CN216087918U - Lifting device that steel construction big-arch shelter was reformed transform - Google Patents

Lifting device that steel construction big-arch shelter was reformed transform Download PDF

Info

Publication number
CN216087918U
CN216087918U CN202121991459.4U CN202121991459U CN216087918U CN 216087918 U CN216087918 U CN 216087918U CN 202121991459 U CN202121991459 U CN 202121991459U CN 216087918 U CN216087918 U CN 216087918U
Authority
CN
China
Prior art keywords
steel
lifting device
frame
back timber
heat preservation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121991459.4U
Other languages
Chinese (zh)
Inventor
王广超
秦学亭
李文生
马献军
周刘卜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhengda Steel Structure Engineering Co ltd
Original Assignee
Henan Zhengda Steel Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhengda Steel Structure Engineering Co ltd filed Critical Henan Zhengda Steel Structure Engineering Co ltd
Priority to CN202121991459.4U priority Critical patent/CN216087918U/en
Application granted granted Critical
Publication of CN216087918U publication Critical patent/CN216087918U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Abstract

The utility model discloses a lifting device for steel structure greenhouse transformation, which comprises a steel structure main frame and a top beam structure, wherein the steel structure main frame is formed by four steel members which are distributed in a rectangular array, the four steel members are divided into two groups, one group of steel members comprises two steel members which are distributed on the left and the right, the top beam structure is lapped on the top of the steel structure main frame, a heat preservation side film is paved on the side surface of the steel structure main frame, and a heat preservation top film is paved on the top of the top beam structure. This lifting device that steel construction big-arch shelter was reformed transform, the lifting button dish rotates during the lifting back timber structure, make found the lead screw and rotate and along connecting square pole a rebound, because found the lead screw and put up the rotation and be connected, so stand the lead screw and move up can the jack-up back timber structure, bracing piece upwards slides along connecting square pole b in this while, and then makes the back timber structure break away from the steel structure body frame and leave the clearance, thereby make more sunlight shine in the big-arch shelter, help the plant to carry out photosynthesis, and ventilation effect is good.

Description

Lifting device that steel construction big-arch shelter was reformed transform
Technical Field
The utility model relates to the technical field of steel structure greenhouse construction, in particular to a lifting device for steel structure greenhouse transformation.
Background
At present, with the continuous development of society, the use of steel structures in society is more and more common, for example, the steel structures can be used in some industrially used greenhouses, the steel structures are mainly made of steel materials, and the steel materials have high strength, light dead weight, good integral rigidity and strong deformability, so the steel materials are particularly suitable for some temporarily built buildings or buildings which do not need high cost, for example, the greenhouses for cultivating out-of-season vegetables.
And connect into an organic whole structure through the welded mode between the steel in the current big-arch shelter, this kind of connected mode is consuming time and is used up power, and is inconvenient dismantles original steel to lead to the practicality relatively poor, its is sealed moreover and ventilates and can not switch, makes it can not satisfy abundant sunshine demand, has reduced the growth quality of plant. Therefore, a lifting device for transforming a steel structure greenhouse needs to be designed so as to solve the problems provided in the above.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a lifting device for steel structure greenhouse transformation, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a lifting device that steel construction big-arch shelter was reformed transform, includes steel structure body frame and back timber structure, the steel structure body frame is rectangular array by four steel members and distributes and form, and four steel members divide into two sets ofly, and wherein two steel members that distribute about a set of steel member contains, back timber structure overlap joint is in the top of steel structure body frame, the side of steel structure body frame has been laid and has been kept warm the side membrane, the top of back timber structure has been laid and has been kept warm the top membrane, fixedly connected with connects square bar an between a set of steel member, and threaded mounting has the upright lead screw on connecting square bar an, the top of upright lead screw is passed through stop gear and is rotated and connect in the back timber structurally, and the bottom fixedly connected with lifting button dish of upright lead screw.
Preferably, fixedly connected with between another group of steel members connects square bar b, slidable mounting has the bracing piece on connecting square bar b, and the top fixed connection of bracing piece is structural in the back timber.
Preferably, the back timber structure is including building frame, powerful connecting rod, elasticity steel wire frame, couple and holding ring, the quantity of building the frame is two, and two build the frame overlap joint respectively on two sets of steel hook pieces, powerful connecting rod fixed connection is between two building frames, the equal fixedly connected with couple in both ends of elasticity steel wire frame, two equal fixed mounting in top of building the frame have the holding ring, and the couple lock joint is on the holding ring, the top membrane that keeps warm is laid on the elasticity steel wire frame, the top fixed connection of bracing piece is on building the frame.
Preferably, stop gear includes movable bearing and spacing groove, the bottom of building the frame is seted up in the spacing groove, movable bearing slidable mounting is in the spacing inslot, and movable bearing and found the screw rod and be connected.
Preferably, the steel structure greenhouse is formed by combining a plurality of steel structure main frames, a top beam structure, a heat preservation top film and heat preservation side films, and the adjacent steel structure main frames are fixed through screws.
Compared with the prior art, the utility model has the beneficial effects that:
(1) this lifting device that steel construction big-arch shelter was reformed transform, the lifting button dish rotates during the lifting back timber structure, make found the lead screw and rotate and along connecting square pole a rebound, because found the lead screw and put up the rotation and be connected, so stand the lead screw and move up can the jack-up back timber structure, herein the bracing piece upwards slides along connecting square pole b simultaneously, and then make the back timber structure break away from the steel structure body frame and leave the clearance, the back timber structure that can reset is found the lead screw in the reversal, thereby make more sunlight shine in the big-arch shelter, help the plant to carry out photosynthesis, and ventilation effect is good.
(2) This lifting device that steel construction big-arch shelter was reformed transform earlier is fixed in appointed cultivation position with the steel structure body frame during the equipment to lay the heat preservation side membrane in its side, in order to reach the heat retaining purpose of separating wind, with back timber structure overlap joint on the steel structure body frame again, offset both and connect through the vertical lead screw, make it constitute a whole, the elasticity steel wire frame supports heat preservation side membrane, and the easy dismounting of elasticity steel wire frame, so that maintain or change heat preservation side membrane.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a perspective view of the overall structure of a steel frame and roof beam structure of the present invention;
FIG. 3 is a perspective view of a portion of the present invention;
FIG. 4 is a perspective view of the structural elastic wire frame of the present invention;
FIG. 5 is a perspective view of the structural header structure of the present invention after it has been raised;
FIG. 6 is a sectional view of the connection structure of the vertical screw rod and the erection frame.
In the figure: 1. the steel framework is made; 2. a top beam structure; 21. building a frame; 22. a strong connecting rod; 23. an elastic wire frame; 24. hooking; 25. a positioning ring; 3. a heat-insulating top film; 4. insulating the side film; 5. connecting a square rod a; 6. erecting a screw rod; 7. lifting the button disc; 8. connecting a square rod b; 9. a support bar; 10. a limiting groove; 11. and a movable bearing.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: the utility model provides a lifting device that steel construction big-arch shelter was reformed transform, including steel structure body frame 1 and back timber structure 2, steel structure body frame 1 is the rectangle array by four steel members and distributes and form, and four steel members divide into two sets ofly, wherein two steel members that distribute about a set of steel member contains, back timber structure 2 overlap joint in the top of steel structure body frame 1, heat preservation side membrane 4 has been laid to the side of steel structure body frame 1, heat preservation top membrane 3 has been laid at the top of back timber structure 2, fixedly connected with connects square bar a5 between a set of steel member, and threaded mounting has found lead screw 6 on connecting square bar a5, the top of founding lead screw 6 is passed through stop gear and is rotated and connect on back timber structure 2, and the bottom fixedly connected with lifting button dish 7 of founding lead screw 6.
And a connecting square bar b8 is fixedly connected between the other group of steel members, a supporting bar 9 is slidably mounted on the connecting square bar b8, and the top end of the supporting bar 9 is fixedly connected to the top beam structure 2.
Top beam structure 2 is including building frame 21, powerful connecting rod 22, elasticity steel wire frame 23, couple 24 and holding ring 25, the quantity of building frame 21 is two, and two building frames 21 overlap joint respectively on two sets of steel hook spare, powerful connecting rod 22 fixed connection is between two building frames 21, the equal fixedly connected with couple 24 in both ends of elasticity steel wire frame 23, two equal fixed mounting in top of building frame 21 have holding ring 25, and couple 24 lock joint is on holding ring 25, heat preservation epiphragma 3 is laid on elasticity steel wire frame 23, the top fixed connection of bracing piece 9 is on building frame 21.
The limiting mechanism comprises a movable bearing 11 and a limiting groove 10, the limiting groove 10 is arranged at the bottom of the building frame 21, the movable bearing 11 is slidably mounted in the limiting groove 10, and the movable bearing 11 is connected with the vertical screw rod 6.
The steel structure greenhouse is formed by combining a plurality of steel structure main frames 1, a top beam structure 2, a heat preservation top film 3 and a heat preservation side film 4, and the adjacent steel structure main frames 1 are fixed through screws.
The specific implementation mode of the utility model is as follows: when the top beam structure 2 is lifted, the lifting button disc 7 is rotated, so that the vertical screw rod 6 rotates and moves upwards along the connecting square rod a5, the vertical screw rod 6 is rotatably connected with the building frame 21, the vertical screw rod 6 moves upwards to jack the top beam structure 2, meanwhile, the support rod 9 slides upwards along the connecting square rod b8, the top beam structure 2 is separated from the steel structure main frame 1 and a gap is reserved, the top beam structure 2 can be reset by reversing the vertical screw rod 6, more sunlight irradiates in the greenhouse, photosynthesis of plants is facilitated, and the ventilation effect is good;
during the equipment earlier steel structure body frame 1 is fixed in appointed cultivation position to lay heat preservation side membrane 4 in its side, in order to reach the heat retaining purpose of separating wind, with back timber structure 2 overlap joint on steel structure body frame 1 again, offset the connection with both through upright lead screw 6, make it constitute a whole, elastic steel wire frame 23 supports heat preservation side membrane 3, and elastic steel wire frame 23's easy dismounting, so that maintain or change heat preservation side membrane.
Those not described in detail in this specification are within the skill of the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the utility model can be made, and equivalents and modifications of some features of the utility model can be made without departing from the spirit and scope of the utility model.

Claims (5)

1. The utility model provides a lifting device that steel construction big-arch shelter was reformed transform, includes steel structure body frame (1) and back timber structure (2), its characterized in that: steel structure body frame (1) is rectangular array by four steel members and distributes and form, and four steel members divide into two sets ofly, and wherein two steel members that distribute about a set of steel member contains, back timber structure (2) overlap joint in the top of steel structure body frame (1), heat preservation side membrane (4) have been laid to the side of steel structure body frame (1), heat preservation top membrane (3) have been laid at the top of back timber structure (2), fixedly connected with connection square bar an (5) between a set of steel member, and threaded mounting has found lead screw (6) on connecting square bar an (5), the top of found lead screw (6) is rotated through stop gear and is connected on back timber structure (2), and the bottom fixedly connected with lifting button dish (7) of found lead screw (6).
2. The lifting device of claim 1, wherein the lifting device comprises: fixedly connected with connects square bar b (8) between another group of steel members, slidable mounting has bracing piece (9) on connecting square bar b (8), and the top fixed connection of bracing piece (9) is on back timber structure (2).
3. The lifting device of claim 2, wherein the lifting device comprises: top beam structure (2) are including building frame (21), powerful connecting rod (22), elasticity steel wire frame (23), couple (24) and holding ring (25), the quantity of building frame (21) is two, and two build frame (21) overlap joint respectively on two sets of steel hook spare, powerful connecting rod (22) fixed connection is in two between building frame (21), the equal fixedly connected with couple (24) in both ends of elasticity steel wire frame (23), and the equal fixed mounting in top of two building frame (21) has holding ring (25), and couple (24) lock joint on holding ring (25), lay on elasticity steel wire frame (23) heat preservation epiphragma (3), the top fixed connection of bracing piece (9) is on building frame (21).
4. The lifting device of claim 3, wherein the lifting device comprises: stop gear includes movable bearing (11) and spacing groove (10), the bottom of building frame (21) is seted up in spacing groove (10), movable bearing (11) slidable mounting is in spacing groove (10), and movable bearing (11) and found silk pole (6) and be connected.
5. The lifting device of claim 1, wherein the lifting device comprises: the steel structure greenhouse is formed by combining a plurality of steel structure main frames (1), a top beam structure (2), a heat preservation top film (3) and heat preservation side films (4), and the adjacent steel structure main frames (1) are fixed through screws.
CN202121991459.4U 2021-08-24 2021-08-24 Lifting device that steel construction big-arch shelter was reformed transform Active CN216087918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121991459.4U CN216087918U (en) 2021-08-24 2021-08-24 Lifting device that steel construction big-arch shelter was reformed transform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121991459.4U CN216087918U (en) 2021-08-24 2021-08-24 Lifting device that steel construction big-arch shelter was reformed transform

Publications (1)

Publication Number Publication Date
CN216087918U true CN216087918U (en) 2022-03-22

Family

ID=80727936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121991459.4U Active CN216087918U (en) 2021-08-24 2021-08-24 Lifting device that steel construction big-arch shelter was reformed transform

Country Status (1)

Country Link
CN (1) CN216087918U (en)

Similar Documents

Publication Publication Date Title
CN212106496U (en) Thing networking is big-arch shelter supporting framework connecting device for agricultural
CN204157372U (en) Bamboo frame wind-resistant device of greenhouse
CN216087918U (en) Lifting device that steel construction big-arch shelter was reformed transform
CN203492459U (en) Transferring, exhibiting and seedling-cultivation cart for flowers
CN202211036U (en) Adjustable rain-shielding growing unit
CN110637648A (en) Modern agriculture plants big-arch shelter
CN205052340U (en) Film big -arch shelter can be opened and shed roof structure of adjustable height with drawing formula to one side
CN211881318U (en) Greenhouse supporting frame with changeable internal space framework
CN210808534U (en) Prevent wind grape and plant frame
CN112740939A (en) Photovoltaic agricultural planting greenhouse and using method thereof
CN209964778U (en) Novel light-duty greenhouse of full assembled device
CN210782276U (en) Facility greenhouse tarpaulin rolling control device
CN108849272B (en) Planting frame device of usefulness is planted to fungus mushroom big-arch shelter
CN203412506U (en) Door-type flower stand
CN211020246U (en) Environment-friendly anti-aging double-layer heat-preservation sun shed
CN202680133U (en) Novel table grape rain shelter planting device
CN111527937A (en) Wind-resistant steel constructs big-arch shelter
CN210202683U (en) Illumination intensity adjusting device for green house
CN219019712U (en) Cold shed frame for cold region
CN219514729U (en) Fully assembled small span greenhouse
CN216438062U (en) Plant flower storage type cultivation frame
CN215122547U (en) Canopy is planted to dual-purpose arch form melon and fruit in south China
CN214853138U (en) Intelligent greenhouse's that different angles were installed regulation stand can carry out
CN211482157U (en) Low-energy-consumption heat preservation device of agricultural greenhouse
CN215380267U (en) Double-arch double-film greenhouse inner arch inner film joint sealing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant