CN216109011U - Modular rapid construction structure of building - Google Patents

Modular rapid construction structure of building Download PDF

Info

Publication number
CN216109011U
CN216109011U CN202122176748.5U CN202122176748U CN216109011U CN 216109011 U CN216109011 U CN 216109011U CN 202122176748 U CN202122176748 U CN 202122176748U CN 216109011 U CN216109011 U CN 216109011U
Authority
CN
China
Prior art keywords
wall
fixedly connected
cylinder
fixed
drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122176748.5U
Other languages
Chinese (zh)
Inventor
李江
柯家权
李兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyi Dingsheng Construction Group Co.,Ltd.
Original Assignee
Shenzhen Dingsheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Dingsheng Construction Engineering Co ltd filed Critical Shenzhen Dingsheng Construction Engineering Co ltd
Priority to CN202122176748.5U priority Critical patent/CN216109011U/en
Application granted granted Critical
Publication of CN216109011U publication Critical patent/CN216109011U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a modular rapid construction structure of a building, which comprises two modules, wherein the side wall of one of the modules is symmetrically and fixedly connected with two rotary bases, a fixed rod is fixedly connected between the two rotary bases, the outer wall of the other module is fixedly connected with two fixed blocks which are movably sleeved on the outer wall of the fixed rod, the two fixed blocks are respectively positioned in the two rotary bases, and the side wall of one side of the module, which is close to the fixed blocks, is fixedly connected with a connecting block which is movably sleeved on the outer wall of the fixed rod. According to the utility model, the knob is rotated to realize the engagement of the internal thread cylinder and the threaded opening, and the cylinder is moved downwards until the cylinder is completely abutted against the connecting block, so that the angle between the two modules is fixed, the angle adjustment is completed, and the problems that a plurality of nuts need to be screwed and completely fall off, and the nuts are easily lost are solved, and the device is simple and convenient.

Description

Modular rapid construction structure of building
Technical Field
The utility model relates to the technical field of building construction, in particular to a modular rapid construction structure of a building.
Background
In some construction applications, the combination of two or more structural forms helps to give the most suitable structural solution for the building.
Through the retrieval, chinese patent publication is a building modularization quick construction structure of CN212772883U, first regulating plate is two, and all arrange the inside wall of left side connecting plate in, be located between the first regulating plate of top and the second regulating plate and all be equipped with adjusting screw between the first regulating plate and the second regulating plate that are located the below, rotate between the lateral wall of two-way screw rod and the adjustment tank and be connected, the other end of two-way screw rod passes the connecting plate and is equipped with the nut, two sets of splint are arranged in two adjustment tanks respectively, two splint upper ends of every group respectively with on the two-way screw rod between screw rod and the anti-screw rod threaded connection, sliding connection between the lower extreme of splint and the slide bar, can be as required with two building modules with suitable angle connect, the practicality has, can also adjust the width of building module, the commonality has.
However, the above-mentioned patent has the following disadvantages that when two building modules are properly angularly adjusted, the two nuts need to be unscrewed and tightened to adjust and fix the angles of the two building modules, which is time-consuming, and the nuts are easily lost and dropped after falling off the threaded rods, which causes unnecessary troubles.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems in the background art and provides a modular rapid construction structure of a building.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a modular rapid construction structure of a building comprises two modules, wherein the side wall of one of the modules is symmetrically and fixedly connected with two rotary seats, a fixed rod is fixedly connected between the two rotary seats, the outer wall of the other module is fixedly connected with two fixed blocks which are movably sleeved on the outer wall of the fixed rod, the two fixed blocks are respectively positioned in the two rotary seats, one side wall of the module, which is close to the fixed blocks, is fixedly connected with a connecting block which is movably sleeved on the outer wall of the fixed rod, the upper side wall of the connecting block is fixedly connected with a threaded opening which is movably sleeved on the outer wall of the fixed rod, the outer wall of the fixed rod is fixedly connected with a rectangular block, the outer wall of the rectangular block is slidably sleeved with a cylinder, the inner wall of the cylinder is fixedly connected with a fixed plate, the lower side wall of the fixed plate and the inner bottom wall of the cylinder are fixedly connected with a first bearing, and the inner rings of the two first bearings are fixedly connected with an inner threaded cylinder which is meshed with the threaded opening together, the outer wall of the internal thread cylinder is fixedly sleeved with a first bevel gear, a rotating shaft penetrates through the outer wall of the cylinder, one end, located in the cylinder, of the rotating shaft is fixedly connected with a second bevel gear meshed with the first bevel gear, and one end, located outside the cylinder, of the rotating shaft is fixedly connected with a knob.
Preferably, the upper side wall of the cylinder is provided with a rectangular hole matched with the rectangular block.
Preferably, the lower side wall of the cylinder is provided with a round opening matched with the threaded opening.
Preferably, the outer wall of the rotating shaft is fixedly sleeved with a second bearing fixedly connected with the inner wall of the cylinder.
Preferably, the lower end of the cylinder is fixedly connected with an anti-skid gasket.
Compared with the prior art, the modular rapid construction structure of the building has the advantages that:
1. the internal thread cylinder and the cylinder are arranged, after the angle between the two modules is adjusted, the cylinder is slid onto the threaded opening, the internal thread cylinder is driven to be meshed with the threaded opening through the rotation of the knob, so that the cylinder is driven to move downwards until the cylinder completely abuts against the connecting block, the angle between the two modules is fixed, the angle adjustment is completed, the problems that a plurality of nuts need to be screwed, the nuts need to be completely separated, and the nuts are easily lost are solved, and the device is simple and convenient;
2. the anti-slip gasket is arranged, so that the friction force between the cylinder and the connecting block can be increased by using the anti-slip gasket, the stability between the cylinder and the connecting block is increased, and the stability between the two modules is improved;
in conclusion, the internal thread cylinder is meshed with the threaded opening by rotating the knob, and the cylinder is moved downwards until the cylinder is completely abutted against the connecting block, so that the angle between the two modules is fixed, the angle adjustment is completed, the problem that the nuts are easily lost due to the fact that the nuts need to be screwed and completely fall off is solved, and the device is simple and convenient.
Drawings
FIG. 1 is a schematic structural view of a modular rapid construction structure for a building according to the present invention;
FIG. 2 is a cross-sectional view of a drum in the modular rapid construction structures for buildings according to the present invention;
FIG. 3 is a perspective view of a cylinder in the modular rapid construction structure for a building according to the present invention;
fig. 4 is a bottom perspective view of a modular rapid construction structure cylinder for a building according to the present invention.
In the figure: the device comprises a module 1, a rotary seat 2, a fixing rod 3, a fixing block 4, a connecting block 5, a thread opening 6, a rectangular block 7, a cylinder 8, a fixing plate 9, a cylinder with internal threads 10, a bearing I11, a bevel gear I12, a rotating shaft 13, a bevel gear II 14, a knob 15, a round opening 16, a bearing II 17 and a rectangular hole 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Referring to fig. 1-4, a modular rapid construction structure for buildings comprises two modules 1, wherein two rotary bases 2 are symmetrically and fixedly connected to the side wall of one module 1, a fixing rod 3 is fixedly connected between the two rotary bases 2, two fixing blocks 4 are fixedly connected to the outer wall of the other module 1 and movably sleeved on the outer wall of the fixing rod 3, the two fixing blocks 4 are respectively arranged in the two rotary bases 2, a connecting block 5 is fixedly connected to the side wall of one side of the module 1, which is close to the fixing block 4, and movably sleeved on the outer wall of the fixing rod 3, and the connecting block 5 and the two fixing blocks 4 are movably sleeved on the outer wall of the fixing rod 3, so that the two modules 1 can freely rotate around the fixing rod 3, and the effect of adjusting the angle between the two modules 1 is achieved.
The side wall fixedly connected with movable sleeve of going up of connecting block 5 establishes the screw thread mouth 6 on 3 outer walls of dead lever, the outer wall fixedly connected with rectangular block 7 of dead lever 3, the outer wall sliding sleeve of rectangular block 7 is equipped with drum 8, the side wall of going up of drum 8 seted up with rectangular block 7 assorted rectangular hole 18, the side wall of going down of drum 8 seted up with screw thread mouth 6 assorted round mouth 16, setting up of rectangular hole 18 makes drum 8 can freely slide on rectangular block 7, simultaneously because the spacing nature of rectangle, guarantee relatively stable between drum 8 and the dead lever 3.
The inner wall fixedly connected with fixed plate 9 of drum 8, the equal fixedly connected with bearing 11 of lower lateral wall of fixed plate 9 and the interior diapire of drum 8, the common fixedly connected with of inner circle of two bearing 11 and the internal thread section of thick bamboo 10 that the screw thread mouth 6 meshed mutually, the fixed cover of outer wall of internal thread section of thick bamboo 10 is equipped with bevel gear 12, the outer wall of drum 8 runs through and is equipped with pivot 13, the fixed cover of outer wall of pivot 13 is equipped with two 17 with drum 8 inner wall fixed connection's bearing, bearing two 17 has made things convenient for the rotation of pivot 13.
One end of the rotating shaft 13, which is positioned in the cylinder 8, is fixedly connected with a bevel gear II 14 meshed with the bevel gear I12, one end of the rotating shaft 13, which is positioned outside the cylinder 8, is fixedly connected with a knob 15, after the angle adjustment between the two modules 1 is completed, the cylinder 8 is slid onto the threaded opening 6, so that the threaded opening 6 penetrates through a round opening 16 to be in threaded contact with the inner thread cylinder 10, then the knob 15 is rotated to enable the bevel gear II 14 to rotate through the rotating shaft 13, the bevel gear I12 meshed with the bevel gear II drives the inner thread cylinder 10 to rotate, so as to drive the inner thread cylinder 10 to be meshed with the threaded opening 6, because the position of the threaded opening 6 is fixed, the inner thread cylinder 10 can be driven to rotate and move downwards when being meshed with the threaded opening 6, so as to drive the cylinder 8 to move downwards axially until the inner side wall of the connecting block 5 is abutted against the upper side wall of the connecting block 5, and the friction force between the cylinder 8 and the connecting block 5 is large enough by matching with an anti-slip gasket, thereby realize the fixed between drum 8 and the connecting block 5, accomplish the angle modulation between two modules 1 to solved and to have twisted a plurality of nuts and move and need drop the nut completely, caused the problem that the nut loses easily, it is simple and convenient.
Further, unless otherwise specifically stated or limited, the above-described fixed connection is to be understood in a broad sense, and may be, for example, welded, glued, or integrally formed as is conventional in the art.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (5)

1. A modular rapid construction structure of a building comprises two modules (1) and is characterized in that the lateral wall of one of the modules (1) is symmetrically and fixedly connected with two rotary bases (2), a fixed rod (3) is fixedly connected between the two rotary bases (2) together, the outer wall of the other module (1) is fixedly connected with two fixed blocks (4) which are movably sleeved on the outer wall of the fixed rod (3), the two fixed blocks (4) are respectively positioned in the two rotary bases (2), the lateral wall of one side of the module (1) close to the fixed block (4) is fixedly connected with a connecting block (5) which is movably sleeved on the outer wall of the fixed rod (3), the upper lateral wall of the connecting block (5) is fixedly connected with a threaded opening (6) which is movably sleeved on the outer wall of the fixed rod (3), and the outer wall of the fixed rod (3) is fixedly connected with a rectangular block (7), the outer wall of rectangle piece (7) slides and overlaps and is equipped with drum (8), the inner wall fixedly connected with fixed plate (9) of drum (8), the equal fixedly connected with bearing (11), two of lower lateral wall of fixed plate (9) and the interior diapire of drum (8) the common fixedly connected with of inner circle of bearing (11) and screw thread mouth (6) engaged with interior screw thread section of thick bamboo (10), the outer wall fixed cover of interior screw thread section of thick bamboo (10) is equipped with bevel gear (12), the outer wall of drum (8) runs through and is equipped with pivot (13), one end fixedly connected with that pivot (13) are located drum (8) and bevel gear two (14) that bevel gear (12) engaged with, one end fixedly connected with knob (15) that pivot (13) are located drum (8) outside.
2. The modular rapid construction structure of buildings according to claim 1 characterized in that the upper side wall of the cylinder (8) is opened with rectangular holes (18) matching with the rectangular blocks (7).
3. The modular rapid construction structure of buildings according to claim 1 characterized in that the lower side wall of the cylinder (8) is opened with a round mouth (16) matching with the threaded mouth (6).
4. The modular rapid construction structure of buildings according to claim 1, characterized in that the outer wall of the rotating shaft (13) is fixedly sleeved with a second bearing (17) fixedly connected with the inner wall of the cylinder (6).
5. The modular rapid construction structure of buildings according to claim 1 characterized in that the lower end of the cylinder (8) is fixedly connected with an anti-skid gasket.
CN202122176748.5U 2021-09-09 2021-09-09 Modular rapid construction structure of building Active CN216109011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122176748.5U CN216109011U (en) 2021-09-09 2021-09-09 Modular rapid construction structure of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122176748.5U CN216109011U (en) 2021-09-09 2021-09-09 Modular rapid construction structure of building

Publications (1)

Publication Number Publication Date
CN216109011U true CN216109011U (en) 2022-03-22

Family

ID=80733090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122176748.5U Active CN216109011U (en) 2021-09-09 2021-09-09 Modular rapid construction structure of building

Country Status (1)

Country Link
CN (1) CN216109011U (en)

Similar Documents

Publication Publication Date Title
CN216109011U (en) Modular rapid construction structure of building
CN221364698U (en) Automobile part overturning tool
CN211889998U (en) Rotary tool magazine structure
CN208051781U (en) Hole ratchet spanner living
CN215434422U (en) Cement brick cutter
CN114992467A (en) Supervision device for building quality safety management
CN213541037U (en) Locking anticreep bolt and nut subassembly
CN112775916A (en) VR is spare part assembly jig for helmet manufacturing
CN213928283U (en) Mechanical arm upright post device
CN218468027U (en) Pull-adjustable fastening bolt
CN209825903U (en) Gardens sightseeing seat
CN220529462U (en) Fishing umbrella regulating fitting
CN210452421U (en) Case and bag fixing device is used in case and bag production
CN218137763U (en) Tray extractor for aviation oil filtering separator
CN221284329U (en) Multidimensional angle adjusting device
CN218440074U (en) Connecting component for furniture assembly
CN208462763U (en) A kind of fishing fort
CN221145872U (en) Shooting device with camera module convenient to replace
CN215409993U (en) One-way gear linkage controller
CN111300743A (en) Combined clamp for injection mold
CN2734727Y (en) Wooden-plug bottle opener
CN218082451U (en) Double offset ring spanner that can incline and use
CN2582493Y (en) Fruit squeezer
CN2055082U (en) Multi-function combined spanner
CN220508468U (en) Soil sampling device convenient to clearance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 518000 902, building F, penglongpan hi tech park, No. 11, Dafu Industrial Zone, Dafu community, Guanlan street, Longhua District, Shenzhen, Guangdong Province

Patentee after: Zhongyi Dingsheng Construction Group Co.,Ltd.

Address before: 518000 902, building F, penglongpan hi tech park, No. 11, Dafu Industrial Zone, Dafu community, Guanlan street, Longhua District, Shenzhen, Guangdong Province

Patentee before: Shenzhen Dingsheng Construction Engineering Co.,Ltd.