CN216081423U - Settlement observation point device - Google Patents

Settlement observation point device Download PDF

Info

Publication number
CN216081423U
CN216081423U CN202122435450.1U CN202122435450U CN216081423U CN 216081423 U CN216081423 U CN 216081423U CN 202122435450 U CN202122435450 U CN 202122435450U CN 216081423 U CN216081423 U CN 216081423U
Authority
CN
China
Prior art keywords
point device
mounting panel
slot
observation point
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122435450.1U
Other languages
Chinese (zh)
Inventor
薛青
张永健
徐仲秋
尤金辉
侯雲翔
张枫
祁邵臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bucg Eighth Construction Development Co ltd
Original Assignee
Bucg Eighth Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bucg Eighth Construction Development Co ltd filed Critical Bucg Eighth Construction Development Co ltd
Priority to CN202122435450.1U priority Critical patent/CN216081423U/en
Application granted granted Critical
Publication of CN216081423U publication Critical patent/CN216081423U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a settlement observation point device in building construction technical field, it includes the mounting panel, one side of mounting panel is fixed with the body of a perpendicular to mounting panel, the hollow cross section size of body is the polygon, the mounting panel deviates from body one side and sets up a jack with the hollow intercommunication of body, the cross-section of jack is the same with the hollow cross section of body, insert jointly in jack and the body and establish and slide and be connected with a connecting rod, connecting rod one end is stretched out to the jack outside by the direction of body to the mounting panel, the connecting rod stretches out the observation pole that is fixed with a perpendicular to connecting rod to the outer one end of jack. The method and the device have the advantages that the protection of the settlement observation point device is improved, and the settlement measurement accuracy of the building structures such as the foundation is improved.

Description

Settlement observation point device
Technical Field
The application relates to the technical field of building construction, in particular to a settlement observation point device.
Background
After foundation filling such as fluid solidified soil and the like is carried out and a building structure main body is poured on the foundation, the settlement observation of the building structure is required to be carried out regularly, so that a settlement observation point device is indispensable equipment installed on a building structure wall; the settlement observation point is required to meet the observation requirements of each construction stage; therefore, the observation significance is lost due to the fact that the continuous observation cannot be carried out in the decoration stage due to construction damage or covering of settlement observation points; the existing settlement observation point device is arranged in the wall and outside the wall as a whole, and the settlement observation point is protected by a structure which is not shielded in the subsequent construction stage, so that the settlement observation point is easily smashed by a heavy object to deform or is polluted by a decorative material to influence the use, and the accurate settlement amount cannot be obtained.
SUMMERY OF THE UTILITY MODEL
In order to improve the protection to subsiding observation point device, improve measurement accuracy of structures such as ground settlement volume, this application provides a subsides observation point device.
The application provides a subside observation point device adopts following technical scheme:
the utility model provides a subside observation point device, including the mounting panel, one side of mounting panel is fixed with the body of a perpendicular to mounting panel, the hollow cross section size of body is the polygon, the mounting panel deviates from body one side and sets up a jack with the hollow intercommunication of body, the cross-section of jack is the same with the hollow cross section of body, insert jointly in jack and the body and establish and slide and be connected with a connecting rod, connecting rod one end is stretched out to the direction of mounting panel to the jack outside by the body, the one end that the connecting rod stretches out to the jack outside is fixed with the observation pole of a perpendicular to connecting rod.
Through adopting above-mentioned technical scheme, when needs subside when observing building structures such as ground, the staff only needs to insert the connecting rod and establish in jack and body, then the staff alright use other equipment such as spirit level to observe the settlement condition of building structure, after subsiding the observation, the staff can with connecting rod and observation pole and mounting panel and body alternate segregation, avoid pounding connecting rod and observation pole because of the heavy object, and make connecting rod and observation pole take place to warp or by ornamental material pollution influence use and can not obtain accurate settlement volume, the protection to subsiding observation point device has been improved, and then the measurement accuracy of structure settlement volume such as ground has been improved.
Optionally, one side of the mounting plate, which deviates from the pipe body, corresponds to the jack and is provided with a circular groove, and when the connecting rod is separated from the pipe body and the jack, the circular groove is internally threaded with a plugging plate.
Through adopting above-mentioned technical scheme, shutoff board threaded connection shelters from jack and body are hollow in the circular slot, has reduced the possibility that external debris led to the fact the jam to jack and body are hollow, has improved the stability in use of device.
Optionally, a polygonal slot is formed in one side, away from the pipe body, of the plugging plate, and when the plugging plate is in threaded connection with the circular groove, one side, away from the pipe body, of the plugging plate is parallel and level to one side, away from the pipe body, of the mounting plate.
Through adopting above-mentioned technical scheme, the arrangement of slot, the staff of being convenient for uses the instrument to revolve to the shutoff board and revolves, has improved the efficiency that the staff fixed each other and dismantled shutoff board and mounting panel.
Optionally, a baffle is arranged in the slot and close to the opening of the slot, a spring is connected between one side of the baffle facing the pipe body and the slot, and the axis of the spring is parallel to the depth direction of the slot.
Through adopting above-mentioned technical scheme, the setting of baffle has hidden effect to the slot, has reduced the possibility of non-staff's maloperation, when needs rotate the closure plate moreover, the staff only need use tool to the direction of spring promote the baffle can, simple structure, the simple operation has guaranteed the operating efficiency to the closure plate.
Optionally, a plurality of sliding grooves are formed in the side wall of the slot, the sliding grooves are arranged along the depth direction of the slot, the sliding grooves are not communicated with the outer side face of the baffle, and a sliding block is fixed on the baffle corresponding to each sliding groove.
Through adopting above-mentioned technical scheme, the mutual card of slider and spout is established for the baffle can be more stable shelter from the slot, has improved the disguise of slot.
Optionally, the one end that the body deviates from the mounting panel sets up for sealing.
By adopting the technical scheme, the possibility that building materials forming the wall body enter the pipe body is avoided, and the cleanness of the space in the pipe body is improved.
Optionally, a plurality of reinforcing rib plates are fixed between the outer circumferential surface of the pipe body and the side wall of the mounting plate facing the pipe body.
Through adopting above-mentioned technical scheme, the arrangement of deep floor has reduced the body and the damage possibility of bending takes place for the mounting panel junction, has improved the joint strength between mounting panel and the body.
And a plurality of limiting rods are fixed on the periphery of the selectable pipe body.
Through adopting above-mentioned technical scheme, the arrangement of gag lever post can make body and the wall body building material on its periphery closely fixed, has improved the fixed stability of body and mounting panel and wall body.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the protection to the settlement observation point device is improved, the connecting rod is inserted into the jack and the pipe body, then a worker can observe the settlement condition of the building structure by using other equipment such as a level gauge and the like, after the settlement observation is finished, the worker can separate the connecting rod and the observation rod from the mounting plate and the pipe body, the phenomenon that the connecting rod and the observation rod are deformed or polluted by decorative materials to influence the use and cannot obtain accurate settlement amount due to the fact that heavy objects hit the connecting rod and the observation rod is avoided, and the measurement accuracy of the settlement amount of the structures such as a foundation is improved;
2. the whole use stability of the device is improved, the plugging plate is in threaded connection in the circular groove, the inserting holes and the hollow pipe body are shielded, and the possibility that external sundries block the inserting holes and the hollow pipe body is reduced.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a settlement observation point device according to an embodiment of the present application;
FIG. 2 is a schematic view showing a structure of a fixing portion;
FIG. 3 is a schematic structural view of a movable part;
FIG. 4 is a schematic structural view embodying a concealment assembly;
fig. 5 is a partially enlarged schematic view of a portion a in fig. 4.
Description of reference numerals: 1. a fixed part; 11. mounting a plate; 111. a jack; 112. a circular groove; 12. a pipe body; 13. reinforcing rib plates; 14. a limiting rod; 2. a movable portion; 21. a connecting rod; 22. an observation rod; 3. a concealment assembly; 31. a plugging plate; 311. a slot; 312. a chute; 32. a baffle plate; 33. a slider; 34. a spring; 4. a wall body.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses settlement observation point device. Referring to fig. 1, the settlement observation point device can be used for settlement observation of building structures such as fluid solidified soil foundations and the like, and comprises a fixed part 1 pre-buried in a wall 4 and a movable part 2 detachably connected to the fixed part 1.
Referring to fig. 2 and 3, the fixed part 1 includes the mounting panel 11 of a rectangle, one side of mounting panel 11 is close to the center department of mounting panel 11 and is fixed with a body 12, the length direction perpendicular to mounting panel 11 place plane of body 12, the hollow cross sectional dimension of body 12 is the square, mounting panel 11 deviates from body 12 one side and offers one with the same jack 111 of the hollow intercommunication of body 12 and cross sectional dimension, mounting panel 11 and body 12 are pre-buried on wall body 4, and one side that mounting panel 11 deviates from body 12 corresponds the lateral wall and is parallel and level each other with wall body 4, the one end that body 12 deviates from mounting panel 11 is for sealing the arrangement, inside in order to avoid the building material of wall body 4 to enter into body 12.
Referring to fig. 2, in order to improve the connection strength between the mounting plate 11 and the pipe body 12, four reinforcing rib plates 13 are arranged on the outer peripheral surface of the pipe body 12 and between the side wall of the mounting plate 11 facing the pipe body 12, the reinforcing rib plates 13 are in a right-angled triangle plate-shaped structure, two right-angled sides of the reinforcing rib plates 13 are respectively fixed with the outer peripheral surface of the pipe body 12 and the side wall of the mounting plate 11 facing the pipe body 12, and the four reinforcing rib plates 13 are uniformly arranged around the pipe body 12, under the supporting effect of the reinforcing rib plates 13, the possibility of bending damage at the connection part of the pipe body 12 and the mounting plate 11 is reduced, and the connection stability between the mounting plate 11 and the pipe body 12 is further improved.
Referring to fig. 2, three rows of round rod-shaped limiting rods 14 are further arranged on the outer circumferential surface of the tube body 12, four limiting rods 14 are arranged in each row, the three rows of limiting rods 14 are arranged at intervals along the length direction of the tube body 12, the four limiting rods 14 in each row are uniformly distributed around the axis of the tube body 12, the length direction of the limiting rods 14 is perpendicular to the length direction of the tube body 12, and one end of each limiting rod 14 is fixed to the outer circumferential surface of the tube body 12; when the pipe body 12 is poured on the wall 4, the limiting rod 14 is tightly fixed with the building materials around the limiting rod, so that the pipe body 12 and the mounting plate 11 are more firmly fixed with the wall 4.
Referring to fig. 3, the movable portion 2 includes a connecting rod 21 having a rectangular rod shape, a cross section of the connecting rod 21 is the same as a hollow cross section of the insertion hole 111 and the hollow cross section of the tube 12, one end of the connecting rod 21 is inserted into the insertion hole 111 and the tube 12 from an opening of a side of the insertion hole 111 away from the tube 12, the other end of the connecting rod 21 is located outside a side of the insertion hole 111 away from the tube 12, an observation rod 22 is fixed to an end of the connecting rod 21 located outside the insertion hole 111, and a length direction of the observation rod 22 is perpendicular to the connecting rod 21 and the observation rod 22 extends vertically upward.
After the settlement observation of building structures such as foundations is finished, the staff can drag observation rod 22 to the direction of keeping away from mounting panel 11, drive connecting rod 21 and slide to the direction of keeping away from body 12 and mounting panel 11, until connecting rod 21 and body 12 and jack 111 break away from each other, realize the alternate segregation to connecting rod 21 and observation rod 22 and wall body 4, avoid pounding connecting rod 21 and observation rod 22 because of the heavy object, and make connecting rod 21 and observation rod 22 take place to warp or by ornamental material pollution influence use and can not obtain accurate settlement volume, not only improved the protection to settlement observation point device, and improved the measurement accuracy of the structure settlement volume such as foundations.
Referring to fig. 4 and 5, a circular groove 112 is further formed in a side of the mounting plate 11 away from the tube body 12 corresponding to the insertion hole 111, the circular groove 112 is coaxially arranged with the tube body 12, and the size of the circular groove 112 is larger than that of the insertion hole 111, and a concealing assembly 3 is arranged in the circular groove 112 and is used for concealing the hollow insertion hole 111 and the tube body 12 when the connecting rod 21, the observation rod 22 and the mounting plate 11 are separated from each other; the concealing assembly 3 comprises a blocking plate 31 screwed in the circular groove 112, and one side of the blocking plate 31, which is far away from the pipe body 12, is flush with the corresponding side wall of the mounting plate 11.
Referring to fig. 5, a regular hexagonal slot 311 is opened at one side of the blocking plate 31 facing away from the tube body 12, a baffle 32 is disposed in the slot 311 near an opening of the slot 311, two sliding grooves 312 arranged at intervals are opened on a side wall of the slot 311, the sliding grooves 312 are arranged along a depth direction of the slot 311, outer side surfaces of the sliding grooves 312 and the baffle 32 are not communicated with each other, a sliding block 33 is respectively fixed at a position corresponding to each sliding groove 312 on the baffle 32, a spring 34 is connected between one side of the baffle 32 facing the tube body 12 and the slot 311, and an axis of the spring 34 is parallel to the depth direction of the slot 311.
After the staff dismantled connecting rod 21 and observation pole 22 from mounting panel 11, can align shutoff board 31 and circular slot 112, then use the instrument to promote baffle 32 until the instrument inserts and carry out in slot 311, later the staff alright use the instrument to rotate shutoff board 31 to shutoff board 31 threaded connection in circular slot 112, under shutoff board 31 and circular slot 112's connection, realize the sheltering from of jack 111 and body 12 are hollow, reduce the possibility that external debris enters into body 12, not only realized the interior clear maintenance of body 12, and reduced in the body 12 and piled up debris and led to the fact the possibility of influence to connecting rod 21 and body 12 pegging graft each other.
The implementation principle of the settlement observation point device in the embodiment of the application is as follows: when the building structures such as the foundation and the like need to be settled, a worker firstly uses a tool to push the baffle 32 to enable the spring 34 to be elastically compressed until the tool and the slot 311 are mutually clamped, then the worker rotates the tool to drive the plugging plate 31 to rotate until the plugging plate 31 and the circular groove 112 are mutually separated, then the worker can insert one end, far away from the observation rod 22, of the connecting rod 21 into the insertion hole 111 and the pipe body 12, and then uses other equipment such as a level gauge and the like to observe the settlement condition of the building structures.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a subside observation point device which characterized in that: including mounting panel (11), one side of mounting panel (11) is fixed with body (12) of a perpendicular to mounting panel (11), the hollow cross section size of body (12) is the polygon, mounting panel (11) deviate from body (12) one side and offer one with body (12) hollow intercommunication jack (111), the cross-section of jack (111) is the same with the hollow cross section of body (12), insert jointly in jack (111) and body (12) and establish and slide and be connected with connecting rod (21), connecting rod (21) one end is stretched out to the direction of mounting panel (11) by body (12) and is stretched out to jack (111) outside, connecting rod (21) stretch out to jack (111) outer one end and are fixed with observation pole (22) of a perpendicular to connecting rod (21).
2. A settlement observation point device according to claim 1, wherein: one side of the mounting plate (11) departing from the pipe body (12) corresponds to the insertion hole (111) and is provided with a circular groove (112), and when the connecting rod (21) is separated from the pipe body (12) and the insertion hole (111), the circular groove (112) is internally connected with a plugging plate (31).
3. A settlement observation point device according to claim 2, wherein: one side that shutoff board (31) deviate from body (12) has seted up a polygonal slot (311), and when shutoff board (31) and circular slot (112) threaded connection, one side that shutoff board (31) deviate from body (12) and one side that mounting panel (11) deviate from body (12) are parallel and level each other.
4. A settlement observation point device according to claim 3, wherein: a baffle (32) is arranged in the slot (311) and close to the opening of the slot (311), a spring (34) is connected between one side, facing the pipe body (12), of the baffle (32) and the slot (311), and the axis of the spring (34) is parallel to the depth direction of the slot (311).
5. A settlement observation point device according to claim 4, wherein: a plurality of sliding grooves (312) are formed in the side wall of the slot (311), the sliding grooves (312) are arranged in the depth direction of the slot (311), the sliding grooves (312) are not communicated with the outer side face of the baffle (32), and a sliding block (33) is fixed on the baffle (32) corresponding to each sliding groove (312).
6. A settlement observation point device according to claim 1, wherein: one end of the pipe body (12) deviating from the mounting plate (11) is arranged in a sealing mode.
7. A settlement observation point device according to claim 1, wherein: and a plurality of reinforcing rib plates (13) are fixed between the outer peripheral surface of the pipe body (12) and the side wall of the mounting plate (11) facing the pipe body (12).
8. A settlement observation point device according to claim 1, wherein: a plurality of limiting rods (14) are fixed on the outer peripheral surface of the pipe body (12).
CN202122435450.1U 2021-10-09 2021-10-09 Settlement observation point device Active CN216081423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122435450.1U CN216081423U (en) 2021-10-09 2021-10-09 Settlement observation point device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122435450.1U CN216081423U (en) 2021-10-09 2021-10-09 Settlement observation point device

Publications (1)

Publication Number Publication Date
CN216081423U true CN216081423U (en) 2022-03-18

Family

ID=80638089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122435450.1U Active CN216081423U (en) 2021-10-09 2021-10-09 Settlement observation point device

Country Status (1)

Country Link
CN (1) CN216081423U (en)

Similar Documents

Publication Publication Date Title
ES2637263T5 (en) System for anchoring objects on the ground
US8613573B2 (en) Telescopic shoring system
CN216081423U (en) Settlement observation point device
CN112301887A (en) Suspension bridge main cable anchoring system under bedrock deep-buried condition and construction method
CN213509634U (en) House building arch type support body
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN110878879A (en) Pre-buried pipeline protector
CN206635780U (en) A kind of soil nailed wall retaining structure
CN210887226U (en) Civil engineering assembled pit foundation supporting device
CN212129887U (en) Steel plate net and steel pipe connecting piece and connecting structure thereof
CN211850005U (en) Environment-friendly recyclable assembled mixing station bin
CN208201892U (en) A kind of white-out tubular pole and soil nail wall composite supporting construction
TWM590605U (en) Base stand structure
CN107119694B (en) The method of construction of the deep basal pit auxiliary support apparatus of anti-pipe network deformation under urban environment
CN107607910B (en) Wind profile radar purse net and installation method thereof
CN210341942U (en) Building foundation pit reinforcing and supporting structure under cross construction complex environment
CN110751880B (en) Telegraph pole assembling or centralizing training device and method
CN204252589U (en) Polygon movable pond
CN219604160U (en) Trestle bridge plate template support structure for foundation pit supporting limited space
CN215211102U (en) A side slope supporting construction for side slope ecological management
CN209779599U (en) Trap type cylindrical sand barrier
CN211061207U (en) Rectangular large-section pipe curtain underground excavation method simulation device
CN218952237U (en) Retaining wall with ecological hole
CN112962614B (en) Foundation pit support and construction method thereof
CN220377332U (en) Trapezoidal composite soil nailing wall supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant