CN216242657U - Pneumatic pipeline chute of non-pressure air door - Google Patents

Pneumatic pipeline chute of non-pressure air door Download PDF

Info

Publication number
CN216242657U
CN216242657U CN202122836322.8U CN202122836322U CN216242657U CN 216242657 U CN216242657 U CN 216242657U CN 202122836322 U CN202122836322 U CN 202122836322U CN 216242657 U CN216242657 U CN 216242657U
Authority
CN
China
Prior art keywords
pipeline
rack
girder
plate
pressureless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122836322.8U
Other languages
Chinese (zh)
Inventor
陈利明
翟高峰
陈厚芳
孟凡豹
马守富
杜永星
李春元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Poly Yufeng Coal Industry Co ltd
Original Assignee
Shanxi Poly Yufeng Coal Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Poly Yufeng Coal Industry Co ltd filed Critical Shanxi Poly Yufeng Coal Industry Co ltd
Priority to CN202122836322.8U priority Critical patent/CN216242657U/en
Application granted granted Critical
Publication of CN216242657U publication Critical patent/CN216242657U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of cabling racks, in particular to a pressureless pneumatic pipeline cabling rack which comprises a cabling rack main body, wherein the cabling rack main body comprises two main beams arranged along the length direction, one side of each main beam is provided with a connecting structure which can be conveniently disassembled and assembled, the top of the connecting structure is provided with an installing plate, the top of the installing plate is provided with an installing hole corresponding to the connecting structure, a plurality of cross beams along the width direction are equidistantly distributed between the two main beams, the two ends of each cross beam along the width direction are connected and installed with the main beams through angle iron pieces, the top of each cross beam is provided with a placing rack, the placing rack comprises a fixing structure which can effectively prevent a pipeline from falling off, each fixing structure comprises a stop block, and the cabling rack can effectively limit the position of the pipeline and prevent the pipeline from falling off and can better arrange the pipeline.

Description

Pneumatic pipeline chute of non-pressure air door
Technical Field
The utility model relates to the technical field of wiring racks, in particular to a wiring rack for a pneumatic pipeline of a non-pressure air door.
Background
The non-pressure air door is an ideal air door under a coal mine in China at present, is mainly used in each connection lane between an underground mine entry-return lane and a main entry-return lane, is a substitute of all the existing air doors, generally needs to process some pneumatic pipelines in the installation process of some non-pressure air doors, and is usually placed by using a wiring rack at present so as to realize the wiring of the pneumatic pipelines.
However, the pneumatic pipeline chute without the pressure air door in the prior art still has a lot of defects, the installation work of the chute in the prior art is more complicated, and the chute needs to be repeatedly disassembled or assembled when needing to be replaced and maintained, so that the wall surface is greatly damaged; and the chute among the prior art usually places the circuit on the chute and adopts the mode of ligature to fix for wiring insecure and easy coming off, the chute among the prior art can not be better arranges the circuit simultaneously.
Therefore, there is a need to design a pneumatic pipeline rack without pressure damper to solve the above problems in the background art.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a pneumatic pipeline cabling rack without a pressure air door, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a pneumatic pipeline chute of non-pressure air door, including chute main part, the chute main part includes two girders that set up along length direction, girder one side is equipped with the connection structure that can conveniently dismantle and the installation work goes on, the connection structure top is equipped with the mounting panel, the position that the mounting panel top corresponds with connection structure is equipped with the mounting hole, the equidistance distributes between two girders has a plurality of crossbeams along width direction, the installation is connected through angle bar spare between crossbeam along width direction's both ends and the girder, the crossbeam top is equipped with the rack, the rack is including the fixed knot who can effectively avoid the pipeline to drop to construct, fixed knot constructs including the dog.
As a preferable scheme of the utility model, the connecting structure comprises a connecting geometric piece, a screw rod is arranged at the bottom of the connecting geometric piece, a matching block is connected and installed at the bottom of the screw rod through a connecting block, and a limiting bolt is arranged at the top of the matching block.
As a preferable scheme of the utility model, four groups of connecting structures are arranged, the four groups of connecting structures are symmetrically distributed on one side of the two main beams away from the cross beam in pairs, matching grooves matched with the matching blocks are arranged on one sides of the main beams away from the cross beam, and limiting holes corresponding to the limiting bolts are arranged at the tops of the main beams.
As a preferable scheme of the utility model, the placing frame comprises a connecting plate, the connecting plate is connected and installed at the top of the cross beam through a connecting bolt, and a plurality of fixing structures are arranged at the top of the connecting plate.
As a preferable scheme of the utility model, the fixing structure comprises a first fixing plate and a second fixing plate, wherein springs are arranged at the tops of the first fixing plate close to one side of the second fixing plate, and a stop block is arranged at one side of the springs far away from the first fixing plate.
As a preferable aspect of the present invention, two stoppers and two springs are symmetrically disposed between the first fixing plate and the second fixing plate, and the stoppers are formed in a semi-cylindrical shape.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the wiring rack, by arranging the connecting structure, when the wiring rack is installed, a user can connect and install the connecting geometric-shaped piece and the installation plate with a wall body through the matching of the bolts and the installation holes in advance, and then sequentially install the lead screw and the connecting block, so that when the user needs to install and dismantle a pipeline, the user only needs to take down the limiting bolt, and then the main beam and the cross beam can be moved in a drawing mode under the mutual matching of the matching block and the matching groove, and the wall surface cannot be damaged greatly, so that the wiring rack is simple to install and dismantle in the using process, and meanwhile, the wall surface can be effectively prevented from being damaged greatly.
2. According to the utility model, through arranging the fixing structure, when the pipeline is placed at the upper end of the chute, a user places the pipeline above the connecting plate, because the two stop blocks are both in a semi-cylindrical shape, and springs are arranged between the two stop blocks and the first fixing plate and between the two stop blocks and the second fixing plate, a pressing force can be applied to the pipeline by a worker, so that the pipeline can rapidly enter the position between the first fixing plate and the second fixing plate and below the two stop blocks and the position of the pipeline is limited, meanwhile, because the fixing structure is provided with a plurality of stop blocks, the pipeline can be effectively arranged, the position of the pipeline can be effectively limited by the chute, the pipeline can be prevented from falling off, and the pipeline can be better arranged.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a partial schematic view of the present invention;
FIG. 3 is a schematic view of the connection structure of the present invention;
fig. 4 is an enlarged view of region a of the present invention.
In the figure: 1. a rack main body; 11. a main beam; 12. mounting a plate; 13. a connecting structure; 131. a screw rod; 132. a mating groove; 133. connecting the several pieces; 134. connecting blocks; 135. a matching block; 136. a limit bolt; 137. a limiting hole; 14. a cross beam; 15. a corner iron piece; 16. placing a rack; 161. a connecting plate; 162. a connecting bolt; 163. a fixed structure; 1631. a first fixing plate; 1632. a spring; 1633. a stopper; 1634. a second fixing plate; 17. and (7) installing holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative efforts based on the embodiments of the present invention belong to the protection scope of the present invention.
To facilitate an understanding of the utility model, the utility model will now be described more fully with reference to the accompanying drawings. Several embodiments of the utility model are presented in the drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the utility model herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1-4, the present invention provides a technical solution:
a pneumatic pipeline chute without a pressure air door comprises a chute main body 1, wherein the chute main body 1 comprises two main beams 11 arranged along the length direction, one side of each main beam 11 is provided with a connecting structure 13 which can be conveniently disassembled and assembled, the top of each connecting structure 13 is provided with an assembling plate 12, the top of each assembling plate 12 is provided with an assembling hole 17 at the position corresponding to the corresponding connecting structure 13, a plurality of cross beams 14 along the width direction are equidistantly distributed between the two main beams 11, the two ends of each cross beam 14 along the width direction are connected and assembled with the main beams 11 through angle iron pieces 15, the top of each cross beam 14 is provided with a placing frame 16, each placing frame 16 comprises a fixing structure 163 capable of effectively avoiding pipelines from falling off, each fixing structure 163 comprises a stop 1633, and the connecting structures 13 are arranged, so that the mounting and disassembling work of the chute in the using process is simpler, and the wall can be effectively prevented from being greatly damaged, through setting up fixed knot structure 163 for this chute can be effectual prescribe a limit to the position of pipeline, avoids the pipeline to drop and can also carry out better arrangement to the pipeline simultaneously.
In the embodiment, referring to fig. 1 and fig. 3, the connecting structure 13 includes a connecting shaped member 133, the bottom of the connecting shaped member 133 is provided with a screw rod 131, the bottom of the screw rod 131 is connected with a matching block 135 through a connecting block 134, the top of the matching block 135 is provided with a limiting bolt 136, the connecting structure 13 is provided with four groups, and the four groups of connecting structures 13 are distributed on one side of the two main beams 11 away from the cross beam 14 in a pairwise symmetry manner, one side of the main beam 11 away from the cross beam 14 is provided with a matching groove 132 matched with the matching block 135, and the top of the main beam 11 is provided with a limiting hole 137 corresponding to the limiting bolt 136, by providing the connecting structure 13, the mounting and dismounting of the cable frame in the use process is relatively simple, and simultaneously, the relatively large damage to the wall surface can be effectively avoided, when the frame is actually used, a user can connect the connecting shaped member 133 and the mounting plate 12 with the wall body through the matching of the bolt and the mounting hole 17 in advance, install lead screw 131 and connecting block 134 afterwards in proper order, thereby the user is when needs installation and dismantlement pipeline, only need take off limit bolt 136, after that cooperate 135 with cooperate the mode of twitching under the mutual cooperation in groove 132 remove girder 11 and crossbeam 14 can, and can not lead to the fact great damage to the wall, make this installation and the dismantlement work of routing frame in the use comparatively simple, also can effectively avoid causing great injury to the wall simultaneously.
In an embodiment, referring to fig. 1, fig. 2 and fig. 4, the placing rack 16 includes a connecting plate 161, the connecting plate 161 is connected and installed on the top of the cross beam 14 through a connecting bolt 162, and a plurality of fixing structures 163 are disposed on the top of the connecting plate 161.
In an embodiment, referring to fig. 1, 2 and 4, the fixing structure 163 includes a first fixing plate 1631 and a second fixing plate 1634, wherein a top of one side of the first fixing plate 1631 close to the second fixing plate 1634 is provided with a spring 1632, a side of the spring 1632 away from the first fixing plate 1631 is provided with a stopper 1633, two stoppers 1633 and two springs 1632 are symmetrically arranged between the first fixing plate 1631 and the second fixing plate 1634, and the stopper 1633 is configured to be semi-cylindrical, by providing the fixing structure 163, the chute can effectively limit a position of a pipeline, avoid the pipeline from falling off, and better tidying the pipeline, in practical use, when the pipeline is placed at an upper end of the chute, a user places the pipeline above the connecting plate 161, because both stoppers 1633 are configured to be semi-cylindrical, and two stoppers 1632 are provided between the stopper 1633 and the first fixing plate 1631 and the second fixing plate 1634, thereby the worker can exert a pressing force to the pipeline, thereby the pipeline can be quick enter into between first fixed plate 1631 and the second fixed plate 1634 and be located the position of two dog 1633 below and inject the position of pipeline, meanwhile because fixed knot constructs 163 and is equipped with a plurality ofly, thereby can effectually arrange in order the pipeline, make this chute can effectually prescribe a limit to the position of pipeline, avoid the pipeline to drop and can also carry out better arrangement to the pipeline simultaneously.
The working principle is as follows: when the cable rack is used, when the cable rack is installed, a user can connect the connecting pieces 133 and the installation plate 12 with a wall body and install the connecting pieces 12 and the installation plate 12 with the wall body through the matching of the bolts and the installation holes 17, and then sequentially install the screw rods 131 and the connecting blocks 134, so that when the user needs to install and dismantle a pipeline, the user only needs to take down the limiting bolts 136, and then moves the main beam 11 and the cross beam 14 in a drawing mode under the mutual matching of the matching blocks 135 and the matching grooves 132, and cannot cause great damage to the wall surface, so that the installation and the disassembly of the cable rack in the use process are simpler, and simultaneously can effectively avoid great damage to the wall surface, when the pipeline is placed at the upper end of the cable rack, the user places the pipeline above the connection plate 161, because the two stoppers 1633 are both in a semi-cylindrical shape, and springs 1632 are arranged between the two stoppers 1633 and the first fixing plate 1631 and the second fixing plate 1634, thereby the worker can exert a pressing force to the pipeline, thereby the pipeline can be quick enter into between first fixed plate 1631 and the second fixed plate 1634 and be located the position of two dog 1633 below and inject the position of pipeline, meanwhile because fixed knot constructs 163 and is equipped with a plurality ofly, thereby can effectually arrange in order the pipeline, make this chute can effectually prescribe a limit to the position of pipeline, avoid the pipeline to drop and can also carry out better arrangement to the pipeline simultaneously.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pneumatic pipeline chute of non-pressure air door, includes chute main part (1), its characterized in that: the chute main part (1) includes two girder (11) that set up along length direction, girder (11) one side is equipped with connection structure (13) that can conveniently dismantle and the installation work goes on, connection structure (13) top is equipped with mounting panel (12), the position that mounting panel (12) top and connection structure (13) correspond is equipped with mounting hole (17), equidistant distribution has a plurality of crossbeam (14) along width direction between two girder (11), install through angle iron (15) connection between crossbeam (14) along width direction's both ends and girder (11), crossbeam (14) top is equipped with rack (16), rack (16) are including fixed knot structure (163) that can effectively avoid the pipeline to drop, fixed knot constructs (163) and includes dog (1633).
2. The pressureless pneumatic duct rack of claim 1, wherein: the connecting structure (13) comprises connecting pieces (133), a screw rod (131) is arranged at the bottom of the connecting pieces (133), a matching block (135) is installed at the bottom of the screw rod (131) through a connecting block (134), and a limiting bolt (136) is arranged at the top of the matching block (135).
3. The pressureless pneumatic duct rack of claim 1, wherein: connection structure (13) are equipped with four groups, and two bisymmetry distributions of four groups connection structure (13) are in two girder (11) one side of keeping away from crossbeam (14), and girder (11) keep away from crossbeam (14) one side be equipped with cooperation piece (135) cooperation groove (132) of mutually supporting, and girder (11) top be equipped with spacing hole (137) that spacing bolt (136) correspond each other.
4. The pressureless pneumatic duct rack of claim 1, wherein: the placing rack (16) comprises a connecting plate (161), the connecting plate (161) is connected and installed on the top of the beam (14) through a connecting bolt (162), and a plurality of fixing structures (163) are arranged on the top of the connecting plate (161).
5. The pressureless pneumatic duct rack of claim 1, wherein: fixed knot constructs (163) including first fixed plate (1631) and second fixed plate (1634), wherein first fixed plate (1631) are close to one side top of second fixed plate (1634) and all are equipped with spring (1632), and one side that first fixed plate (1631) was kept away from in spring (1632) is equipped with dog (1633).
6. A pressureless air door pneumatic duct rack according to claim 1 or 5, wherein: the stopper (1633) and the spring (1632) are symmetrically arranged between the first fixing plate (1631) and the second fixing plate (1634), and the stopper (1633) is formed in a semi-cylindrical shape.
CN202122836322.8U 2021-11-16 2021-11-16 Pneumatic pipeline chute of non-pressure air door Expired - Fee Related CN216242657U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122836322.8U CN216242657U (en) 2021-11-16 2021-11-16 Pneumatic pipeline chute of non-pressure air door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122836322.8U CN216242657U (en) 2021-11-16 2021-11-16 Pneumatic pipeline chute of non-pressure air door

Publications (1)

Publication Number Publication Date
CN216242657U true CN216242657U (en) 2022-04-08

Family

ID=80947676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122836322.8U Expired - Fee Related CN216242657U (en) 2021-11-16 2021-11-16 Pneumatic pipeline chute of non-pressure air door

Country Status (1)

Country Link
CN (1) CN216242657U (en)

Similar Documents

Publication Publication Date Title
CN216242657U (en) Pneumatic pipeline chute of non-pressure air door
CN206800949U (en) Operating platform for construction work high above the ground
CN202831617U (en) Large-scale integrated steel template
CN209243957U (en) The pre-buried weldment of curtain wall slot type
CN209066844U (en) A kind of climbing frame limiting and fixing device
CN104818845A (en) Column formwork fastening method and clamping frame thereof
CN204362452U (en) A kind of extensible universal cabinet and combined case thereof fast
CN211622593U (en) Modular floor formwork device
CN209429326U (en) A kind of wall body module steel construction intensity reinforcing prop
KR101209239B1 (en) Underground power transmission cable and power distribution cable array device
CN207484684U (en) A kind of assembly board house
CN207120478U (en) A kind of thickness controller being easily installed
CN110847352A (en) Bolt ball net rack purline assembling construction method
CN216277936U (en) Coal mine stope face supporting construction
CN217720554U (en) Base mechanism for mounting and reinforcing bridge frame
CN104481127A (en) Rigidly-connected and high-strength die plate supporting system
CN220799001U (en) A prefabricated slope protection structure for construction of high standard farmland
CN210917749U (en) Connection structure of steel construction for green construction
CN220620469U (en) Assembled support roof beam board
CN209494311U (en) A kind of assembly type building safety guardrail that novel stable is high
CN210194443U (en) Hoop device for transverse/oblique connection of bridge steel pipe column support
CN112942677B (en) Assembled double-side-plate all-bolt steel connecting beam
CN213929942U (en) Electromechanical installation pipeline fixing equipment
CN217080989U (en) Assembled plywood
CN218990445U (en) Novel large-span shaped steel skeleton

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220408

CF01 Termination of patent right due to non-payment of annual fee