CN216238965U - Green building steel construction of unit-installment - Google Patents

Green building steel construction of unit-installment Download PDF

Info

Publication number
CN216238965U
CN216238965U CN202122793041.9U CN202122793041U CN216238965U CN 216238965 U CN216238965 U CN 216238965U CN 202122793041 U CN202122793041 U CN 202122793041U CN 216238965 U CN216238965 U CN 216238965U
Authority
CN
China
Prior art keywords
block
green building
building steel
spacer pin
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122793041.9U
Other languages
Chinese (zh)
Inventor
刘畅
郭家琛
辛卫宁
房维娟
周军逸
韩杰
杨敬波
毛迎道
刘凤山
刘杰
张艳红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Lvjian Integrated Technology Co ltd
Original Assignee
Qingdao Lvjian Integrated Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Lvjian Integrated Technology Co ltd filed Critical Qingdao Lvjian Integrated Technology Co ltd
Priority to CN202122793041.9U priority Critical patent/CN216238965U/en
Application granted granted Critical
Publication of CN216238965U publication Critical patent/CN216238965U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses an integrally assembled green building steel structure, which comprises: the mounting block is arranged on the outer side of the upright column, is of a hollow structure, and is internally provided with a butt joint block; the fixed block sets up the both sides of installation piece, and one side through connection of fixed block has the spacer pin to be provided with the shrink spring between spacer pin and the fixed block, the spread groove has been seted up to one side that the stand is close to the spacer pin. This green building steel construction of unit-installment, thereby make the shrink spring stretch out and draw back through the stand, thereby utilize the shrink spring to drive the spacer pin and remove to the one end and the spread groove of spacer pin dock, thereby carry on spacingly with the installation piece, utilize the backing plate, can make the inseparable laminating more of butt joint piece and stand, through mutually supporting of oxidation resisting layer and protection shield, thereby make the green building steel construction of unit-installment have corrosion-resistant effect.

Description

Green building steel construction of unit-installment
Technical Field
The utility model relates to the technical field of building steel structures, in particular to an integrally assembled green building steel structure.
Background
The building steel structure is one of the main types of the current building structures, and is widely applied to various places such as factory buildings, venues and the like because of the characteristics of low economic cost, simple construction, light self type and the like, wherein the assembly type green building steel structure generally refers to a building manufactured by prefabricated components in the construction and construction process of a construction site, and the building built by the method has the characteristics of high speed, low labor cost and the like, but the integral assembly type green building steel structure on the market has various types, but has some defects in the use process, such as:
according to the patent number: CN202022121850.0 a green building steel construction of unit-installment, the stand inserts and indulges the sheath upper end, can play the fixed action to the stand, insert the long round pin axle in first through-hole and the first logical groove, the first nut of screwing, overhead gage and lower baffle can be in indulging the sheath inner chamber activity from top to bottom, the middle vibration that indulges the spring board and can absorb the direction from top to bottom and the variable of thermal expansion, prevent that the size of steelframe can change, the panel of fixing on the steelframe is stretched, lead to panel deformation, can strengthen the stability of steel construction, this kind of prior art scheme still has following problem when using:
1. the integrally assembled green building steel structure is inconvenient to carry out limiting installation;
2. the firm supporting effect of the integrally assembled green building steel structure is poor;
3. the corrosion resistant effect of the whole assembly type green building steel structure is not good.
Therefore, improvements are made to the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an integrally assembled green building steel structure, and aims to solve the problems that the integrally assembled green building steel structure in the existing market is inconvenient to carry out limiting installation, the firm supporting effect of the integrally assembled green building steel structure is poor, and the corrosion resistance effect of the integrally assembled green building steel structure is poor, which are provided by the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: an integrally assembled green building steel structure comprising:
the mounting block is arranged on the outer side of the upright column and is of a hollow structure, the butt-joint block is arranged inside the mounting block, and the cross section of the upright column is H-shaped;
the fixed block sets up the both sides of installation piece, and one side through connection of fixed block has the spacer pin to be provided with the shrink spring between spacer pin and the fixed block, the spread groove has been seted up to one side that the stand is close to the spacer pin.
Preferably, the spacer pin docks with the spread groove, and the spacer pin constitutes extending structure through contracting between spring and the fixed block, thereby makes the shrink spring stretch out and draw back through the stand, thereby utilizes the shrink spring to drive the spacer pin and remove to the one end and the spread groove of spacer pin dock, thereby will install the piece and carry on spacingly.
Preferably, a groove is formed in one side of the butt joint block, a connecting block is arranged in the groove, a base plate is arranged on one side of the connecting block, the bolt sequentially penetrates through the installation block, the stand column, the base plate and the butt joint block, and the bolt is fastened with the matched nut, so that the installation block and the stand column are installed.
Preferably, the backing plate is the symmetric distribution about the central line of stand, and the connecting block passes through to constitute sliding construction between recess and the butt joint piece, utilizes the backing plate, can make the inseparable laminating more of butt joint piece and stand.
Preferably, one side through connection of installation piece has the bolt, and adjacent two be provided with the crossbeam between the stand to the crossbeam docks with the installation piece, thereby makes the crossbeam have anti-oxidant effect through the antioxidation layer.
Preferably, the outside of crossbeam is provided with the antioxidation layer, and the outside of antioxidation layer is provided with the protection shield, the antioxidation layer adopts ceramic material, and the protection shield adopts the aluminum plate material, through mutually supporting of antioxidation layer and protection shield to make the green building steel construction of unit-installment have corrosion-resistant effect.
Compared with the prior art, the utility model has the beneficial effects that: this green building steel construction of unit-installment, thereby make the shrink spring stretch out and draw back through the stand, thereby utilize the shrink spring to drive the spacer pin and remove to the one end and the spread groove of spacer pin dock, thereby carry on spacingly with the installation piece, utilize the backing plate, can make the inseparable laminating more of butt joint piece and stand, through mutually supporting of oxidation resisting layer and protection shield, thereby make the green building steel construction of unit-installment have corrosion-resistant effect.
1. This green building steel construction of unit-installment, will install piece and stand and dock, extrude the spacer pin through the surface of stand simultaneously, thereby make the shrink spring stretch out and draw back, when the spacer pin meets with the spread groove, thereby drive the spacer pin through the shrink spring and remove, so that the one end and the spread groove of spacer pin dock, mutually support through shrink spring and spacer pin, so that carry on spacingly to the installation piece, thereby make the green building steel construction of unit-installment have spacing mounting structure.
2. This green building steel construction of unit-installment, promote the backing plate, thereby drive the connecting block and remove in the inside of recess, when the connecting block removes the bottom of recess, utilize the bolt to run through the installation piece in proper order, the stand, backing plate and butt joint piece, the supporting nut of rethread fastens with the bolt, thereby will install the piece and install with the stand, utilize the backing plate simultaneously, can make the inseparable laminating more of butt joint piece and stand, thereby make the firm support effect of the green building steel construction of unit-installment better.
3. This green building steel construction of unit-installment, because the antioxidation layer adopts ceramic material to make the crossbeam have anti-oxidant effect, simultaneously because the protection shield adopts the aluminium plate material, thereby make the protection shield can protect against the antioxidation layer, through mutually supporting of antioxidation layer and protection shield, thereby make the green building steel construction of unit-installment have corrosion-resistant effect, so that improve the life of the green building steel construction of unit-installment.
Drawings
FIG. 1 is a schematic sectional view of the present invention;
FIG. 2 is a schematic top cross-sectional view of the present invention;
FIG. 3 is an enlarged view of a portion of FIG. 2;
fig. 4 is a schematic perspective view of the column 1 of the present invention.
In the figure: 1. a column; 2. mounting blocks; 3. a butt joint block; 4. a fixed block; 5. a spacing pin; 6. a retraction spring; 7. connecting grooves; 8. a groove; 9. connecting blocks; 10. a base plate; 11. a bolt; 12. a cross beam; 13. an anti-oxidation layer; 14. and (5) protecting the board.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an integrally assembled green building steel structure comprising: stand 1, the outside of stand 1 is provided with installation piece 2, and installation piece 2 is hollow structure to the inside of installation piece 2 is provided with butt joint piece 3, and the cross sectional shape of stand 1 is "H" style of calligraphy, and fixed block 4 sets up in the both sides of installation piece 2, and one side through connection of fixed block 4 has spacer pin 5, and be provided with shrink spring 6 between spacer pin 5 and the fixed block 4, and spread groove 7 has been seted up to one side that stand 1 is close to spacer pin 5.
The limit pin 5 is in butt joint with the connecting groove 7, and the limit pin 5 and the fixing block 4 form a telescopic structure through a contraction spring 6.
Will install piece 2 and butt joint of stand 1, extrude spacer pin 5 through stand 1's surface simultaneously, thereby make shrink spring 6 stretch out and draw back, when spacer pin 5 meets with spread groove 7, thereby drive spacer pin 5 through shrink spring 6 and remove, so that the one end of spacer pin 5 docks with spread groove 7, through mutually supporting of shrink spring 6 and spacer pin 5, so that carry on spacingly to installation piece 2, thereby make the green building steel construction of whole assembled have spacing mounting structure.
One side of the butt joint block 3 is provided with a groove 8, a connecting block 9 is arranged in the groove 8, and a base plate 10 is arranged on one side of the connecting block 9; the base plates 10 are symmetrically distributed about the center line of the upright post 1, and the connecting blocks 9 form a sliding structure with the butt-joint blocks 3 through the grooves 8.
Promote backing plate 10 to drive connecting block 9 and remove in the inside of recess 8, when connecting block 9 removed the bottom of recess 8, utilize bolt 11 to run through installation piece 2, stand 1, backing plate 10 and butt joint piece 3 in proper order, the supporting nut of rethread fastens with bolt 11, thereby installs installation piece 2 and stand 1, utilizes backing plate 10 simultaneously, can make butt joint piece 3 and the inseparable laminating more of stand 1.
One side of the mounting block 2 is connected with a bolt 11 in a penetrating way, a cross beam 12 is arranged between two adjacent upright posts 1, and the cross beam 12 is butted with the mounting block 2; the outer side of the cross beam 12 is provided with an oxidation resistant layer 13, the outer side of the oxidation resistant layer 13 is provided with a protective plate 14, the oxidation resistant layer 13 is made of ceramic materials, and the protective plate 14 is made of aluminum plates.
Because oxidation resisting layer 13 adopts ceramic material to make crossbeam 12 have anti-oxidant effect, simultaneously because protection shield 14 adopts the aluminium plate material, thereby make protection shield 14 can protect oxidation resisting layer 13, through oxidation resisting layer 13 and protection shield 14 mutually supporting, thereby make the green building steel construction of whole assembled have corrosion-resistant effect.
In conclusion, when the integrally assembled green building steel structure is used, the mounting block 2 is butted with the upright post 1, the contraction spring 6 is extended and contracted through the surface of the upright post 1, the limit pin 5 is driven to move through the contraction spring 6, so that one end of the limit pin 5 is in butt joint with the connecting groove 7 to push the backing plate 10, thereby driving the connecting block 9 to move in the groove 8, utilizing the bolt 11 to sequentially penetrate through the mounting block 2, the upright post 1, the backing plate 10 and the butt-joint block 3, and then fastening with the bolt 11 through the matched nut, so that the mounting block 2 and the upright post 1 are mounted, through the mutual matching of the oxidation resisting layer 13 and the protection plate 14, so that the integrally assembled green building steel structure has a corrosion resistance effect, and the contents which are not described in detail in the present specification belong to the prior art which is well known to those skilled in the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the utility model can be made, and equivalents and modifications of some features of the utility model can be made without departing from the spirit and scope of the utility model.

Claims (6)

1. The utility model provides a green building steel construction of unit-installment, its characterized in that includes:
the mounting structure comprises a vertical column (1), wherein an installation block (2) is arranged on the outer side of the vertical column (1), the installation block (2) is of a hollow structure, a butt-joint block (3) is arranged inside the installation block (2), and the cross section of the vertical column (1) is H-shaped;
fixed block (4), the setting is in the both sides of installation piece (2), and one side through connection of fixed block (4) has spacer pin (5) to be provided with shrink spring (6) between spacer pin (5) and fixed block (4), spread groove (7) have been seted up to one side that stand (1) is close to spacer pin (5).
2. The integrally assembled green building steel structure of claim 1, wherein: the limiting pin (5) is in butt joint with the connecting groove (7), and the limiting pin (5) forms a telescopic structure with the fixing block (4) through the contraction spring (6).
3. The integrally assembled green building steel structure of claim 1, wherein: one side of the butt joint block (3) is provided with a groove (8), a connecting block (9) is arranged inside the groove (8), and a base plate (10) is arranged on one side of the connecting block (9).
4. The integrally assembled green building steel structure of claim 3, wherein: the base plate (10) is symmetrically distributed about the center line of the upright post (1), and the connecting block (9) forms a sliding structure with the butt-joint block (3) through the groove (8).
5. The integrally assembled green building steel structure of claim 1, wherein: one side of the mounting block (2) is connected with a bolt (11) in a penetrating manner, a cross beam (12) is arranged between every two adjacent upright columns (1), and the cross beam (12) is in butt joint with the mounting block (2).
6. The integrally assembled green building steel structure of claim 5, wherein: the outer side of the cross beam (12) is provided with an oxidation resistant layer (13), the outer side of the oxidation resistant layer (13) is provided with a protective plate (14), the oxidation resistant layer (13) is made of ceramic materials, and the protective plate (14) is made of aluminum plate materials.
CN202122793041.9U 2021-11-15 2021-11-15 Green building steel construction of unit-installment Active CN216238965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122793041.9U CN216238965U (en) 2021-11-15 2021-11-15 Green building steel construction of unit-installment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122793041.9U CN216238965U (en) 2021-11-15 2021-11-15 Green building steel construction of unit-installment

Publications (1)

Publication Number Publication Date
CN216238965U true CN216238965U (en) 2022-04-08

Family

ID=80941104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122793041.9U Active CN216238965U (en) 2021-11-15 2021-11-15 Green building steel construction of unit-installment

Country Status (1)

Country Link
CN (1) CN216238965U (en)

Similar Documents

Publication Publication Date Title
CN207160453U (en) Balustrade with glass panel fixed structure
CN216238965U (en) Green building steel construction of unit-installment
CN211690968U (en) Composite curtain wall structure
CN112065013A (en) Outer wall scaffold reinforcing mechanism for construction
CN204624885U (en) A kind of standard knot support chassis of elevator
CN215166991U (en) Curtain wall with four sides capable of freely stretching
CN211369204U (en) High stability combination formula steel construction building curtain
CN109208757B (en) Steel beam and column connecting node
CN217266913U (en) Aluminum alloy upright post structure
CN108400756B (en) Large-span flexible support double-glass photovoltaic system
CN217266914U (en) Aluminum alloy handrail structure
CN217266880U (en) Aluminum alloy view bridge
CN217266923U (en) Aluminum alloy bridge deck structure
CN218861753U (en) Assembled supporting steel structure
CN217871259U (en) Glass curtain wall crossbeam stand pin formula connected system
CN216142213U (en) Honeycomb aluminum plate of high sound insulation
CN206279623U (en) A kind of tier building steel structure frame
CN217735091U (en) Photovoltaic power generation rail guard
CN220434602U (en) Main panel for water baffle and water baffle
CN215681638U (en) Right angle crane span structure is made to polyurethane convenient to connect equipment
CN217150908U (en) Steel construction wall body
CN220184396U (en) Keel installation node
CN221408288U (en) Novel PVC composite cable bridge
CN210685482U (en) Scaffold for assembly type building construction
CN221799259U (en) Assembled building fixed base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant