CN216109566U - Building engineering repair equipment of caulking - Google Patents

Building engineering repair equipment of caulking Download PDF

Info

Publication number
CN216109566U
CN216109566U CN202122342465.3U CN202122342465U CN216109566U CN 216109566 U CN216109566 U CN 216109566U CN 202122342465 U CN202122342465 U CN 202122342465U CN 216109566 U CN216109566 U CN 216109566U
Authority
CN
China
Prior art keywords
push rod
rod motor
liquid pump
support plate
fixed mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122342465.3U
Other languages
Chinese (zh)
Inventor
刘非凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma Jiajia
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122342465.3U priority Critical patent/CN216109566U/en
Application granted granted Critical
Publication of CN216109566U publication Critical patent/CN216109566U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of building joint filling equipment, and discloses building engineering repairing joint filling equipment which comprises a support plate, wherein a storage box is fixedly arranged on the rear side of the upper surface of the support plate, a liquid pump is fixedly arranged in the middle of the upper surface of the support plate and is communicated with the storage box, a hose is communicated with the front side of the liquid pump, a through hole is formed in the front side of the support plate, which is close to the liquid pump, and penetrates through the through hole, a nozzle is communicated with the bottom of the hose, and a steel plate is fixedly arranged on the outer side of the bottom of the nozzle. According to the utility model, the push rod motor a and the steel plate are arranged, when a short crack is repaired, the supporting plate can be driven to move downwards through the transmission shaft of the push rod motor a, the supporting plate can drive the steel plate to move downwards, the sealing gasket is extruded on the road surface by the steel plate and is used for sealing and covering the crack, then the material is pumped into the crack through the liquid pump and the hose, and the defect caused by too much and too little liquid material is effectively avoided in a one-step filling mode.

Description

Building engineering repair equipment of caulking
Technical Field
The utility model relates to the technical field of building joint filling equipment, in particular to a joint filling equipment for building engineering repair.
Background
The gap filler has the characteristics of strong adhesiveness, small shrinkage, strong color fixing force, crack-proof flexibility, good decoration texture, pressure resistance, wear resistance and mould resistance, can perfectly repair cracks or damages on the surface of a floor, can be painted on the surface of the floor, has good waterproof performance, is particularly important for filling gaps in building construction, and is applied to filling the gaps in many occasions, including filling the gaps among tiles after the tiles are pasted, and also including repairing after the gaps appear on the road surface and the wall surface in building construction.
In the process of implementing the utility model, the inventor finds that the following problems in the prior art are not solved: the existing device for repairing and filling joints in constructional engineering is very easy to cause the situation of adding too much and too little liquid materials during the process of filling joints and feeding materials, the situation that the liquid materials are added too much and need to be flatly processed on redundant materials, the situation that the liquid materials are added too little and need to be fed materials for many times frequently, the repairing and filling joint efficiency is directly influenced, the practicability is poor, and the like.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a gap filling device for building engineering repair, which solves the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a kind of building engineering repairs the joint filling apparatus, including the support plate;
the rear side of the upper surface of the support plate is fixedly provided with a storage box, the middle part of the upper surface of the support plate is fixedly provided with a liquid pump, the liquid pump is communicated with the storage box, the front side of the liquid pump is communicated with a hose, the front side of the support plate close to the liquid pump is provided with an opening, the hose penetrates through the opening, the bottom of the hose is communicated with a nozzle, the outer side of the bottom of the nozzle is fixedly provided with a steel plate, the lower end surface of the steel plate is fixedly provided with a sealing gasket, the nozzle is fixedly provided with a valve close to the upper side of the steel plate, the right side of the lower surface of the support plate is fixedly provided with a push rod motor a, the bottom of a transmission shaft of the push rod motor a is in transmission connection with the support plate, the left side of the bottom of the support plate is provided with a push rod motor b, the right side of the lower surface of the support plate is fixedly provided with a support rod, and the connection of the steel plate, the connection of the push rod motor a and the support plate, and the transmission shaft of the push rod motor a and the steel plate are all provided with rotating seats, four edges and corners in support plate bottom all are connected with the universal wheel through the wheel carrier rotation, support plate left side fixed mounting has the fagging, and fagging left side top fixed mounting has the handle.
In a preferred embodiment of the present invention, the right side of the front wall of the storage box is integrally formed with a viewing window.
In a preferred embodiment of the utility model, a storage basket is fixedly arranged at the top of the right side of the supporting plate.
As a preferred embodiment of the present invention, a storage battery is fixedly installed on the left side of the top of the carrier plate, and the storage battery is electrically connected to the push rod motor a, the push rod motor b and the liquid pump through wires.
As a preferred embodiment of the present invention, the liquid pump and the push rod motor a are both fixedly connected to the carrier plate through a flange.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the repairing and gap filling equipment for the building engineering, the push rod motor a and the steel plate are arranged, when a short crack is repaired, the supporting plate can be driven to move downwards through the transmission shaft of the push rod motor a, the supporting plate can drive the steel plate to move downwards, the steel plate extrudes the sealing gasket on the road surface and covers the crack in a sealing mode, then materials are pumped into the crack through the liquid pump and the hose, a filling mode is achieved in place at one time, and the defect caused by too much liquid material is effectively avoided.
2. According to the construction engineering repair joint filling equipment, the push rod motor b and the support rod are arranged, the transmission shaft of the push rod motor b can stretch and retract, the joint of the steel plate and the support rod is inclined by taking the center as the center, the steel plate can be parallel to the slope pavement, and the angle of the steel plate can be adjusted.
Drawings
Other features, objects and advantages of the utility model will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
FIG. 1 is a schematic structural view of an overall front cross section of a joint filling device for repairing construction engineering according to the present invention;
fig. 2 is a schematic structural diagram of a connecting portion between a steel plate and a push rod motor b of the gap filling device for repairing in construction engineering.
In the figure: 1. a carrier plate; 2. a universal wheel; 3. a supporting plate; 4. a handle; 5. a liquid pump; 6. a visual window; 7. a material storage box; 8. a push rod motor a; 9. a hose; 10. a storage battery; 11. a steel plate; 12. a valve; 13. a support plate; 14. a strut; 15. a rotating seat; 16. a push rod motor b; 17. a nozzle; 18. and a gasket.
Detailed Description
Referring to fig. 1-2, the present invention provides a technical solution: a kind of building engineering repairs the joint filling apparatus, including the carrier plate 1;
1 upper surface rear side fixed mounting of support plate has storage case 7, 1 upper surface middle part fixed mounting of support plate has liquid pump 5, and liquid pump 5 and storage case 7 intercommunication setting, 5 front sides intercommunication of liquid pump are provided with hose 9, support plate 1 is close to the front side of liquid pump 5 and has seted up the opening, and hose 9 runs through in the opening, hose 9 bottom intercommunication is provided with nozzle 17, nozzle 17 bottom outside fixed mounting has steel sheet 11, terminal surface fixed mounting has sealed the pad 18 under the steel sheet 11, nozzle 17 is close to the upside fixed mounting of steel sheet 11 has valve 12, 1 lower surface right side fixed mounting of support plate has push rod motor a8, push rod motor a 8's transmission shaft bottom is connected with layer board 13, push rod motor b16 has been placed in layer board 13 bottom left side, layer board 13 lower surface right side fixed mounting has branch 14, branch 14 and 11 junction of steel sheet 11, The joint of a push rod motor a8 and a supporting plate 13 and the joint of a transmission shaft of a push rod motor a8 and a steel plate 11 are both provided with a rotating seat 15, four edges and corners at the bottom of the supporting plate 1 are all rotatably connected with universal wheels 2 through wheel carriers, a supporting plate 3 is fixedly installed at the left side of the supporting plate 1, a handle 4 is fixedly installed at the top of the left side of the supporting plate 3, a push rod motor a8 and the steel plate 11 are arranged, when a short crack is repaired, the supporting plate 13 can be driven by the transmission shaft of a push rod motor a8 to move downwards, the steel plate 11 can be driven by the supporting plate 13 to move downwards, a sealing gasket 18 is extruded on the road surface by the steel plate 11 and is covered on the crack in a sealing manner, then the material is pumped into the crack through a liquid pump 5 and a hose 9, the filling mode is in place at one time, the defect caused by too much adding of liquid is effectively avoided, and the transmission shaft of a push rod motor b16 and a supporting rod 14 can be stretched through the transmission shaft of a push rod motor b16, the steel plate 11 and the supporting rod 14 are inclined by taking the joint as the center, so that the steel plate 11 is parallel to the slope surface, the angle of the steel plate 11 can be adjusted, the steel plate is also suitable for gap filler of the slope surface, and the applicability is strong.
In this embodiment (as shown in fig. 1), but storage case 7 front wall right side integrated into one piece is provided with visual window 6, and accessible visual window 6 looks over incasement material volume, and the staff ration of being convenient for is reinforced.
In this embodiment (as shown in fig. 1), a storage basket is fixedly installed on the top of the right side of the supporting plate 3, and personal belongings and construction tools can be stored through the storage basket.
In this embodiment (as shown in fig. 1 and fig. 2), a battery 10 is fixedly installed on the left side of the top of the carrier plate 1, and the battery 10 is electrically connected to the push rod motor a8, the push rod motor b16 and the liquid pump 5 through wires, so that electric energy can be provided through the battery 10, the power supply requirement of the mobile device is met, and a long wire is prevented from being pulled.
In this embodiment (as shown in fig. 1), the liquid pump 5 and the push rod motor a8 are both fixedly connected to the carrier plate 1 through flanges, and are detachably fixed, so that the later-stage disassembly and assembly maintenance is facilitated, and the operation is convenient and fast.
The working principle is as follows: the utility model is to be noted that the utility model is a building engineering repair gap filling device, which comprises a carrier plate 1, a universal wheel 2, a supporting plate 3, a handle 4, a liquid pump 5, a visible window 6, a material storage box 7, a push rod motor a8, a hose 9, a storage battery 10, a steel plate 11, a valve 12, a supporting plate 13, a supporting rod 14, a rotating seat 15, a push rod motor b16, a nozzle 17 and a sealing gasket 18, wherein the components are all universal standard components or components known by technicians in the field, the structure and principle of the device can be known by technical manuals or conventional test methods, when the building engineering repair gap filling device is used, the storage battery 10 is respectively and electrically connected with the liquid pump 5, the push rod motor a8 and the push rod motor b16, the workers carry out opening and closing control through respective switches, and by arranging the push rod motor a8 and the steel plate 11, when repairing shorter cracks, the transmission shaft of accessible push rod motor a8 drives layer board 13 and moves down, layer board 13 can drive steel sheet 11 and move down, steel sheet 11 will seal the extrusion of pad 18 on the road surface, and to the sealed cover of crack, the material is pumped to the crack in through liquid pump 5 and hose 9 afterwards, disposable filler mode that targets in place, effectively avoid the drawback that too much too little arouses to the interpolation of liquid material to appear, through being provided with push rod motor b16 and branch 14, the transmission shaft of accessible push rod motor b16 is flexible, make steel sheet 11 and branch 14 handing-over department for central slope, can make steel sheet 11 parallel with domatic road surface, the angle adjustable characteristic of steel sheet 11, be applicable to domatic road surface gap filler equally, the suitability is strong, the result of use is comparatively ideal.

Claims (5)

1. The utility model provides a building engineering repair equipment of caulking which characterized in that: comprises a carrier plate (1);
the utility model discloses a support plate, including support plate (1), surface middle part fixed mounting has liquid pump (5), and liquid pump (5) and storage case (7) intercommunication set up, liquid pump (5) front side intercommunication is provided with hose (9), the front side that support plate (1) is close to liquid pump (5) is opened and is equipped with the opening, and hose (9) run through in the opening, hose (9) bottom intercommunication is provided with nozzle (17), nozzle (17) bottom outside fixed mounting has steel sheet (11), terminal surface fixed mounting has sealed pad (18) under steel sheet (11), the upside fixed mounting that nozzle (17) are close to steel sheet (11) has valve (12), support plate (1) lower surface right side fixed mounting has push rod motor a (8), the transmission shaft bottom transmission of push rod motor a (8) is connected with layer board (13), push rod motor b (16) have been placed in layer board (13) bottom left side, layer board (13) lower surface right side fixed mounting has branch (14), branch (14) all are provided with rotation seat (15) with steel sheet (11) junction, push rod motor a (8) and layer board (13) junction and the transmission shaft and steel sheet (11) junction of push rod motor a (8), four edges and corners in support plate (1) bottom all rotate through the wheel carrier and are connected with universal wheel (2), support plate (1) left side fixed mounting has fagging (3), and fagging (3) left side top fixed mounting has handle (4).
2. The construction engineering repair caulking apparatus of claim 1, wherein: the right side of the front wall of the material storage box (7) is integrally provided with a visual window (6).
3. The construction engineering repair caulking apparatus of claim 1, wherein: and a storage basket is fixedly arranged at the top of the right side of the supporting plate (3).
4. The construction engineering repair caulking apparatus of claim 1, wherein: the liquid pump is characterized in that a storage battery (10) is fixedly mounted on the left side of the top of the support plate (1), and the storage battery (10) is electrically connected with a push rod motor a (8), a push rod motor b (16) and a liquid pump (5) through wires respectively.
5. The construction engineering repair caulking apparatus of claim 1, wherein: the liquid pump (5) and the push rod motor a (8) are fixedly connected with the carrier plate (1) through flange plates.
CN202122342465.3U 2021-09-27 2021-09-27 Building engineering repair equipment of caulking Active CN216109566U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122342465.3U CN216109566U (en) 2021-09-27 2021-09-27 Building engineering repair equipment of caulking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122342465.3U CN216109566U (en) 2021-09-27 2021-09-27 Building engineering repair equipment of caulking

Publications (1)

Publication Number Publication Date
CN216109566U true CN216109566U (en) 2022-03-22

Family

ID=80688918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122342465.3U Active CN216109566U (en) 2021-09-27 2021-09-27 Building engineering repair equipment of caulking

Country Status (1)

Country Link
CN (1) CN216109566U (en)

Similar Documents

Publication Publication Date Title
CN211306722U (en) Superimposed sheet mould
CN210766447U (en) Bridge is maintained and is used road surface prosthetic devices
CN216109566U (en) Building engineering repair equipment of caulking
CN212250061U (en) Tunnel inner wall repair equipment
CN209942174U (en) Wall whitewashes device for interior decoration
CN212942677U (en) Hot melt vacuum compounding device is used in heat insulating strip production
CN215405483U (en) Bridge road maintenance repair construction device
CN216042236U (en) Waterproof coating's equipment of paining is used on building roof
CN216838899U (en) Crack repairing device for highway bridge
CN211571339U (en) Automatic patching device of highway road surface detection
CN210634403U (en) Electric pile that fills that water-proof effects is good
CN210022702U (en) Waterproof board surface waterproof material brushing device for building waterproofing
CN113275191B (en) Intelligent three-dimensional gluing equipment for trailing edge of wind driven generator blade
CN214459499U (en) Municipal administration road crack filling device
CN213114649U (en) Foundation mud pours into repair equipment into
CN207955368U (en) A kind of direct current pilework of corrosion fatigue life length
CN220927451U (en) Road crack pouring device for road construction
CN218520502U (en) Automatic conveying and placing device for beautiful slit pipes
CN215997242U (en) Charging pile shell surface spraying device
CN213831392U (en) Electric bicycle intelligent charging stake shell convenient to dismantle
CN214328695U (en) Multi-energy-utilization new-energy electric sanitation vehicle
CN218233105U (en) A road surface repair complementary unit for road engineering construction
CN219528434U (en) A divide storehouse instrument for grout construction
CN216173764U (en) A circuit laying device for tunnel construction
CN215289638U (en) Road crack pouring device for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ma Jiajia

Inventor after: Zhao Jin

Inventor after: Zhang Li

Inventor after: Liu Feifan

Inventor before: Liu Feifan

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220527

Address after: 066000 No. 78, Jiaozhuang village, dapuhe Town, Changli County, Qinhuangdao City, Hebei Province

Patentee after: Ma Jiajia

Address before: 510000 taipingsha No. 24, Yuexiu District, Guangzhou, Guangdong

Patentee before: Liu Feifan