CN216078633U - Pipeline fixing device - Google Patents

Pipeline fixing device Download PDF

Info

Publication number
CN216078633U
CN216078633U CN202122067911.4U CN202122067911U CN216078633U CN 216078633 U CN216078633 U CN 216078633U CN 202122067911 U CN202122067911 U CN 202122067911U CN 216078633 U CN216078633 U CN 216078633U
Authority
CN
China
Prior art keywords
backup pad
mounting
lateral wall
mounting panel
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202122067911.4U
Other languages
Chinese (zh)
Inventor
唐梓珺
白皓文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Divion Southern Construction Co Ltd
Original Assignee
China Construction Eighth Engineering Divion Southern Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Divion Southern Construction Co Ltd filed Critical China Construction Eighth Engineering Divion Southern Construction Co Ltd
Priority to CN202122067911.4U priority Critical patent/CN216078633U/en
Application granted granted Critical
Publication of CN216078633U publication Critical patent/CN216078633U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention provides a pipeline fixing device, including: the mounting panel, first backup pad and second backup pad, the lateral wall of mounting panel is provided with first spout, first backup pad sets up in first spout with sliding, the second backup pad sets up on the lateral wall of mounting panel, first backup pad and second backup pad lie in same one side of mounting panel, the opposite side of first backup pad and second backup pad all is provided with and is used for supporting tight subassembly of supporting on the building frame support, first backup pad and second backup pad pass through locking Assembly locking, the mounting panel deviates from on the lateral wall of first backup pad and is provided with a plurality of centre gripping subassemblies at the interval, the centre gripping subassembly is used for the centre gripping pipeline, in the building construction place that exists among the prior art has been solved, be not convenient for carry out the problem of arranging in order to the pipeline that the construction was used.

Description

Pipeline fixing device
Technical Field
The utility model relates to the technical field of building construction equipment, in particular to a pipeline fixing device.
Background
In the construction process of a building site, building frames are usually erected around a building so as to process the building, wherein the building frames are formed by a plurality of supports, different types of equipment are usually used in the construction process, most of the equipment comprises pipelines, and due to the complex construction site environment, if the pipelines are not arranged, the pipelines are messy, and great energy is consumed in the subsequent recovery of single equipment and the pipelines thereof; and is not convenient for later maintenance of equipment and pipelines.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model provides a pipeline fixing device, which solves the problem that pipelines used for construction are inconvenient to arrange in a building construction site in the prior art.
According to an embodiment of the present invention, a pipeline fixing device includes: the mounting panel, first backup pad and second backup pad, the lateral wall of mounting panel is provided with first spout, first backup pad sets up in first spout with sliding, the second backup pad sets up on the lateral wall of mounting panel, first backup pad and second backup pad lie in same one side of mounting panel, the opposite side of first backup pad and second backup pad all is provided with and is used for supporting tight subassembly on the building frame support, first backup pad and second backup pad pass through locking Assembly locking, the mounting panel deviates from and is provided with a plurality of centre gripping subassemblies on the lateral wall of first backup pad at the interval, the centre gripping subassembly is used for the centre gripping pipeline.
Compared with the prior art, the utility model has the following beneficial effects: the distance between the first supporting plate and the second supporting plate can be adjusted according to the size of the building frame bracket by arranging the first supporting plate in the first sliding chute in a sliding manner, so that the first supporting plate and the second supporting plate can be locked on the bracket by the locking assembly, wherein the first supporting plate and the second supporting plate are respectively provided with the abutting assembly to abut against two side walls of the bracket, the first supporting plate and the second supporting plate are locked on the bracket by the locking assembly, and further the pipeline fixing device is installed, further, a plurality of clamping assemblies are arranged on the side walls of the mounting plate, each clamping assembly is used for clamping a pipeline, and as the clamping assemblies are arranged on the mounting plate at intervals, the pipelines are ensured not to be crossed with each other, the pipeline is convenient to be appointed by workers to recover a pipeline, and the appointed pipeline is convenient to overhaul, the construction efficiency is improved, the construction safety is improved, and other potential safety hazards caused by the fact that pipelines are crossed in the pipeline recycling process are prevented.
Each of the abutting assemblies comprises: the mounting block is arranged on the side wall of the mounting seat, the mounting block is detachably connected with the corresponding first supporting plate or second supporting plate through bolts, and the clamping block is fixedly arranged on the side wall, close to the support, of the mounting seat.
Furthermore, each clamping block is arc-shaped, a clamping pad is arranged on the side wall, close to the support, of each clamping block, and the clamping pads are made of rubber materials.
Further, the locking assembly includes: the one end of connecting rod sets up on the lateral wall that the second backup pad is close to first backup pad fixedly, and the other end of connecting rod passes first backup pad horizontally, and lock nut locking is passed through to the one end that the connecting rod passed first backup pad, connecting rod and first backup pad sliding connection.
Further, each of the clamping assemblies comprises: the limiting ring and the two mounting rods symmetrically arranged at the top of the mounting plate are arranged, one end of the limiting ring is rotatably arranged at the top of one of the mounting rods through a rotating shaft, and the other end of the limiting ring is detachably connected with the other mounting rod through a locking mechanism.
Further, each of the locking mechanisms includes: the bayonet lock, push rod and spring, the sunken mounting groove that forms in top of installation pole, the spacing ring deviates from the sunken clamping groove that supplies bayonet lock male that forms of one end of pivot, the bayonet lock sets up in the mounting groove with sliding, the spring also sets up in the mounting groove, the bayonet lock inserts in the clamping groove under the elasticity of spring, be provided with the second spout with the mounting groove intercommunication on the lateral wall of installation pole, the push rod sets up in the second spout with sliding, the one end of push rod and the lateral wall fixed connection of bayonet lock.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is a schematic structural view of the clamping assembly.
In the above drawings: 1. mounting a plate; 2. a first chute; 3. a first support plate; 4. a second support plate; 5. a support; 6. a mounting seat; 7. mounting blocks; 8. a clamping block; 9. a clamping pad; 10. mounting a rod; 11. a limiting ring; 12. a clamping channel; 13. a rotating shaft; 14. mounting grooves; 15. a bayonet lock; 16. a spring; 17. a push rod; 18. a second chute; 19. locking the nut; 20. a connecting rod.
Detailed Description
The technical solution of the present invention is further explained with reference to the drawings and the embodiments.
As shown in fig. 1, an embodiment of the present invention provides a pipeline fixing device, including: mounting panel 1, first backup pad 3 and second backup pad 4, the lateral wall of mounting panel 1 is provided with first spout 2, first backup pad 3 sets up in first spout 2 with sliding, second backup pad 4 sets up on the lateral wall of mounting panel 1, first backup pad 3 and second backup pad 4 are located same one side of mounting panel 1, the opposite side of first backup pad 3 and second backup pad 4 all is provided with and is used for supporting the tight subassembly of supporting on building frame support 5, first backup pad 3 and second backup pad 4 are locked through locking Assembly, mounting panel 1 deviates from on the lateral wall of first backup pad 3 and is provided with a plurality of clamping components at the interval, clamping components is used for the centre gripping pipeline.
The distance between the first supporting plate 3 and the second supporting plate 4 can be adjusted according to the size of the building frame bracket 5 by arranging the first supporting plate 3 in the first sliding chute 2 in a sliding manner, so that the first supporting plate 3 and the second supporting plate 4 can be locked on the bracket 5 by the locking assembly, wherein the first supporting plate 3 and the second supporting plate 4 are respectively provided with the abutting assembly for abutting against two side walls of the bracket 5, the first supporting plate 3 and the second supporting plate 4 are locked on the bracket 5 by the locking assembly, so that the pipeline fixing device is installed, a plurality of clamping assemblies are further arranged on the side wall of the mounting plate 1, each clamping assembly is used for clamping a pipeline, and the clamping assemblies are arranged on the mounting plate 1 at intervals, so that the pipelines are ensured not to be crossed with each other, and the pipeline can be conveniently recovered by the appointed personnel, meanwhile, the specified pipelines are convenient to overhaul, the working efficiency of construction is improved, the safety of construction is improved, and other potential safety hazards caused by intercrossing among the pipelines in the pipeline recycling process are prevented.
As shown in fig. 1, each of the fastening assemblies includes: mount pad 6, press from both sides tight piece 8 and installation piece 7, installation piece 7 sets up on the lateral wall of mount pad 6, and installation piece 7 can be dismantled with corresponding first backup pad 3 or second backup pad 4 through the bolt and be connected, presss from both sides the fixed lateral wall that is close to support 5 that sets up at mount pad 6 of tight piece 8. Each clamping block 8 is arc-shaped, a clamping pad 9 is arranged on the side wall, close to the support 5, of each clamping block 8, and the clamping pad 9 is made of rubber materials.
Specifically, the clamping block 8 is arranged to be circular arc-shaped, and the clamping pad 9 made of rubber material is arranged on the clamping block 8, so that the contact area between the clamping block 8 and the support 5 is increased, and the friction force between the support 5 and the clamping block 8 is increased.
The locking assembly includes: the connecting rod 20, the one end of connecting rod 20 is fixedly set up on the lateral wall that is close to first backup pad 3 in second backup pad 4, and the other end of connecting rod 20 passes first backup pad 3 horizontally, and the one end that connecting rod 20 passed first backup pad 3 is locked through lock nut 19, connecting rod 20 and first backup pad 3 sliding connection. The working principle of the locking assembly is as follows: when the pipeline fixing device is installed, firstly, the clamping blocks 8 on the installation plate 1 and the second support plate 4 are tightly attached to the support 5, then the first support plate 3 is pushed to approach towards the second support plate 4, the connecting rod 20 horizontally penetrates through the first support plate 3, after the clamping blocks 8 on the first support plate 3 are tightly attached to the support 5, the locking nut 19 is sleeved on the connecting rod 20 from one end of the connecting rod 20, which is far away from the second support plate 4, the locking nut 19 is in threaded connection with the connecting rod 20, then the locking nut 19 is rotated to approach towards the first support plate 3, so that the locking nut 19 locks the first support plate 3 and the second support plate 4, the pipeline fixing device is fixed on the support 5 of a building frame, the pipeline fixing device is simple to operate, and workers can conveniently install and dismantle the pipeline fixing device; furthermore, the number of the pipeline fixing devices can be reasonably selected according to the length of the pipeline used in the construction site.
As shown in fig. 1 and 2, each of the clamping assemblies includes: the mounting structure comprises a limiting ring 11 and two mounting rods 10 symmetrically arranged at the top of the mounting plate 1, wherein one end of the limiting ring 11 is rotatably arranged at the top of one of the mounting rods 10 through a rotating shaft 13, and the other end of the limiting ring 11 is detachably connected with the other mounting rod 10 through a locking mechanism. Each of the locking mechanisms includes: bayonet 15, push rod 17 and spring 16, the sunken mounting groove 14 that forms in top of installation pole 10, the spacing ring 11 deviates from the sunken clamping groove that supplies bayonet 15 male that forms in one end of pivot 13, bayonet 15 sets up in mounting groove 14 with sliding, spring 16 also sets up in mounting groove 14, bayonet 15 inserts in the clamping groove under spring 16's elasticity, be provided with the second spout 18 that communicates with mounting groove 14 on the lateral wall of installation pole 10, push rod 17 sets up in second spout 18 with sliding, push rod 17's one end and bayonet 15's lateral wall fixed connection.
The working principle of the specific clamping assembly is as follows: after the free end of the limiting ring 11 is locked by the locking mechanism, the two mounting rods 10, the limiting ring 11 and the side wall of the mounting plate 1 form a closed clamping channel 12, each clamping channel 12 is only used for a pipeline to pass through, the pipeline is fixed in the clamping channel 12, the pipeline is prevented from being crossed with other pipelines, the uniformity among the pipelines is improved, and the pipelines are prevented from being intertwined together to influence other operations of subsequent construction; specifically, when the clamping channel 12 needs to be opened, the push rod 17 is pushed to push the bayonet 15 out of the bayonet slot at the end of the limiting ring 11.
Finally, the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications or equivalent substitutions may be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all of them should be covered in the claims of the present invention.

Claims (6)

1. A line securing device, comprising: mounting panel (1), first backup pad (3) and second backup pad (4), the lateral wall of mounting panel (1) is provided with first spout (2), first backup pad (3) set up in first spout (2) with sliding, second backup pad (4) set up on the lateral wall of mounting panel (1), first backup pad (3) and second backup pad (4) are located the same one side of mounting panel (1), the opposite side of first backup pad (3) and second backup pad (4) all is provided with and is used for supporting tight subassembly of supporting on building frame support (5), first backup pad (3) and second backup pad (4) are locked through locking Assembly, be provided with a plurality of centre gripping subassemblies on mounting panel (1) the lateral wall that deviates from first backup pad (3) at intervals, centre gripping subassembly is used for the centre gripping pipeline.
2. The line fixture of claim 1, wherein each said retention assembly comprises: the mounting seat (6), press from both sides tight piece (8) and installation piece (7), installation piece (7) set up on the lateral wall of mounting seat (6), and installation piece (7) can be dismantled with first backup pad (3) or second backup pad (4) that correspond through the bolt and be connected, press from both sides tight piece (8) and fix the lateral wall that sets up near support (5) in mounting seat (6).
3. A pipeline fixing device as claimed in claim 2, wherein each clamping block (8) is circular arc-shaped, and a clamping pad (9) is provided on the side wall of each clamping block (8) close to the bracket (5), the clamping pad (9) being made of rubber material.
4. The line fixture of claim 3, wherein the locking assembly comprises: the connecting rod (20), the one end of connecting rod (20) sets up fixedly on second backup pad (4) is close to the lateral wall of first backup pad (3), and first backup pad (3) are passed horizontally to the other end of connecting rod (20), and locking is passed through lock nut (19) to the one end that connecting rod (20) passed first backup pad (3), connecting rod (20) and first backup pad (3) sliding connection.
5. The line fixture of any of claims 1-4, wherein each of the clamping assemblies comprises: the mounting structure comprises a limiting ring (11) and two mounting rods (10) symmetrically arranged at the top of a mounting plate (1), wherein one end of the limiting ring (11) is rotatably arranged at the top of one mounting rod (10) through a rotating shaft (13), and the other end of the limiting ring (11) is detachably connected with the other mounting rod (10) through a locking mechanism.
6. The line fixture of claim 5, wherein each of the locking mechanisms comprises: bayonet lock (15), push rod (17) and spring (16), the top of installation pole (10) is sunken to form mounting groove (14), spacing ring (11) deviate from the sunken draw-in groove that supplies bayonet lock (15) to insert of one end of pivot (13), bayonet lock (15) set up in mounting groove (14) with sliding, spring (16) also set up in mounting groove (14), bayonet lock (15) insert the draw-in groove under the elasticity of spring (16), be provided with second spout (18) with mounting groove (14) intercommunication on the lateral wall of installation pole (10), push rod (17) set up in second spout (18) with sliding, the one end of push rod (17) and the lateral wall fixed connection of bayonet lock (15).
CN202122067911.4U 2021-08-30 2021-08-30 Pipeline fixing device Withdrawn - After Issue CN216078633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122067911.4U CN216078633U (en) 2021-08-30 2021-08-30 Pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122067911.4U CN216078633U (en) 2021-08-30 2021-08-30 Pipeline fixing device

Publications (1)

Publication Number Publication Date
CN216078633U true CN216078633U (en) 2022-03-18

Family

ID=80673538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122067911.4U Withdrawn - After Issue CN216078633U (en) 2021-08-30 2021-08-30 Pipeline fixing device

Country Status (1)

Country Link
CN (1) CN216078633U (en)

Similar Documents

Publication Publication Date Title
CN210827962U (en) Building curtain wall mounting structure convenient to articulate
CN216078633U (en) Pipeline fixing device
CN215789456U (en) Convenient type micro base station clamping device
CN215721303U (en) Fire-fighting pipeline support convenient to installation
CN211405349U (en) Bridge installation fixing support
CN212986275U (en) Natural gas line support convenient to installation
CN212804987U (en) Community monitoring equipment convenient to install
CN211908948U (en) Intelligent building monitoring device with quick installation mechanism
CN210577492U (en) Anti-rotation power cable protection device
CN217299024U (en) Municipal administration underground pipe gallery
CN213935107U (en) Fixed effectual laboratory audio frequency and video is reminded and is used alarm device
CN215629185U (en) Ceiling device for road roller
CN204081441U (en) A kind of locking device fixing for railing
CN213712466U (en) Monitoring device for monitoring
CN214217826U (en) Fixing device for elevator car roof maintenance box
CN220622967U (en) Combined pipeline for building water supply and drainage
CN216244935U (en) Combined solar heat collecting plate
CN217464141U (en) Night emergency lighting device for power maintenance
CN216734377U (en) Construction steel pipe conveyer that easily fixes
CN219140063U (en) Novel electromechanical installation support and hanger
CN215801223U (en) Building engineering management safety warning device
CN213760320U (en) Fire-fighting pipeline fixer for fire engineering
CN215388555U (en) Location mounting structure for active carbon adsorption equipment
CN218242581U (en) Switch cabinet convenient for wire arrangement
CN215616500U (en) End cover turning tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20220318

Effective date of abandoning: 20230811

AV01 Patent right actively abandoned

Granted publication date: 20220318

Effective date of abandoning: 20230811

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned