CN216109423U - Coiled material laying device for building waterproof construction - Google Patents

Coiled material laying device for building waterproof construction Download PDF

Info

Publication number
CN216109423U
CN216109423U CN202122037679.XU CN202122037679U CN216109423U CN 216109423 U CN216109423 U CN 216109423U CN 202122037679 U CN202122037679 U CN 202122037679U CN 216109423 U CN216109423 U CN 216109423U
Authority
CN
China
Prior art keywords
bolt
box
coiled material
bolts
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122037679.XU
Other languages
Chinese (zh)
Inventor
王历
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huang Furui
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122037679.XU priority Critical patent/CN216109423U/en
Application granted granted Critical
Publication of CN216109423U publication Critical patent/CN216109423U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a coiled material laying device for building waterproof construction, which comprises a box body, a fixed box and an auxiliary assembly, wherein a front plate is installed on one side of the box body through a bolt, an adjusting plate is installed at the bottom of the front plate through a bolt, a cleaning brush is installed at the bottom of the adjusting plate through a bolt, the fixed box is installed at the bottom of the inner part of the box body through a bolt, a bidirectional screw rod is installed in the fixed box through a rotating shaft, two groups of screw sleeve frames are installed on the outer sides of the bidirectional screw rod in a surrounding mode, and a scraping plate is installed at the bottom of each screw sleeve frame through a knob. According to the utility model, the scraper plate is arranged at the bottom of the wire sleeve frame, and can be used for flatly scraping the coiled material laid by the device, so that the laid coiled material is attached to the ground for use, and no gap is left between the laid coiled material and the ground, thereby ensuring the waterproof function of the coiled material on the building ground, increasing the practicability of the device and improving the waterproof effect of the coiled material on the building ground.

Description

Coiled material laying device for building waterproof construction
Technical Field
The utility model relates to the technical field of building construction, in particular to a coiled material laying device for building waterproof construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and can also be said to be the process of changing various lines on design drawings into objects at specified places, and the process comprises basic engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein the construction operation place is called as a building construction site or a construction site, also called as a construction site, open-air construction is needed in the building construction, when the cement and other building materials are laid in rainy weather, the cement laying surface which is not completely solidified in the interior needs to be covered and waterproofed, and at this time, a coiled material laying device for building waterproofing construction is needed.
The existing coiled material laying device for building waterproof construction has the defects that:
1. the existing coiled material laying device for building waterproof construction usually places a coiled material on the surface of a cement laying surface when laying is carried out, but the coiled material is completely attached to the cement laying surface when laying is impossible, so that the phenomenon of water seepage is caused at a gap between the coiled material and the cement laying surface, the waterproof effect of the coiled material is reduced, and the practicability of the device is reduced;
2. the existing coiled material laying device for building waterproof construction lays coiled materials on cement laying surfaces which are not completely solidified inside, the cement laying surfaces with solidified surfaces cannot be cleaned, and a small amount of solid matters such as building stones and the like are remained on the surfaces of the solidified cement laying surfaces, so that the coiled materials are broken when the coiled materials are laid subsequently, and the service life of the coiled materials is shortened.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a coiled material laying device for building waterproof construction, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a coiled material laying device for building waterproof construction comprises a box body, a fixing box and an auxiliary assembly, wherein an auxiliary roller is installed on one side of the box body through a bolt, a front plate is installed on one side of the box body through a bolt, a regulating plate is installed at the bottom of the front plate through a bolt, a cleaning brush is installed at the bottom of the regulating plate through a bolt, a fixing box is installed at the bottom of the inner part of the box body through a bolt, a bidirectional lead screw is installed in the fixing box through a rotating shaft, two groups of lead screw frames are installed on the outer sides of the bidirectional lead screw frames in a surrounding mode, a scraping plate is installed at the bottom of each lead screw frame through a knob, the auxiliary assembly is installed in the box body through a bolt and comprises a connecting piece, a roller rod and a rubber ring, the roller rod is installed on the bottom of the connecting piece through a bolt, the rubber ring is installed on the outer side of the roller rod, an installation box is installed at the bottom of one side of the box body through a bolt, and a supporting plate is arranged at the top of one side of the box body through a bolt.
Preferably, a sealing box is mounted at the top inside the box body through bolts, and a sealing plate is movably mounted inside the sealing box.
Preferably, the motor is installed in the installation box through the bolt, and the output end of the motor is connected with the bidirectional screw rod through the bolt.
Preferably, the top of the supporting plate is provided with two groups of adjusting rods through bolts, and the top of each adjusting rod is provided with a handle through a bolt.
Preferably, the mounting panel is installed through the bolt in the box front, and the controller is installed through the bolt in the mounting panel front.
Preferably, the inspection plate is installed through the bolt in the installation box openly, and the louvre is installed through the bolt in the inspection plate openly.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the scraper plate is arranged at the bottom of the wire sleeve frame, and can be used for flatly scraping the coiled material laid by the device, so that the laid coiled material is attached to the ground for use, and no gap is left between the laid coiled material and the ground, thereby ensuring the waterproof function of the coiled material on the building ground, increasing the practicability of the device and improving the waterproof effect of the coiled material on the building ground.
2. According to the utility model, the cleaning brush is arranged at the bottom of the adjusting plate, so that residual building debris on the ground can be cleaned before the device lays the coiled material, the coiled material is prevented from being sunk due to residual building garbage on the ground when the coiled material is laid, the coiled material is prevented from being damaged due to the residual building garbage on the ground, the laying effect of the coiled material is ensured, the laying integrity of the coiled material is also ensured, and the service life of the coiled material is prolonged.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic cross-sectional front view of the present invention;
FIG. 3 is a schematic front view of the present invention;
FIG. 4 is a schematic side view of the present invention;
fig. 5 is a partial structural diagram of the auxiliary assembly of the present invention.
In the figure: 1. a box body; 101. an auxiliary roller; 102. a sealing box; 103. a sealing plate; 2. a front plate; 201. an adjusting plate; 202. cleaning a brush; 3. installing a box; 301. a motor; 4. a fixed box; 401. a bidirectional screw rod; 402. a wire sleeve frame; 403. a squeegee; 5. a support plate; 501. adjusting a rod; 502. a grip; 6. an auxiliary component; 601. a connecting member; 602. a roll bar; 603. a rubber ring; 7. mounting a plate; 701. a controller; 8. an access panel; 801. and (4) heat dissipation holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, an embodiment of the present invention is shown: a coiled material laying device for building waterproof construction comprises a box body 1, a fixed box 4 and an auxiliary assembly 6, wherein an auxiliary roller 101 is installed on one side of the box body 1 through a bolt, the box body 1 can provide an installation position for the auxiliary roller 101, the stability of the auxiliary roller 101 is improved, the auxiliary roller 101 can assist in flattening coiled materials laid by the device, the coiled materials are guaranteed to be flatly laid on the ground, laying errors caused by the fact that the coiled materials are tilted when the coiled materials are laid by the device are avoided, workers do not need to manually flatten the coiled materials, the work burden of the workers is reduced, the practicability of the device is improved, a front plate 2 is installed on one side of the box body 1 through the bolt, the front plate 2 can provide an installation position for an adjusting plate 201, the stability of the adjusting plate 201 is improved, an adjusting plate 201 is installed on the bottom of the front plate 2 through the bolt, the adjusting plate 201 can provide an installation position for a cleaning brush 202, and the stability of the cleaning brush 202 is improved, the bottom of the adjusting plate 201 is provided with the cleaning brush 202 through a bolt, the cleaning brush 202 can clean residual building debris on the ground before the device lays the coiled material, the coiled material is prevented from being hollow due to residual building garbage on the ground when the coiled material is laid, meanwhile, the coiled material is prevented from being damaged due to the residual building garbage on the ground, the laying effect of the coiled material is ensured, the laying integrity of the coiled material is ensured, the service life of the coiled material is prolonged, the bottom of the inside of the box body 1 is provided with the fixing box 4 through the bolt, the fixing box 4 can provide a mounting position for the bidirectional screw rod 401 and increase the stability of the bidirectional screw rod 401, the inside of the fixing box 4 is provided with the bidirectional screw rod 401 through a rotating shaft, the bidirectional screw rod 401 can provide a mounting position for the screw sleeve frame 402 and increase the stability of the screw sleeve frame 402, two groups of screw sleeve frames 402 are arranged around the outside of the bidirectional screw rod 401, and the screw sleeve frame 402 can provide a mounting position for the scraper 403, the stability of the scraper 403 is improved, the scraper 403 is installed at the bottom of the screw frame 402 through a knob, and the scraper 403 can be driven to do arc motion by rotating the knob, the scraper 403 can smoothly scrape the coiled material laid by the device, so that the laid coiled material can be used by being attached to the ground, and no gap is left between the laid coiled material and the ground, thereby ensuring the waterproof function of the coiled material to the building ground, increasing the practicability of the device, improving the waterproof effect of the coiled material to the building ground, the auxiliary assembly 6 is installed in the box body 1 through bolts, the auxiliary assembly 6 comprises a connecting piece 601, a roller rod 602 and a rubber ring 603, the roller rod 602 is installed at the bottom of the connecting piece 601 through bolts, the connecting piece 601 can provide an installation position for the roller rod 602, the stability of the roller rod 602 is increased, the roller rod 602 can provide an installation position for the rubber ring 603, the stability of the rubber ring 603 is increased, the rubber ring 603 is installed around the outer side of the roller rod 602, rubber circle 603 can provide the coiled material and place the space, and the staff of being convenient for user equipment lays the coiled material, and install bin 3 through the bolt in the bottom of box 1 one side, and install bin 3 can provide the mounted position to motor 301, increases motor 301's stability, and backup pad 5 is installed through the bolt in the top of box 1 one side, and backup pad 5 can provide the mounted position to adjusting lever 501, increases the stability of adjusting lever 501.
Further, the sealing box 102 is installed at the top of the interior of the box body 1 through bolts, the sealing box 102 can provide an installation position for the sealing plate 103, the stability of the sealing plate 103 is improved, the sealing plate 103 is movably installed in the sealing box 102, the sealing plate 103 can seal the device, and the service life of the device is prolonged.
Further, motor 301 is installed through the bolt in installation case 3 inside, and the output of motor 301 passes through the bolt and is connected with two-way lead screw 401, and motor 301 circular telegram back can drive two-way lead screw 401 and rotate, can drive silk covering frame 402 through two-way lead screw 401 rotation and carry out reciprocating motion, can drive scraper blade 403 through silk covering frame 402 reciprocating motion and carry out reciprocal horizontal migration, and the device of being convenient for uses.
Further, two sets of regulation poles 501 are installed through the bolt in backup pad 5 top, and regulation pole 501 can provide the mounted position to handle 502, increases handle 502's stability, and adjusts pole 501 top and install handle 502 through the bolt, and handle 502 can provide the hand space for the staff, and the staff of being convenient for removes the device.
Further, the mounting panel 7 is installed through the bolt in the box 1 openly, and the mounting panel 7 can provide the mounted position to controller 701, increases controller 701's stability, and controller 701 is installed through the bolt in the mounting panel 7 openly, and controller 701 adopts PLC control system, and controller 701 accessible wire carries out electric connection with motor 301.
Further, install maintenance board 8 through the bolt in install 3 openly, maintenance board 8 can provide the maintenance space for the staff, and the staff of being convenient for overhauls the device, and maintenance board 8 openly installs louvre 801 through the bolt, and louvre 801 can arrange the scattering to 3 inside temperatures of install bin, avoids the too high device damage that causes of 3 inside temperatures of install bin.
The working principle is as follows: before using this device, the user of service detects the device earlier, confirm and use after not having the problem, the staff places the coiled material through roller pole 602 and rubber circle 603, utilize cleaning brush 202 to clear up the remaining building piece in ground before the device is laid the coiled material, the coiled material of laying the device through auxiliary roll 101 when the device removes helps pushing away the tie, can drive two-way lead screw 401 after motor 301 circular telegram and rotate, can drive silk covering frame 402 through two-way lead screw 401 is rotatory and carry out reciprocating motion, can drive scraper blade 403 through silk covering frame 402 reciprocating motion and carry out the removal of reciprocal horizontal migration through scraper blade 403 and carry out the tie scraping to the coiled material that the device was laid.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a coiled material laying device for waterproof construction of building, includes box (1), fixed case (4) and auxiliary assembly (6), its characterized in that: the cleaning device is characterized in that auxiliary rollers (101) are installed on one side of the box body (1) through bolts, a front plate (2) is installed on one side of the box body (1) through bolts, an adjusting plate (201) is installed on the bottom of the front plate (2) through bolts, a cleaning brush (202) is installed on the bottom of the adjusting plate (201) through bolts, a fixed box (4) is installed on the bottom of the interior of the box body (1) through bolts, a bidirectional screw rod (401) is installed on the interior of the fixed box (4) through a rotating shaft, two groups of screw sleeve frames (402) are installed on the outer side of the bidirectional screw rod (401) in a surrounding mode, a scraping plate (403) is installed on the bottom of each screw sleeve frame (402) through a knob, auxiliary assemblies (6) are installed on the interior of the box body (1) through bolts, each auxiliary assembly (6) comprises a connecting piece (601), a roller rod (602) and a rubber ring (603), and the roller rod (602) is installed on the bottom of the connecting piece (601) through bolts, the roller rod (602) outside is encircleed and is installed rubber circle (603), install box (3) through the bolt in the bottom of box (1) one side, backup pad (5) are installed through the bolt in the top of box (1) one side.
2. The coil laying device for building waterproofing according to claim 1, characterized in that: the top of the interior of the box body (1) is provided with a sealing box (102) through bolts, and a sealing plate (103) is movably arranged in the sealing box (102).
3. The coil laying device for building waterproofing according to claim 1, characterized in that: the motor (301) is installed in the installation box (3) through a bolt, and the output end of the motor (301) is connected with the bidirectional screw rod (401) through the bolt.
4. The coil laying device for building waterproofing according to claim 1, characterized in that: two groups of adjusting rods (501) are installed at the top of the supporting plate (5) through bolts, and a handle (502) is installed at the top of each adjusting rod (501) through bolts.
5. The coil laying device for building waterproofing according to claim 1, characterized in that: the box (1) openly installs mounting panel (7) through the bolt, and mounting panel (7) openly installs controller (701) through the bolt.
6. The coil laying device for building waterproofing according to claim 1, characterized in that: install access panel (8) openly through the bolt in install shutter (8), and access panel (8) openly install louvre (801) through the bolt.
CN202122037679.XU 2021-08-27 2021-08-27 Coiled material laying device for building waterproof construction Active CN216109423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122037679.XU CN216109423U (en) 2021-08-27 2021-08-27 Coiled material laying device for building waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122037679.XU CN216109423U (en) 2021-08-27 2021-08-27 Coiled material laying device for building waterproof construction

Publications (1)

Publication Number Publication Date
CN216109423U true CN216109423U (en) 2022-03-22

Family

ID=80727836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122037679.XU Active CN216109423U (en) 2021-08-27 2021-08-27 Coiled material laying device for building waterproof construction

Country Status (1)

Country Link
CN (1) CN216109423U (en)

Similar Documents

Publication Publication Date Title
CN211850639U (en) Building wall mortar spraying and strickling device
CN211321390U (en) On-spot monitoring device for construction
CN216109423U (en) Coiled material laying device for building waterproof construction
CN215542957U (en) Solar energy electron stop borad convenient to it is clean
CN210327801U (en) Novel 220KV intelligent substation is with control device
CN209261076U (en) A kind of accumulated snow cleaning plant of roof photovoltaic panel
CN216474364U (en) Road surface leveling device for highway engineering
CN212944244U (en) Pipeline fixing device on civil and industrial building scaffold
CN214089341U (en) Road leveling device is used in municipal works construction
CN215072644U (en) Mountain landslide disaster image recognition device
CN115318703A (en) Automatic cleaning device of insulator
CN210225984U (en) Waterproof dustproof anticorrosive control box
CN209597794U (en) Clearing apparatus suitable for carrying out electric power maintenance cable duct
CN220727776U (en) Electric power monitoring device
CN220513682U (en) Dust fall device for civil construction
CN214497092U (en) Road surface leveling device for highway engineering
CN219347759U (en) Automatic lifting mapping device
CN216360816U (en) Adjustable energy-saving building photovoltaic curtain wall
CN216517254U (en) Civil engineering rail guard
CN215563962U (en) Efficient laying device for waterproof engineering
CN216746090U (en) Monitoring device for electromechanical equipment of highway tunnel
CN219300412U (en) Idle land information collecting and monitoring device
CN217978147U (en) Monitoring device
CN208231448U (en) A kind of building roof grinding device for clearing up dust
CN211880358U (en) High tension transmission line on-line monitoring electrical power generating system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Huang Furui

Inventor after: Liu Yun

Inventor after: Dong Jinqiu

Inventor after: Wang Li

Inventor before: Wang Li

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20220413

Address after: 266000 Yilin Meidi community, Tiantai City, Chengyang District, Qingdao City, Shandong Province

Patentee after: Huang Furui

Address before: 350000 No. 438, fufei North Road, Jin'an District, Fuzhou City, Fujian Province

Patentee before: Wang Li

TR01 Transfer of patent right