CN216099600U - Prefabricated post grouting plugging device of assembly type building - Google Patents

Prefabricated post grouting plugging device of assembly type building Download PDF

Info

Publication number
CN216099600U
CN216099600U CN202122356725.2U CN202122356725U CN216099600U CN 216099600 U CN216099600 U CN 216099600U CN 202122356725 U CN202122356725 U CN 202122356725U CN 216099600 U CN216099600 U CN 216099600U
Authority
CN
China
Prior art keywords
plugging device
slide rail
rail frame
wooden plug
prefabricated column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122356725.2U
Other languages
Chinese (zh)
Inventor
马文鹏
谢石利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122356725.2U priority Critical patent/CN216099600U/en
Application granted granted Critical
Publication of CN216099600U publication Critical patent/CN216099600U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of assembly type buildings, and particularly discloses a grouting plugging device for prefabricated columns of an assembly type building. According to the utility model, the position of the cylinder seat is limited by screwing the first bolt, the trigger cord is connected with the mounting ring, when slurry flows out of the hole of the prefabricated column, the wooden plug can be pushed open, the trigger cord pulls the switch body to start the alarm, field personnel can hammer the wooden plug in time to block the hole of the prefabricated column, and the structure can automatically monitor whether the slurry flows out of the hole of the prefabricated column and judge the time for hammering the wooden plug, so that the waste caused by excessive slurry flowing out is avoided.

Description

Prefabricated post grouting plugging device of assembly type building
Technical Field
The utility model relates to the technical field of assembly type buildings, in particular to a grouting plugging device for prefabricated columns of an assembly type building.
Background
The prefabricated construction carries out the building prefab in the mill and produces, transport the prefab to the scene again and assemble alright, can shorten the fashioned time limit for a project greatly, wherein prefabricated post is produced through the grout, indicate during the grout to inject concrete slurry toward wall body inside, there is prefabricated reinforcing bar frame wall body inside, treat that wall body inside is full of concrete slurry and the grout solidifies the back, prefabricated post just is the shaping success, the surface of prefabricated post generally can be provided with a plurality of row thick liquid mouth, in order to show the inside thick liquid position of wall body, need use the wooden plug to carry out the shutoff when row thick liquid mouth row thick liquid, there are some defects when using the wooden plug shutoff, so I, we propose an assembly type construction prefabricated post grout plugging device.
The existing patent (publication number: CN213234302U), an assembled prefabricated post of building plugging device that grouts, including the grout mould body, the right side of the grout mould body has set the grout tube head, the sleeve pipe has been cup jointed in the right-hand member outside of grout tube head, the inboard fixedly connected with toper cutting ferrule of sheathed tube right-hand member, the grout shower nozzle has been alternate to toper cutting ferrule inboard, the equal fixedly connected with connecting block of downside on the sheathed tube right-hand member, vertically be connected with fixed top plug on the connecting block.
In the process of implementing the utility model, the inventor finds that at least the following problems in the prior art are not solved; when the wooden plug is used for plugging, the grout outlet needs to be stared all the time to prevent missing plugging time, but the plugging is too troublesome, a limiting fixing mechanism is lacked after the wooden plug plugs the grout outlet, and if the wooden plug falls off, grout can be quickly leaked from the grout outlet, so that grouting failure is caused.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a grouting plugging device for an assembled building precast column, which solves the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides an assembled prefabricated post of building shutoff device that is in milk, including the slide rail frame, the internal thread hole has all been seted up to slide rail frame both sides outer wall, first bolt is installed to internal thread hole screw thread, demountable installation has the collection cell body bottom the slide rail frame outer wall, inside the inlaying of slide rail frame installs two barrel seats with the size, the second bolt is installed to barrel seat outer wall screw thread, inside the inlaying of barrel seat installs the wooden plug, wooden plug outer wall fixed mounting has the collar, the outside fixed surface of slide rail frame installs two power seats with the size, the outside electric mounting of power seat has siren and switch body, switch body fixed surface installs the trigger cotton rope.
As a preferred embodiment of the present invention, the end of the trigger cord is attached to the mounting ring.
In a preferred embodiment of the present invention, the switch body is electrically connected to the alarm.
As a preferred embodiment of the utility model, the first bolt is in contact with the outer wall of the cylinder seat.
As a preferred embodiment of the utility model, a fixed ground nail is embedded and installed on the bottom surface of the slide rail frame.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, the barrel seat is connected with the wooden plug in an embedding manner, the height of the barrel seat can be adjusted, the wooden plug is connected with the hole of the prefabricated column in an embedding manner, the position of the barrel seat is limited by screwing the first bolt, the trigger cord is connected with the mounting ring, when slurry flows out of the hole of the prefabricated column, the wooden plug is jacked open, the trigger cord pulls the switch body to start the alarm, field personnel can hammer the wooden plug in time to block the hole of the prefabricated column, the structure can automatically monitor whether the slurry flows out of the hole of the prefabricated column and judge the time for hammering the wooden plug, and waste caused by excessive slurry flow is avoided.
2. According to the utility model, the wooden plug can be embedded into the hole of the prefabricated column by hammering the wooden plug to finish slurry plugging, then the wooden plug and the cylinder body seat can be in limit fixed connection by screwing the second bolt, and the fixed ground nail is embedded into the ground, so that slurry leakage caused by the falling of the wooden plug and the hole of the prefabricated column can be avoided.
Drawings
Other features, objects and advantages of the utility model will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
FIG. 1 is a side view of a prefabricated column grouting plugging device for an assembly type building according to the present invention;
FIG. 2 is a front view of a prefabricated column grouting plugging device for an assembly type building according to the present invention;
fig. 3 is a schematic structural diagram of a power socket of the prefabricated column grouting plugging device for an assembly type building according to the utility model.
In the figure: 1. a slide rail frame; 2. an internally threaded bore; 3. a first bolt; 4. a second bolt; 5. a barrel base; 6. a wooden plug; 7. a mounting ring; 8. triggering a cord; 9. a switch body; 10. a power supply base; 11. an alarm; 12. fixing ground nails; 13. a collection trough body.
Detailed Description
As shown in fig. 1-3, the present invention provides a technical solution: the utility model provides an assembled prefabricated post of building plugging device that is in milk, including slide rail frame 1, internal thread hole 2 has all been seted up to 1 both sides outer wall of slide rail frame, first bolt 3 is installed to internal thread hole 2 screw thread, 1 outer wall bottom demountable installation of slide rail frame has collection cell body 13, 1 inside inlaying of slide rail frame installs two barrel seats 5 with the size, second bolt 4 is installed to 5 outer wall screw threads of barrel seat, 5 inside inlaying of barrel seat installs wooden plug 6, 6 outer wall fixed mounting of wooden plug have collar 7, 1 outside fixed surface of slide rail frame installs two power bases 10 with the size, 10 outside electric mounting of power base has siren 11 and switch body 9, switch body 9 fixed surface installs and triggers cotton rope 8.
In the embodiment, as shown in fig. 1 and fig. 2, the barrel seat 5 is connected with the wooden plug 6 in an embedded manner, and then the height of the barrel seat 5 is adjusted, so that the wooden plug 6 is connected with the hole of the prefabricated column in an embedded manner, and the inner part of the corresponding internal thread hole 2 screwed by the first bolt 3 is contacted with the outer surface of the cylinder body seat 5, the position of the cylinder body seat 5 can be limited, the trigger wire 8 is connected with the mounting ring 7, when slurry flows out of the hole of the prefabricated column, the wooden plug 6 can be pushed open, the trigger cord 8 pulls the switch body 9 to start the alarm 11, field personnel can hammer the wooden plug 6 in time to avoid waste caused by excessive outflow of slurry, after the wooden plug 6 enters the hole of the prefabricated column, the second bolt 4 is screwed to limit and fixedly connect the wooden plug 6 and the cylinder body seat 5, and the fixed ground nail 12 is embedded into the ground, so that the slurry leakage caused by the falling of the hole of the wood plug 6 and the prefabricated column can be avoided.
In this embodiment, the distal end of the trigger cord 8 is attached to the mounting ring 7 such that the trigger cord 8 is attached to the cork 6.
In this embodiment, the switch body 9 is electrically connected with the alarm 11, and the trigger cord 8 pulls the switch body 9 to start the alarm 11, so as to remind field personnel to hammer the cork 6 in time.
In this embodiment, the first bolt 3 contacts with the outer wall of the cylinder base 5, so as to limit the position of the cylinder base 5.
In this embodiment, the fixed ground nail 12 is installed on the surface of the bottom of the slide rail frame 1 in an embedded manner, and the fixed ground nail 12 is embedded into the ground to prevent the slide rail frame 1 from moving integrally.
The working principle is as follows: when the prefabricated column grouting plugging device for the fabricated building is used, the barrel seat 5 is connected with the wooden plug 6 in an embedding manner, then the height of the barrel seat 5 is adjusted, the wooden plug 6 is connected with the hole of the prefabricated column in an embedding manner, the inner part of the corresponding inner threaded hole 2 screwed by the first bolt 3 is contacted with the outer surface of the barrel seat 5, the position of the barrel seat 5 can be limited, the trigger cord 8 is connected with the mounting ring 7, when slurry flows out from the hole of the prefabricated column, the wooden plug 6 is pushed open, the switch body 9 is pulled by the trigger cord 8 to start the alarm 11, field personnel can hammer the wooden plug 6 in time, then the second bolt 4 is screwed to limit, fixedly connect the wooden plug 6 with the barrel seat 5 and embed the fixed ground nail 12 into the ground, the phenomenon that the slurry leaks out due to the falling of the hole of the wooden plug 6 and the prefabricated column and the slurry leaked out of the hole of the prefabricated column can be collected in the collecting groove body 13, the leaked slurry can be prevented from falling to the ground.

Claims (5)

1. The utility model provides an assembly type structure precast column plugging device that is in milk, includes slide rail frame (1), its characterized in that: internal thread hole (2) have all been seted up to slide rail frame (1) both sides outer wall, first bolt (3) are installed to internal thread hole (2) screw thread, slide rail frame (1) outer wall bottom demountable installation has collection cell body (13), slide rail frame (1) inside is inlayed and is installed two barrel seats (5) with the size, second bolt (4) are installed to barrel seat (5) outer wall screw thread, barrel seat (5) inside is inlayed and is installed wooden plug (6), wooden plug (6) outer wall fixed mounting has collar (7), slide rail frame (1) outside fixed surface installs two power bases (10) with the size, power base (10) outside electric mounting has siren (11) and switch body (9), switch body (9) fixed surface installs and triggers cotton rope (8).
2. The prefabricated column grouting plugging device for the fabricated building as claimed in claim 1, wherein: the tail end of the trigger wire rope (8) is connected with the mounting ring (7).
3. The prefabricated column grouting plugging device for the fabricated building as claimed in claim 1, wherein: the switch body (9) is electrically connected with the alarm (11).
4. The prefabricated column grouting plugging device for the fabricated building as claimed in claim 1, wherein: the first bolt (3) is in contact with the outer wall of the cylinder seat (5).
5. The prefabricated column grouting plugging device for the fabricated building as claimed in claim 1, wherein: the bottom surface of the slide rail frame (1) is embedded with a fixed ground nail (12).
CN202122356725.2U 2021-09-28 2021-09-28 Prefabricated post grouting plugging device of assembly type building Expired - Fee Related CN216099600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122356725.2U CN216099600U (en) 2021-09-28 2021-09-28 Prefabricated post grouting plugging device of assembly type building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122356725.2U CN216099600U (en) 2021-09-28 2021-09-28 Prefabricated post grouting plugging device of assembly type building

Publications (1)

Publication Number Publication Date
CN216099600U true CN216099600U (en) 2022-03-22

Family

ID=80689367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122356725.2U Expired - Fee Related CN216099600U (en) 2021-09-28 2021-09-28 Prefabricated post grouting plugging device of assembly type building

Country Status (1)

Country Link
CN (1) CN216099600U (en)

Similar Documents

Publication Publication Date Title
CN103590414B (en) A kind of attachment structure of concrete tubular pile and cushion cap
CN202913682U (en) Embedded wall connecting piece
CN205000721U (en) Flange switching communication tower
CN202187556U (en) Tool-type hole reserving mould
CN216099600U (en) Prefabricated post grouting plugging device of assembly type building
CN210564563U (en) Mechanical grouting opening device for small guide pipe and medium pipe shed type pipe
CN201377147Y (en) Assembly-type stair handrail with randomly-adjusted oblique angle
CN108589972B (en) Connecting structure of steel reinforced concrete shock insulation shear wall and construction method thereof
CN108951852A (en) A kind of prefabricated column
CN211286573U (en) Scaffold foot supporting component capable of being recycled
CN210104727U (en) Mechanical connection structure
CN208966008U (en) A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device
CN201679004U (en) Strip-shaped mechanical connecting card used for uplift pile foundation connecting
CN209742411U (en) A frock spare for prefabricated wall structure horizontal joint shutoff of being in milk
CN216194764U (en) Superfluid concrete pile bottom grouting device
CN201574394U (en) Full length screw anchor pressure grouting device
CN210395512U (en) Fastening device for prefabricated pump station
CN219734486U (en) Novel pre-buried sleeve pipe of floor downcomer
CN216787834U (en) A preformed hole model for building plumbing pipe
CN209855053U (en) Vertical bar connection is with half grout formula steel bar joint
CN211221312U (en) Plugging device suitable for prefabricated stand grout sleeve
CN220150300U (en) Novel slope protection cement cartridge anchor rod
CN211714555U (en) Scaffold frame is wall spare even suitable for roofing parapet
CN217312555U (en) Dust treatment device for underground environmental protection
CN216739190U (en) High polymer grouting guide pipe and mounting tool thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220322

CF01 Termination of patent right due to non-payment of annual fee