CN216219181U - Environment restoration is with green rail of planting in abandonment mine - Google Patents

Environment restoration is with green rail of planting in abandonment mine Download PDF

Info

Publication number
CN216219181U
CN216219181U CN202122508485.3U CN202122508485U CN216219181U CN 216219181 U CN216219181 U CN 216219181U CN 202122508485 U CN202122508485 U CN 202122508485U CN 216219181 U CN216219181 U CN 216219181U
Authority
CN
China
Prior art keywords
mounting
fence
green
fixed
planting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122508485.3U
Other languages
Chinese (zh)
Inventor
杨薇薇
贾超贤
亓雅茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan vocational technical college
Original Assignee
Huainan vocational technical college
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan vocational technical college filed Critical Huainan vocational technical college
Priority to CN202122508485.3U priority Critical patent/CN216219181U/en
Application granted granted Critical
Publication of CN216219181U publication Critical patent/CN216219181U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Plants (AREA)

Abstract

The utility model discloses a green plant planting fence for abandoned mine for environmental restoration, which comprises a mounting plate, wherein a through groove is formed in the middle of the mounting plate in a penetrating manner, shielding fences are symmetrically and movably mounted on two sides of the through groove, supporting rods are movably mounted on the side walls of the shielding fences and can be clamped and fixed on the surface of the mounting plate, a plurality of butt-joint rings are arranged on the side walls of the two shielding fences, a supporting structure with adjustable height is arranged on the surface of the mounting plate and above the through groove and used for supporting green plants, and the supporting structure is opened in the middle and can be used for fixing green plants with different diameters. The utility model is convenient for transportation and on-site assembly, and can effectively improve the rooting rate and survival rate of green plants.

Description

Environment restoration is with green rail of planting in abandonment mine
Technical Field
The utility model relates to the technical field of protection structures, in particular to a green planting fence for abandoned mine for environmental restoration.
Background
Abandoned mine is what the mountain body left after carrying out mineral exploitation, mineral exploitation is very big to the geology injury, the self-repairing time of mountain body is long, in order to reduce repair time, the method of artificial interference can be taken, if the manual work carries out green planting, improve mountain body intensity in the mine, because the geology of mine is special, when carrying out green planting, green planting is difficult to roll the root, the steadiness that leads to green planting is low, easy emergence is emptyd, and because mineral exploitation leads to the interior rubble of mine more, in order to protect green planting, the green rail of planting of abandoned mine for environmental remediation has been designed.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to solving, at least to some extent, one of the technical problems in the related art. Therefore, the utility model aims to provide the abandoned mine green plant planting fence for environmental restoration, the device is convenient to transport and assemble on site, and the rooting rate and survival rate of green plants can be effectively improved.
The waste mine green plant planting fence for environmental restoration comprises a mounting plate, wherein a through groove is formed in the middle of the mounting plate in a penetrating mode, shielding bars are symmetrically and movably mounted on two sides of the through groove, supporting rods are movably mounted on the side walls of the shielding bars and can be fixed on the surface of the mounting plate in a clamping mode, a plurality of butt-joint rings are arranged on the side walls of the two shielding bars, a supporting structure with the adjustable height is arranged on the surface of the mounting plate and located above the through groove and used for supporting green plants, and the supporting structure is opened in the middle and can be used for fixing green plants with different diameters.
Preferably, bearing structure includes two installing framves, first spacing groove and second spacing groove have been seted up respectively to the outer lane and the inner circle of installing frame, the inside of installing frame is fixed with the gag lever post, the movable surface mounting of gag lever post has the removal pipe, the both sides of removing the pipe are fixed with first movable plate and telescopic link respectively, the telescopic link is kept away from the one end of removing the pipe and is fixed with the second movable plate, first movable plate and second movable plate movable mounting are respectively in the inside of first spacing groove and second spacing groove, the lateral wall of first movable plate is fixed with the push pedal, the lateral wall of second movable plate is fixed with the pressure gasket, the external fixation of pressure gasket has the rubber cushion, the pressure gasket realizes information transmission with data terminal.
Preferably, the mounting panel includes left plate body and right plate body, and left plate body and right plate body can assemble the split, a plurality of through-holes have been seted up to the both ends symmetry of mounting panel, and are a plurality of the inside of through-hole all is provided with the peg.
Preferably, bearing structure's lower surface movable mounting has a plurality of expansion plates, just bearing structure's one end is kept away from to the expansion plate with mounting panel upper surface is articulated, the inside of expansion plate is provided with from the locking piece, the lateral wall of expansion plate is provided with the regulation button.
Preferably, the inner ring and the outer ring of the mounting frame are non-concentric circular arc surfaces.
Preferably, the gag lever post is arc member, remove the pipe and be the arc pipe fitting, and gag lever post and removal pipe looks adaptation.
The beneficial effects of the utility model are as follows: the device is an integrated assembly structure, is convenient for batch transportation, and the shielding plate can be deflected and unfolded when being installed, and the adjacent shielding plates can be butted and fixed through a butting ring, so that a range fence is formed, because of the special geology of the mine, the green plants are not easy to root in the place, when the green plant planting culture is carried out, in order to improve the rooting effect and the survival rate of the green plants, the supporting structure is arranged to provide auxiliary support for the green plants, and the supporting structure has an adjusting range, is suitable for the green plants with different diameters, during the rooting growth period of the green plants, the green plant main rods also grow, in order to make the supporting structure adapt to the growth of the green plants, a pressure-sensitive gasket is arranged for monitoring, and can transmit data information to data terminal, the supervisory personnel adjusts bearing structure at any time, adapts to green planting and grows, and this device makes things convenient for transportation and on-the-spot equipment to can effectively improve root rate and the survival rate of green planting.
Drawings
Fig. 1 is a perspective view of the overall structure of a green planting fence for a waste mine for environmental remediation according to the present invention.
Fig. 2 is a perspective view of a support structure of the green planting fence for the abandoned mine for environmental remediation according to the present invention.
Fig. 3 is a perspective view of an internal structure of a mounting frame of the green planting fence for the abandoned mine for environmental remediation according to the present invention.
Fig. 4 is an exploded view of an installation structure inside an installation frame of the green planting fence for the abandoned mine for environmental remediation according to the utility model.
In the figure: the device comprises a 1-mounting plate, a 2-through groove, a 3-shielding fence, a 4-supporting rod, a 5-butt ring, a 6-supporting structure, a 601-mounting frame, a 602-first limiting groove, a 603-second limiting groove, a 604-limiting rod, a 605-moving pipe, a 606-first moving plate, a 607-telescopic rod, a 608-second moving plate, a 609-push plate, a 610-pressure-sensitive gasket, a 611-rubber cushion and a 7-telescopic plate.
Detailed Description
Referring to fig. 1-4, green planting rail of abandonment mine for environmental remediation, including mounting panel 1, logical groove 2 has been seted up in the middle part of mounting panel 1 through, the equal symmetrical movable mounting in both sides that leads to groove 2 has the fence of sheltering from, the equal movable mounting in lateral wall that shelters from the fence has bracing piece 4, but bracing piece 4 joint fix on the surface of mounting panel 1, two lateral walls that shelter from the fence all are provided with a plurality of butt rings 5, the surface of mounting panel 1 and the top that is located logical groove 2 are provided with height-adjustable's that is used for supporting green bearing structure 6 of planting, bearing structure 6 middle part opening just can fix green planting of different diameters.
The supporting structure 6 comprises two mounting frames 601, a first limiting groove 602 and a second limiting groove 603 are respectively formed on the outer ring and the inner ring of the mounting frame 601, a limiting rod 604 is fixed inside the mounting frame 601, a moving tube 605 is movably mounted on the surface of the limiting rod 604, a first moving plate 606 and a telescopic rod 607 are respectively fixed on two sides of the moving tube 605, a second moving plate 608 is fixed on one end of the telescopic rod 607 far away from the moving tube 605, the first moving plate 606 and the second moving plate 608 are respectively movably mounted inside the first limiting groove 602 and the second limiting groove 603, a push plate 609 is fixed on the side wall of the first moving plate 606, a pressure-sensitive gasket 610 is fixed on the side wall of the second moving plate 608, a rubber cushion 611 is fixed on the outside of the pressure-sensitive gasket 610, the pressure-sensitive gasket 610 realizes information transmission with a data terminal, the data terminal is monitored by a tester, when data detected by the pressure-sensitive gasket 610 reaches a set value, the data terminal can send out a prompt.
Mounting panel 1 includes left plate body and right plate body, and left plate body and right plate body can assemble the split, and a plurality of through-holes have been seted up to mounting panel 1's both ends symmetry, and the inside of a plurality of through-holes all is provided with the peg, plants the mature back in the development of root system at green, then has accomplished the cultivation work of planting green, can remove this device this moment, and the growth space of increase plant also conveniently drops into other areas with this device and uses.
Supporting structure 6's lower surface movable mounting has a plurality of expansion plates 7, and expansion plate 7 keeps away from supporting structure 6's one end and 1 upper surface of mounting panel articulated, and expansion plate 7's inside is provided with from the latch fitting, and expansion plate 7's lateral wall is provided with the regulation button, through the height position that control expansion plate 7 deflected and flexible adjustment supporting structure 6 to the green planting that adapts to the support.
As shown in fig. 2, when the second moving plate 608 moves, a distance between the rubber cushion 611 and a center of the outer ring changes, so that the supporting structure 6 has applicability and adjustability.
The gag lever post 604 is arc member, remove pipe 605 and be the arc pipe fitting, and gag lever post 604 and remove pipe 605 looks adaptation.
When the device is used, the device is transported to a mine planting position in batches, then positioning and placing are carried out, the mounting plates 1 are fixed on the ground of a mine pit by using studs, the shielding columns 3 are turned over, the two supporting rods 4 are clamped and fixed with the mounting plates 1 to realize the expansion of the shielding columns 3, the shielding plates of adjacent devices are fixed by the butt rings 5 while expanding to form a range fence, during planting, ground hole opening operation is carried out in the range of the through grooves 2, then green planting is carried out, if the green planting is trees, the trees can be fixed by using the supporting structures 6, the telescopic plates 7 are deflected at first, the length of the telescopic plates 7 is adjusted, so that the height of the supporting structures 6 is adjusted, then the two mounting frames 601 are fixed on the surfaces of the trees in an encircling manner and fixed by using bolts, the push plates 609 are pushed, so that the first moving plate 606 drives the moving pipes 605 to move on the surfaces of the limiting rods 604, meanwhile, the moving pipe 605 drives the telescopic rod 607 and the second moving plate 608 to move, because the inner ring and the outer ring of the mounting frame 601 are eccentric cambered surfaces, the telescopic rod 607 is in telescopic fit while the second moving plate 608 moves, when the second moving plate 608 moves, the rubber cushion 611 mounted on the side wall of the second moving plate 608 also moves synchronously, and because of the special structure of the inner ring of the mounting plate 1, the distance from the rubber cushion 611 to the tree changes during moving, thereby realizing support for trees with different diameters, because the geology of a pit is hard, the root pricking period of the tree is long, the time for supporting the tree is long, but during the root pricking period, the tree still grows, in order to protect the tree from being excessively extruded by the supporting structure 6 during growing, the side wall of the second moving plate 608 is provided with the pressure sensing gasket 610, pressure is transmitted by using the deformation of the rubber cushion 611, pressure is detected by pressure-sensitive gasket 610, and in the tree growth process, the pressure that pressure-sensitive gasket 610 detected progressively increases, and pressure-sensitive gasket 610 sends pressure information to data terminal, is observed by the supervisory personnel, adjusts bearing structure 6 at any time, promotes push plate 609, alleviates the pressure of rubber cushion 611 to the tree, improves the survival rate that the tree was planted.

Claims (6)

1. Environment restoration is with green planting rail of abandonment mine, its characterized in that: including the mounting panel, the middle part of mounting panel is run through and has been seted up logical groove, the equal symmetrical movable mounting in both sides that leads to the groove has the fence of sheltering from, the equal movable mounting in lateral wall that shelters from the fence has the bracing piece, just but bracing piece joint is fixed on the surface of mounting panel, two the lateral wall that shelters from the fence all is provided with a plurality of butt rings, the surface of mounting panel and the top that is located logical groove are provided with height-adjustable's a bearing structure who is used for supporting green planting, bearing structure middle part opening just can fix the green planting of different diameters.
2. The environment-remediating waste mine green plant planting fence as claimed in claim 1, wherein: the utility model discloses a bearing structure, including bearing structure, mounting frame, first spacing groove and second spacing groove, the inside of mounting frame is fixed with the gag lever post, the movable mounting of surface of gag lever post has the removal pipe, the both sides of removing the pipe are fixed with first movable plate and telescopic link respectively, the telescopic link is kept away from the one end of removing the pipe and is fixed with the second movable plate, first movable plate and second movable plate movable mounting are respectively in the inside of first spacing groove and second spacing groove, the lateral wall of first movable plate is fixed with the push pedal, the lateral wall of second movable plate is fixed with the pressure gasket, the external fixation of pressure gasket has rubber cushion, the pressure gasket realizes information transmission with data terminal.
3. The environment-remediating waste mine green plant planting fence as claimed in claim 1, wherein: the mounting panel includes left plate body and right plate body, and left plate body and right plate body can assemble the split, a plurality of through-holes have been seted up to the both ends symmetry of mounting panel, and are a plurality of the inside of through-hole all is provided with the peg.
4. The environment-remediating waste mine green plant planting fence as claimed in claim 1, wherein: the lower surface movable mounting of bearing structure has a plurality of expansion plates, just bearing structure's one end is kept away from to the expansion plate with mounting panel upper surface is articulated, the inside of expansion plate is provided with from the latch fitting, the lateral wall of expansion plate is provided with the regulation button.
5. The environment-remediating waste mine green plant planting fence as claimed in claim 2, wherein: the inner ring and the outer ring of the mounting frame are non-concentric circular arc surfaces.
6. The environment-remediating waste mine green plant planting fence as claimed in claim 2, wherein: the gag lever post is arc member, remove the pipe and be the arc pipe fitting, and gag lever post and removal pipe looks adaptation.
CN202122508485.3U 2021-10-19 2021-10-19 Environment restoration is with green rail of planting in abandonment mine Active CN216219181U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122508485.3U CN216219181U (en) 2021-10-19 2021-10-19 Environment restoration is with green rail of planting in abandonment mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122508485.3U CN216219181U (en) 2021-10-19 2021-10-19 Environment restoration is with green rail of planting in abandonment mine

Publications (1)

Publication Number Publication Date
CN216219181U true CN216219181U (en) 2022-04-08

Family

ID=80988209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122508485.3U Active CN216219181U (en) 2021-10-19 2021-10-19 Environment restoration is with green rail of planting in abandonment mine

Country Status (1)

Country Link
CN (1) CN216219181U (en)

Similar Documents

Publication Publication Date Title
CN111653913B (en) Convenient installation device of basic station vertical grounding body
CN216219181U (en) Environment restoration is with green rail of planting in abandonment mine
CN103938914A (en) Portable pole centralizing device and method for centralizing telegraph pole
CN205249127U (en) Photovoltaic module's pretension mounting structure
CN205005619U (en) Foundation earth anchor
CN212270825U (en) Plant-growing concrete revetment structure
CN112376979B (en) Wire pole that conveniently carries out electric power and overhauls
CN111953277A (en) Photovoltaic support system suitable for easily sinking and collapsing areas
CN211080088U (en) Ecological protection stock barricade suitable for hydro-fluctuation belt and ordinary side slope
CN212343709U (en) Photovoltaic support system suitable for easily sinking and collapsing areas
CN218680600U (en) Forest ecological remediation device
CN217204083U (en) Fixed frame device that worker's method stake was used
CN212786862U (en) Support is used in garden engineering construction
CN220686935U (en) Foundation pit safety protection device
CN215011990U (en) Planting frame that vegetable planting used
CN212600358U (en) Vegetable greenhouse steel pipe frame fixed length cutting auxiliary positioning mechanism
CN220864389U (en) Reinforcing bar punching auxiliary device is planted to constructional column top surface
CN218499878U (en) Bird-proof net convenient to use
CN215906818U (en) Vegetation slope protection soil and water conservation device
CN108934745A (en) A kind of simple type plant fixing frame
CN218940998U (en) Photovoltaic panel support convenient to install on greenery patches
CN220827820U (en) Side slope soil fixing device
CN211991039U (en) Mountain region photovoltaic pre-buried pile and support stand are to wearing bolt drilling equipment
CN214613572U (en) Adjustable device of demolising in expansion joint waterproof rubber area
CN214942430U (en) Novel template support for building engineering construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant