CN216243362U - On-spot mapping device of building engineering cost - Google Patents
On-spot mapping device of building engineering cost Download PDFInfo
- Publication number
- CN216243362U CN216243362U CN202121469335.XU CN202121469335U CN216243362U CN 216243362 U CN216243362 U CN 216243362U CN 202121469335 U CN202121469335 U CN 202121469335U CN 216243362 U CN216243362 U CN 216243362U
- Authority
- CN
- China
- Prior art keywords
- rod
- gear
- surveying
- mapping device
- servo motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Photovoltaic Devices (AREA)
Abstract
The utility model discloses a construction engineering cost on-site surveying and mapping device, which comprises a fixed plate, a protective device and a base, wherein the protective device is arranged at the top end of the fixed plate, the protective device is specifically composed of a surveying and mapping instrument, a protective shed, a storage battery, a connecting pipe, a water tank, a heat conducting rod, a supporting rod A, a supporting rod B and a solar cell panel, the storage battery is arranged at the top end of the surveying and mapping instrument, the top end of the storage battery is fixedly connected with the protective shed through bolts, the bottom end of the protective shed is connected with the supporting rod A in an inserting mode, the bottom end of one side of the protective shed is provided with the connecting pipe, one end of the connecting pipe is connected with the water tank in an inserting mode, the heat conducting rod is fixedly connected to one side of the water tank, and the supporting rod B is welded to the top end of the protective shed. Whole on-spot mapping device of building engineering cost through mutually supporting between protection canopy and the heat conduction pole, can avoid the surveying instrument to insolate and the rainwater corrodes, improves the on-spot mapping device's of building engineering cost life.
Description
Technical Field
The utility model relates to the technical field of surveying and mapping, in particular to a construction engineering cost on-site surveying and mapping device.
Background
The construction cost refers to the construction price of the project, and refers to the total sum of all the expenses expected or actually required for completing the construction of one project. Surveying and mapping are measurement and mapping, a computer technology, a photoelectric technology, a network communication technology, space science and information science are taken as bases, a global navigation satellite positioning system (GNSS), Remote Sensing (RS) and a Geographic Information System (GIS) are taken as technical cores, existing feature points and boundary lines on the ground are measured to obtain figure and position information reflecting the current situation of the ground, the figure and the position information are used for planning and design and administrative management of engineering construction, and a total station is often used for assisting site construction in the construction engineering.
Patent No. 202021320448.9 discloses an on-spot mapping device of building engineering cost, including the containing box, the top of containing box articulates there is the case lid fixed through the hasp, the bottom plate has been placed to the interior bottom surface of containing box, be fixed with the surveying instrument on the bottom plate, the both sides of bottom plate all are connected with the slide bar that slides and set up at the containing box inner wall, the slide bar slip cap is equipped with the sliding sleeve, be equipped with the peg on the sliding sleeve, the interior bottom surface of case lid is fixed with the briquetting of contradicting on the surveying instrument to the surveying instrument can be at the containing box activity from top to bottom, and it can hang the case mouth department of putting at the containing box under the effect of peg, makes it keep at stable state, accords with the user demand, and it conveniently relieves again to hang to put the fixed accomodating of state convenient surveying instrument simultaneously, conveniently operates and uses, better the in-service use demand that satisfies.
This on-spot mapping device of building engineering cost has following drawback: 1. fail to prevent sunshine and rainwater to surveying and mapping personnel's injury, and do not carry out fine protection to the total powerstation, when the instrument is penetrated directly to sunshine, the electronic components inside the total powerstation receives temperature influence performance unstability, leads to measuring to have the deviation, and too high temperature causes the ageing yellow of total powerstation display screen easily moreover. 2. The height can not be adjusted, the efficiency of surveying and mapping can be reduced, and the practicability of the construction engineering cost field surveying and mapping device is reduced. Meanwhile, the circuit is easy to be damaged by water inflow in rainy days.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide a construction project cost field mapping device which can effectively solve the problems in the background technology.
In order to achieve the purpose, the utility model adopts the technical scheme that:
the utility model provides an on-spot mapping device of building engineering cost, includes the fixed plate, still includes protector and base, protector is installed on the fixed plate top, protector specifically comprises surveying instrument, protection canopy, battery, connecting pipe, water tank, heat conduction pole, bracing piece A, bracing piece B and solar cell panel, surveying instrument top installation battery, the battery, bolt fixed connection protection canopy is passed through on the battery top, protection canopy bottom plug-in connection bracing piece A, the connecting pipe is installed to protection canopy one side bottom, connecting pipe one end plug-in connection water tank, water tank one side fixed connection heat conduction pole, the welding of protection canopy top has bracing piece B, bolt fixed connection solar cell panel is passed through on bracing piece B top.
Wherein, still include elevating gear, elevating gear is installed on the base top and passes through elevating gear adjustable height, can improve the efficiency of survey and drawing, has improved the on-the-spot mapping device's of building engineering cost practicality.
Wherein, elevating gear specifically comprises support, servo motor, transmission shaft, gear A, gear B, threaded rod, telescopic link, hollow pole and thread groove, bolt fixed connection servo motor is passed through to the support bottom, servo motor's output passes through the coupling joint with the input of transmission shaft, the nested installation gear A in the transmission shaft outside, gear A one side meshing connecting gear B, gear B inboard rotates connecting threaded rod, the hollow pole of threaded rod outside installation, the thread groove has been seted up to hollow pole inboard, hollow pole one side welding has the telescopic link, can reciprocate hollow pole through the thread groove, adjusts the height of the on-the-spot mapping device of building engineering cost.
Wherein, the universal wheel of bolt fixed connection is passed through to the base bottom, just universal wheel has four, and universal wheel is convenient for remove the on-the-spot mapping device of building engineering cost.
Wherein, support, telescopic link, servo motor, transmission shaft and gear A are the axisymmetric structure along the axis of base, through mutually supporting between support and the telescopic link, multiplicable stability when the telescopic link goes up and down.
The output end of the solar cell panel is electrically connected with the input end of the storage battery through a wire, the output end of the storage battery is electrically connected with the input end of the surveying instrument and the input end of the servo motor through wires, and power supply circulation can be formed through mutual matching between the storage battery and the solar cell panel.
1. Compared with the prior art, the utility model has the following beneficial effects: when the sunshine and the rainwater weather appear violently, the rainwater falls into the protection canopy, avoids rainwater and sun to cause the damage to the surveying instrument, reduces its life, and in the rainwater got into the case water through the connecting pipe, the heat conduction pole will survey and draw the leading-in water tank of heat that produces.
2. Servo motor rotates and drives the transmission shaft and rotates, the transmission shaft rotates and makes gear A rotate, through gear A rotating gear B, gear B rotates and drives the threaded rod and rotates, the threaded rod rotates and makes hollow rod reciprocate through the thread groove, hollow rod up-and-down movement control fixed plate reciprocates, the fixed plate reciprocates and drives the surveying instrument and reciprocates, through mutually supporting between support and the telescopic link, multiplicable stability when the telescopic link goes up and down, so that adjust the on-the-spot mapping device height of building engineering cost.
Drawings
Fig. 1 is a schematic diagram of the overall structure of a construction cost on-site surveying and mapping device of the utility model.
Fig. 2 is a schematic view of a hollow rod of the construction cost on-site surveying and mapping apparatus of the present invention in a three-dimensional partially cut-away structure.
1. A lifting device; 101. a servo motor; 102. a drive shaft; 103. a gear A; 104. a gear B; 105. a threaded rod; 106. a support; 107. a telescopic rod; 108. a hollow shaft; 109. A thread groove; 2. a guard; 201. a surveying instrument; 202. a protective shed; 203. a storage battery; 204. a connecting pipe; 205. a water tank; 206. a heat conducting rod; 207. a support rod A; 208. a support bar B; 209. a solar panel; 3. a base; 4. a universal wheel; 5. And (7) fixing the plate.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
As shown in fig. 1-2, the construction cost field mapping device comprises a fixing plate 5, a protective device 2 and a base 3, the top end of the fixing plate 5 is provided with a protective device 2, the protective device 2 is composed of a surveying instrument 201, a protective shed 202, a storage battery 203, a connecting pipe 204, a water tank 205, a heat conducting rod 206, a support rod A207, a support rod B208 and a solar cell panel 209, the top end of the surveying instrument 201 is provided with a storage battery 203, the top end of the storage battery 203 is fixedly connected with a protective shed 202 through bolts, the bottom end of the protective shed 202 is connected with a support rod A207 in an inserting way, the bottom end of one side of the protective shed 202 is provided with a connecting pipe 204, one end of the connecting pipe 204 is connected with a water tank 205 in an inserting way, one side of the water tank 205 is fixedly connected with a heat conducting rod 206, the top end of the protection shed 202 is welded with a support rod B208, and the top end of the support rod B208 is fixedly connected with a solar cell panel 209 through a bolt.
Wherein, still include elevating gear 1, elevating gear 1 is installed on 3 tops of base and is passed through elevating gear 1 height-adjustable, can improve the efficiency of survey and drawing, has improved the on-the-spot mapping device's of building engineering cost practicality.
The lifting device 1 specifically comprises a support 106, a servo motor 101, a transmission shaft 102, a gear A103, a gear B104, a threaded rod 105, an expansion link 107, a hollow rod 108 and a thread groove 109, the bottom end of the support 106 is fixedly connected with the servo motor 101 through a bolt, the output end of the servo motor 101 is connected with the input end of the transmission shaft 102 through a coupler, the gear A103 is installed outside the transmission shaft 102 in a nested mode, one side of the gear A103 is meshed with the gear B104, the threaded rod 105 is connected to the inner side of the gear B104 in a rotating mode, the hollow rod 108 is installed on the outer side of the threaded rod 105, the thread groove 109 is formed in the inner side of the hollow rod 108, the expansion link 107 is welded to one side of the hollow rod 108, the hollow rod 108 can move up and down through the thread groove 109, and the height of the construction engineering site surveying and mapping device is adjusted.
Wherein, 3 bottom of base pass through bolt fixed connection universal wheel 4, just universal wheel 4 has four, and universal wheel 4 is convenient for remove the on-the-spot mapping device of building engineering cost.
The support 106, the telescopic rod 107, the servo motor 101, the transmission shaft 102 and the gear A103 are in an axisymmetric structure along the central axis of the base 3, and the telescopic rod 107 can increase stability when lifted through mutual matching between the support 106 and the telescopic rod 107.
Wherein, the output of solar cell panel 209 passes through the wire with the input of battery 203 and constitutes the electricity and be connected, the output of battery 203 passes through the wire with the input of surveying instrument 201 and servo motor 101 and constitutes the electricity and be connected, through mutually supporting between battery 203 and the solar cell panel 209, can form power supply circulation.
It should be noted that, the utility model is a construction engineering cost field surveying and mapping device, when working, the servo motor 101 is started, the servo motor 101 rotates to drive the transmission shaft 102 to rotate, the transmission shaft 102 rotates to drive the gear A103 to rotate, the gear B104 rotates to drive the threaded rod 105 to rotate, the threaded rod 105 rotates to drive the hollow rod 108 to move up and down through the threaded groove 109, the hollow rod 108 moves up and down to control the fixed plate 5 to move up and down, the fixed plate 5 moves up and down to drive the surveying and mapping instrument 201 to move up and down, through the mutual cooperation between the bracket 106 and the telescopic rod 107, the stability can be increased when the telescopic rod 107 moves up and down, so as to adjust the height of the construction engineering cost field surveying and mapping device, when the weather of sunshine and rain occurs, the rain falls into the protective shed 202, enters the water tank 205 through the connecting pipe 204, the heat conducting rod 206 guides the heat generated by surveying and mapping into the water tank 205, the solar panel 209 absorbs solar energy and stores the solar energy in the storage battery 203, and the storage battery 203 supplies power to the surveying instrument 201 and the servo motor 101.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (6)
1. The utility model provides a construction engineering cost on-site mapping device, includes fixed plate (5), its characterized in that still includes protector (2) and base (3), protector (2) are installed on fixed plate (5) top, protector (2) specifically comprises surveying instrument (201), protection canopy (202), battery (203), connecting pipe (204), water tank (205), heat conduction pole (206), bracing piece A (207), bracing piece B (208) and solar cell panel (209), battery (203) are installed on surveying instrument (201) top, battery (203), bolt fixed connection protection canopy (202) are passed through to battery (203) top, protection canopy (202) bottom grafting joint support pole A (207), connecting pipe (204) are installed to protection canopy (202) one side bottom, water tank (205) is connected in the grafting of connecting pipe (204) one end, the solar protection shed is characterized in that a heat conducting rod (206) is fixedly connected to one side of the water tank (205), a supporting rod B (208) is welded to the top end of the protection shed (202), and the top end of the supporting rod B (208) is fixedly connected with a solar panel (209) through a bolt.
2. A construction cost on-site surveying and mapping device according to claim 1, characterized by further comprising a lifting device (1), wherein the lifting device (1) is mounted on the top end of the base (3).
3. The construction cost on-site surveying and mapping device according to claim 2, characterized in that the lifting device (1) is composed of a support (106), a servo motor (101), a transmission shaft (102), a gear A (103), a gear B (104), a threaded rod (105), an expansion link (107), a hollow rod (108) and a threaded groove (109), the bottom end of the support (106) is fixedly connected with the servo motor (101) through a bolt, the output end of the servo motor (101) is connected with the input end of the transmission shaft (102) through a coupler, the gear A (103) is nested and installed on the outer side of the transmission shaft (102), one side of the gear A (103) is engaged and connected with the gear B (104), the inner side of the gear B (104) is rotatably connected with the threaded rod (105), the hollow rod (108) is installed on the outer side of the threaded rod (105), and the threaded groove (109) is opened on the inner side of the hollow rod (108), and an expansion rod (107) is welded on one side of the hollow rod (108).
4. The construction cost on-site mapping device as claimed in claim 1, wherein the bottom end of the base (3) is fixedly connected with universal wheels (4) through bolts, and the number of the universal wheels (4) is four.
5. The construction cost on-site mapping device according to claim 3, characterized in that the support (106), the telescopic rod (107), the servo motor (101), the transmission shaft (102) and the gear A (103) are in an axisymmetric structure along the central axis of the base (3).
6. The construction cost on-site surveying device according to claim 1, wherein the output end of the solar panel (209) is electrically connected with the input end of the storage battery (203) through a wire, and the output end of the storage battery (203) is electrically connected with the input ends of the surveying instrument (201) and the servo motor (101) through a wire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121469335.XU CN216243362U (en) | 2021-06-30 | 2021-06-30 | On-spot mapping device of building engineering cost |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121469335.XU CN216243362U (en) | 2021-06-30 | 2021-06-30 | On-spot mapping device of building engineering cost |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216243362U true CN216243362U (en) | 2022-04-08 |
Family
ID=80979809
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121469335.XU Expired - Fee Related CN216243362U (en) | 2021-06-30 | 2021-06-30 | On-spot mapping device of building engineering cost |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216243362U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115046111A (en) * | 2022-05-20 | 2022-09-13 | 浙江同信工程项目管理有限公司 | On-spot intelligent measuring device of building engineering cost |
CN116642476A (en) * | 2023-07-26 | 2023-08-25 | 内江市市政设施建设管护中心 | Construction engineering cost budget assessment device with mapping function |
-
2021
- 2021-06-30 CN CN202121469335.XU patent/CN216243362U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115046111A (en) * | 2022-05-20 | 2022-09-13 | 浙江同信工程项目管理有限公司 | On-spot intelligent measuring device of building engineering cost |
CN116642476A (en) * | 2023-07-26 | 2023-08-25 | 内江市市政设施建设管护中心 | Construction engineering cost budget assessment device with mapping function |
CN116642476B (en) * | 2023-07-26 | 2023-09-22 | 内江市市政设施建设管护中心 | Construction engineering cost budget assessment device with mapping function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216243362U (en) | On-spot mapping device of building engineering cost | |
CN207571885U (en) | A kind of express highway intelligent monitoring device | |
CN210740217U (en) | Automatic sun-tracking solar street lamp | |
CN213519087U (en) | Stake is marked to city view type solar energy light | |
WO2023227105A1 (en) | Solar photovoltaic power generation device | |
CN213180004U (en) | Surveying and mapping device for field surveying engineering | |
CN211262220U (en) | Watershed remote sensing hydrology viewing device is administered to aquatic attitude | |
CN219895007U (en) | Site mapping tool for engineering cost | |
CN210088338U (en) | Outdoor electronic information notice board utilizing wind energy | |
CN210441870U (en) | Hydrology measuring stick convenient to installation | |
CN203851568U (en) | Electric tricycle based solar irrigation system | |
CN113566926A (en) | Water level measuring device for reservoir flood prevention | |
CN208253032U (en) | The complementary antifreeze heating apparatus of oil extraction in oil field liquid injecting pipeline wind-light storage | |
CN216046469U (en) | Ecological hydrology observation device | |
CN213876074U (en) | Municipal administration environmental monitoring instrument based on internet technique | |
CN219757391U (en) | Rod-type small reservoir water rain condition monitoring and early warning station | |
CN209784570U (en) | Wisdom is view formula rainfall measuring device for water utilities in sponge city | |
CN214097590U (en) | Electricity consumption measurement display device | |
CN210514663U (en) | Outdoor distributed hydrogeological information new energy acquisition unit | |
CN214566834U (en) | Waterproof type wind power generator cabin cover transportation support | |
CN219738243U (en) | Hydropower station weather forecast early warning integrated device | |
CN214200095U (en) | Multifunctional hydrological telemetering device | |
CN104106447A (en) | Solar electric tricycle irrigating system | |
CN218916350U (en) | Marking device for hydraulic engineering investigation | |
CN215055765U (en) | Building engineering safety protection reinforcing bar protection canopy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220408 |
|
CF01 | Termination of patent right due to non-payment of annual fee |