CN216212175U - Construction progress record management device for engineering cost - Google Patents
Construction progress record management device for engineering cost Download PDFInfo
- Publication number
- CN216212175U CN216212175U CN202121830867.1U CN202121830867U CN216212175U CN 216212175 U CN216212175 U CN 216212175U CN 202121830867 U CN202121830867 U CN 202121830867U CN 216212175 U CN216212175 U CN 216212175U
- Authority
- CN
- China
- Prior art keywords
- bottom shell
- fixedly arranged
- management device
- construction progress
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a construction progress recording management device for engineering cost, which comprises a bottom shell, wherein a rotating shaft is arranged on one side wall of the bottom shell, a cover body is fixedly arranged on one side wall of the rotating shaft, which is far away from the bottom shell, an insertion block is fixedly arranged at the lower end of the cover body, a clamping hole is formed in the upper end of the bottom shell, an iron sheet is arranged in the bottom shell, recording paper is arranged at the upper end of the iron sheet, a first magic tape is fixedly arranged on one side wall of the bottom shell, which is far away from the rotating shaft, a second magic tape is fixedly arranged at the upper end of the cover body, a placing groove is formed in the bottom shell, a supporting plate is arranged in the placing groove, an installation cavity is fixedly arranged in the bottom shell, a moving rod is arranged in the installation cavity in a sliding mode, and limiting grooves are formed in the inner walls of two sides of the installation cavity. This practicality is provided with the structure that carries out fine protection to this structure corner to and the structure of person's of facilitating the use record.
Description
Technical Field
The utility model relates to the field of project cost progress records, in particular to a construction progress record management device for project cost.
Background
The building engineering is an engineering entity which performs various technical works and completions such as planning, surveying, designing, constructing, completing and the like for newly building, reconstructing or extending building buildings and affiliated structures and installation engineering of lines, pipelines and equipment matched with the engineering entity. Also refers to the construction of various houses and buildings, also known as the construction workload. The investment amount of the part can be realized only by the construction activities with the need of carrying out the work and the material movement.
The prior patent No. (CN210733628U) proposes a progress recording device for engineering project management, which is characterized in that a plurality of sliding grooves are arranged on a recording plate, a sliding block is connected in the sliding grooves in a sliding manner, clamping blocks on the sliding block are connected with clamping grooves on the sliding grooves in a clamping manner, a plurality of sliding grooves correspond to a plurality of task columns on the recording plate, a plurality of rows of clamping grooves correspond to a plurality of time columns, the sliding block is fixed at a certain position through the sliding block, the current progress of the current task can be clearly known, the problem that the progress of the engineering is inconvenient to record in a construction site with a complex environment is solved, but when the device is closed, the whole device at a corner is fixed by only using a fixing buckle, the upper cover cannot be fixed and is possibly damaged in use, and when the device is disciplined, the whole device is made of soft material, therefore, when recording the use of the pen, the recording is troublesome, and the utility model provides a construction progress recording management device for engineering cost aiming at the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art and provides a construction progress recording and managing device for construction cost.
In order to achieve the purpose, the utility model adopts the following technical scheme: a construction progress recording management device for engineering cost comprises a bottom shell, wherein a rotating shaft is arranged on one side wall of the bottom shell, a cover body is fixedly arranged on one side wall of the rotating shaft, which is far away from the bottom shell, an insertion block is fixedly arranged at the lower end of the cover body, a clamping hole is formed in the upper end of the bottom shell, an iron sheet is arranged in the bottom shell, recording paper is arranged at the upper end of the iron sheet, a first magic tape is fixedly arranged on one side wall of the bottom shell, which is far away from the rotating shaft, and a second magic tape is fixedly arranged at the upper end of the cover body;
the mounting structure is characterized in that a placing groove is formed in the bottom shell, a supporting plate is arranged in the placing groove, an installation cavity is fixedly arranged in the bottom shell, a moving rod is arranged in the installation cavity in a sliding mode, limiting grooves are formed in the inner walls of the two sides of the installation cavity, limiting blocks are fixedly arranged on the two side walls of the moving rod, grooves are formed in the bottom end of the placing groove, a connecting rod is fixedly arranged at the front end of the moving rod, and a sliding groove is formed in the front end of the bottom shell.
As a further description of the above technical solution:
the insertion block is clamped in the clamping hole.
As a further description of the above technical solution:
and a magnet is arranged at the upper end of the recording paper.
As a further description of the above technical solution:
the first magic tape and the second magic tape are pasted.
As a further description of the above technical solution:
the limiting block is located in the limiting groove and slides up and down.
As a further description of the above technical solution:
the lower end of the moving rod is communicated with the inside of the groove.
As a further description of the above technical solution:
the connecting rod front end runs through the spout and leads to drain pan front end and fixedly connected with connecting block.
As a further description of the above technical solution:
the lower end of the bottom shell is provided with a through hole.
The utility model has the following beneficial effects:
compare with current device, the device is provided with the structure that can guarantee that the corner of lid can not receive the damage to and the structure of opening fast and closing, the cooperation of inserted block and card accuse, stability when assurance the device that can be better closes.
Compare with current device, the device is provided with the backup pad, is carrying out many characters note as the record person, places the recording paper lower extreme with the backup pad, increases the hardness of paper, improves the writing speed of writing of taking notes, and it is more convenient to use.
Compare with current device, the device is provided with the standing groove that can accomodate the backup pad to can fix it, it is simple and convenient to use.
Compare with current device, the device is provided with magnet and paster, can easily fix the record paper.
Drawings
Fig. 1 is a top view of a construction progress recording management apparatus for construction cost according to the present invention;
fig. 2 is a structural view of a construction progress recording and managing apparatus for construction costs according to the present invention;
fig. 3 is a structural view of a construction progress recording and managing apparatus for construction costs according to the present invention;
FIG. 4 is a view showing a partial structure of a construction progress recording and managing apparatus for construction costs according to the present invention;
fig. 5 is a partial front sectional view of a construction progress recording management apparatus for construction costs according to the present invention;
FIG. 6 is an enlarged view taken at A in FIG. 2;
FIG. 7 is an enlarged view at B of FIG. 5;
fig. 8 is a partial structural view of a construction progress recording and managing apparatus for construction costs according to the present invention.
Illustration of the drawings:
1. a bottom case; 2. a rotating shaft; 3. a cover body; 4. inserting a block; 5. a clamping hole; 6. iron sheets; 7. recording paper; 8. A magnet; 9. a first magic tape; 10. a second magic tape; 11. a placement groove; 12. a support plate; 13. a mounting cavity; 14. a travel bar; 15. a limiting groove; 16. a connecting rod; 17. a limiting block; 18. a groove; 19. A chute; 20. connecting blocks; 21. and a through hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-8, one embodiment of the present invention is provided: a construction progress recording management device for engineering cost comprises a bottom shell 1, a through hole 21 is formed in the lower end of the bottom shell 1, a supporting plate 12 is convenient to take out of the through hole 21, a rotating shaft 2 is arranged on one side wall of the bottom shell 1, the rotating shaft 2 is used for rotatably connecting a cover body 3, a cover body 3 is fixedly arranged on one side wall, away from the bottom shell 1, of the rotating shaft 2, an inserting block 4 is fixedly arranged at the lower end of the cover body 3, a clamping hole 5 is formed in the upper end of the bottom shell 1, the clamping hole 5 is convenient for clamping the inserting block 4, the inserting block 4 is clamped into the clamping hole 5, an iron sheet 6 is arranged inside the bottom shell 1, a recording paper 7 is arranged at the upper end of the iron sheet 6, a magnet 8 is arranged at the upper end of the recording paper 7, a first magic tape 9 is fixedly arranged on one side wall, away from the rotating shaft 2, a second magic tape 10 is fixedly arranged at the upper end of the cover body 3, and the first magic tape 9 is adhered to the second magic tape 10;
standing groove 11 has been seted up to 1 inside of drain pan, the inside backup pad 12 that is provided with of standing groove 11, 1 inside fixed installation cavity 13 that is provided with of drain pan, installation cavity 13 inside slides and is provided with carriage release lever 14, carriage release lever 14 is used for spacing to backup pad 12, carriage release lever 14 lower extreme leads to inside 18 recesses, spacing groove 15 has all been seted up to the both sides inner wall of installation cavity 13, 14 both sides walls of carriage release lever are all fixed and are provided with stopper 17, stopper 17 is located 15 inside upper and lower slides of spacing groove, 11 bottoms of standing groove are provided with recess 18, the placing of 14 lower extremes of recess 18 convenience carriage release lever, 14 front ends of carriage release lever are fixed and are provided with connecting rod 16, spout 19 has been seted up to 1 front end of drain pan to connecting rod 16 front end through spout 19 and fixedly connected with connecting block 20.
The working principle is as follows: tear first magic subsides 9, pulling lid 3, inserted block 4 is pulled out from calorie hole 5, the opening device, place recording paper 7 in 6 tops of iron sheet, place magnet 8 on recording paper 7, fix recording paper 7, manual with connecting block 20 rebound, connecting block 20 drives connecting rod 16 rebound, thereby drive carriage release lever 14 rebound, thereby it slides to drive stopper 17 to be located 15 insides of spacing groove, thereby propose the lower extreme of carriage release lever 14 from recess 18, the finger takes out backup pad 12 through-hole 21, place backup pad 12 at the 7 lower extremes of recording paper, thereby carry out the record, after the record is accomplished, place standing groove 11 with backup pad 12, close.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the utility model.
Claims (8)
1. The utility model provides a construction progress record management device for engineering cost, includes drain pan (1), its characterized in that: a rotating shaft (2) is arranged on one side wall of the bottom shell (1), a cover body (3) is fixedly arranged on one side wall, away from the bottom shell (1), of the rotating shaft (2), an inserting block (4) is fixedly arranged at the lower end of the cover body (3), a clamping hole (5) is formed in the upper end of the bottom shell (1), an iron sheet (6) is arranged inside the bottom shell (1), recording paper (7) is arranged at the upper end of the iron sheet (6), a first magic tape (9) is fixedly arranged on one side wall, away from the rotating shaft (2), of the bottom shell (1), and a second magic tape (10) is fixedly arranged at the upper end of the cover body (3);
the improved structure of the plastic packaging box is characterized in that a placing groove (11) is formed in the bottom shell (1), a supporting plate (12) is arranged in the placing groove (11), an installation cavity (13) is fixedly arranged in the bottom shell (1), a moving rod (14) is slidably arranged in the installation cavity (13), limiting grooves (15) are formed in the inner walls of the two sides of the installation cavity (13), limiting blocks (17) are fixedly arranged on the two side walls of the moving rod (14), a groove (18) is formed in the bottom end of the placing groove (11), a connecting rod (16) is fixedly arranged at the front end of the moving rod (14), and a sliding groove (19) is formed in the front end of the bottom shell (1).
2. The construction progress recording management device for construction costs according to claim 1, characterized in that: the inserting block (4) is clamped in the clamping hole (5).
3. The construction progress recording management device for construction costs according to claim 1, characterized in that: and a magnet (8) is arranged at the upper end of the recording paper (7).
4. The construction progress recording management device for construction costs according to claim 1, characterized in that: the first magic tape (9) and the second magic tape (10) are pasted.
5. The construction progress recording management device for construction costs according to claim 1, characterized in that: the limiting block (17) is positioned in the limiting groove (15) and slides up and down.
6. The construction progress recording management device for construction costs according to claim 1, characterized in that: the lower end of the moving rod (14) is communicated with the inside of the groove (18).
7. The construction progress recording management device for construction costs according to claim 1, characterized in that: the front end of the connecting rod (16) penetrates through the sliding groove (19) to be communicated with the front end of the bottom shell (1) and is fixedly connected with a connecting block (20).
8. The construction progress recording management device for construction costs according to claim 1, characterized in that: the lower end of the bottom shell (1) is provided with a through hole (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121830867.1U CN216212175U (en) | 2021-08-06 | 2021-08-06 | Construction progress record management device for engineering cost |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121830867.1U CN216212175U (en) | 2021-08-06 | 2021-08-06 | Construction progress record management device for engineering cost |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216212175U true CN216212175U (en) | 2022-04-05 |
Family
ID=80896055
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121830867.1U Active CN216212175U (en) | 2021-08-06 | 2021-08-06 | Construction progress record management device for engineering cost |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216212175U (en) |
-
2021
- 2021-08-06 CN CN202121830867.1U patent/CN216212175U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216212175U (en) | Construction progress record management device for engineering cost | |
CN215685815U (en) | Budget instrument is used in hydraulic and hydroelectric engineering cost management | |
CN209769360U (en) | Building engineering cost budget rehearsal device | |
CN210574455U (en) | Ancient poetry memorial auxiliary device | |
CN215457924U (en) | Outdoor intelligent integrated physique tester | |
CN214095790U (en) | Measuring tool for architectural design | |
CN113689636A (en) | Book circulation management device capable of improving working efficiency | |
CN211578089U (en) | Novel accounting computerization teaching is used device | |
CN213751511U (en) | Foldable college mathematics teaching aid | |
CN216035945U (en) | Pipeline strorage device for building engineering | |
CN210227437U (en) | Special tool for learning computer | |
CN217373965U (en) | A portable file cover for student management | |
CN214446253U (en) | Engineering detection box | |
CN206249586U (en) | A kind of Portable English teaching aid | |
CN219191748U (en) | Outdoor information input equipment for engineering cost | |
CN218439342U (en) | Rock debris box for well drilling, stratum layer information display mechanism and display device | |
CN218288681U (en) | Fire-fighting equipment inspection record card storage device | |
CN216334069U (en) | Anti-adhesion and corrosion-resistant plastic lock box | |
CN210465556U (en) | Charger electrification detection device | |
CN210836718U (en) | English teaching is with teaching board | |
CN210259337U (en) | Kit for detecting helicobacter pylori | |
CN214677905U (en) | Engineering cost construction cost liquidation recording device | |
CN215936689U (en) | Manpower resource file management storage device | |
CN220543531U (en) | Secondary rock core tablet fixer | |
CN212501634U (en) | Memory card storage box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |