CN216075238U - Assembled underground comprehensive pipe gallery - Google Patents

Assembled underground comprehensive pipe gallery Download PDF

Info

Publication number
CN216075238U
CN216075238U CN202122370356.2U CN202122370356U CN216075238U CN 216075238 U CN216075238 U CN 216075238U CN 202122370356 U CN202122370356 U CN 202122370356U CN 216075238 U CN216075238 U CN 216075238U
Authority
CN
China
Prior art keywords
rectangular
piping lane
pipe gallery
channel
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122370356.2U
Other languages
Chinese (zh)
Inventor
朱敬平
董方亮
刘鹏宇
赵首翔
翟振江
石彩芳
杨欣朴
张鑫越
贾东卫
许晓宁
何平
潘王杰
屈海岗
靳培彤
王丽莹
李瑞瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Linfen Municipal Engineering Group Co Ltd
Original Assignee
Shanxi Linfen Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Linfen Municipal Engineering Group Co Ltd filed Critical Shanxi Linfen Municipal Engineering Group Co Ltd
Priority to CN202122370356.2U priority Critical patent/CN216075238U/en
Application granted granted Critical
Publication of CN216075238U publication Critical patent/CN216075238U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model relates to the technical field of pipe galleries, and discloses an assembly type underground comprehensive pipe gallery which comprises a pipe gallery body, wherein a pair of square through holes are formed in two sides in the pipe gallery body, a pipe gallery channel is formed in each square through hole, a rectangular through hole is formed in the middle of the pipe gallery body between the pair of pipe gallery channels, and a wire arrangement channel steel is arranged in each rectangular through hole; the upper and lower position that is located the winding displacement channel-section steel is equipped with a pair of rectangular channel in the front of piping lane body, and the upper and lower position that is located the winding displacement channel-section steel is equipped with the rectangular plate at the back of piping lane body, and every rectangular plate all cooperates and inserts the rectangular channel of establishing at another piping lane. According to the utility model, through the matching use of the components, the problem of low splicing efficiency of the pipe gallery is solved, the overall structure design is compact, the quick splicing and mounting operation of the pipe galleries is facilitated, the splicing tightness between two adjacent pipe galleries is increased, and the phenomenon of generating a gap between the pipe galleries is avoided.

Description

Assembled underground comprehensive pipe gallery
Technical Field
The utility model relates to the technical field of pipe galleries, in particular to an assembly type underground comprehensive pipe gallery.
Background
At the present stage, with the continuous promotion of urban construction in China, the comprehensive utilization consciousness of municipal facilities is enhanced, and underground comprehensive pipe galleries are being vigorously developed in various places. The underground city pipeline comprehensive corridor is the core of city lifeline infrastructure. Because underground piping is complicated and complicated, the construction well is long and narrow and deep, and the construction of underground pipe gallery, trench faces a lot of problems all the time, and how to accelerate the construction progress and guarantee construction quality is the difficult problem of construction all the time.
At present, the process of splicing the pipe gallery has the following defects: 1. because the pipe galleries are formed by one-time pouring, the locking mechanisms are lacked among the pipe galleries in the splicing process of the pipe galleries, and the pipe galleries cannot be quickly and effectively installed and connected; 2. after the piping lane concatenation was accomplished, can produce certain concatenation gap, when meetting rainwater weather, can cause the phenomenon emergence that the gap leaked, can't accomplish effectual sealed encapsulation.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art and provides an assembled underground comprehensive pipe gallery.
In order to solve the problems in the prior art, the utility model adopts the following technical scheme:
the assembly type underground comprehensive pipe gallery comprises a pipe gallery body, wherein a pair of square through holes are formed in two sides in the pipe gallery body, a pipe gallery channel is formed in each square through hole, a rectangular through hole is formed in the middle of the pipe gallery body and located between the pair of pipe gallery channels, and a wire arrangement channel steel is arranged in each rectangular through hole;
the upper and lower position that is located the winding displacement channel-section steel is equipped with a pair of rectangular channel in the front of piping lane body, and the upper and lower position that is located the winding displacement channel-section steel is equipped with the rectangular plate, every at the back of piping lane body the rectangular plate all cooperates and inserts the rectangular channel of establishing at another piping lane.
Preferably, the outside corner of piping lane passageway all is equipped with the chamfer, and the position that is located the chamfer and corresponds all is equipped with a plurality of reinforcement down tube in square through hole's inside corner.
Preferably, a plurality of wire arranging holes are uniformly distributed on two sides of the wire arranging channel steel, and the outer end of each wire arranging hole extends into the corresponding pipe gallery channel on one side.
Preferably, circular grooves are formed in four corners of the front surface of the pipe gallery body, circular columns are arranged at four corners of the back surface of the pipe gallery body, and the outer end of each circular column is matched with and inserted into the circular groove of the other pipe gallery.
Preferably, the front outside edge of piping lane body has seted up the rectangular frame groove, a plurality of locating pin holes have been seted up to the inside equipartition in rectangular frame groove.
Preferably, the back outside border of piping lane body is equipped with the rectangle frame, the back equipartition of rectangle frame is equipped with a plurality of locating pins.
Preferably, the rectangular frame is clamped in a rectangular frame groove of another sleeve gallery in a matching manner, and the outer end part of each positioning pin is inserted into a positioning pin hole of another sleeve gallery in a matching manner.
Preferably, the position that the rectangular channel that is located the top corresponds is inserted at the top surface of piping lane body and is equipped with four first gravity round pins that slide and run through, and four first round pin grooves have been seted up to the top surface that is located the rectangular plate of top, every the bottom end portion of first gravity round pin all cooperates and inserts and establish in the first round pin groove of another set of piping lane.
Preferably, the position that the rectangular channel that is located the below corresponds is equipped with a pair of T shape through-hole on the piping lane body, every the inside of T shape through-hole is all inserted and is equipped with second gravity round pin, every the connecting pin is all inserted at the top of second gravity round pin, and a pair of second round pin groove has been seted up to the top surface of the rectangular plate that is located the below, every the bottom portion of second gravity round pin all cooperates and inserts the second round pin inslot of establishing another piping lane.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, when the two pipe galleries are spliced, the rectangular plates are matched with the rectangular grooves for clamping connection, and the splicing stability of the two pipe galleries is further increased through the splicing effect of the first gravity pin and the second gravity pin, so that the quick splicing and mounting operation of the pipe galleries is facilitated;
2. in the utility model, the rectangular frame is clamped in the rectangular frame groove of the other pipe gallery in a matching way, and the outer end part of the positioning pin is inserted in the positioning pin hole of the other pipe gallery in a matching way, so that the sealing performance of splicing between two adjacent pipe galleries is improved, and the phenomenon that a gap is generated between the adjacent pipe galleries due to the infirm splicing is avoided;
in conclusion, the pipe gallery splicing device has the advantages that the problem of low pipe gallery splicing efficiency is solved through the matching use of all the components, the overall structure design is compact, the pipe galleries can be conveniently and quickly spliced and installed, the splicing tightness between two adjacent pipe galleries is improved, and the phenomenon that gaps are generated between the pipe galleries is avoided.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the utility model and together with the description serve to explain the utility model without limiting the utility model. In the drawings:
FIG. 1 is a front view of the present invention;
FIG. 2 is a front sectional view of the present invention;
FIG. 3 is an enlarged view taken at A of FIG. 2 in accordance with the present invention;
FIG. 4 is a rear view of the present invention;
FIG. 5 is a top view of the present invention;
FIG. 6 is a left side view of the present invention;
number in the figure: the pipe gallery comprises a pipe gallery body 1, a reinforcing inclined rod 11, a pipe gallery channel 12, a wire arranging channel steel 13, a wire arranging hole 14, a circular groove 15, a circular column 16, a rectangular groove 2, a rectangular plate 21, a first gravity pin 22, a T-shaped through hole 23, a second gravity pin 24, a connecting pin 25, a rectangular frame groove 3, a positioning pin hole 31, a rectangular frame 32 and a positioning pin 33.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Example 1: the embodiment provides an assembly type underground comprehensive pipe gallery, which is shown in the figures 1-6 and specifically comprises a pipe gallery body 1, wherein the pipe gallery body 1 is a rectangular pouring plate which is transversely arranged, a pair of square through holes are formed in two sides in the pipe gallery body 1, a pipe gallery channel 12 is formed in each square through hole, a longitudinally-through rectangular through hole is formed in the middle of the pipe gallery body 1 and located between the pair of pipe gallery channels 12, and a flat cable channel steel 13 which is fixedly connected in a through mode is arranged in each rectangular through hole; the position of the upper and lower sides that is located winding displacement channel-section steel 13 is equipped with a pair of rectangular channel 2 in the front of piping lane body 1, and the position of the upper and lower sides that is located winding displacement channel-section steel 13 is equipped with rectangular plate 21 at the back of piping lane body 1, and every rectangular plate 21 all cooperates and inserts in rectangular channel 2 of establishing another set piping lane.
In the utility model, chamfers are arranged at the outer corners of the pipe gallery channel 12, a plurality of reinforcing inclined rods 11 which are obliquely arranged at forty-five degrees are arranged at the inner corners of the square through holes at the positions corresponding to the chamfers, and the stability of the four corners of the pipe gallery channel 12 is improved by the pre-embedding and reinforcing effects of the reinforcing rods 11.
In the utility model, a plurality of wire arranging holes 14 are uniformly distributed on two sides of the wire arranging channel steel 13, the outer end of each wire arranging hole 14 extends into the pipe gallery channel 12 on the corresponding side, and the wire arranging channel steel 13 is matched with the wire arranging holes 14, so that wire arranging operation can be conveniently carried out on a plurality of spliced and installed pipe galleries.
In the utility model, the four corners of the front surface of the pipe gallery body 1 are respectively provided with the circular grooves 15, the four corners of the back surface of the pipe gallery body 1 are respectively provided with the circular columns 16, and the outer end part of each circular column 16 is matched and inserted in the circular groove 15 of the other pipe gallery, so that the four corners of the pipe gallery can be conveniently spliced and installed.
In the utility model, four first gravity pins 22 which slidably penetrate through are inserted into the top surface of the pipe gallery body 1 at the positions corresponding to the upper rectangular grooves 2, four first pin grooves are formed in the top surface of the upper rectangular plate 21, the bottom end part of each first gravity pin 22 is inserted into the first pin groove of another pipe gallery in a matched manner, and the bottom half section of each first gravity pin 22 is inserted into the first pin groove, so that the splicing stability of the upper rectangular plate 21 is improved.
In the utility model, a pair of T-shaped through holes 23 is arranged on the pipe gallery body 1 at the position corresponding to the lower rectangular groove 2, a second gravity pin 24 is inserted into each T-shaped through hole 23, a connecting pin 25 which transversely slides and penetrates through the top of each second gravity pin 24 is inserted into the top of each second gravity pin 24, a pair of second pin grooves are formed in the top surface of the lower rectangular plate 21, the bottom end part of each second gravity pin 24 is inserted into the second pin groove of another pipe gallery in a matched manner, and after the lower rectangular plate 21 is inserted into the rectangular groove 2, the connecting pin 25 is transversely pulled out, so that the bottom half section of each second gravity pin 24 is inserted into the second pin groove, and the splicing stability of the lower rectangular plate 21 is improved.
Example 2: in embodiment 1, there is also a problem that the pipe gallery is not tightly sealed, and therefore, this embodiment further includes, on the basis of embodiment 1:
according to the utility model, the outer edge of the front side of the pipe gallery body 1 is provided with the rectangular frame groove 3, the rectangular frame grooves 3 are uniformly distributed and provided with the plurality of positioning pin holes 31, the outer edge of the back side of the pipe gallery body 1 is provided with the rectangular frame 32, the back side of the rectangular frame 32 is uniformly distributed and provided with the plurality of positioning pins 33, the rectangular frame 32 is matched and clamped in the rectangular frame groove 3 of another pipe gallery, the outer end part of each positioning pin 33 is matched and inserted in the positioning pin hole 31 of the other pipe gallery, and the splicing tightness between the two adjacent pipe galleries is increased.
According to the utility model, through the matching use of the components, the problem of low splicing efficiency of the pipe gallery is solved, the overall structure design is compact, the quick splicing and mounting operation of the pipe galleries is facilitated, the splicing tightness between two adjacent pipe galleries is increased, and the phenomenon of generating a gap between the pipe galleries is avoided.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (9)

1. Assembled utility tunnel, including piping lane body (1), its characterized in that: a pair of square through holes are formed in two sides in the pipe gallery body (1), a pipe gallery channel (12) is formed in each square through hole, a rectangular through hole is formed in the middle of the pipe gallery body (1) and located between the pair of pipe gallery channels (12), and a wire arrangement channel steel (13) is arranged in each rectangular through hole;
the upper and lower position that is located winding displacement channel-section steel (13) is equipped with a pair of rectangular channel (2) in the front of piping lane body (1), and the upper and lower position that is located winding displacement channel-section steel (13) is equipped with rectangular plate (21), every rectangular plate (21) all cooperate to insert and establish in rectangular channel (2) of another set piping lane.
2. The fabricated underground utility tunnel of claim 1, wherein: the outside corner of piping lane passageway (12) all is equipped with the chamfer, and the position that is located the chamfer and corresponds all is equipped with a plurality of reinforcement down tube (11) in square through hole's inside corner.
3. The fabricated underground utility tunnel of claim 1, wherein: a plurality of wire arranging holes (14) are uniformly formed in the two sides of the wire arranging channel steel (13), and each wire arranging hole (14) is formed in the outer end of each wire arranging hole (14) and extends into the corresponding pipe gallery channel (12) on one side.
4. The fabricated underground utility tunnel of claim 1, wherein: circular recess (15) have all been seted up to four corners in the front of piping lane body (1), four corners in the back of piping lane body (1) all are equipped with circular post (16), every the outer tip of circular post (16) all cooperates and inserts and establish in circular recess (15) of another set piping lane.
5. The fabricated underground utility tunnel of claim 1, wherein: rectangular frame groove (3) have been seted up to the positive outside border of piping lane body (1), a plurality of locating pin holes (31) have been seted up to the inside equipartition in rectangular frame groove (3).
6. The fabricated underground utility tunnel of claim 5, wherein: the back outside of piping lane body (1) is along being equipped with rectangle frame (32), the back equipartition of rectangle frame (32) is equipped with a plurality of locating pins (33).
7. The fabricated underground utility tunnel of claim 6, wherein: the rectangular frame (32) is clamped in a rectangular frame groove (3) of another sleeve gallery in a matching mode, and the outer end portion of each positioning pin (33) is inserted into a positioning pin hole (31) of the other sleeve gallery in a matching mode.
8. The fabricated underground utility tunnel of claim 1, wherein: the position that rectangular channel (2) that are located the top correspond is inserted at the top surface of piping lane body (1) and is equipped with four first gravity round pins (22) that slide and run through, and four first round pin grooves have been seted up, every to the top surface that is located rectangular plate (21) of top the bottom portion of first gravity round pin (22) all cooperates and inserts the first round pin inslot of establishing another piping lane.
9. The fabricated underground utility tunnel of claim 1, wherein: the position that rectangular channel (2) that is located the below correspond is equipped with a pair of T shape through-hole (23), every on piping lane body (1) the inside of T shape through-hole (23) is all inserted and is equipped with second gravity round pin (24), every connecting pin (25) are all inserted at the top of second gravity round pin (24), and a pair of second keyway has been seted up to the top surface of rectangular plate (21) that is located the below, every the bottom portion of second gravity round pin (24) all cooperates and inserts the second keyway of establishing at another piping lane.
CN202122370356.2U 2021-09-29 2021-09-29 Assembled underground comprehensive pipe gallery Active CN216075238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122370356.2U CN216075238U (en) 2021-09-29 2021-09-29 Assembled underground comprehensive pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122370356.2U CN216075238U (en) 2021-09-29 2021-09-29 Assembled underground comprehensive pipe gallery

Publications (1)

Publication Number Publication Date
CN216075238U true CN216075238U (en) 2022-03-18

Family

ID=80636626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122370356.2U Active CN216075238U (en) 2021-09-29 2021-09-29 Assembled underground comprehensive pipe gallery

Country Status (1)

Country Link
CN (1) CN216075238U (en)

Similar Documents

Publication Publication Date Title
CN111636906A (en) Connecting water-stopping structure between pipe joints of transverse bearing pipe curtain and construction method thereof
CN216075238U (en) Assembled underground comprehensive pipe gallery
CN214220351U (en) Energy-saving assembled building wall
CN218061487U (en) Prefabricated column root grout shutoff piece, plugging device
CN214329856U (en) Fixed effectual concrete placement template
CN215055316U (en) Primary and secondary beam node post-cast section template device
CN215211002U (en) Foundation composite pile
CN114060042A (en) Binding structure of concrete pipe joint and construction method thereof
CN217353516U (en) Frame structure capable of improving large-section concrete forming quality
CN217741276U (en) Electric power calandria fixing device
CN113136989A (en) Assembled shear force wall tooth's socket type connection structure
CN213233318U (en) Waterproof construction is used in water conservancy construction convenient to maintain
CN215210980U (en) Prefabricated pile wall and underground assembly type wall body
CN214993643U (en) Assembled irrigation and water conservancy culvert gate structure
CN215165481U (en) Underground continuous wall grooving structure
CN218862629U (en) Filling curtain for mine roadway safety
CN215009420U (en) Fixing device of electric power communication calandria
CN216041811U (en) Assembly type floor connection structure for assembly type building
CN209837471U (en) Special-shaped steel pipe concrete combined column
CN218712876U (en) Prefabricated pile wall and assembled wall body
CN218814316U (en) Quick concatenation node suitable for various types of shaped steel post
CN219973671U (en) Low-carbon concrete prefabricated part
CN213477093U (en) Novel assembled escape canal
CN210947139U (en) Horizontal and vertical connecting joint of underground space structure
CN215630623U (en) Prefabricated beam column connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant