CN216130156U - Building basement bottom plate water-collecting device - Google Patents
Building basement bottom plate water-collecting device Download PDFInfo
- Publication number
- CN216130156U CN216130156U CN202121317729.3U CN202121317729U CN216130156U CN 216130156 U CN216130156 U CN 216130156U CN 202121317729 U CN202121317729 U CN 202121317729U CN 216130156 U CN216130156 U CN 216130156U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- water collecting
- basement bottom
- steel
- collecting tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a water collecting device for a basement bottom plate of a building, which comprises a basement bottom plate (3); a hole (4) is arranged on the basement bottom plate (3), and a foundation pit (10) is arranged on a foundation (11) at the bottom of the hole (4); a steel water collecting tank (1) is arranged in the foundation pit (10), and a group of angle steel stiffening rings (2) is sleeved at the upper part of the steel water collecting tank (1); the periphery of the angle steel stiffening ring (2) is connected with embedded steel bars (6) in the basement bottom plate (3). Compared with a water collecting pit poured by concrete, the water collecting tank manufactured by the steel plate has the advantage that the construction time is obviously shortened. The steel water catch bowl can obviously reduce wallboard thickness, and basement bottom plate chiseling work load reduces. The steel water collecting tank is installed in place and can replace the template after the steel bars of the basement bottom plate are firmly connected, so that the workload and time for erecting and dismantling the template are saved.
Description
Technical Field
The utility model relates to a water collecting device for a bottom plate of a building basement, and belongs to the technical field of construction of the building basement.
Background
When the basement is transformed, a water collecting pit is often required to be added on the bottom plate of the basement. In the prior art, a concrete pouring water collecting pit is adopted after a basement bottom plate is chiseled. In the prior art, a template needs to be erected, sump concrete is poured, after the sump concrete is completely solidified and reaches a maintenance period, the template and a template supporting member need to be dismantled, the construction process is complex, and the construction period is long. And because concrete placement sump pit lateral wall thickness is great, the area that basement bottom plate chiseled is also corresponding great. Thus, the prior art still has deficiencies and needs to be further improved.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a water collecting device for a bottom plate of a basement of a building, which is used for shortening the construction period and overcoming the defects in the prior art.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model relates to a water collecting device for a basement bottom plate of a building, which comprises a basement bottom plate; a hole is formed in the basement bottom plate, and a foundation pit is formed in the foundation at the bottom of the hole; a steel water collecting tank is arranged in the foundation pit, and a group of angle steel stiffening rings are sleeved at the upper part of the steel water collecting tank; the periphery of the angle steel stiffening ring is connected with embedded steel bars in the basement bottom plate.
In the building basement bottom plate water collecting device, the foundation pit is a cone cavity with a large upper part and a small lower part.
In the building basement bottom plate water collecting device, a bottom plate cushion layer is arranged between the top surface of the foundation pit and the bottom surface of the basement bottom plate.
In the building basement bottom plate water collecting device, a concrete cushion and a non-shrinkage grouting material are sequentially paved between the foundation pit and the steel water collecting tank.
In the aforementioned building basement bottom plate water-collecting device, the angle steel stiffening ring has been pour around and has not had shrink pea gravel concreten with the pre-buried reinforcing bar junction between the basement bottom plate.
Due to the adoption of the technical scheme, compared with the prior art, the utility model adopts the steel plate to manufacture the water collecting tank, and the construction time is obviously shortened compared with a concrete-poured water collecting pit. The steel water catch bowl can obviously reduce wallboard thickness, and basement bottom plate chiseling work load reduces. The steel water collecting tank is installed in place and can replace the template after the steel bars of the basement bottom plate are firmly connected, so that the workload and time for erecting and dismantling the template are saved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a partial enlarged view of a portion a in fig. 1.
The figures are labeled as follows: 1-a steel water collecting tank, 2-an angle steel stiffening ring, 3-a basement bottom plate, 4-holes, 5-a bottom plate cushion layer and 6-embedded steel bars; 7-concrete cushion, 8-shrinkage-free grouting material, 9-shrinkage-free fine aggregate concrete, 10-foundation pit and 11-foundation.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
The utility model relates to a water collecting device for a basement bottom plate of a building, which comprises a basement bottom plate 3 as shown in figures 1 and 2; a hole 4 is arranged on the basement bottom plate 3, and a foundation pit 10 is arranged on a foundation 11 at the bottom of the hole 4; a steel water collecting tank 1 is arranged in the foundation pit 10, and a group of angle steel stiffening rings 2 are sleeved on the upper part of the steel water collecting tank 1; the periphery of the angle steel stiffening ring 2 is connected with the embedded steel bars 6 in the basement bottom plate 3. The foundation pit 10 is a conical cavity with a large upper part and a small lower part. A bottom plate cushion layer 5 is arranged between the top surface of the foundation pit 10 and the bottom surface of the basement bottom plate 3. And a concrete cushion 7 and a non-shrinkage grouting material 8 are sequentially paved between the foundation pit 10 and the steel water collecting tank 1. And the joints of the embedded steel bars 6 between the periphery of the angle steel stiffening ring 2 and the basement bottom plate 3 are poured with shrinkage-free fine stone concrete 9.
In the specific implementation, the construction is carried out according to the following steps:
And 2, paying off the basement bottom plate 3 according to the size and the position of the steel water collecting tank 1, and considering factors such as the depth of the steel water collecting tank, the slope of the concrete cushion 7, the reserved construction operation space and the like when determining the chiseling-off range line of the basement bottom plate.
And 3, chiseling holes on the basement bottom plate after checking that the chiseling range line of the basement bottom plate is not wrong. And cutting off the embedded steel bars 6 in the basement bottom plate 3 when the hole is chiseled.
And 4, digging a foundation pit 10 on the foundation 11 below the basement bottom plate.
And 5, pouring a concrete cushion 7 and maintaining. The concrete cushion 7 can adopt the same concrete strength grade as the bottom plate cushion 5 under the bottom plate of the basement.
And 6, when the concrete cushion layer 7 reaches the set concrete strength, the steel water collecting tank 1 can be installed. During installation, after the steel water collecting tank 1 is in place, the bottom plate reinforcing steel bars 6 are welded with the angle steel stiffening ring 2.
And 7, pouring a non-shrinkage grouting material 8 between the outer wall of the part, below the basement bottom plate 3, of the steel water collecting tank 1 and the inner wall of the concrete cushion 7, wherein the concrete strength grade of the non-shrinkage grouting material 8 is not lower than that of the basement bottom plate 3.
And 8, filling non-shrinkage fine stone concrete 9 between the outer wall of the upper part of the steel water collecting tank 1 and the basement bottom plate 3 at the pit edge of the foundation pit 10, and vibrating to be compact. The concrete strength grade of the non-shrinkage fine-stone concrete 9 is higher than that of the basement bottom plate 3 by one grade.
And 9, after the concrete strength of the non-shrinkage fine aggregate concrete 9 reaches the set requirement, constructing the upper building surface.
Compared with a water collecting pit poured by concrete, the water collecting tank manufactured by the steel plate has the advantage that the construction time is obviously shortened. The steel water catch bowl can obviously reduce wallboard thickness, and basement bottom plate chiseling work load reduces. The steel water collecting tank is installed in place and can replace the template after the steel bars of the basement bottom plate are firmly connected, so that the workload and time for erecting and dismantling the template are saved.
Claims (5)
1. A building basement bottom plate water collecting device comprises a basement bottom plate (3); the method is characterized in that: a hole (4) is arranged on the basement bottom plate (3), and a foundation pit (10) is arranged on a foundation (11) at the bottom of the hole (4); a steel water collecting tank (1) is arranged in the foundation pit (10), and a group of angle steel stiffening rings (2) is sleeved at the upper part of the steel water collecting tank (1); the periphery of the angle steel stiffening ring (2) is connected with embedded steel bars (6) in the basement bottom plate (3).
2. The building basement bottom plate water collecting device of claim 1, wherein: the foundation pit (10) is a conical cavity with a large upper part and a small lower part.
3. The building basement bottom plate water collecting device of claim 1, wherein: and a bottom plate cushion layer (5) is arranged between the top surface of the foundation pit (10) and the bottom surface of the basement bottom plate (3).
4. The building basement bottom plate water collecting device of claim 1, wherein: and a concrete cushion (7) and a non-shrinkage grouting material (8) are sequentially paved between the foundation pit (10) and the steel water collecting tank (1).
5. The building basement bottom plate water collecting device of claim 1, wherein: and shrinkage-free fine aggregate concrete (9) is poured at the joint of the embedded steel bars (6) between the periphery of the angle steel stiffening ring (2) and the basement bottom plate (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121317729.3U CN216130156U (en) | 2021-06-11 | 2021-06-11 | Building basement bottom plate water-collecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121317729.3U CN216130156U (en) | 2021-06-11 | 2021-06-11 | Building basement bottom plate water-collecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216130156U true CN216130156U (en) | 2022-03-25 |
Family
ID=80766362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121317729.3U Active CN216130156U (en) | 2021-06-11 | 2021-06-11 | Building basement bottom plate water-collecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216130156U (en) |
-
2021
- 2021-06-11 CN CN202121317729.3U patent/CN216130156U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110409244B (en) | Composite bearing prefabricated road slab and prefabricated pavement construction method | |
CN206298900U (en) | A kind of diaphram wall built-in type steel encloses purlin plug system | |
CN110056000B (en) | Construction method and structure of counter weight type retaining wall | |
CN108035379B (en) | Comprehensive pipe gallery and construction method thereof | |
CN110005200B (en) | Construction process for concrete pouring compaction of horizontal hidden beam | |
CN206308707U (en) | A kind of city integrated Pipe rack of prefabricated assembled concrete | |
CN112431208A (en) | Construction method for deep foundation pit supporting by adopting component type force transmission belt | |
CN106400838B (en) | A kind of city integrated Pipe rack of prefabricated assembled concrete and construction method | |
CN216130156U (en) | Building basement bottom plate water-collecting device | |
CN111749277A (en) | Pipe-jacking building wall structure and construction method thereof | |
CN212506305U (en) | Combined supporting structure of inclined wedge-shaped pile and vertical wedge-shaped pile | |
CN212506306U (en) | Combined supporting structure of inclined wedge-shaped pile and vertical tubular pile | |
CN212506308U (en) | Combined supporting structure of inclined tubular pile and vertical wedge-shaped pile | |
CN217579581U (en) | Bituminous paving inspection shaft reinforced structure | |
CN116677061A (en) | Municipal rainwater and sewage inspection well integrated prefabricated installation device and construction method thereof | |
CN111962522A (en) | Combined supporting structure of inclined wedge-shaped pile and vertical pipe pile and construction method thereof | |
CN108442503A (en) | A kind of building basement bottom plate catch pit and construction method | |
CN212835365U (en) | Construction structure of PHC tubular pile | |
CN210122735U (en) | Underground structure anti-floating system based on outward-protruding wing foot plate | |
CN109667278B (en) | Anti-cracking and anti-seepage construction method for arranging tower crane foundation under independent foundation of underground garage | |
CN109989415B (en) | Construction method of fabricated foundation | |
CN210049264U (en) | Assembled foundation | |
CN109989414B (en) | Assembled foundation | |
CN113775174A (en) | Construction method for reinforcing underground external wall formwork of complex limited space in foundation pit | |
CN112012330A (en) | Installation and construction method of integrated sewage lifting equipment under roadway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |