CN216084234U - Progress display device for construction management of building engineering - Google Patents

Progress display device for construction management of building engineering Download PDF

Info

Publication number
CN216084234U
CN216084234U CN202122317913.4U CN202122317913U CN216084234U CN 216084234 U CN216084234 U CN 216084234U CN 202122317913 U CN202122317913 U CN 202122317913U CN 216084234 U CN216084234 U CN 216084234U
Authority
CN
China
Prior art keywords
fixedly connected
frame
adjusting device
display device
construction management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122317913.4U
Other languages
Chinese (zh)
Inventor
于志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122317913.4U priority Critical patent/CN216084234U/en
Application granted granted Critical
Publication of CN216084234U publication Critical patent/CN216084234U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a progress display device for construction management of building engineering, which comprises a storage frame, wherein universal wheels are fixedly connected to two sides of the bottom of the storage frame, an upright post is fixedly connected to the top of the storage frame, an adjusting device is arranged in a gap of the upright post, moving blocks are fixedly connected to two sides of the adjusting device, the moving blocks are connected with the upright post in a sliding manner, and a traction device is arranged at the top of the storage frame. This progress display device for building engineering construction management has reached whole and has been convenient for remove, and the storing frame top sets up the stand, and adjusting device's both sides set up the motion piece, motion piece and stand sliding connection set up draw gear, are convenient for pull adjusting device, and then adjust the height of show board, make things convenient for the staff to operate, and adjusting device can change the show angle of show board simultaneously, improves the bandwagon effect, satisfies user demand's purpose.

Description

Progress display device for construction management of building engineering
Technical Field
The utility model relates to the field of engineering management, in particular to a progress display device for construction management of constructional engineering.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. In the construction process of the constructional engineering, a manager is needed to manage a construction site, and the construction progress is displayed by using the progress display device for the construction management of the constructional engineering. At present, current progress display device for building engineering construction management, single structure, high relatively fixed is not convenient for the staff and is adjusted, and the show angle is fixed, and the bandwagon effect is poor, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems that the prior progress display device for construction management of building engineering in the prior art has a single structure, relatively fixed height, inconvenience for workers to adjust, fixed display angle, poor display effect and incapability of meeting use requirements, the utility model aims to provide the progress display device for construction management of building engineering, which can realize that a storage frame, a universal wheel, an upright post, an adjusting device, a moving block, a traction device and a display board form a whole body, the whole body is convenient to move, the storage frame is arranged, the workers can conveniently place data, the whole gravity center is reduced, the integral stability is improved, the upright post is arranged at the top of the storage frame, the moving blocks are arranged at two sides of the adjusting device, the moving blocks are connected with the upright post in a sliding manner, the traction device is arranged, the adjusting device is convenient to traction, the height of the display board is further adjusted, and the operation of the workers is convenient, meanwhile, the adjusting device can change the display angle of the display board, the display effect is improved, the construction progress is displayed, and the use requirement is met.
2. Technical scheme
In order to solve the above problems, the present invention adopts the following technical solutions.
The utility model provides a progress display device for building engineering construction management, includes the storing frame, the bottom both sides fixedly connected with universal wheel of storing frame, the top fixedly connected with stand of storing frame, the clearance of stand is provided with adjusting device, adjusting device's both sides fixedly connected with motion piece, motion piece and stand sliding connection, the top of storing frame is provided with draw gear, draw gear is connected with adjusting device, adjusting device's fixed surface is connected with the show board.
Preferably, the adjusting device comprises a fixed frame, the moving block is fixedly connected with two sides of the fixed frame, and the traction device is connected with the top of the fixed frame.
Preferably, the bottom fixedly connected with installation piece of fixed frame, the installation piece rotates and is connected with the link, link fixedly connected with mounting panel, show board and mounting panel fixed surface are connected.
Preferably, fixed frame rotates and is connected with the rotation lead screw, the top fixedly connected with hand wheel of rotation lead screw, the clearance fixedly connected with slide bar of fixed frame, it has the lead screw slider to rotate lead screw threaded connection, lead screw slider and slide bar sliding connection.
Preferably, the screw rod sliding block is rotatably connected with a rotating frame, one end of the rotating frame, far away from the screw rod sliding block, is rotatably connected with a connecting block, and the connecting block is fixedly connected with the back of the mounting plate.
Preferably, draw gear includes the fixed block, the top fixed connection of fixed block and storing frame, the top fixedly connected with support frame of fixed block, the tip fixedly connected with sleeve of support frame, the sleeve has cup jointed the axis of rotation, the middle part fixedly connected with rolling disc of axis of rotation, telescopic surface is provided with fastening bolt, the sleeve is consolidated the axis of rotation through fastening bolt.
Preferably, the rotating shaft is connected with the stand column in a rotating mode, the winding wheels are fixedly connected to the two ends of the rotating shaft, the traction rope is wound on the surfaces of the winding wheels, the guide wheel frame is fixedly connected to the top of the stand column, guide wheels are arranged on the two sides of the guide wheel frame, the traction rope is connected with the winding wheels in a sliding mode, one end, far away from the winding wheels, of the traction rope is fixedly connected with a connecting bolt, and the connecting bolt is in threaded connection with the top of the fixing frame.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages that: the device is characterized in that the device is integrated with a display board through a storage frame, universal wheels, upright posts, an adjusting device, a moving block, a traction device and the display board, the whole device is convenient to move, the storage frame is arranged, workers can place data conveniently, the center of gravity of the whole device is reduced, the whole stability is improved, the upright posts are arranged at the tops of the storage frame, the moving blocks are arranged on two sides of the adjusting device, the moving block is connected with the upright posts in a sliding manner, the traction device is arranged, the adjusting device is convenient to traction, the height of the display board is adjusted, the workers can operate conveniently, meanwhile, the display angle of the display board can be changed through the adjusting device, the display effect is improved, the construction progress is displayed, the adjusting device is arranged, the moving block is fixedly connected with two sides of a fixing frame, the moving block is connected with the upright posts in a sliding manner, the traction device is connected with the fixing frame, the fixing frame is driven to move, and the moving block is driven to slide with the upright posts, the height of the display board can be adjusted, the bottom of the fixed frame is provided with the installation block, the bottom of the installation plate is provided with the connecting frame which is rotatably connected with the installation block, the angle of the installation plate can be conveniently adjusted, and further the angle of the display board can be adjusted, when the angle of the display board needs to be adjusted, the hand wheel is rotated to drive the rotary screw rod to rotate, the screw rod slide block is in threaded connection with the rotary screw rod, the rotary screw rod drives the screw rod slide block to move, the screw rod slide block slides with the slide rod, the motion stability of the screw rod slide block is improved, the rotary frame is driven to rotate to drive the connecting block to move, the angle of the installation plate can be adjusted, the traction device is arranged to remove the limitation of the fastening bolt on the rotary shaft, the rotary disc is rotated to drive the rotary shaft to rotate, the rotary shaft is rotatably connected with the sleeve, the sleeve supports the rotary shaft, the rotary stability of the rotary shaft is improved, and the two sides of the rotary shaft are provided with the winding wheels, the rotating shaft rotates to drive the winding wheel to rotate to drive the traction rope to wind and drive the connecting bolt to move, the bolt is connected with the top of the fixing frame in a threaded manner, so that the fixing frame is driven to move upwards to adjust the height of the display board and improve the display effect, the storage frame, the universal wheel, the upright post, the adjusting device, the motion block, the traction device and the display board are integrated into a whole, the whole is convenient to move, the storage frame is arranged to facilitate workers to place data, the integral gravity center is reduced, the integral stability is improved, the upright post is arranged at the top of the storage frame, the motion blocks are arranged on two sides of the adjusting device and are in sliding connection with the upright post, the traction device is arranged to facilitate traction on the adjusting device and further adjust the height of the display board, the workers can operate conveniently, meanwhile, the adjusting device can change the display angle of the display board and improve the display effect, the construction progress is displayed, and the purpose of using requirements is met.
Drawings
FIG. 1 is a schematic view of the overall external structure of the present invention;
FIG. 2 is a schematic view of the overall internal structure of the present invention;
fig. 3 is a schematic structural diagram of the adjusting device of the present invention.
The reference numbers in the figures illustrate:
1. a storage frame; 2. a universal wheel; 3. a column; 4. an adjustment device; 41. a fixing frame; 42. mounting blocks; 43. a connecting frame; 44. mounting a plate; 45. rotating the screw rod; 46. a hand wheel; 47. a slide bar; 48. a lead screw slider; 49. a rotating frame; 410. connecting blocks; 5. a motion block; 6. a traction device; 61. a fixed block; 62. a support frame; 63. a sleeve; 64. a rotating shaft; 65. rotating the disc; 66. fastening a bolt; 67. a winding wheel; 68. a hauling rope; 69. a guide wheel frame; 610. a guide wheel; 611. a connecting bolt; 7. a display board.
Detailed Description
The drawings in the embodiments of the utility model will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the utility model; rather than all embodiments. Based on the embodiments of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all fall within the scope of protection of the present invention.
Example 1:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a progress display device for building engineering construction management, including storing frame 1, the bottom both sides fixedly connected with universal wheel 2 of storing frame 1, the top fixedly connected with stand 3 of storing frame 1, the clearance of stand 3 is provided with adjusting device 4, adjusting device 4's both sides fixedly connected with motion piece 5, motion piece 5 and stand 3 sliding connection, the top of storing frame 1 is provided with draw gear 6, draw gear 6 is connected with adjusting device 4, adjusting device 4's fixed surface is connected with show board 7. Storing frame 1, the universal wheel 2, the stand 3, adjusting device 4, motion piece 5, draw gear 6 constitutes a whole with show board 7, wholly be convenient for remove, set up storing frame 1, the staff of being convenient for places the data, reduce whole focus simultaneously, improve the overall stability, 1 top of storing frame sets up stand 3, and adjusting device 4's both sides set up motion piece 5, motion piece 5 and 3 sliding connection of stand, set up draw gear 6, be convenient for pull adjusting device 4, and then adjust the height of show board 7, make things convenient for the staff to operate, adjusting device 4 can change the show angle of show board 7 simultaneously, improve the bandwagon effect, show the progress of being under construction.
Example 2:
referring to fig. 2, a progress display device for construction management of a construction project, further, an adjusting device 4 includes a fixed frame 41, a moving block 5 fixedly connected to both sides of the fixed frame 41, and a traction device 6 connected to a top of the fixed frame 41. Set up adjusting device 4, the both sides fixed connection of motion piece 5 and fixed frame 41, and motion piece 5 and stand 3 sliding connection, draw gear 6 is connected with fixed frame 41, utilizes draw gear 6, drives fixed frame 41 motion, drives motion piece 5 and slides with stand 3, can adjust the show board 7 height.
Example 3:
referring to fig. 3, in a progress display device for construction management of a building engineering, further, a mounting block 42 is fixedly connected to the bottom of a fixing frame 41, the mounting block 42 is rotatably connected to a connecting frame 43, the connecting frame 43 is fixedly connected to a mounting plate 44, and a display plate 7 is fixedly connected to the surface of the mounting plate 44. The bottom of the fixing frame 41 is provided with an installation block 42, the bottom of the installation plate 44 is provided with a connecting frame 43, and the connecting frame 43 is rotatably connected with the installation block 42, so that the angle of the installation plate 44 can be conveniently adjusted, and further the angle of the display board 7 can be adjusted.
Example 4:
referring to fig. 3, a progress display device for construction management of building engineering is further provided, in which a fixed frame 41 is rotatably connected with a rotary screw rod 45, a hand wheel 46 is fixedly connected to the top of the rotary screw rod 45, a sliding rod 47 is fixedly connected to a gap of the fixed frame 41, a screw rod slider 48 is in threaded connection with the rotary screw rod 45, and the screw rod slider 48 is slidably connected with the sliding rod 47. When the angle of the display board 7 needs to be adjusted, the hand wheel 46 is rotated to drive the rotary screw rod 45 to rotate, the screw rod slide block 48 is in threaded connection with the rotary screw rod 45, the rotary screw rod 45 drives the screw rod slide block 48 to move, the screw rod slide block 48 slides with the sliding rod 47, and the motion stability of the screw rod slide block 48 is improved.
Example 5:
referring to fig. 3, in a progress display device for construction management of building engineering, further, a rotating frame 49 is rotatably connected to a lead screw slider 48, a connecting block 410 is rotatably connected to one end of the rotating frame 49 away from the lead screw slider 48, and the connecting block 410 is fixedly connected to the back of a mounting plate 44. The lead screw slide block 48 moves to drive the rotating frame 49 to rotate, and the connecting block 410 is driven to move, so that the angle of the mounting plate 44 can be adjusted.
Example 6:
referring to fig. 2, a progress display device for construction management of building engineering, further, the traction device 6 includes a fixing block 61, the fixing block 61 is fixedly connected to the top of the storage frame 1, the top of the fixing block 61 is fixedly connected to a support frame 62, the end of the support frame 62 is fixedly connected to a sleeve 63, the sleeve 63 is sleeved with a rotating shaft 64, the middle of the rotating shaft 64 is fixedly connected to a rotating disc 65, a fastening bolt 66 is arranged on the surface of the sleeve 63, and the sleeve 63 is used for reinforcing the rotating shaft 64 through the fastening bolt 66. The traction device 6 is provided, the restriction of the fastening bolt 66 on the rotating shaft 64 is released, the rotating disc 65 is rotated to drive the rotating shaft 64 to rotate, the rotating shaft 64 is rotatably connected with the sleeve 63, and the sleeve supports the rotating shaft 64 63, so that the rotating stability of the rotating shaft 64 is improved.
Example 7:
referring to fig. 2, a progress display device for construction management of building engineering, further, a rotating shaft 64 is rotatably connected with an upright post 3, two ends of the rotating shaft 64 are fixedly connected with a winding wheel 67, a traction rope 68 is wound on the surface of the winding wheel 67, a guide wheel frame 69 is fixedly connected with the top of the upright post 3, guide wheels 610 are arranged on two sides of the guide wheel frame 69, the traction rope 68 is slidably connected with the winding wheel 67, a connecting bolt 611 is fixedly connected with one end of the traction rope 68 far away from the winding wheel 67, and the connecting bolt 611 is in threaded connection with the top of the fixed frame 41. The both sides of axis of rotation 64 set up rolling wheel 67, and axis of rotation 64 rotates, drives rolling wheel 67 and rotates, drives haulage rope 68 and rolls, drives connecting bolt 611 motion, because bolted connection 611 and fixed frame 41 top threaded connection then drive fixed frame 41 upward movement, and then adjust the height of show board 7, improve the bandwagon effect.
The above; but are merely preferred embodiments of the utility model; the scope of the utility model is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; the technical scheme and the improved concept of the utility model are equally replaced or changed; are intended to be covered by the scope of the present invention.

Claims (7)

1. The utility model provides a progress display device for building engineering construction management, includes storing frame (1), the bottom both sides fixedly connected with universal wheel (2) of storing frame (1), its characterized in that: the top fixedly connected with stand (3) of storing frame (1), the clearance of stand (3) is provided with adjusting device (4), the both sides fixedly connected with motion piece (5) of adjusting device (4), motion piece (5) and stand (3) sliding connection, the top of storing frame (1) is provided with draw gear (6), draw gear (6) are connected with adjusting device (4), the fixed surface of adjusting device (4) is connected with show board (7).
2. The progress display device for construction management of building engineering according to claim 1, characterized in that: the adjusting device (4) comprises a fixed frame (41), the moving block (5) is fixedly connected with two sides of the fixed frame (41), and the traction device (6) is connected with the top of the fixed frame (41).
3. The progress display device for construction management of building engineering according to claim 2, characterized in that: the bottom fixedly connected with installation piece (42) of fixed frame (41), installation piece (42) are rotated and are connected with link (43), link (43) fixedly connected with mounting panel (44), show board (7) and mounting panel (44) fixed surface are connected.
4. The progress display device for construction management of building engineering according to claim 3, characterized in that: fixed frame (41) rotate and are connected with rotation lead screw (45), the top fixedly connected with hand wheel (46) of rotation lead screw (45), clearance fixedly connected with slide bar (47) of fixed frame (41), rotation lead screw (45) threaded connection has lead screw slider (48), lead screw slider (48) and slide bar (47) sliding connection.
5. The progress display device for construction management of building engineering according to claim 4, characterized in that: the lead screw slider (48) rotates and is connected with a rotating frame (49), one end of the rotating frame (49), which is far away from the lead screw slider (48), rotates and is connected with a connecting block (410), and the connecting block (410) is fixedly connected with the back of the mounting plate (44).
6. The progress display device for construction management of construction engineering according to any one of claims 2 to 5, wherein: draw gear (6) include fixed block (61), the top fixed connection of fixed block (61) and storing frame (1), the top fixedly connected with support frame (62) of fixed block (61), tip fixedly connected with sleeve (63) of support frame (62), axis of rotation (64) has been cup jointed in sleeve (63), the middle part fixedly connected with rolling disc (65) of axis of rotation (64), the surface of sleeve (63) is provided with fastening bolt (66), sleeve (63) are consolidated axis of rotation (64) through fastening bolt (66).
7. The progress display device for construction management of building engineering according to claim 6, characterized in that: the utility model discloses a fixed frame of building, including axis of rotation (64), axis of rotation (64) and stand (3) rotate to be connected, the both ends fixedly connected with rolling wheel (67) of axis of rotation (64), the surface winding of rolling wheel (67) is connected with haulage rope (68), the top fixedly connected with guide pulley frame (69) of stand (3), the both sides of guide pulley frame (69) are provided with guide pulley (610), haulage rope (68) and rolling wheel (67) sliding connection, one end fixedly connected with connecting bolt (611) of rolling wheel (67) are kept away from in haulage rope (68), connecting bolt (611) and the top threaded connection of fixed frame (41).
CN202122317913.4U 2021-09-24 2021-09-24 Progress display device for construction management of building engineering Active CN216084234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122317913.4U CN216084234U (en) 2021-09-24 2021-09-24 Progress display device for construction management of building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122317913.4U CN216084234U (en) 2021-09-24 2021-09-24 Progress display device for construction management of building engineering

Publications (1)

Publication Number Publication Date
CN216084234U true CN216084234U (en) 2022-03-18

Family

ID=80678543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122317913.4U Active CN216084234U (en) 2021-09-24 2021-09-24 Progress display device for construction management of building engineering

Country Status (1)

Country Link
CN (1) CN216084234U (en)

Similar Documents

Publication Publication Date Title
CN206530840U (en) A kind of professional animation portable adjustable camera support
CN213420543U (en) Electronic information display screen assembly
CN211574607U (en) Teaching play device for agricultural technology popularization
CN207569475U (en) A kind of computer software research and development training device
CN214303030U (en) Strutting arrangement is used in building engineering construction
CN216084234U (en) Progress display device for construction management of building engineering
CN213539814U (en) A consolidate bearing structure for building engineering
CN113882639A (en) Multifunctional construction platform
CN211149959U (en) Warning sign for building engineering
CN207361732U (en) A kind of aerial work platform being arranged on Car Crane Retractable Arms
CN212802426U (en) Liftable scaffold for building outer wall
CN215423361U (en) Building engineering management comprehensive operation platform
CN216352905U (en) University student's ideological and political education achievement display device
CN212984717U (en) Slant construction equipment for construction
CN215563851U (en) House building upright post structure
CN214615509U (en) Installation equipment for steel structure corridor
CN214652707U (en) Device capable of realizing automatic winding of flexible wire harness pipe
CN209385028U (en) The tensioning system of hollow shutter
CN215742616U (en) Dust removal spray set for construction safety engineering
CN114470689B (en) Liftable basketball stand
CN220377918U (en) Building facility safety protection supporting mechanism
CN214786528U (en) Building construction encloses fender with safety protection that has rain-proof function
CN208935686U (en) A kind of advertisement screen convenient for adjusting height
CN216871545U (en) Flow bulletin board for engineering cost management
CN108771844A (en) One Multifunctional feather net

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant