CN216240560U - Natural gas is opened and is adopted spiral drainage atomizing drainage gas production device - Google Patents

Natural gas is opened and is adopted spiral drainage atomizing drainage gas production device Download PDF

Info

Publication number
CN216240560U
CN216240560U CN202122351787.4U CN202122351787U CN216240560U CN 216240560 U CN216240560 U CN 216240560U CN 202122351787 U CN202122351787 U CN 202122351787U CN 216240560 U CN216240560 U CN 216240560U
Authority
CN
China
Prior art keywords
fixedly connected
drainage
gas production
spiral
production device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122351787.4U
Other languages
Chinese (zh)
Inventor
王一发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zeng Lingfa
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122351787.4U priority Critical patent/CN216240560U/en
Application granted granted Critical
Publication of CN216240560U publication Critical patent/CN216240560U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Humidification (AREA)

Abstract

The utility model discloses a spiral drainage, injection, atomization, drainage and gas production device for natural gas production, which comprises a gas production pipe, wherein an inner ring is inserted into an inner cavity of the gas production pipe, the top of the inner ring is fixedly connected with a frame body, hanging buckles are fixedly connected to the left side and the right side of the top of the frame body and are symmetrically arranged, a threaded rod is in threaded connection with the upper end of the outer side of the frame body, clamping blocks are fixedly connected to the inner side of the threaded rod, connecting plates are fixedly connected to the outer side of the threaded rod, a shell is fixedly connected to the lower end of the outer side of the frame body, springs are fixedly connected to the inner cavity of the shell, limiting blocks are fixedly connected to the inner sides of the springs, and rollers are arranged on the inner sides of the limiting blocks. The drainage and gas production device is provided with the connecting plate, the shell, the clamping block and the spring, so that the purpose of good stability is achieved, and the problem that the use requirements of people cannot be met due to the fact that the existing drainage and gas production device does not have the function of good stability is solved.

Description

Natural gas is opened and is adopted spiral drainage atomizing drainage gas production device
Technical Field
The utility model relates to the technical field of natural gas, in particular to a spiral drainage, injection, atomization, drainage and gas production device for natural gas exploitation.
Background
Natural gas refers to all natural gases in nature, including gases formed by various natural processes in the air space, water space and rock space (including oil field gas, gas field gas, mud volcanic gas, coal bed gas, biogenesis gas and the like), the definition of "natural gas", which has been common for a long time, is a narrow definition from the energy point of view, referring to a mixture of hydrocarbon and non-hydrocarbon gases naturally trapped in the formation, in petrogeology, usually oil field gas and gas field gas, the composition of the gas recovery device mainly comprises hydrocarbons and non-hydrocarbon gas, wherein a spiral drainage jet atomization drainage gas recovery device is adopted for natural gas exploitation, the existing drainage gas production device does not have the function of good stability, so that the use requirements of people cannot be met.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a spiral drainage, injection, atomization, drainage and gas production device for natural gas exploitation, which has the advantage of good stability and solves the problem that the existing drainage and gas production device does not have the function of good stability and cannot meet the use requirements of people.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a natural gas is opened and is adopted spiral drainage atomizing drainage gas production device, includes the gas production pipe, the inner chamber of gas production pipe is pegged graft and is had the inner circle, the top fixedly connected with framework of inner circle, the equal fixedly connected with suspension clasp in the left and right sides at framework top, and the suspension clasp is the symmetry setting, the upper end threaded connection in the framework outside has the threaded rod, the equal fixedly connected with clamp splice in inboard of threaded rod, the equal fixedly connected with connecting plate in the outside of threaded rod, the equal fixedly connected with casing of lower extreme in the framework outside, the equal fixedly connected with spring in inner chamber of casing, the equal fixedly connected with stopper in inboard of spring, the inboard of stopper all is provided with the gyro wheel, and the inboard of gyro wheel contacts in the upper end in the gas production pipe outside.
Preferably, the upper end of the inner cavity of the gas production pipe is fixedly connected with a sealing plate, and a spiral pipe is arranged on the left side of the sealing plate.
Preferably, the top of the spiral pipe penetrates through the frame body and is provided with a spray head, and the bottom of the inner cavity of the spiral pipe is fixedly connected with a connecting rod.
Preferably, the inner side of the connecting rod is provided with a rotating connecting seat, and the top of the rotating connecting seat is provided with a rotating blade.
Preferably, the middle end on the right side of the inner ring is fixedly connected with a guide plate, and the guide plate is triangular.
Preferably, the lower ends of the left side and the right side of the inner cavity of the inner ring are fixedly connected with brackets, and the inner sides of the brackets are provided with filter screens.
Compared with the prior art, the utility model has the following beneficial effects:
1. the utility model is provided with the connecting plate, the shell, the clamping block and the spring, people hang the suspension buckle through the hoisting equipment, the suspension buckle drives the inner ring to be inserted into the top of the gas production pipe through the frame body, when the inner ring is inserted into the inner surface of the gas production pipe, the frame body drives the shell to move downwards, the roller wheel is attached to the outer side of the gas production pipe to roll downwards, the roller wheel forces the limiting block to move outwards, the limiting block extrudes the spring to deform the spring, meanwhile, the roller is pushed inwards by the counterforce of the spring, so that the roller can adapt to the width of the gas production pipe, when the bottom of the frame body contacts the top end of the gas production pipe, people rotate the threaded rod through the connecting plate, the threaded rod drives the clamping block to move inwards to clamp the gas production pipe, through the cooperation of above structure, reached the good purpose of stability, solved current drainage gas production device and did not possess the good function of stability, lead to not having satisfied people's user demand's problem.
2. The spiral pipe, the rotary blade, the connecting rod and the rotary connecting seat are arranged, when fluid enters the inner ring through the bottom of the gas production pipe, impurities are filtered through the filter screen firstly, the fluid enters the bottom of the spiral pipe through the flow guide of the flow guide plate, the rotary blade is rotated by the pressure of the fluid to increase the ascending smoothness of the rotary blade, the fluid is sprayed out through the spray head finally, the next procedure is carried out, and the purpose of high efficiency is achieved through the matching of the structures.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the spring structure of the present invention;
FIG. 3 is a schematic view of the structure of the rotating blade of the present invention.
In the figure: 1. gas production pipe; 2. a roller; 3. a threaded rod; 4. a spray head; 5. a frame body; 6. hanging buckles; 7. a connecting plate; 8. a housing; 9. a clamping block; 10. a spring; 11. a spiral tube; 12. a sealing plate; 13. a limiting block; 14. filtering with a screen; 15. a baffle; 16. an inner ring; 17. rotating the leaf; 18. a connecting rod; 19. rotating the connecting seat; 20. a bracket.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The gas production pipe 1, the roller 2, the threaded rod 3, the spray nozzle 4, the frame 5, the suspension buckle 6, the connecting plate 7, the shell 8, the clamping block 9, the spring 10, the spiral pipe 11, the sealing plate 12, the limiting block 13, the filter screen 14, the guide plate 15, the inner ring 16, the rotating blade 17, the connecting rod 18, the rotating connecting seat 19 and the bracket 20 are all universal standard parts or parts known by a person skilled in the art, and the structure and the principle of the gas production pipe can be known by technical manuals or conventional experimental methods.
Referring to fig. 1-3, a spiral drainage, spray, atomization, drainage and gas production device for natural gas production comprises a gas production pipe 1, a sealing plate 12 is fixedly connected to the upper end of the inner cavity of the gas production pipe 1, a spiral pipe 11 is arranged on the left side of the sealing plate 12, the top of the spiral pipe 11 penetrates through a frame body 5 and is provided with a nozzle 4, a connecting rod 18 is fixedly connected to the bottom of the inner cavity of the spiral pipe 11, a rotary connecting seat 19 is arranged on the inner side of the connecting rod 18, a rotary vane 17 is arranged on the top of the rotary connecting seat 19, an inner ring 16 is inserted into the inner cavity of the gas production pipe 1, a guide plate 15 is fixedly connected to the middle end of the right side of the inner ring 16, the guide plate 15 is triangular, brackets 20 are fixedly connected to the lower ends of the left and right sides of the inner cavity of the inner ring 16, a filter screen 14 is arranged on the inner side of the bracket 20, the spiral pipe 11, the rotary vane 17, the connecting rod 18 and the rotary connecting seat 19 are arranged, when fluid enters the inner ring 16 through the bottom of the gas production pipe 1, firstly, impurities are filtered by a filter screen 14, the impurities enter the bottom of a spiral pipe 11 through the flow guide of a flow guide plate 15, a rotating blade 17 is rotated by the pressure of fluid to increase the ascending smoothness, and finally the impurities are sprayed out through a spray head 4, and then the next process is carried out, through the matching of the above structures, the purpose of high efficiency is achieved, the top of an inner ring 16 is fixedly connected with a frame body 5, the left side and the right side of the top of the frame body 5 are fixedly connected with suspension buckles 6, the suspension buckles 6 are symmetrically arranged, the upper end of the outer side of the frame body 5 is in threaded connection with a threaded rod 3, the inner side of the threaded rod 3 is fixedly connected with a clamping block 9, the outer side of the threaded rod 3 is fixedly connected with a connecting plate 7, the lower end of the outer side of the frame body 5 is fixedly connected with a shell 8, the inner cavity of the shell 8 is fixedly connected with a spring 10, the inner side of the spring 10 is fixedly connected with a limiting block 13, and the inner side of the limiting block 13 is provided with a roller 2, and the inner side of the roller 2 contacts the upper end of the outer side of the gas production pipe 1, a connecting plate 7, a shell 8, a clamping block 9 and a spring 10 are arranged, people lift the suspension buckle 6 through a lifting device, the suspension buckle 6 drives the inner ring 16 to be inserted into the top of the gas production pipe 1 through the frame body 5, after the inner ring 16 is inserted into the inner surface of the gas production pipe 1, the frame body 5 drives the shell 8 to move downwards, the roller 2 is attached to the outer side of the gas production pipe 1 to roll downwards, the roller 2 forces the limiting block 13 to move outwards, the limiting block 13 extrudes the spring 10 to deform, meanwhile, the counter-acting force of the spring 10 pushes the roller 2 inwards, so that the roller 2 can adapt to the width of the gas production pipe 1, after the bottom of the frame body 5 contacts the top end of the gas production pipe 1, people rotate the threaded rod 3 through the connecting plate 7, the threaded rod 3 drives the clamping block 9 to move to clamp the gas production pipe 1 inwards, and through the matching of the above structures, the purpose of good stability is achieved.
When the drainage gas production device is used, the connecting plate 7, the shell 8, the clamping block 9 and the spring 10 are arranged, people lift the suspension buckle 6 through a lifting device, the suspension buckle 6 drives the inner ring 16 to be inserted into the top of the gas production pipe 1 through the frame body 5, after the inner ring 16 is inserted into the inner surface of the gas production pipe 1, the frame body 5 drives the shell 8 to move downwards, the roller 2 is attached to the outer side of the gas production pipe 1 to roll downwards, the roller 2 forces the limiting block 13 to move outwards, the limiting block 13 extrudes the spring 10 to deform, meanwhile, the counter-acting force of the spring 10 pushes the roller 2 inwards, so that the roller 2 can adapt to the width of the gas production pipe 1, after the bottom of the frame body 5 is contacted with the top end of the gas production pipe 1, people rotate the threaded rod 3 through the connecting plate 7, the threaded rod 3 drives the clamping block 9 to move inwards to clamp the gas production pipe 1, and the aim of good stability is achieved through the matching of the structure, and the problem that the existing drainage gas production device does not have good stability is solved, lead to the problem that can not satisfy people's user demand, spiral pipe 11 has been set up, rotating vane 17, connecting rod 18 and rotation connecting seat 19, when the bottom that the fluid passes through gas production pipe 1 gets into inner circle 16, at first filter impurity through filter screen 14, the water conservancy diversion through guide plate 15 gets into the bottom of spiral pipe 11, fluidic pressure makes rotating vane 17 rotate, increase its smooth and easy nature that rises, spout through shower nozzle 4 at last, carry out process on next step again, through the cooperation of above structure, the purpose of high efficiency has been reached.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a natural gas exploitation adopts spiral drainage spray atomization drainage gas production device, includes gas production pipe (1), its characterized in that: an inner ring (16) is inserted into the inner cavity of the gas production pipe (1), the top of the inner ring (16) is fixedly connected with a frame body (5), the left side and the right side of the top of the frame body (5) are both fixedly connected with hanging buckles (6), the hanging buckles (6) are symmetrically arranged, the upper end of the outer side of the frame body (5) is connected with a threaded rod (3) through threads, the inner sides of the threaded rods (3) are fixedly connected with clamping blocks (9), the outer sides of the threaded rods (3) are fixedly connected with connecting plates (7), the lower ends of the outer sides of the frame bodies (5) are fixedly connected with a shell (8), the inner cavities of the shell (8) are fixedly connected with springs (10), the inner sides of the springs (10) are fixedly connected with limit blocks (13), the inner sides of the limit blocks (13) are provided with rollers (2), and the inner side of the roller (2) is contacted with the upper end of the outer side of the gas production pipe (1).
2. The spiral drainage, injection, atomization, drainage and gas production device for natural gas exploitation according to claim 1, wherein: the upper end of the inner cavity of the gas production pipe (1) is fixedly connected with a sealing plate (12), and a spiral pipe (11) is arranged on the left side of the sealing plate (12).
3. The spiral drainage, injection, atomization, drainage and gas production device for natural gas exploitation according to claim 2, wherein: the top of the spiral pipe (11) penetrates through the frame body (5) and is provided with the spray head (4), and the bottom of the inner cavity of the spiral pipe (11) is fixedly connected with a connecting rod (18).
4. The spiral drainage, injection, atomization, drainage and gas production device for natural gas exploitation according to claim 3, wherein: the inner side of the connecting rod (18) is provided with a rotary connecting seat (19), and the top of the rotary connecting seat (19) is provided with a rotating blade (17).
5. The spiral drainage, injection, atomization, drainage and gas production device for natural gas exploitation according to claim 1, wherein: the middle end on the right side of the inner ring (16) is fixedly connected with a guide plate (15), and the guide plate (15) is triangular.
6. The spiral drainage, injection, atomization, drainage and gas production device for natural gas exploitation according to claim 1, wherein: the lower ends of the left side and the right side of the inner cavity of the inner ring (16) are fixedly connected with brackets (20), and filter screens (14) are arranged on the inner sides of the brackets (20).
CN202122351787.4U 2021-09-27 2021-09-27 Natural gas is opened and is adopted spiral drainage atomizing drainage gas production device Expired - Fee Related CN216240560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122351787.4U CN216240560U (en) 2021-09-27 2021-09-27 Natural gas is opened and is adopted spiral drainage atomizing drainage gas production device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122351787.4U CN216240560U (en) 2021-09-27 2021-09-27 Natural gas is opened and is adopted spiral drainage atomizing drainage gas production device

Publications (1)

Publication Number Publication Date
CN216240560U true CN216240560U (en) 2022-04-08

Family

ID=80984772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122351787.4U Expired - Fee Related CN216240560U (en) 2021-09-27 2021-09-27 Natural gas is opened and is adopted spiral drainage atomizing drainage gas production device

Country Status (1)

Country Link
CN (1) CN216240560U (en)

Similar Documents

Publication Publication Date Title
CN204225813U (en) A kind of speed tubing string coiled tubing hanger
CN104358536A (en) Continuous oil pipe hanger for velocity tubular column
CN207356425U (en) A kind of used in fire-fighting automatic water-replenishing device
CN216240560U (en) Natural gas is opened and is adopted spiral drainage atomizing drainage gas production device
CN202745837U (en) Natural energy circulation gas lift well completion pipe string
CN201176867Y (en) Intelligentized novel yield-increasing gas lift device
CN109879465B (en) Underground filtering-precipitating device for loose sandstone thermal storage geothermal exploitation well
CN209778493U (en) Loose sandstone heat storage geothermal exploitation well underground filtering-precipitating device
CN113663384A (en) Continuous type filtering pipeline with anti-blocking function
CN205117312U (en) CO2 drives gas -tight technology tubular column
CN215057280U (en) Bottom pouring and producing device for petroleum producing well
CN208203218U (en) Closed type sieve tube ball seat
CN106268058A (en) It is easy to the vertical gas-liquid separator of fixing assembling
CN213540368U (en) Novel oil development sand filtering device
CN2758474Y (en) Under well gas liquid separating and back filling sand proof gas recovering device
CN210264642U (en) Hydrate sand production collecting device
CN208534434U (en) Uniform jet de-plugging fills integral process tubing string
CN205895202U (en) Device for fracturing wellhead
CN219452063U (en) Underground mechanical oil extraction device for oil field
CN206543504U (en) A kind of low-pressure gas well gas production filter
CN204327052U (en) Negative-pressure liquid discharge device
CN203978416U (en) Descaler under tubing pump pump
CN217999553U (en) Anti-collapse sand screen
CN214847412U (en) Teaching model for hydraulic engineering design
CN206668205U (en) Steam injection producing well universal well mouth device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220812

Address after: No. 33, Group 2, Shuangzhai Village, Qianfeng Town, Guang'an District, Guang'an City, Sichuan Province, 638500

Patentee after: Zeng Lingfa

Address before: 510000 No. 11, Cuiyu street, Huangge Town, Nansha District, Guangzhou City, Guangdong Province

Patentee before: Wang Yifa

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220408

CF01 Termination of patent right due to non-payment of annual fee