CN216190565U - Tower crane attaches wall device - Google Patents

Tower crane attaches wall device Download PDF

Info

Publication number
CN216190565U
CN216190565U CN202122307762.4U CN202122307762U CN216190565U CN 216190565 U CN216190565 U CN 216190565U CN 202122307762 U CN202122307762 U CN 202122307762U CN 216190565 U CN216190565 U CN 216190565U
Authority
CN
China
Prior art keywords
frame
fixed block
tower crane
block
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122307762.4U
Other languages
Chinese (zh)
Inventor
李学丁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongcheng Mechanical Engineering Co ltd
Original Assignee
Shandong Zhongcheng Mechanical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongcheng Mechanical Engineering Co ltd filed Critical Shandong Zhongcheng Mechanical Engineering Co ltd
Priority to CN202122307762.4U priority Critical patent/CN216190565U/en
Application granted granted Critical
Publication of CN216190565U publication Critical patent/CN216190565U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application discloses tower crane attaches wall device, including building subject, staple bolt frame one, staple bolt frame two, fastening structure, bearing structure one, bearing structure two and bearing structure three, building subject passes through bearing structure one and connects staple bolt frame one and staple bolt frame two, be provided with bearing structure two between building subject and the bearing structure one. This application fastens joint piece one and joint piece two each other, make staple bolt frame one and staple bolt frame two firm in connection, fix two fastening pieces through bolt and nut, further make staple bolt frame one and staple bolt frame two firm in connection, be convenient for guarantee staple bolt frame one and staple bolt frame two firm in connection, it is not hard up to avoid the connection between the staple bolt to appear when stabilizing the tower crane, this article apply bracing piece one can support the tower crane and keep the tower crane stable, the support frame can further support the tower crane and keep the tower crane stable, through bracing piece one, bracing piece two and support frame are convenient for guarantee the stability of tower crane.

Description

Tower crane attaches wall device
Technical Field
The application relates to the tower crane field, especially a tower crane attaches wall device.
Background
The tower crane is the most common hoisting equipment on the construction site, also called tower crane, and is used for hoisting construction raw materials such as reinforcing steel bars, wood ridges, concrete, steel pipes and the like for construction by the extension (height) of one section and one section (called standard section for short). The tower crane is an indispensable device on a construction site.
In the construction of conventional super high-rise building tower crane, the tower crane height is higher, and the cross-section of its basal portion is less to probably lead to empting of tower crane because the root is shakiness in the in-service use process, so when the tower crane surpassed free height, need set up the bracing piece and support the tower crane, in addition, when the staple bolt of joint on the tower crane was connected, traditional mode was only adopted the bolt to fix, and this makes the in-process of stabilizing the tower crane at the staple bolt easily produce not hard up. Therefore, a tower crane wall-attached device is provided for solving the problems.
Disclosure of Invention
The tower crane attaches wall device is provided in this embodiment for solving among the prior art staple bolt and only adopt the bolt to connect the problem that easily becomes flexible and keep the tower crane stable.
According to an aspect of the application, a tower crane attaches wall device is provided, including building subject, staple bolt frame one, staple bolt frame two, fastening structure, bearing structure one, bearing structure two and bearing structure three, building subject passes through bearing structure one and connects staple bolt frame one and staple bolt frame two, be provided with bearing structure two between building subject and the bearing structure one, be provided with bearing structure three between bearing structure two and staple bolt frame one and the staple bolt frame two, two joint pieces one of both ends fixed connection of staple bolt frame one, two joint pieces two of both ends fixed connection of staple bolt frame two, joint piece one and joint piece two mutually support, be provided with fastening structure on joint piece one and the joint piece two.
Furthermore, the clamping pads are fixedly connected to the inner side walls of the first hoop frame and the second hoop frame and are made of rubber.
Further, the fastening structure includes fastening block, nut, screw hole and bolt, fastening block fixed connection is on the lateral wall of joint piece one and joint piece two both sides, equidistant set up screw hole on the fastening block, screw hole female connection bolt, threaded connection nut on the bolt.
Further, bearing structure one includes fixed block one, bracing piece one and fixed block two, fixed block one fixed connection is in the building main part, the one end of fixed connection bracing piece one on the fixed block one, the other end fixed connection fixed block of bracing piece one is on the second, fixed block two fixed connection is on the lateral wall of staple bolt frame one and staple bolt frame two.
Further, bearing structure two includes fixed block three, bracing piece two and fixed block four, three fixed block fixed connection of fixed block is on the building subject, the last one end of two bracing piece two of fixed connection of fixed block three, the other end fixed connection two fixed block four of bracing piece two, four fixed block fixed connection of fixed block is on the lateral wall of bracing piece one.
Further, bearing structure three includes fixed block five, support frame and fixed block six, five fixed block fixed connection are on the lateral wall of bracing piece two, fixed connection support frame on the five fixed block, the support frame is "X" type structure, the other end fixed connection fixed block six of support frame, six fixed connection of fixed block are on staple bolt frame one and staple bolt frame two's bottom lateral wall.
Through the above-mentioned embodiment of this application, adopted fastening structure, bearing structure one, bearing structure two and bearing structure three, solved the staple bolt and only adopted the bolt to connect and easily become flexible and keep the stable problem of tower crane, gained the stable effect of being convenient for guarantee staple bolt frame one and staple bolt frame two firm in connection and being convenient for guarantee the tower crane.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic overall perspective view of an embodiment of the present application;
FIG. 2 is a schematic diagram of the overall internal structure of an embodiment of the present application;
FIG. 3 is a schematic overall side view of an embodiment of the present application;
fig. 4 is a schematic diagram of a partial enlarged structure at a in fig. 2 according to an embodiment of the present application.
In the figure: 1. a building body; 2. a hoop frame I; 3. a hoop frame II; 4. a first clamping block; 5. a second clamping block; 6. clamping the pad; 7. a fastening structure; 701. a fastening block; 702. a nut; 703. a threaded hole; 704. a bolt; 8. a first supporting structure; 801. a first fixed block; 802. a first supporting rod; 803. a second fixed block; 9. a second support structure; 901. a third fixed block; 902. a second supporting rod; 903. a fourth fixed block; 10. a support structure III; 1001. a fifth fixed block; 1002. a support frame; 1003. and a sixth fixing block.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In this application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings. These terms are used primarily to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in this application will be understood by those of ordinary skill in the art as appropriate.
Furthermore, the terms "mounted," "disposed," "provided," "connected," and "sleeved" are to be construed broadly. For example, it may be a fixed connection, a removable connection, or a unitary construction; can be a mechanical connection, or an electrical connection; may be directly connected, or indirectly connected through intervening media, or may be in internal communication between two devices, elements or components. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
The wall-attached device in this embodiment can be applicable to the stability that keeps the tower crane, for example, provides such a dregs transport vechicle in this embodiment, and dust keeper in this embodiment can be used for carrying out the dust fall to the dust that such dregs transport vechicle was raised.
The utility model provides a tower crane, includes the body of the tower, be used for supporting the base of the body of the tower, set up swing arm on the body of the tower, set up in the lifting hook of swing arm and set up in the swing arm and keep away from the balancing weight of lifting hook one end, the swing arm is kept away from lifting hook one end and is provided with the removal rack, it has a plurality of holding chambeies to remove to set up on the rack, the balancing weight is arranged in the holding chamber, one side that the swing arm is close to the removal rack is provided with the slide rail, remove be provided with on the rack with slide rail cooperation and mobilizable gyro wheel, be provided with hoisting mechanism on the swing arm, hoisting mechanism is located and is close to on the swing arm of removal rack one end and be close to the body of the tower, be provided with on the hoisting mechanism and be used for connecting the steel cable that removes rack moving direction both ends, it is provided with brake equipment to remove the rack and be located gyro wheel department.
When assembling the counterweight block of the tower crane, firstly installing the movable placing frame and the lifting mechanism on the movable arm, and then installing the counterweight block into the accommodating cavity; when the balance of the movable arm needs to be adjusted, the lifting mechanism is started, a steel rope on the lifting mechanism applies force to the movable placing frame, the movable placing frame moves on the sliding rail through the idler wheels under the action of the lifting mechanism, the movable placing frame is further positioned by the brake device, and the distance between the balancing weight and the tower body can be adjusted.
The balancing weight is installed in the accommodating cavity, so that the balancing weight can be prevented from falling off and the mounting of the balancing weight is stable, the distance between the balancing weight and the tower body is adjusted by moving the placing frame, the movable arm is balanced, the dangerous situation occurring when the number of the balancing weight is adjusted is avoided, and the balance adjustment of the movable arm is facilitated.
The brake device comprises a cylinder and a rubber block, the end of a piston rod of the cylinder faces the side wall of the roller, and the rubber block is arranged on the end of the piston rod.
When the mobile placing rack needs to be further positioned, the piston rod moves through the air cylinder, the rubber block on the piston rod supports against the side wall of the roller, the roller is prevented from rotating, and therefore the mobile placing rack is stable.
The side wall of the rubber block facing the roller is provided with a plurality of bulges.
The friction force between the rubber block and the side wall of the roller can be increased due to the convex arrangement, and the roller is effectively prevented from rotating.
Brake equipment includes cylinder and rubber sleeve, the piston rod end of cylinder is towards the gyro wheel lateral wall, the rubber sleeve set up in the piston rod, the gyro wheel lateral wall encircles its axle center and is provided with a plurality of tight holes that support, the piston rod can insert the hole that supports tightly.
When the mobile placing rack needs to be further positioned, the piston rod is moved through the air cylinder, the piston rod drives the rubber sleeve block to be inserted into the abutting hole, the idler wheel is prevented from rotating, and therefore the mobile placing rack is stable in arrival.
The roller is sleeved with a wheel sleeve for increasing friction.
Of course, the present embodiment may also be used to maintain the stability of tower cranes with other structures. Here, details are not repeated, and the wall-attached device according to the embodiment of the present application is described below.
Please refer to fig. 1-4, a tower crane wall attachment device comprises a building main body 1, a hoop frame one 2, a hoop frame two 3, a fastening structure 7, a supporting structure one 8, a supporting structure two 9 and a supporting structure three 10, wherein the building main body 1 is connected with the hoop frame one 2 and the hoop frame two 3 through the supporting structure one 8, the supporting structure two 9 is arranged between the building main body 1 and the supporting structure one 8, the supporting structure three 10 is arranged between the supporting structure two 9 and the hoop frame one 2 and the hoop frame two 3, two ends of the hoop frame one 2 are fixedly connected with two first clamping blocks 4, two ends of the hoop frame two 3 are fixedly connected with two second clamping blocks 5, the first clamping blocks 4 are matched with the second clamping blocks 5, and the fastening structure 7 is arranged on the first clamping blocks 4 and the second clamping blocks 5.
Utilize joint piece one 4, joint piece two 5 and fastening structure 7 to make staple bolt frame one 2 and staple bolt frame two 3 firm in connection, be convenient for guarantee staple bolt frame one 2 and staple bolt frame two 3 firm in connection, it is not hard up to avoid the connection between the staple bolt when stabilizing the tower crane to appear, utilize bearing structure one 8, bearing structure two 9 and bearing structure three 10 to support the tower crane and keep the tower crane stable, be convenient for guarantee the stability of tower crane through bracing piece one 802, bracing piece two 902 and support frame 1002.
Fixed connection joint pad 6 on the inside wall of staple bolt frame 2 and staple bolt frame two 3, joint pad 6 adopts rubber to make, and rubber can increase the friction between staple bolt frame 2 and the two 3 tower cranes of staple bolt frame.
The fastening structure 7 comprises a fastening block 701, a nut 702, a threaded hole 703 and a bolt 704, the fastening block 701 is fixedly connected to the outer side walls of the two sides of the first 4 and the second 5 clamping blocks, the threaded hole 703 is formed in the fastening block 701 at an equal distance, the bolt 704 is connected with the threaded hole 703 in the threaded hole 703, the nut 702 is connected with the nut 702 in the threaded hole 703 in the bolt 704 in a threaded mode, the nut 702 is connected with the bolt 704 in a threaded mode, the nut 702 is screwed, the nut 702 is enabled to abut against the fastening block 701, and the two fastening blocks 701 are fixed through the bolt 704 and the nut 702.
Support structure 8 includes fixed block 801, bracing piece 802 and two 803 of fixed block, a fixed block 801 fixed connection is on building subject 1, the one end of a fixed connection bracing piece 802 on the fixed block 801, on the other end fixed connection fixed block two 803 of bracing piece 802, two 803 fixed connections of fixed block are on staple bolt frame 2 and two 3's of staple bolt frame lateral wall, and bracing piece 802 can support the tower crane and keep the tower crane stable.
The second supporting structure 9 comprises a third fixed block 901, a second supporting rod 902 and a fourth fixed block 903, the third fixed block 901 is fixedly connected to the building main body 1, one end of the second supporting rod 902 is fixedly connected to the third fixed block 901, the other end of the second supporting rod 902 is fixedly connected to the fourth fixed block 903, the fourth fixed block 903 is fixedly connected to the side wall of the first supporting rod 802, a triangular structure is formed among the second supporting rod 902, the first supporting rod 802 and the building main body 1, the triangular structure has high stability, and the second supporting rod 902 is used for stably supporting the first supporting rod 802.
Three 10 of bearing structure include five 1001, support frame 1002 and six 1003 of fixed block, five 1001 fixed connection of fixed block is on the lateral wall of two 902 of bracing pieces, fixed connection support frame 1002 on five 1001 of fixed block, support frame 1002 is "X" type structure, six 1003 of other end fixed connection fixed block of support frame 1002, six 1003 fixed connection of fixed block are on staple bolt frame 2 and staple bolt frame two 3's bottom lateral wall, and support frame 1002 can further support the tower crane and keep the tower crane stable.
When the tower crane is used, the anchor ear frame I2 and the anchor ear frame II 3 are clamped on the tower crane, the clamping block I4 on the anchor ear frame I2 is clamped on the clamping block II 5 on the anchor ear frame, the clamping block I4 and the clamping block II 5 are fastened with each other, so that the anchor ear frame I2 and the anchor ear frame II 3 are firmly connected, then the bolt 704 is screwed into the threaded hole 703 on the fastening block 701, the nut 702 is screwed on the bolt 704, the nut 702 is screwed, so that the nut 702 abuts against the fastening block 701, the two fastening blocks 701 are fixed through the bolt 704 and the nut 702, further the anchor ear frame I2 and the anchor ear frame II 3 are firmly connected, the anchor ear frame I2 and the anchor ear frame II 3 are conveniently ensured to be firmly connected, the looseness of connection between anchor ears when the tower crane is stabilized is avoided, the fixing block I801 is fixedly connected on the building main body 1, the fixing block II 803 is fixedly connected on the anchor ear frame I2 and the anchor ear frame II 3, a first support rod 802 is fixedly connected between a first fixing block 801 and a second fixing block 803, the first support rod 802 can support the tower crane to keep the tower crane stable, a third fixing block 901 is fixedly connected to the building main body 1, a fourth fixing block 903 is fixedly connected to the first support rod 802, a second support rod 902 is fixedly connected between the third fixing block 901 and the fourth fixing block 903, a triangular structure is formed between the second support rod 902, the second support rod 902 and the building main body 1, the second support rod 902 is used for stably supporting the first support rod 802, a fifth fixing block 1001 is fixedly connected to the second support rod 902, a sixth fixing block 1003 is fixedly connected to a first anchor ear frame 2 and a second anchor ear frame 3, a support frame 1002 is fixedly connected between the fifth fixing block 1001 and the sixth fixing block 1003, and the support frame 1002 can further support the tower crane to keep the tower crane stable, the stability of the tower crane is convenient to guarantee through the first support rod 802, the second support rod 902 and the support frame 1002.
The application has the advantages that:
1. this application is rational in infrastructure, on joint piece one joint to joint piece two, joint piece one and the mutual straining of joint piece two, make staple bolt frame one and two firm in connection of staple bolt frame, again with bolt threaded connection to the screwed hole on the fastening block, with nut threaded connection to the bolt, twist the nut, make the nut support tight fastening block, fix two fastening blocks through bolt and nut, further make staple bolt frame one and two firm in connection of staple bolt frame, be convenient for guarantee staple bolt frame one and two firm in connection of staple bolt frame, it is not hard up to avoid the connection appearance between the staple bolt when stabilizing the tower crane.
2. This paper application is rational in infrastructure, and bracing piece one can support the tower crane and keep the tower crane stable, forms the triangle-shaped structure between bracing piece two, bracing piece one and the building subject, has stronger stability, utilizes the bracing piece to carry out the outrigger to bracing piece one, and the support frame can further support the tower crane and keep the tower crane stable, is convenient for guarantee the stability of tower crane through bracing piece one, bracing piece two and support frame.
The modules referred to are prior art and are fully implemented by those skilled in the art, and it is not necessary to state that the present invention is not directed to software and process improvements.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (6)

1. The utility model provides a tower crane attaches wall device which characterized in that: comprises a building main body (1), a hoop frame I (2), a hoop frame II (3), a fastening structure (7), a supporting structure I (8), a supporting structure II (9) and a supporting structure III (10), the building main body (1) is connected with the hoop frame I (2) and the hoop frame II (3) through the supporting structure I (8), a second supporting structure (9) is arranged between the building main body (1) and the first supporting structure (8), a third support structure (10) is arranged between the second support structure (9) and the first hoop frame (2) and the second hoop frame (3), two ends of the hoop frame I (2) are fixedly connected with two clamping blocks I (4), two ends of the hoop bracket II (3) are fixedly connected with two clamping blocks II (5), the clamping device is characterized in that the first clamping block (4) and the second clamping block (5) are matched with each other, and fastening structures (7) are arranged on the first clamping block (4) and the second clamping block (5).
2. The tower crane wall-attached device according to claim 1, wherein: and clamping pads (6) are fixedly connected to the inner side walls of the first hoop frame (2) and the second hoop frame (3), and the clamping pads (6) are made of rubber.
3. The tower crane wall-attached device according to claim 1, wherein: fastening structure (7) are including fastening block (701), nut (702), screw hole (703) and bolt (704), fastening block (701) fixed connection is on the lateral wall of joint piece one (4) and joint piece two (5) both sides, equidistant screw hole (703) have been seted up in fastening block (701), screw hole (703) female connection bolt (704), threaded connection nut (702) are gone up in bolt (704).
4. The tower crane wall-attached device according to claim 1, wherein: the utility model discloses a building structure, including bearing structure one (8) and anchor ear frame two (3), bearing structure one (801) is including fixed block one (801), bracing piece one (802) and fixed block two (803), fixed block one (801) fixed connection is on building subject (1), the one end of fixed connection bracing piece one (802) is gone up to fixed block one (801), on the other end fixed connection fixed block two (803) of bracing piece one (802), fixed block two (803) fixed connection is on the lateral wall of anchor ear frame one (2) and anchor ear frame two (3).
5. The tower crane wall-attached device according to claim 1, wherein: the supporting structure II (9) comprises a fixed block III (901), a supporting rod II (902) and a fixed block IV (903), the fixed block III (901) is fixedly connected to the building main body (1), one end of the supporting rod II (902) is fixedly connected to the fixed block III (901), the other end of the supporting rod II (902) is fixedly connected to the fixed block IV (903), and the fixed block IV (903) is fixedly connected to the side wall of the supporting rod I (802).
6. The tower crane wall-attached device according to claim 1, wherein: the supporting structure III (10) comprises a fixed block five (1001), a supporting frame (1002) and a fixed block six (1003), the fixed block five (1001) is fixedly connected to the side wall of the supporting rod two (902), the fixed block five (1001) is fixedly connected with the supporting frame (1002), the supporting frame (1002) is of an X-shaped structure, the other end of the supporting frame (1002) is fixedly connected with the fixed block six (1003), and the fixed block six (1003) is fixedly connected to the outer side wall of the bottom of the hoop frame I (2) and the hoop frame II (3).
CN202122307762.4U 2021-09-23 2021-09-23 Tower crane attaches wall device Active CN216190565U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122307762.4U CN216190565U (en) 2021-09-23 2021-09-23 Tower crane attaches wall device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122307762.4U CN216190565U (en) 2021-09-23 2021-09-23 Tower crane attaches wall device

Publications (1)

Publication Number Publication Date
CN216190565U true CN216190565U (en) 2022-04-05

Family

ID=80922506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122307762.4U Active CN216190565U (en) 2021-09-23 2021-09-23 Tower crane attaches wall device

Country Status (1)

Country Link
CN (1) CN216190565U (en)

Similar Documents

Publication Publication Date Title
EP2639196A1 (en) Tower crane and balance arm tension rod structure thereof and mounting method for the structure
CN208422589U (en) A kind of transformer mounting rack of efficient stable
CN110329915A (en) A kind of overhead crane with carrier-beam
CN216190565U (en) Tower crane attaches wall device
CN105016218A (en) Guide rail mechanism fixed to building
CN206244301U (en) A kind of architectural engineering tower crane anti-sway control device
CN201952153U (en) Portable detachable hoisting equipment
CN108025897B (en) Tower crane
CN214404501U (en) Sliding type anti-seismic support and hanger
JP2005248585A (en) Temporary arm and assembling method of crossarm in power transmission line steel tower using the temporary arm
CN201292225Y (en) A shaped frame for crawler crane
CN204778289U (en) Cable support tower construction reinforcing bar festival section hoist
CN207330121U (en) A kind of crane hook device for building
CN2291443Y (en) Hanging basket on front support
CN209722771U (en) A kind of bridge construction Hanging Basket
CN203529707U (en) Double-plate-hole type H-steel balance beam with bending moment
CN110040618A (en) A kind of wall-mounted equipment mounting tool
CN110125836A (en) A kind of fixed equipment and its application method for studying tower crane mechanical property
CN207608190U (en) A kind of major diameter surge shaft brill filling cantilever trolley
CN218619797U (en) Steel construction section bar lifting device
CN201850091U (en) Tower crane and balance arm pull rod structure thereof
CN217102788U (en) Gantry crane landing leg hard support fixed connection device
CN204823905U (en) Fix guide rail mechanism on building
CN221118272U (en) Bridge cantilever pouring construction hanging basket with high stability
CN213229802U (en) A concatenation formula support frame for depositing electric block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant