博
王少鹏
王鹏
张树志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Sixth Group Co Ltd
Original Assignee
Beijing Urban Construction Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Sixth Group Co Ltd filed Critical Beijing Urban Construction Sixth Group Co Ltd
Priority to CN202122423291.3U priority Critical patent/CN216244870U/en
Application granted granted Critical
Publication of CN216244870U publication Critical patent/CN216244870U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Resistance Heating (AREA)

Abstract

The utility model discloses a water heating device for winter construction, which comprises a heating water barrel, wherein the top end of the heating water barrel is hinged with a barrel cover, the outer side of the barrel body is wound with an electric tracing band, the two sides of the top of the barrel body are respectively provided with a water inlet and a water outlet, the bottom of the barrel body is provided with an observation mechanism for observing the water level and the water temperature in the barrel, the water inlet is provided with a water injection pipe, one end of the water injection pipe extends into the heating water barrel, the other end of the water injection pipe is connected with a water supply system, the water outlet is provided with a water taking pipe, one end of the water taking pipe extends into the bottom of the heating water barrel and is connected with a submersible pump, and the other end of the water taking pipe extends to the water inlet of a mortar tank. According to the utility model, the heating of the water in the barrel is realized through the low-pressure high-heat type electric tracing band wound on the outer wall of the heating water barrel, the water in the barrel is heated more uniformly, and the observation mechanism arranged at the bottom of the barrel body can enable an operator to more intuitively master the real-time water level and water temperature conditions in the barrel, so that the heating water barrel has the characteristics of low energy consumption, good reliability, high safety factor and convenience in mounting, dismounting and maintenance.

Description

Water heating device for winter construction
Technical Field
The utility model relates to the technical field of winter concrete construction, in particular to a water heating device for winter construction.
Background
In winter construction, the secondary structure masonry mortar needs to be mixed by warm water so as to ensure the on-site masonry quality. The existing warm water preparation mode is to adopt a high-temperature resistance wire to directly heat in a water source inside a heating water tank. The warm water preparation method adopting the high-temperature resistance wire to heat inside the water source of the heating water tank has the following defects: the potential hazards of electric leakage and electric shock exist when the water source is internally heated; because the equipment needs to be in construction site and outdoor severe environment for a long time, the used electronic devices are easy to damage, so that dry burning is caused, and fire disasters are caused; the high-temperature resistance wire heats the water tank, so that the power consumption is large and energy is wasted; the price is high and the maintenance cost is high; limited by factors such as field and environment, and limited application range.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a water heating device for winter construction, which solves the technical problems in the background technology.
In order to achieve the technical purpose, the utility model adopts the following technical scheme:
the utility model provides a water heating device for construction in winter, includes adds the hot water bucket, it articulates to add the hot water bucket top has the bung, and its staving outside winding has the electric tracing area, and water inlet and delivery port have been seted up respectively to its staving top both sides, and its staving bottom is provided with the observation mechanism who is used for surveing bucket water level and water temperature, water inlet department installs the water injection pipe, water injection pipe one end stretches into in adding the hot water bucket, and the other end inserts water supply system, water outlet department installs the intake pipe, intake pipe one end stretches into adds the hot water bucket bottom and meets with the immersible pump, and the other end extends to mortar jar water injection port department.
Preferably, the observation mechanism comprises a water level observation tube made of transparent materials, the water level observation tube is vertically attached to the outer wall of the heating water barrel, two ends of the top and bottom of the water level observation tube are respectively communicated with the inside of the heating water barrel through a connecting transverse tube, and a thermometer is arranged inside the tube body of the water level observation tube.
Preferably, a plurality of attaching rods are fixed on the outer wall of the circumferential side of the heating water barrel at intervals, the attaching rods are vertically arranged, a plurality of cuffs are fixed on the outer side of the rod body at intervals, the cuffs arranged on all the attaching rods are spirally arranged on the outer wall of the heating water barrel, and the electric tracing band penetrates through the cuffs and is tightly attached to the outer wall of the heating water barrel.
Preferably, the electric tracing band is a low-voltage high-heat type electric tracing band, the arrangement distance between two adjacent circles of electric tracing bands is between 5 and 10cm, and the arrangement distance between two adjacent hoops on the same attachment rod is 1 to 3 times of the arrangement distance of the electric tracing bands.
Preferably, the heating water barrel is a cylindrical iron barrel, the attachment rod and the hoop are both made of galvanized iron wires, and the attachment rod, the heating water barrel and the hoop are fixed through welding.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the heating of the water in the barrel is realized through the low-pressure high-heat type electric tracing band wound on the outer wall of the heating water barrel, the water in the barrel is heated more uniformly, and the observation mechanism arranged at the bottom of the barrel body can enable an operator to more intuitively master the real-time water level and water temperature condition in the barrel, so that the electric heating barrel has the characteristics of low energy consumption, good reliability, high safety factor and convenience in mounting, dismounting and maintenance, fundamentally blocks electric shock and hidden danger of burning, is not influenced by environment and site factors, and has a wider application range;
2. the water bucket is simple in structure, convenient to transform and low in transformation cost, the water requirement of winter application can be met by simply transforming the existing water bucket, and the water bucket is in accordance with the green construction concept.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are meant to be illustrative, not limiting of the utility model, and in which:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic cross-sectional view of the present invention;
FIG. 3 is a schematic view of the attachment bar and ferrule of the present invention.
Reference numerals: 1-heating water barrel, 2-barrel cover, 3-water inlet, 4-water injection pipe, 5-water outlet, 6-water taking pipe, 7-submersible pump, 8-electric tracing band, 9-attachment rod, 10-hoop, 11-water level observation pipe and 12-thermometer.
Detailed Description
Hereinafter, an embodiment of a winter construction water heating apparatus according to the present invention will be described with reference to the accompanying drawings. The examples described herein are specific embodiments of the present invention, are intended to be illustrative and exemplary in nature, and are not to be construed as limiting the scope of the utility model. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
In the description of the present invention, it should be noted that the terms "top", "bottom", "lateral", "vertical", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only used for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of respective portions and their mutual relationships. It is noted that the drawings are not necessarily to the same scale so as to clearly illustrate the structures of the various elements of the embodiments of the utility model. Like reference numerals are used to denote like parts.
The principles and features of this invention are described below in conjunction with the following drawings, which are set forth to illustrate, but are not to be construed to limit the scope of the utility model. Preferred embodiments of the present invention are described in further detail below with reference to FIGS. 1-3:
as shown in fig. 1-2, the preferred water heating device for winter construction of the present invention comprises a heating water barrel 1, wherein the heating water barrel 1 is a cylindrical iron barrel, the top end of the heating water barrel is hinged with a turnover barrel cover 2, the outer side of the barrel body is wound with an electric tracing band 8, the two sides of the top of the barrel body are respectively provided with a water inlet 3 and a water outlet 5, the bottom of the barrel body is provided with an observation mechanism for observing the water level and the water temperature in the barrel, a water injection pipe 4 is installed at the water inlet 3, one end of the water injection pipe 4 extends into the heating water barrel 1, the other end is connected to a water supply system, a water intake pipe 6 is installed at the water outlet 5, one end of the water intake pipe 6 extends into the bottom of the heating water barrel 1 and is connected with a submersible pump 7, and the other end extends to a water injection port of a mortar tank;
the electric tracing band 8 adopts a low-voltage high-heat type electric tracing band and is connected with a power supply through a transformer, in order to prevent the electric tracing band from falling off and ensure that the electric tracing band can be tightly attached to the outer wall of the heating water barrel 1, as shown in figure 3, a plurality of attachment rods 9 are fixed on the outer wall of the circumferential side of the heating water barrel 1 at intervals in a circular array, the attachment rods 9 are vertically arranged, a plurality of cuffs 10 are fixed on the outer side of the rod body at intervals, the cuffs 10 arranged on all the attachment rods 9 are spirally arranged on the outer wall of the heating water barrel 1, the electric tracing band 8 penetrates through the cuffs 10 and is tightly attached to the outer wall of the heating water barrel 1, the arrangement distance between two adjacent circles of electric tracing bands 8 is between 5 and 10cm, the arrangement distance between two adjacent cuffs 10 on the same attachment rod 9 is 1 to 3 times of the arrangement distance between the electric tracing bands 8, in order to ensure the reliable connection of the attachment rods 9, the attachment rods 9 and the cuffs 10 are both made of galvanized iron wires, the attachment rod 9, the heating water barrel 1 and the hoop 10 are fixed through welding;
the observation mechanism comprises a water level observation pipe 11 made of transparent materials, the water level observation pipe 11 is vertically attached to the outer wall of the heating water barrel 1, the top end and the bottom end of the water level observation pipe are respectively communicated with the interior of the heating water barrel 1 through a connecting transverse pipe, and a thermometer 12 is arranged inside the pipe body of the water level observation pipe.
The operation can be implemented on the construction site, the installation can be completed by the cooperation of an electrician, the shape of the heating water container is not limited, the size of the heating water container can be adjusted, and the heating time can be adjusted.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (5)

1. The utility model provides a water heating device is used in winter construction which characterized in that: including heating water bucket (1), it has bung (2) to articulate on heating water bucket (1) top, and its staving outside winding has electric tracing band (8), and water inlet (3) and delivery port (5) have been seted up respectively to its staving top both sides, and its staving bottom is provided with the observation mechanism who is used for surveing bucket internal water level and water temperature, water inlet (3) department installs water injection pipe (4), in water injection pipe (4) one end stretched into heating water bucket (1), the other end inserts water supply system, delivery port (5) department installs intake pipe (6), intake pipe (6) one end stretches into heating water bucket (1) bottom and meets with immersible pump (7), and the other end extends to mortar jar water injection department.
2. The water heating apparatus for winter construction according to claim 1, wherein: the observation mechanism comprises a water level observation pipe (11) made of transparent materials, the water level observation pipe (11) is vertically attached to the outer wall of the heating water barrel (1), the top end and the bottom end of the water level observation pipe are respectively communicated with the interior of the heating water barrel (1) through a connecting transverse pipe, and a thermometer (12) is arranged inside the pipe body of the water level observation pipe.
3. The water heating apparatus for winter construction according to claim 1, wherein: a plurality of adhering rods (9) are fixed on the outer wall of the circumferential side of the heating water barrel (1) at intervals, the adhering rods (9) are vertically arranged, a plurality of cuffs (10) are fixed on the outer side of the rod body at intervals, cuffs (10) arranged on all the adhering rods (9) are spirally arranged on the outer wall of the heating water barrel (1), and the electric tracing band (8) penetrates through the cuffs (10) and clings to the outer wall of the heating water barrel (1).
4. The water heating apparatus for winter construction according to claim 3, wherein: the electric tracing band (8) adopts a low-voltage high-heat type electric tracing band, the arrangement distance between two adjacent circles of electric tracing bands (8) is between 5 and 10cm, and the arrangement distance between two adjacent hoops (10) on the same attachment rod (9) is 1 to 3 times of the arrangement distance of the electric tracing bands (8).
5. The water heating apparatus for winter construction according to claim 3, wherein: the heating water barrel (1) is a cylindrical iron barrel, the attachment rod (9) and the hoop (10) are both made of galvanized iron wires, and the attachment rod (9), the heating water barrel (1) and the hoop (10) are fixed through welding.
CN202122423291.3U 2021-10-09 2021-10-09 Water heating device for winter construction Expired - Fee Related CN216244870U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122423291.3U CN216244870U (en) 2021-10-09 2021-10-09 Water heating device for winter construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122423291.3U CN216244870U (en) 2021-10-09 2021-10-09 Water heating device for winter construction

Publications (1)

Publication Number Publication Date
CN216244870U true CN216244870U (en) 2022-04-08

Family

ID=80986048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122423291.3U Expired - Fee Related CN216244870U (en) 2021-10-09 2021-10-09 Water heating device for winter construction

Country Status (1)

Country Link
CN (1) CN216244870U (en)

Similar Documents

Publication Publication Date Title
CN216244870U (en) Water heating device for winter construction
CN2784715Y (en) Multifunctional heating stove for oil well
CN214139806U (en) Heat preservation type molasses jar
CN104110575A (en) Electrical-heating water-bath-type carbon dioxide gasification device
CN204507826U (en) A kind of carburetor of biodiesel barreled solid feed oil
CN211999727U (en) Biogas digester system with external source type temperature-transfer contact surface heating increasing function
CN208567094U (en) A kind of environment-friendly type anti-explosion heater with very high performance
CN209910182U (en) Graphene heating tube and graphene water heating equipment
CN208250067U (en) One kind cultivating drinking water temperature control system for deer
CN102538226A (en) Large-caliber glass and metal covering solarization type solar water heater
CN204806648U (en) Instant heater of pure water pipeline
CN207006586U (en) A kind of large scale industry boiler
CN208223231U (en) Half-volume type heat exchanger
CN106047671A (en) Integrated biogas production device with circulating heating function
CN220321043U (en) Novel liquid chlorine vaporization device
CN206269348U (en) Electrically heated boiler
CN102661615B (en) Solar comprehensive heating system capable of supplying heat and hot water integrally for house
CN205425896U (en) Multipurpose difference in temperature conversion equipment
CN213726328U (en) A urea solution heating device for urea hydrolysis system ammonia
CN203190032U (en) Electric heating water-bath type carbon dioxide gasifying device
CN107606681A (en) A kind of electrothermal heating furnace
CN207876473U (en) Electrical heating type asphalt tank
CN2608815Y (en) Directly-buried vacuum insulating steam pipeline drainage device
CN209042514U (en) Dual-energy source superconduction energy heat supply machine system
CN220981437U (en) Floor heating device based on electric boiler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220408