CN216075535U - Building steel structure connecting device - Google Patents

Building steel structure connecting device Download PDF

Info

Publication number
CN216075535U
CN216075535U CN202122418349.5U CN202122418349U CN216075535U CN 216075535 U CN216075535 U CN 216075535U CN 202122418349 U CN202122418349 U CN 202122418349U CN 216075535 U CN216075535 U CN 216075535U
Authority
CN
China
Prior art keywords
main pipe
pipe body
steel
connecting device
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122418349.5U
Other languages
Chinese (zh)
Inventor
刘岳军
刘岳超
胡轲
刘俊甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Yuehuang Building Materials Technology Co ltd
Original Assignee
Hunan Yuehuang Building Materials Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Yuehuang Building Materials Technology Co ltd filed Critical Hunan Yuehuang Building Materials Technology Co ltd
Priority to CN202122418349.5U priority Critical patent/CN216075535U/en
Application granted granted Critical
Publication of CN216075535U publication Critical patent/CN216075535U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building steel structure connecting device, which relates to the technical field of building steel and comprises a main pipe body, wherein a fixing hole is formed in the pipe wall of the main pipe body, a partition plate is arranged in the middle of the main pipe body and fixedly connected with the main pipe body, ejector rods are arranged above and below the partition plate, springs are welded on the upper surface and the lower surface of the partition plate, a buffer plate is fixed above the springs, one surface, far away from the springs, of the buffer plate is respectively in contact with two steel pipes, the two steel pipes extend into the main pipe body, and hoops are fixed at the joints of the two steel pipes and the main pipe body. The utility model has novel conception and simple structure, the plum blossom handle and the hoop are unscrewed after the building is built, the spring arranged in the main pipe body is matched with the buffer block to directly eject the steel structures at two ends, the working efficiency is improved, meanwhile, the buffer plate can provide buffer when the steel structures are installed, the damage of the steel structures in the installation process can be effectively avoided, in addition, the hoop can effectively prevent the steel structures from sliding outwards in the use process, and the connecting parts are prevented from being exposed and scratching workers.

Description

Building steel structure connecting device
Technical Field
The utility model belongs to the technical field of building steel, and particularly relates to a connecting device for a building steel structure.
Background
The steel structure building is a novel building system, and compared with the traditional concrete building, the steel structure building replaces reinforced concrete with steel plates or profile steel, and has higher strength and better shock resistance, and because the components can be manufactured in a factory and installed on site, the construction period is greatly reduced, and because the steel can be reused, the construction waste can be greatly reduced, and the steel structure building is more green and environment-friendly, so the steel structure building is widely adopted by countries all over the world and applied to industrial buildings and civil buildings, and the application of the steel structure building on high-rise and super high-rise buildings is increasingly mature at present, and gradually becomes the mainstream building process, and is the development direction of future buildings.
Need use steel construction connecting device to fix when the work frame installation, but the steel construction uses the bolt to fix mostly today, and is inconvenient to dismantle after the building construction is good, needs extravagant a large amount of workman's time, makes work efficiency reduce.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a connecting device for a building steel structure, which is used for solving the following technical problems:
the prior art mostly uses the bolt to fix, and is inconvenient to dismantle after the building construction is good, needs a large amount of workman's time of extravagant, makes work efficiency reduce.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a building steel structure connecting device, is including being responsible for the body, be provided with the fixed orifices on being responsible for the body pipe wall, it is provided with the baffle to be responsible for body middle part, the baffle passes through bolt fixed connection with being responsible for the body, the baffle top is equipped with first ejector pin, the baffle below is equipped with the second ejector pin, the spring, two have all been welded on the two sides about the baffle the spring top is fixed with the buffer board, two the one side that the spring was kept away from to the buffer board contacts with first steel pipe and second steel pipe respectively, first steel pipe and second steel pipe extend to being responsible for internal portion, first steel pipe and second steel pipe all are fixed with the staple bolt with being responsible for body linking department.
Further, the fixing holes in the wall of the main pipe body are evenly distributed in an equal angle mode relative to the center line.
Furthermore, the first steel pipe and the second steel pipe are provided with threaded holes which are uniformly distributed in an equal angle mode relative to the center line, and the threaded holes correspond to the threaded holes in the pipe wall of the main pipe body.
Furthermore, two groups of plum blossom-shaped handles are arranged at the positions, close to the two ends, of the main pipe body, and the two groups of plum blossom-shaped handles are uniformly distributed in an equal angle mode about the center line of the main pipe body.
Furthermore, the inner walls of the upper end and the lower end of the main pipe body are provided with chamfers.
Further, the second ejector rod penetrates through the partition plate and is in threaded connection with the first ejector rod.
Further, the outer diameter of the baffle plate is smaller than the inner diameter of the main pipe body.
Further, the contraction range of the spring is less than half of the length of the main pipe body.
Compared with the prior art, the utility model has the beneficial effects that:
the utility model has novel conception and simple structure, the plum blossom handle and the hoop are unscrewed to remove the fixation after the building is built, the spring arranged in the main pipe body is matched with the buffer plate to directly eject the steel structures at the two ends, the working efficiency is improved, meanwhile, the buffer cushion can also provide buffer when the steel structures are installed, the damage of the steel structures in the installation process can be effectively avoided, the repeated utilization rate of the steel structures is increased, in addition, the hoop can effectively prevent the steel structures from sliding outwards in the use process, and the connecting parts from being exposed and scratching workers.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
FIG. 1 is a sectional view of a construction steel structure connection device;
FIG. 2 is an enlarged view of a portion of the area I in FIG. 1;
fig. 3 is an exploded view of a construction steel structure connection device.
In the figure: 1. a primary tube; 2. a partition plate; 3. a first ejector rod; 4. a second ejector rod; 5. a bolt; 6. a spring; 7. a buffer plate; 8. a first steel pipe; 9. a plum blossom handle; 10. hooping; 11. a second steel pipe.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the detailed description and specific examples, while indicating the preferred embodiment of the utility model, are intended for purposes of illustration only and are not intended to limit the scope of the utility model. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the utility model, as claimed, but is merely representative of selected embodiments of the utility model. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the present invention without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 3, in the embodiment of the utility model, a connecting device for a building steel structure includes a main pipe body 1, a fixing hole is formed in a pipe wall of the main pipe body 1, a partition plate 2 is arranged in the middle of the main pipe body 1, the partition plate 2 is fixedly connected with the main pipe body 1 through a bolt 5, a first ejector rod 3 is arranged above the partition plate 2, a second ejector rod 4 is arranged below the partition plate 2, springs 6 are welded on the upper and lower surfaces of the partition plate 2, buffer plates 7 are fixed above the two springs 6, one surfaces, far away from the springs 6, of the two buffer plates 7 are respectively in contact with a first steel pipe 8 and a second steel pipe 11, the first steel pipe 8 and the second steel pipe 11 extend into the main pipe body 1, and hoops 10 are fixed at the joints of the first steel pipe 8 and the second steel pipe 11 and the main pipe body 1.
The fixing holes in the pipe wall of the main pipe body 1 are uniformly distributed in an equal angle mode about the central line, the middle fixing hole is a countersunk hole, the 5 heads of the bolts are completely embedded into the main pipe body 1 after the bolts 5 are installed, the structure is attractive, and the anti-scratch effect can be achieved.
The first steel pipe 8 and the second steel pipe 11 are provided with threaded holes which are uniformly distributed in an equal angle mode about a central line, and the threaded holes correspond to the threaded holes in the pipe wall of the main pipe body 1, so that the second steel pipe 11 or the second steel pipe 11 is easy to position when being installed.
Two groups of plum blossom handles 9 are arranged at two ends of the main pipe body 1, and the plum blossom handles 9 are uniformly distributed at equal angles relative to the center line of the main pipe body 1. The two groups of plum blossom handles 9 are used for realizing positioning, and can be slightly adjusted from left to right, so that the first steel pipe 8, the second steel pipe 11 and the main pipe body 1 are ensured to be positioned at the same axis.
The inner walls of the upper end and the lower end of the main pipe body 1 are provided with chamfers, so that the situation that the main pipe body cannot be installed due to slight deviation when the main pipe body is installed into the first steel pipe 8 or the second steel pipe 11 is avoided.
The second ejector rod 4 penetrates through the partition plate 2 and is in threaded connection with the first ejector rod 3, limiting is provided for the spring 6, play is avoided, and meanwhile the guide rod can limit the first steel pipe 8 or the second steel pipe 11 for the second time.
The outer diameter of the partition plate 2 is smaller than the inner diameter of the main pipe body 1.
The contraction range of the spring 6 is less than half of the length of the main pipe body 1, so that the situation that an operator is hurt due to the fact that the first steel pipe 8 or the second steel pipe 11 is bounced too high when the main pipe body is disassembled is avoided.
The working principle of the utility model is as follows: when the steel structure is installed and connected, the plum blossom handle 9 on the main pipe body 1 is in a loose state, the first steel pipe 8 and the second steel pipe 11 are installed in the main pipe body 1, chamfers on the inner walls of two ends of the main pipe body 1 form guiding and quick positioning, meanwhile, the buffer cushion is extruded, the spring 6 is compressed to slow down the installation speed, when the fixing hole positions are aligned, the plum blossom handle 9 is screwed into the hole positions corresponding to the first steel pipe 8 and the second steel pipe 11, and then the hoop 10 is sleeved and screwed to form secondary fixing; when the steel pipe is disassembled, only the hoop 10 and the plum blossom handle 9 need to be loosened, and the cushion pad ejects the steel pipe under the action of the force of the spring 6.
The foregoing is merely exemplary and illustrative of the present invention, and various modifications, additions and substitutions of the specific embodiments described herein may be made by those skilled in the art without departing from the scope of the utility model as defined in the accompanying claims.

Claims (8)

1. The utility model provides a building steel structure connecting device, includes the main pipe body (1), its characterized in that: be provided with the fixed orifices on being responsible for body (1) pipe wall, be responsible for body (1) middle part and be provided with baffle (2), baffle (2) and being responsible for body (1) through bolt (5) fixed connection, baffle (2) top is equipped with first ejector pin (3), baffle (2) below is equipped with second ejector pin (4), spring (6), two have all been welded on the two sides about baffle (2) spring (6) top is fixed with buffer board (7), two the one side that spring (6) were kept away from in buffer board (7) respectively with first steel pipe (8) and second steel pipe (11) contact, first steel pipe (8) and second steel pipe (11) extend to being responsible for inside body (1), first steel pipe (8) and second steel pipe (11) all are fixed with staple bolt (10) with being responsible for body (1) linking department.
2. The connecting device for the construction steel structure according to claim 1, characterized in that the fixing holes on the pipe wall of the main pipe body (1) are uniformly distributed in an equal angle with respect to the center line.
3. The connecting device for the building steel structure according to claim 1, wherein the first steel pipe (8) and the second steel pipe (11) are provided with threaded holes which are uniformly distributed at equal angles with respect to a central line, and the threaded holes correspond to the threaded holes in the pipe wall of the main pipe body (1).
4. The connecting device for the building steel structure according to claim 2, characterized in that two groups of plum blossom-shaped handles (9) are arranged at the position of the main pipe body (1) close to the two ends, and the two groups of plum blossom-shaped handles (9) are uniformly distributed at equal angles with respect to the center line of the main pipe body (1).
5. The connecting device for the building steel structure according to claim 4, characterized in that the inner walls of the upper and lower ends of the main pipe body (1) are provided with chamfers.
6. The connecting device for the construction steel structure according to claim 1, characterized in that the second top rod (4) penetrates through the partition plate (2) and is in threaded connection with the first top rod (3).
7. A construction steel structure connecting device according to claim 6, characterized in that the outer diameter of the partition plate (2) is smaller than the inner diameter of the main pipe body (1).
8. A construction steel structure connection device according to claim 1, characterized in that the contraction range of the spring (6) is less than half the length of the main pipe body (1).
CN202122418349.5U 2021-10-08 2021-10-08 Building steel structure connecting device Active CN216075535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122418349.5U CN216075535U (en) 2021-10-08 2021-10-08 Building steel structure connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122418349.5U CN216075535U (en) 2021-10-08 2021-10-08 Building steel structure connecting device

Publications (1)

Publication Number Publication Date
CN216075535U true CN216075535U (en) 2022-03-18

Family

ID=80637714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122418349.5U Active CN216075535U (en) 2021-10-08 2021-10-08 Building steel structure connecting device

Country Status (1)

Country Link
CN (1) CN216075535U (en)

Similar Documents

Publication Publication Date Title
CN214034055U (en) Ready-package steel construction
CN206053324U (en) A kind of curved adjustable securing member of building template list
CN210598200U (en) Building engineering construction floor structure
CN209025297U (en) A kind of Thistle board ceiling suspended ceiling
CN204608980U (en) A kind of hinged four-bladed vane for steel pipe foot joint
CN216075535U (en) Building steel structure connecting device
CN207017623U (en) It is a kind of can be with the cross bar of adjustment length
CN210507796U (en) Convenient connecting piece of beam body
CN211058021U (en) Fast-assembling steel structure
CN206385794U (en) A kind of wall-connecting piece and its connection system
CN211973823U (en) Support for steel structure engineering
CN213927434U (en) Auxiliary attachment device for attached lifting scaffold of overhead structure of super high-rise building
CN209779868U (en) Steel pipe butt joint device in steel structure construction
CN113216596A (en) Flat iron wall connecting piece of building construction outer frame
CN211597055U (en) Steel structure crossbeam mounting structure
CN206091304U (en) Reinforcing apparatus of concrete structure expansion joint template
CN207228632U (en) A kind of building construction formwork clamp device
CN209837474U (en) Combined steel bar anti-seismic connecting piece
CN210659216U (en) Connecting structure between prefabricated steel pipes of external scaffold
CN212715345U (en) Waterproof profiled steel structure
CN212104579U (en) Steel structure connecting accessory
CN212019216U (en) Shock absorber for steel bar straightening cutting machine
CN220539028U (en) Reinforcing bar positioning mechanism for building
CN109915177B (en) Protection device for steel plate for connecting primary support with upper step arch frame of tunnel
CN217028081U (en) Frame post template reinforcing apparatus is built in room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant