CN216209836U - Electric energy metering verification current conversion column sleeve and wiring frame for electric energy meter verification - Google Patents

Electric energy metering verification current conversion column sleeve and wiring frame for electric energy meter verification Download PDF

Info

Publication number
CN216209836U
CN216209836U CN202122490119.XU CN202122490119U CN216209836U CN 216209836 U CN216209836 U CN 216209836U CN 202122490119 U CN202122490119 U CN 202122490119U CN 216209836 U CN216209836 U CN 216209836U
Authority
CN
China
Prior art keywords
electric energy
current
verification
cylinder section
current conversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122490119.XU
Other languages
Chinese (zh)
Inventor
陈旭东
谢逵
吕园芳
王奕骁
苏比努尔·艾尼完
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bazhou Power Supply Co Of State Grid Xinjiang Electric Power Co ltd
State Grid Corp of China SGCC
Original Assignee
Bazhou Power Supply Co Of State Grid Xinjiang Electric Power Co ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bazhou Power Supply Co Of State Grid Xinjiang Electric Power Co ltd, State Grid Corp of China SGCC filed Critical Bazhou Power Supply Co Of State Grid Xinjiang Electric Power Co ltd
Priority to CN202122490119.XU priority Critical patent/CN216209836U/en
Application granted granted Critical
Publication of CN216209836U publication Critical patent/CN216209836U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)

Abstract

The utility model relates to the technical field of electric energy meter verification, in particular to a current conversion column sleeve for electric energy metering verification and a junction frame for electric energy meter verification. The utility model has reasonable and compact structure and convenient use, can be sleeved on the current binding posts of the wiring frame, thus the current binding posts with different sizes do not need to be replaced when the electric energy meters with two different current binding post apertures are verified, the verification operation time is greatly shortened, the operation labor intensity is reduced, the operation efficiency is improved, and the utility model has the characteristics of convenient and efficient use.

Description

Electric energy metering verification current conversion column sleeve and wiring frame for electric energy meter verification
Technical Field
The utility model relates to the technical field of electric energy meter verification, in particular to a current conversion column sleeve for electric energy metering verification and a wiring frame for electric energy meter verification.
Background
In the electric energy meter verification operation, the apertures of current wiring terminals of electric energy meters with different ranges are different, for example, the aperture of the current wiring terminal of a (10), (100) A) direct access type three-phase electric energy meter is generally 7 mm, and the aperture of the current wiring terminal of a (0.3), (1.2) A access type three-phase electric energy meter through a mutual inductor is generally 4 mm.
Disclosure of Invention
The utility model provides a current conversion column sleeve for electric energy metering verification and a wiring frame for electric energy meter verification, overcomes the defects of the prior art, and can effectively solve the problem of low operation efficiency in the existing electric energy meter verification operation.
One of the technical schemes of the utility model is realized by the following measures: the utility model provides an electric energy measurement examination current conversion post sleeve pipe, is including the first cylinder section and the second cylinder section that from top to bottom connect gradually, and first cylinder section and second cylinder section are the electric conductor, the central axis of first cylinder section and the central axis collineation of second cylinder section, and the coaxial current terminal jack of having seted up in second cylinder section bottom surface, the diameter of current terminal jack is greater than the diameter of first cylinder section.
The following is a further optimization or/and improvement of one of the above technical solutions of the present invention:
the diameter of the current terminal jack can be equal to or slightly less than 7 mm, and the diameter of the first cylindrical section is equal to or slightly less than 4 mm.
The upper end surface of the first cylindrical section can be arranged as an inclined surface.
The second technical scheme of the utility model is realized by the following measures: the utility model provides an electric energy meter is examined and determine and is used junction frame, includes the support body, is equipped with transverse guide on the support body, and slidable mounting has six sliders on the transverse guide, and the upper end of every slider all is provided with the electric current terminal, and the lower extreme of every slider all is provided with the connection piece, is equipped with the wiring hole on the connection piece, still includes six electric energy measurement examination electric current conversion post sleeves, and the equal one-to-one of every electric current terminal upper end is inserted and is located in an electric current terminal jack.
The utility model has reasonable and compact structure and convenient use, can be sleeved on the current binding posts of the wiring frame, thus the current binding posts with different sizes do not need to be replaced when the electric energy meters with two different current binding post apertures are verified, the verification operation time is greatly shortened, the operation labor intensity is reduced, the operation efficiency is improved, and the utility model has the characteristics of convenient and efficient use.
Drawings
Fig. 1 is a schematic sectional structure view of a first embodiment of the present invention.
Fig. 2 is a schematic partial sectional structure view of a front view of a second embodiment of the present invention.
The codes in the figures are respectively: 1 is first cylinder section, 2 is the second cylinder section, and 3 are the current terminal jack, and 4 are the support body, and 5 are transverse guide, and 6 are the slider, and 7 are the current terminal, and 8 are the connection piece, and 9 are the wiring hole.
Detailed Description
The present invention is not limited by the following examples, and specific embodiments may be determined according to the technical solutions and practical situations of the present invention.
In the present invention, for convenience of description, the description of the relative positional relationship of the components is described according to the layout pattern of fig. 1 of the specification, such as: the positional relationship of front, rear, upper, lower, left, right, etc. is determined in accordance with the layout direction of the drawings of the specification.
The utility model is further described with reference to the following examples and figures:
implementing one step: as shown in the attached drawing 1, the electric energy metering verification current conversion column sleeve comprises a first cylindrical section 1 and a second cylindrical section 2 which are sequentially connected from top to bottom, the first cylindrical section 1 and the second cylindrical section 2 are electric conductors, the central axis of the first cylindrical section 1 and the central axis of the second cylindrical section 2 are collinear, a current binding post jack 3 is coaxially arranged on the bottom surface of the second cylindrical section 2, and the diameter of the current binding post jack 3 is larger than that of the first cylindrical section 1. According to the requirement, the diameter of the current terminal jack 3 and the diameter of the first cylindrical section 1 can be designed according to the current terminal hole diameters of the electric energy meters with two different ranges to be verified, for example, in the electric energy meters with the two different ranges, the current terminal hole diameter of the electric energy meter with one range is S1, the current terminal hole diameter of the electric energy meter with the other range is S2, S1 is larger than S2, therefore, the diameter of the current terminal jack 3 can be designed to be S1, the diameter of the first cylindrical section 1 is designed to be S2, therefore, when the electric energy meter verification device is used for verifying the electric energy meters with the two different ranges, when the electric energy meter with the larger current terminal hole diameter is verified, only the current terminal on the connection frame in the verification device needs to be inserted into the corresponding current terminal hole diameter, and when the electric energy meter with the smaller current terminal hole diameter is verified, with this electric energy measurement examination current conversion post sleeve pipe suit to the current terminal of link span, then with first cylinder section 1 insert to the current terminal aperture that corresponds in can, through the setting of electric energy measurement examination current conversion post sleeve pipe, from this when the electric energy meter to two kinds of different current terminal apertures examines and determine the operation, need not to change the not current terminal of equidimension, only need on the original current terminal of link span the suit or pull down this electric energy measurement examination current conversion post sleeve pipe can, the time that the change current terminal consumed has been avoided, very big work efficiency who examines and determine the operation has been provided, the operation intensity is reduced.
The first embodiment can be further optimized or/and improved according to actual needs:
as shown in fig. 1, the diameter of the current terminal receptacle 3 is equal to or slightly less than 7 mm, and the diameter of the first cylindrical section 1 is equal to or slightly less than 4 mm. Therefore, the requirements of the verification operation of two different-range electric energy meters of a 10 (100) A direct access type three-phase electric energy meter and a 0.3 (1.2) A access type three-phase electric energy meter through a mutual inductor in the current market can be met.
As shown in the attached figure 1, the upper end surface of the first cylindrical section 1 is arranged as an inclined surface. Thereby facilitating mating with terminals within the electric energy meter.
Example two: as shown in the attached drawing 2, the wiring rack for electric energy meter verification comprises a rack body 4, wherein a transverse guide rail 5 is arranged on the rack body 4, six sliding blocks 6 are arranged on the transverse guide rail 5 in a sliding mode, a current wiring terminal 7 is arranged at the upper end of each sliding block 6, a connecting sheet 8 is arranged at the lower end of each sliding block 6, a wiring hole 9 is formed in each connecting sheet 8, the wiring rack further comprises six current metering verification current conversion column sleeves, and one current wiring terminal 7 is uniformly inserted into one current wiring terminal jack 3 in a corresponding mode. According to the requirement, the current binding post 7 is in clearance fit with the current binding post jack 3, the current conversion post sleeve is sleeved outside the upper end of the current binding post 7 for electric energy metering and verification, therefore, when the electric energy meters with two different current binding post apertures are verified, when the electric energy meters with smaller current binding post apertures are verified, only the upper end of the first cylindrical section 1 is directly inserted into the current binding post aperture of the electric energy meter, when the electric energy meters with larger current binding post apertures are verified, only the current conversion post sleeve for electric energy metering and verification is taken down from the current binding post 7, the current binding post 7 is directly inserted into the current binding post aperture of the electric energy meter, namely, when the electric energy meters with two different current binding post apertures are verified, the current binding posts 7 with different sizes do not need to be replaced, and the whole verification operation process is more time-saving and labor-saving, the working efficiency is improved.
The above technical features constitute the best embodiment of the present invention, which has strong adaptability and best implementation effect, and unnecessary technical features can be increased or decreased according to actual needs to meet the requirements of different situations.

Claims (4)

1. The utility model provides an electric energy measurement examination current conversion post sleeve pipe, its characterized in that is including the first cylinder section and the second cylinder section that from top to bottom connects gradually, and first cylinder section and second cylinder section are the electric conductor, the central axis of first cylinder section and the central axis collineation of second cylinder section, and the coaxial current terminal jack of having seted up in second cylinder section bottom surface, the diameter of current terminal jack is greater than the diameter of first cylinder section.
2. The electrical energy metrological verification current transfer post sleeve of claim 1, wherein the diameter of the current post receptacle is equal to or slightly less than 7 mm and the diameter of the first cylindrical section is equal to or slightly less than 4 mm.
3. The electrical energy metrological verification current conversion column sleeve as claimed in claim 1 or 2, wherein the upper end face of the first cylindrical section is inclined.
4. A connection frame for electric energy meter verification using the electric energy metering verification current conversion column sleeve according to any one of claims 1 to 3, comprising a frame body, wherein a transverse guide rail is arranged on the frame body, six sliding blocks are slidably mounted on the transverse guide rail, a current terminal is arranged at the upper end of each sliding block, a connection sheet is arranged at the lower end of each sliding block, a connection hole is formed in the connection sheet, the connection frame is characterized by further comprising six electric energy metering verification current conversion column sleeves, and the upper ends of the current terminals are inserted into one current terminal column insertion hole in a one-to-one correspondence manner.
CN202122490119.XU 2021-10-15 2021-10-15 Electric energy metering verification current conversion column sleeve and wiring frame for electric energy meter verification Active CN216209836U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122490119.XU CN216209836U (en) 2021-10-15 2021-10-15 Electric energy metering verification current conversion column sleeve and wiring frame for electric energy meter verification

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122490119.XU CN216209836U (en) 2021-10-15 2021-10-15 Electric energy metering verification current conversion column sleeve and wiring frame for electric energy meter verification

Publications (1)

Publication Number Publication Date
CN216209836U true CN216209836U (en) 2022-04-05

Family

ID=80882379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122490119.XU Active CN216209836U (en) 2021-10-15 2021-10-15 Electric energy metering verification current conversion column sleeve and wiring frame for electric energy meter verification

Country Status (1)

Country Link
CN (1) CN216209836U (en)

Similar Documents

Publication Publication Date Title
CN216209836U (en) Electric energy metering verification current conversion column sleeve and wiring frame for electric energy meter verification
CN217903635U (en) Multifunctional plug convenient to disassemble and assemble
CN205944701U (en) Wire harness terminal crimping device
CN213600818U (en) Multipurpose power-on voltage-withstand test device for automobile connector
CN208623043U (en) Maintenance and debugging pinboard
CN209590076U (en) A kind of High-voltage measuring box pressure test ground connection combination row
CN209069975U (en) Absorption type continuity test tool
CN201281762Y (en) Automatic short-circuit automatic connection device for novel three-phase multifunctional electric energy meter calibration stand
CN206132825U (en) Ready -package smart meter support
CN201281761Y (en) Automatic short-circuit automatic connection device for novel single-phase multifunctional electric energy meter calibration stand
CN221037924U (en) Clamping device for cable vibration test
CN108802460B (en) Compatible electric energy meter base and method for realizing compatibility
CN217739438U (en) Automobile wire harness machining detection device
CN221041589U (en) Flexible power distribution device
CN214960297U (en) Common EDA integrated circuit device
CN218549865U (en) Cross bar type automatic test tool
CN211348580U (en) Concatenation formula power module test fixture
CN204758819U (en) Be used for three -phase mutual -inductor access formula table meter to build mark testing arrangement
CN218040161U (en) Assembled automobile terminal mould
CN216598003U (en) Conductive connector
CN212207632U (en) Testing device for wire harness plug
CN214174443U (en) Cable detection wiring auxiliary device
CN212031707U (en) Ammeter clamping instrument
CN220367360U (en) Tool for testing direct-current voltage converter
CN220604451U (en) High-installability transformer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant