CN216092943U CN202122508913.2U CN202122508913U CN216092943U CN 216092943 U CN216092943 U CN 216092943U CN 202122508913 U CN202122508913 U CN 202122508913U CN 216092943 U CN216092943 U CN 216092943U
Authority
CN
China
Prior art keywords
waste gas
pipe
dust removal
chamber
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122508913.2U
Other languages
Chinese (zh)
Inventor
陈新良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi People Herd Environmental Protection Technology Co ltd
Original Assignee
Jiangxi People Herd Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi People Herd Environmental Protection Technology Co ltd filed Critical Jiangxi People Herd Environmental Protection Technology Co ltd
Priority to CN202122508913.2U priority Critical patent/CN216092943U/en
Application granted granted Critical
Publication of CN216092943U publication Critical patent/CN216092943U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Separation Of Particles Using Liquids (AREA)
  • Chimneys And Flues (AREA)

Abstract

An industrial waste gas recovery waste gas tower comprising: the dust removal mechanism comprises a dust removal chamber, a filter element is vertically arranged in the dust removal chamber, a plurality of sixth connecting pipes are further arranged in the dust removal chamber, guide plates are arranged among the sixth connecting pipes and alternately arranged on the inner wall of the dust removal chamber, a plurality of spray heads are arranged on the sixth connecting pipes, and the sixth connecting pipes are arranged above the filter element; purification mechanism includes the purifying box, and the purifying box setting is in the outside of main part, and the purifying box is provided with active carbon filter, ozone sterilization ware, sterilamp through first conveyer pipe and clean room intercommunication in the purifying box (; through setting up dust removal mechanism and purification mechanism, carries out dust removal treatment and purification treatment many times to waste gas, can thoroughly purify industrial waste gas, reaches the effect of environmental protection.

Description

Industrial waste gas recovery waste gas tower
Technical Field
The utility model relates to the technical field of waste gas treatment, in particular to an industrial waste gas recovery waste gas tower.
Background
With the more modern cities and more industrial modes, the quality of the living environment of people becomes worse and worse; the waste gas refers to toxic and harmful gas discharged by human in the production and living processes, especially chemical plants, steel plants, pharmaceutical plants, coking plants, oil refineries and the like, the discharged waste gas has large smell and seriously pollutes the environment and influences human health, the atmospheric pollution is more and more serious at present, industrial waste gas cannot be directly discharged into the atmosphere, and if the industrial waste gas is directly discharged into the atmosphere, the environmental pollution is caused.
Application number 201720357533.4 discloses a purify waste gas tower of industrial waste gas, including main reaction tower, spray set, main reaction tower includes first reaction chamber, second reaction chamber, third reaction chamber, fourth reaction chamber, waste gas row mouth, install the absorption filter layer between second reaction chamber and the first reaction chamber, the catalyst reaction layer has been placed in the fourth reaction chamber.
In the process of treating industrial waste gas, the existing device usually uses a spraying method to purify pollutants in the waste gas, part of the industrial waste gas contains higher heat, and the sprayed water is evaporated at high temperature and is discharged into the air along with the waste gas, so that water resources are consumed; and the treatment effect on industrial waste gas is poor, the gas cannot be thoroughly purified, and the environment-friendly effect cannot be achieved.
SUMMERY OF THE UTILITY MODEL
The utility model provides an industrial waste gas recovery waste gas tower, which has the following specific technical scheme:
an industrial waste gas recovery waste gas tower comprising: a main body 4, a combustion mechanism 70, a cooling mechanism 71, a dust removal mechanism 73, and a purification mechanism 72; the combustion mechanism 70 is arranged on the top of the main body 4, the cooling mechanism 71 is arranged on the upper part of the main body 4, the cooling mechanism 71 is connected with the combustion mechanism 70, the dust removing mechanism 73 is arranged on the lower part of the main body 4, the dust removing mechanism 73 is connected with the cooling mechanism 71, the purifying mechanism 72 is arranged on the main body 4, and the purifying mechanism 72 is connected with the dust removing mechanism 73.
On the basis of above-mentioned scheme, burning mechanism 70 includes combustion box 9, one side of combustion box 9 is equipped with intake pipe 12, be equipped with the air inlet valve of control waste gas flow on the intake pipe 12, the top of combustion box 9 is equipped with install bin 10, install bin 10 size is less than combustion box 9, be equipped with flame gun 30 and oxygen tank 31 in the install bin 10, be connected with oxygen therapy pipe 35 on the oxygen tank 31, be provided with the oxygen delivery valve of control oxygen flow on the oxygen therapy pipe 35, the muzzle of flame gun 30 and the mouth of pipe of oxygen therapy pipe 35 all pass combustion box 9 roof and extend to combustion box 9 inside.
On the basis of the above scheme, the cooling mechanism 71 includes a first partition plate 37 and the pressure pump 14, the first partition plate 37 is disposed inside the main body 4, the first partition plate 37 divides an inner cavity of the main body 4 into a cooling chamber 55 and a dust removing chamber 54, two cavity plates 26 are disposed on an inner wall of the cooling chamber 55, and a plurality of cooling pipes 27 are disposed between the cavity plates 26 in a communication manner; the pressurizing pump 14 is connected to the cavity plate 26 through a second connection pipe 13, and the pressurizing pump 14 is connected to the water tank 16 through a third connection pipe 15.
On the basis of the scheme, the cooling chamber 55 is arranged on the upper portion of the main body 4, the main body 4 is arranged at the bottom of the combustion box 9, the second conveying pipe 28 is arranged between the main body 4 and the combustion box 9, the second conveying pipe 28 is communicated with the cooling chamber 55 and the combustion box 9, the fan is arranged on the second conveying pipe 28, and the bottom of the main body 4 is arranged on the base 1 by being connected with a plurality of supporting rods.
On the basis of the above scheme, the pressure pump 14 is arranged at the top of the water tank 16, the water tank 16 is communicated with the dust chamber 54 through the fourth connecting pipe 17, the water tank 16 is divided into the circulating chamber 42 and the clean room 44 by arranging the partition plate 43, the third connecting pipe 15 is arranged inside the clean room 44, the fourth connecting pipe 17 is arranged inside the circulating chamber 42, and the partition plate 43 is provided with the screen 45 for sieving particulate matters.
On the basis of the above scheme, the dust removing mechanism 73 includes a dust removing chamber 54, a filter element 20 is vertically arranged in the dust removing chamber 54, the filter element 20 is connected with a fifth connecting pipe 21 and a bent pipe 19, the bent pipe 19 is communicated with a third conveying pipe 39, the third conveying pipe 39 passes through a first separating plate 37 and is communicated with a cooling chamber 55, and a fan is arranged on the third conveying pipe 39; still be equipped with a plurality of sixth connecting pipe 38 in the clean room 54, be equipped with guide plate 40 between the sixth connecting pipe 38, guide plate 40 sets up the inner wall at clean room 54 in turn, is equipped with a plurality of shower nozzles 41 on the sixth connecting pipe 38, and sixth connecting pipe 38 communicates with second connecting pipe 13, and sixth connecting pipe 38 sets up the top at filter core 20.
On the basis of the above scheme, the dust removing chamber 54 is arranged at the lower part of the main body 4, the filter elements 20 are arranged in number corresponding to the bent pipes 19 and the fifth connecting pipes 21, and the fifth connecting pipes 21 are communicated with the cavity plate 26 by connecting the first connecting pipes 8.
On the basis of the above scheme, purification mechanism 72 is including the purifying box 6 that is used for purifying waste gas, and purifying box 6 sets up in the outside of main part 4, and purifying box 6 bottom is equipped with mounting panel 5, and purifying box 6 communicates with clean room 54 through first conveyer pipe 7, is provided with active carbon filter 22, ozone sterilizer 23, sterilamp 24 in the purifying box 6.
In summary, in the prior art, the beneficial effects of the utility model are as follows:
by arranging the dust removal mechanism 73 and the purification mechanism 72, the waste gas is subjected to dust removal treatment and purification treatment for multiple times, so that the industrial waste gas can be thoroughly purified, and the environment-friendly effect is achieved; the waste gas contacts with the filter element 20 through the third conveying pipe 39, primary sieving and dust removing treatment is carried out, and the waste gas after sieving fully contacts with the spray liquid under the combined action of the pressure pump 14, the spray nozzle 41 and the guide plate 40, and secondary dust removing treatment is carried out; after dust removal, the waste gas enters a purification box 6 and is purified by an active carbon filter plate 22, an ozone sterilizer 23 and an ultraviolet germicidal lamp 24; this setting can be thorough purify industrial waste gas, reaches the effect of environmental protection.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic front view of an industrial waste gas recovery tower according to the present invention;
FIG. 2 is a schematic view of the overall structure of an industrial waste gas recovery tower according to the present invention;
in the figure: 1-a base; 4-a body; 5, mounting a plate; 6-a purifying box; 7-a first delivery pipe; 8-a first connection pipe; 9-a combustion box; 10-mounting a box; 12-an air inlet pipe; 13-a second connecting tube; 14-a pressure pump; 15-a third connecting tube; 16-a water tank; 17-a fourth connecting tube; 19-bending the tube; 20-a filter element; 21-fifth connecting pipe; 22-an activated carbon filter plate; 23-an ozone sterilizer; 24-ultraviolet germicidal lamps; 26-a cavity plate; 27-a cooling tube; 28-a second delivery pipe; 30-a flame gun; 31-an oxygen tank; 35-oxygen therapy tube; 37-a first divider plate; 38-sixth connecting tube; 39-a third duct; 40-a deflector; 41-a spray head; 42-a circulation chamber; 43-a separator; 44-a clean room; 45-screen mesh; 54-a dust chamber; 55-a cooling chamber; 70-a combustion mechanism; 71-a cooling mechanism; 72-a purification mechanism; 73-dust removal mechanism.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention will be described in further detail with reference to the accompanying drawings, and it is apparent that the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
An industrial waste gas recovery waste gas tower according to an embodiment of the present invention will be described in detail with reference to fig. 1 to 2.
In an embodiment, the present disclosure provides an industrial waste gas recovery tower, including: a main body 4, a combustion mechanism 70, a cooling mechanism 71, a dust removal mechanism 73, and a purification mechanism 72; the combustion mechanism 70 is arranged on the top of the main body 4, and the combustion mechanism 70 is used for carrying out combustion treatment on combustible gas in the waste gas; the cooling mechanism 71 is arranged at the upper part of the main body 4, the cooling mechanism 71 is connected with the combustion mechanism 70, and the cooling mechanism 71 is used for cooling the burnt exhaust gas; the dust removing mechanism 73 is arranged at the lower part of the main body 4, the dust removing mechanism 73 is connected with the cooling mechanism 71, and the dust removing mechanism 73 is used for removing dust in the exhaust gas; the purification mechanism 72 is provided in the main body 4, the purification mechanism 72 is connected to the dust removal mechanism 73, and the purification mechanism 72 is used to purify the exhaust gas.
The combustion mechanism 70 comprises a combustion box 9, the combustion box 9 is used for combustion of waste gas, an air inlet pipe 12 is arranged on one side of the combustion box 9, and an air inlet valve for controlling flow of the waste gas is arranged on the air inlet pipe 12; 9 tops of combustion box are equipped with install bin 10, and install bin 10 size setting is less than combustion box 9, is equipped with flame gun 30 and oxygen jar 31 in the install bin 10, is connected with oxygen therapy pipe 35 on the oxygen jar 31, is provided with the oxygen delivery valve of control oxygen flow on the oxygen therapy pipe 35, and the muzzle of flame gun 30 and the mouth of pipe of oxygen therapy pipe 35 all pass combustion box 9 roof and extend to combustion box 9 inside.
The cooling mechanism 71 comprises a first partition plate 37 and a pressure pump 14, the first partition plate 37 is arranged in the main body 4, the first partition plate 37 divides the inner cavity of the main body 4 into a cooling chamber 55 and a dust removing chamber 54, two cavity plates 26 are arranged on the inner wall of the cooling chamber 55, and a plurality of cooling pipes 27 are communicated between the cavity plates 26; the pressurizing pump 14 is connected to the cavity plate 26 through a second connection pipe 13, and the pressurizing pump 14 is connected to the water tank 16 through a third connection pipe 15.
The cooling chamber 55 is arranged on the upper portion of the main body 4, the main body 4 is arranged at the bottom of the combustion box 9, a second conveying pipe 28 is arranged between the main body 4 and the combustion box 9, the second conveying pipe 28 is communicated with the cooling chamber 55 and the combustion box 9, a fan is arranged on the second conveying pipe 28, and the bottom of the main body 4 is arranged on the base 1 by being connected with a plurality of supporting rods.
The booster pump 14 is arranged at the top of the water tank 16, the water tank 16 is communicated with the dust chamber 54 through a fourth connecting pipe 17, the water tank 16 is divided into a circulating chamber 42 and a clean chamber 44 by arranging a partition plate 43, the third connecting pipe 15 is arranged in the clean chamber 44, the fourth connecting pipe 17 is arranged in the circulating chamber 42, and a screen 45 for sieving particulate matters is arranged on the partition plate 43.
The dust removal mechanism 73 comprises a dust removal chamber 54, the dust removal chamber 54 is used for removing dust from waste gas, a filter element 20 is vertically arranged in the dust removal chamber 54, a fifth connecting pipe 21 and a bent pipe 19 are connected to the filter element 20, the bent pipe 19 is communicated with a third conveying pipe 39, the third conveying pipe 39 penetrates through a first partition plate 37 and is communicated with a cooling chamber 55, and a fan is arranged on the third conveying pipe 39; a plurality of sixth connecting pipes 38 are further arranged in the dust chamber 54, a guide plate 40 is arranged between the sixth connecting pipes 38, the guide plate 40 is alternately arranged on the inner wall of the dust chamber 54, a plurality of spray heads 41 are arranged on the sixth connecting pipes 38, the sixth connecting pipes 38 are communicated with the second connecting pipe 13, and the sixth connecting pipes 38 are arranged above the filter element 20.
The dust chamber 54 is disposed at the lower portion of the main body 4, the number of the filter elements 20 is set to correspond to the number of the bent pipes 19 and the number of the fifth connection pipes 21, and the fifth connection pipes 21 are connected with the first connection pipes 8 to communicate with the cavity plate 26.
Purification mechanism 72 is including the purifying box 6 that is used for purifying waste gas, and purifying box 6 sets up in the outside of main part 4, and purifying box 6 bottom is equipped with mounting panel 5, and purifying box 6 communicates with clean room 54 through first conveyer pipe 7, is provided with active carbon filter 22, ozone sterilization ware 23, sterilamp 24 in the purifying box 6.
When the oxygen supplying device is used, waste gas enters the combustion box 9 through the air inlet pipe 12, the flame gun 30 ignites combustible gas in the waste gas, and the oxygen tank 31 supplies oxygen to the combustion box 9 through the oxygen conveying pipe 35; after being treated by the combustion mechanism 70, the exhaust gas enters the cooling chamber 55 through the second delivery pipe 28, and the pressure pump 14 delivers the cooling liquid into the cooling pipe 27 through the second connecting pipe 13 and the third connecting pipe 15 to cool the exhaust gas; the cooled waste gas enters a dust chamber 54 through a third conveying pipe 39, is in contact with the filter element 20 for primary sieving and dust removal treatment, and is fully in contact with the spray liquid under the combined action of the pressure pump 14, the spray nozzle 41 and the guide plate 40 after being sieved for secondary dust removal treatment; meanwhile, the waste water generated by spraying is discharged through the fourth connecting pipe 17, the cooling liquid in the cooling pipe 27 washes the filter element 20 through the first connecting pipe 8 and the fifth connecting pipe 21, and the washed waste water is also discharged through the fourth connecting pipe 17; the exhaust gas enters the purifying box 6 through the first conveying pipe 7 after being dedusted by the dedusting mechanism 73, and is purified by the activated carbon filter plate 22, the ozone sterilizer 23 and the ultraviolet germicidal lamp 24.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the utility model.

Claims (7)

1. The utility model provides an industrial waste gas retrieves waste gas tower which characterized in that: the method comprises the following steps: a main body (4);
the combustion mechanism (70), the combustion mechanism (70) is arranged on the top of the main body (4); the combustion mechanism (70) is used for carrying out combustion treatment on the combustible gas in the waste gas;
a cooling mechanism (71), wherein the cooling mechanism (71) is arranged at the upper part of the main body (4) and is connected with the combustion mechanism (70); a cooling mechanism (71) for cooling the burned exhaust gas;
the dust removal mechanism (73), the dust removal mechanism (73) is arranged at the lower part of the main body (4) and is connected with the cooling mechanism (71); the dust removal mechanism (73) is used for removing dust in the waste gas; the dust removal mechanism (73) comprises a dust removal chamber (54), a filter element (20) is vertically arranged in the dust removal chamber (54), a plurality of sixth connecting pipes (38) are further arranged in the dust removal chamber (54), guide plates (40) are arranged between the sixth connecting pipes (38), the guide plates (40) are alternately arranged on the inner wall of the dust removal chamber (54), a plurality of spray heads (41) are arranged on the sixth connecting pipes (38), and the sixth connecting pipes (38) are arranged above the filter element (20);
the purification mechanism (72), the purification mechanism (72) is arranged on the main body (4) and is connected with the dust removal mechanism (73); a purification mechanism (72) for purifying the exhaust gas; purification mechanism (72) include purifying box (6), and purifying box (6) set up in the outside of main part (4), and purifying box (6) are provided with active carbon filter (22), ozone sterilizer (23), sterilamp (24) in purifying box (6) through first conveyer pipe (7) and clean room (54) intercommunication.
2. The industrial waste gas recovery waste gas tower of claim 1, wherein: combustion mechanism (70) are equipped with install bin (10) including burning box (9) on burning box (9), are equipped with flame gun (30) and oxygen cylinder (31) in install bin (10), are connected with oxygen therapy pipe (35) on oxygen cylinder (31), and the muzzle of flame gun (30) and the mouth of pipe of oxygen therapy pipe (35) all pass burning box (9) one side and extend to inside burning box (9).
3. The industrial waste gas recovery waste gas tower of claim 1, wherein: cooling body (4) are separated into cooling chamber (55), clean room (54) including first division board (37), force (forcing) pump (14), first division board (37), cooling chamber (55) are separated into with the inner chamber of main part (4), two inside cavity boards (26) of cooling chamber (55), the intercommunication has a plurality of cooling tubes (27) between cavity board (26), force (forcing) pump (14) are connected with cavity board (26) through second connecting pipe (13), force (forcing) pump (14) are connected with water tank (16) through third connecting pipe (15).
4. The industrial waste gas recovery waste gas tower according to claim 3, wherein: the cooling chamber (55) is arranged on the upper portion of the main body (4), the dust removal chamber (54) is arranged on the lower portion of the main body (4), the main body (4) is arranged at the bottom of the combustion box (9), a second conveying pipe (28) is arranged between the main body (4) and the combustion box (9), the second conveying pipe (28) is communicated with the cooling chamber (55) and the combustion box (9), and a fan is arranged on the second conveying pipe (28).
5. The industrial waste gas recovery waste gas tower according to claim 3, wherein: the utility model discloses a clean room, including water tank (16), force (forcing) pump (14), water tank (16) are equipped with division board (43) in water tank (16) through fourth connecting pipe (17) and clean room (54) intercommunication, be equipped with division board (43) in water tank (16), division board (43) are separated the inner chamber of water tank (16) for circulation room (42) and clean room (44), third connecting pipe (15) set up the inside in clean room (44), fourth connecting pipe (17) set up the inside in circulation room (42), be equipped with screen cloth (45) on division board (43).
6. The industrial waste gas recovery waste gas tower of claim 1, wherein: be connected with fifth connecting pipe (21), bent pipe (19) on filter core (20), bent pipe (19) intercommunication third conveyer pipe (39), first division board (37) and cooling chamber (55) intercommunication are passed in third conveyer pipe (39), are equipped with the fan on third conveyer pipe (39), and sixth connecting pipe (38) and second connecting pipe (13) intercommunication.
7. The industrial waste gas recovery waste gas tower of claim 6, wherein: the filter elements (20) are arranged in number and correspond to the bent pipes (19) and the fifth connecting pipes (21), and the fifth connecting pipes (21) are communicated with the cavity plate (26) through connecting the first connecting pipes (8).
CN202122508913.2U 2021-10-19 2021-10-19 Industrial waste gas recovery waste gas tower Active CN216092943U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122508913.2U CN216092943U (en) 2021-10-19 2021-10-19 Industrial waste gas recovery waste gas tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122508913.2U CN216092943U (en) 2021-10-19 2021-10-19 Industrial waste gas recovery waste gas tower

Publications (1)

Publication Number Publication Date
CN216092943U true CN216092943U (en) 2022-03-22

Family

ID=80693834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122508913.2U Active CN216092943U (en) 2021-10-19 2021-10-19 Industrial waste gas recovery waste gas tower

Country Status (1)

Country Link
CN (1) CN216092943U (en)

Similar Documents

Publication Publication Date Title
WO2020207236A1 (en) Integrated equipment for adsorption and catalytic coupling treatment of acid waste gas and organic waste gas
CN216223635U (en) Waste plastic recycling granulation waste gas purification combined device
CN108283821A (en) The treatment process and processing system of coking production Zhong Huachan workshop sections exhaust gas containing naphthalene
CN214416003U (en) Organic waste gas treatment device
CN213101429U (en) Vertical stink waste gas treatment device
CN213159912U (en) Be applied to VOCs waste gas treatment device of refining and chemical industry
CN216092943U (en) Industrial waste gas recovery waste gas tower
CN212017236U (en) Environment-friendly industrial waste gas conveyor
CN115722052B (en) Device and method for removing volatile organic compounds in industrial waste gas
CN115382344B (en) Rubber flue gas treatment system
CN215654545U (en) Peculiar smell clarification plant is used in printing ink production
CN215233243U (en) Device is administered to refinery VOCs and peculiar smell synthesis
CN107913572A (en) Plastic granulating exhaust treatment system and waste gas treatment process
CN210801215U (en) Heat accumulating type catalytic combustion device
CN219290994U (en) Active carbon adsorption tower for organic waste gas treatment
CN212731684U (en) Biological filter deodorization system
CN210874836U (en) Complete set of waste gas treatment device
CN220554648U (en) VOCs exhaust-gas treatment spray column with catalytic oxidation function
CN211837183U (en) Oil fume smell purification system
CN217092601U (en) Combined waste gas treatment device
CN214972855U (en) High-efficient environmental protection's exhaust gas desulfurization dust collecting equipment
CN214051026U (en) Casting flue gas treatment facility
CN216136985U (en) Combined organic waste gas purification system
CN213668612U (en) Organic waste gas treatment device
CN210229443U (en) Waste gas treatment environmental protection equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant