CN216042616U - Beam column pours with solid type device of multi-functional location of construction templates - Google Patents

Beam column pours with solid type device of multi-functional location of construction templates Download PDF

Info

Publication number
CN216042616U
CN216042616U CN202121570379.1U CN202121570379U CN216042616U CN 216042616 U CN216042616 U CN 216042616U CN 202121570379 U CN202121570379 U CN 202121570379U CN 216042616 U CN216042616 U CN 216042616U
Authority
CN
China
Prior art keywords
hole
bolt
positioning
matched
quick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121570379.1U
Other languages
Chinese (zh)
Inventor
李世海
董佶罡
陈玉刚
郑云刚
简祖成
熊伟
石昆
黄富强
徐若之
周建桦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianfeng Construction Technology Co ltd
Original Assignee
Jianfeng Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianfeng Construction Technology Co ltd filed Critical Jianfeng Construction Technology Co ltd
Priority to CN202121570379.1U priority Critical patent/CN216042616U/en
Application granted granted Critical
Publication of CN216042616U publication Critical patent/CN216042616U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a multifunctional positioning and fixing device for a construction template for beam column pouring, which comprises a group of positioning structure components, and a connecting component and a fastening component which are matched with the positioning structure components, wherein the positioning structure components are L-shaped, and a pair of positioning structure components which are oppositely arranged are crossed and matched to form a door-shaped structure; the positioning structure component comprises cross beams and vertical beams, and the cross beams are provided with connecting structures so as to be connected with each other; the vertical beam is provided with a fastening device for pressing the inner side of the door. According to the utility model, an adjustable pre-structure mode is adopted according to the fixing requirement of the formed beam column pouring template, a pair of positioning structure components form a positioning and fixing device with cohesive force of a door-shaped structure, vertical acting force can be respectively applied to the construction template in the door from a cross beam and a vertical beam, and the template is ensured to be positioned and reliably fixed according to the design requirement. The disassembly, assembly and combination are convenient and fast, and the device can be repeatedly recycled; the multifunctional mobile phone has the advantages of being multifunctional, simple in structure, high in practicability and adaptable to various application scenes.

Description

Beam column pours with solid type device of multi-functional location of construction templates
Technical Field
The utility model belongs to the technical field of building equipment, and particularly relates to a multifunctional positioning and fixing device for a construction template for beam column pouring, which has a simple structure and is simple and convenient to operate, and is particularly suitable for fixing a concrete flanging construction template and concrete column pouring occasions needing three-side template fixing.
Background
In the concrete flanging node of the building structure system poured by the construction template, particularly in the group residential engineering, the construction template system is adopted, the installation and reinforcement engineering quantity for processing the concrete flanging construction template is very large, and a plurality of water rooms in a single living room generally need to be poured with concrete flanging. The installation and reinforcement of the concrete flanging construction formwork are generally not reinforced or reinforced by adopting a hanging rod. The hanger rod is not easy to be attached to the template, the stability is poor, the appearance quality of the concrete flanging is influenced, the hanger rod can only be used for turnover of the concrete flanging with partial size, the use process is not flexible, and the turnover utilization rate is low; the manufacturing and dismantling process is complicated, and the efficiency of on-site construction is low. There are also situations where the pouring of auxiliary columns with three-sided formwork fixed is required. The construction template positioning and fixing device has the advantages of simple structure, standardization, convenience in assembly, accurate positioning, firmness in fixation, convenience in disassembly, turnover and use, and is particularly suitable for concrete flanging or side column pouring.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a multifunctional positioning and fixing device for a construction template for beam column pouring, which has a simple structure and is simple and convenient to operate, and is particularly suitable for fixing a concrete flanging construction template and pouring occasions of concrete side stand column bodies needing three-side template fixing.
The utility model aims to realize that the multifunctional positioning and fixing device for the construction template for pouring the beam column comprises a group of positioning structure components, and a connecting component and a fastening component which are matched with the positioning structure components, and is characterized in that the positioning structure components are L-shaped, and a pair of oppositely arranged positioning structure components are crossed and matched to form a door-shaped structure; the positioning structure component comprises cross beams and vertical beams, and the cross beams are provided with connecting structures so as to be connected with each other; and the vertical beam is provided with a fastening device for applying pressure to the inner side of the door. The connecting structure arranged on the cross beam comprises a group of transversely arranged positioning through holes and a positioning pin shaft matched with the positioning through holes. The fastening device arranged on the vertical beam comprises a bolt hole which is vertical to the vertical beam and penetrates through the vertical beam body, and a fastening bolt matched with the bolt hole.
The utility model adopts a door-shaped structure, forms a symmetrical clamping fixed connection structure for concrete flanging, and is fixedly connected with a cross beam by using a vertical beam as a force application structure supporting point through a connecting assembly, so that the reinforcing effect of a first clamping piece and a second clamping piece on the concrete flanging is realized; the reinforcing strength is easy to adjust; the installation and the disassembly are convenient and quick, and the operation is simple and convenient. The T-shaped screw rod can be used for randomly adjusting and reinforcing the concrete flanging according to the designed size. The utility model has strong universality and can be repeatedly recycled.
According to the utility model, an adjustable pre-structure mode is adopted according to the fixing requirement of the formed beam column pouring template, a pair of positioning structure components form a positioning and fixing device with cohesive force of a door-shaped structure, vertical acting force can be respectively applied to the construction template in the door from a cross beam and a vertical beam, and the template is ensured to be positioned and reliably fixed according to the design requirement. The accuracy of the positioning size is guaranteed, and the template displacement caused by the gravity action of the template frame shading concrete in the process of concreting is further guaranteed. The method is not only suitable for pouring the concrete flanging of the wading room in the house building, but also suitable for the occasion that only two pairs of side templates need to apply force for fixing; the method is also suitable for the situation that three sides need to apply force for reinforcement when the side upright posts are poured; the adjustable 'door-shaped' structure is suitable for pouring of the beam column with the rectangular cross section and is also suitable for construction of the beam column with the trapezoidal cross section. The disassembly, assembly and combination are convenient and fast, and the device can be repeatedly recycled; the method has more versatility and is suitable for more application scenes. The multifunctional template fixing device is simple in structure and high in practicability.
Drawings
FIG. 1 is a schematic front view of a single structure of a positioning structure component according to the present invention;
FIG. 2 is a schematic front view of the overall structure of the present invention;
FIG. 3 is a top view of FIG. 2;
FIG. 4 is a schematic overall structure diagram of another embodiment of the present invention;
FIG. 5 is a view showing an operation state of the first embodiment of the present invention;
fig. 6 is a view showing an operation state of another embodiment of the present invention.
In the drawing, 1~ location structure part, 101~ crossbeam, 102~ standing beam, 2~ fastening bolt, 3~ bolt holes, 4~ joint hasp, 5~ flange, 6~ top push plate, 7~ blotter, 8~ abduction stabilizer blades, 9~ staple holes, 10~ positioning hole, 11~ perforating hole, 12~ link up the round pin, 13~ angle indicator, 14~ positioning pin axle, 15~ application of force handle.
Detailed Description
The technical solution of the present invention will be further described with reference to the accompanying drawings, which are not intended to limit the present invention in any way, and any changes or modifications based on the present invention are within the protection scope of the present invention. Technical terms or scientific terms used herein should be given their ordinary meanings as understood by those skilled in the art to which the present invention belongs.
The utility model relates to a multifunctional positioning and fixing device of a construction template for beam column pouring, which comprises a group of positioning structure components 1, and a connecting component and a fastening component which are matched with the positioning structure components 1, and is characterized in that the positioning structure components 1 are L-shaped, and a pair of oppositely arranged positioning structure components 1 are crossed and matched to form a door-shaped structure; the positioning structure component 1 comprises a cross beam 101 and a vertical beam 102, wherein a connecting structure is arranged on the cross beam 101 so as to facilitate the mutual connection of the cross beams; the vertical beam 102 is provided with a fastening device for pressing the inner side of the door. The connecting structure arranged on the cross beam 101 comprises a group of transversely arranged positioning through holes 10 and a positioning pin shaft 14 matched with the positioning through holes. The fastening device arranged on the vertical beam 102 comprises a bolt hole 3 which is perpendicular to the vertical beam 102 and penetrates through the vertical beam body, and a fastening bolt 2 matched with the bolt hole 3.
The joint of the cross beam 101 and the vertical beam 102 of the positioning structure part 1 is an angle-adjustable instant locking structure, the variable angle is 90 +/-45 degrees, and the side surface is provided with an angle indicating mark 13; the instant locking structure is a toothed pin structure, namely a through hole 11 is arranged at a connecting joint between a cross beam 101 and a vertical beam 102, tooth sockets of the through hole parallel to the axis of the through hole are uniformly distributed on the inner circumferential edge of the through hole 11, the through hole 11 is matched with a through pin 12, and the through pin 12 is provided with a tooth socket matched with the tooth socket of the through hole; the tooth space interval is 5-25 degrees in terms of angle.
Still set up on the crossbeam 101 and change pinhole 5, be provided with joint hasp 4 in changeing pinhole 5, joint hasp 4 is pendulum ear joint structure, and the crossbeam 101 with two mutual abutments is in the same place the crossbeam zip through joint hasp 4, sets up joint hasp 4 in the 1/3 section outside the crossbeam 101 promptly, matches the crossbeam 101 joint cooperation that leans on mutually in 1/3 section within the crossbeam 101 of another location structural component 1 who uses with the combination.
At least one through type fixing bolt hole 3 perpendicular to the cross beam 101 is longitudinally arranged on the cross beam 101 and matched with the fastening bolt 2; and the front end of the fastening bolt 2 is provided with a jacking plate 6.
The bolt holes 3 on the vertical beam 102 comprise an upper hole or a middle hole and a lower hole, and the fastening bolts 2 which are matched with the upper hole or the middle hole and apply force inwards are correspondingly arranged; the lower end of the vertical beam 102 is provided with an extending support leg 8, and a fixing nail hole 9 is arranged on the extending support leg. In the use occasion, the vertical beam is fixedly connected and matched with the foundation through the fixing screw holes by the fixing screws.
The front end of a fastening bolt 2 arranged on the vertical beam 102 is provided with a top push plate 6, and the working surface of the top push plate 6 is provided with a cushion pad 7; the buffer pad 7 is made of a wear-resistant weak elastic material.
The fastening bolt 2 is a quick-locking structure bolt, and the corresponding bolt hole on the cross beam 101 is a quick-locking structure threaded hole matched with the bolt hole; the quick-locking structure threaded hole is internally provided with a multi-head female thread, and the corresponding quick-locking structure bolt is provided with a multi-head male thread matched with the quick-locking structure bolt.
The fastening bolt 2 is a quick-locking structure bolt, and the corresponding bolt hole on the beam upright beam 102 is a quick-locking structure threaded hole matched with the bolt hole; the quick-locking structure threaded hole is internally provided with a multi-head female thread, and the corresponding quick-locking structure bolt is provided with a multi-head male thread matched with the quick-locking structure bolt.
The rear end of the fastening bolt 2 is provided with a force application handle 15.
The working principle and the working process of the utility model are as follows:
according to the utility model, an adjustable pre-structure mode is adopted according to the fixing requirement of the formed beam column pouring template, a pair of positioning structure components form a positioning and fixing device with cohesive force of a door-shaped structure, vertical acting force can be respectively applied to the construction template in the door from a cross beam and a vertical beam, and the template is ensured to be positioned and reliably fixed according to the design requirement.
The working process is a using method and is briefly described in two cases:
firstly, the concrete flanging is poured, and according to the design of the flanging, a construction template with a proper specification is selected and basically positioned. Taking a pair of positioning structure parts, wherein a fixing bolt on a cross beam can be omitted; the fixing bolts on the vertical beams are retracted in place, and a door inner space is reserved; the pair of positioning structure components are oppositely crossed and abutted, a proper connecting hole is selected for alignment according to the specification of a flanging, at least one positioning pin shaft is inserted, meanwhile, clamping lock catches on the two cross beams respectively press down through flanges on the cross beams, and the two cross beams are clamped and fixedly combined into a door-shaped structural member (the flanging is of a rectangular cross section, and the cross beams and the vertical beams are arranged and locked at 90 degrees). The door-shaped structural member is clamped and covered on a pre-positioned flanging formwork structure, the lower end of the vertical beam is supported on the foundation, and the vertical beam can be fixed (or not fixed) on the foundation through the abduction support leg and the fixing nail hole on the abduction support leg. And then fastening bolts on the two vertical beams, so that the pushing plate at the front end of the two vertical beams uniformly applies force to push and support the back plate of the construction template, and the flanging pouring size is ensured to meet the design requirement. At least two groups of devices are arranged according to the length of the flanging and the actual requirement. After pouring is completed and maintenance is carried out according to construction specifications, the device is dismantled according to opposite procedures, and the device is orderly and stored for subsequent use.
And secondly, pouring the side upright column, selecting a construction template with a proper specification according to the design of the upright column, and basically positioning. Taking a pair of positioning structure components, installing the fixing bolts on the cross beam and the vertical beam, and retreating the fixing bolts to the right position to reserve a space in a 'door'; the pair of positioning structure parts are oppositely crossed and abutted, proper connecting holes are selected for alignment according to the specification of turned edges, at least one positioning pin shaft is inserted, meanwhile, clamping lock catches on the two cross beams respectively press down through flanges on the cross beams, the two cross beams are clamped and fixedly combined into a door-shaped structural part, and if the upright post is in an inner trapezoid shape or an outer trapezoid shape, the angle between the cross beam and the upright beam is set to be smaller than or larger than 90 degrees and is locked. The door-shaped structural member is clamped and covered on a pre-positioned upright post template structure, and the lower end of the upright beam is supported on the foundation and can be fixed on the foundation through the abduction supporting leg and the fixing nail hole on the abduction supporting leg. And then fastening bolts on the cross beam and the two vertical beams, so that the pushing plate at the front end of the foot bone bolt uniformly applies force to push and support the back plate of the construction template, and the pouring size of the upright post is ensured to meet the design requirement. At least two groups of devices are arranged according to the length and the actual requirement of the pouring template. After pouring is completed and maintenance is carried out according to construction specifications, the device is dismantled according to opposite procedures, and the device is orderly and stored for subsequent use.

Claims (8)

1. A beam column pours and fixes the shape device with the multi-functional location of the construction template, including a pack of location structural component (1) and adapting unit, fastening element cooperating with it, characterized by that the said location structural component (1) is "L" shape, the location structural component (1) of a pair of opposite arrangement intersects and cooperates into the "door type" structure; the positioning structure component (1) comprises a cross beam (101) and a vertical beam (102), wherein a connecting structure is arranged on the cross beam (101) so as to be connected with each other; the vertical beam (102) is provided with a fastening device for pressing the inner side of the door; the connecting structure arranged on the cross beam (101) comprises a group of positioning through holes (10) arranged transversely and a positioning pin shaft (14) matched with the positioning through holes; the fastening device arranged on the vertical beam (102) comprises a bolt hole (3) which is vertical to the vertical beam (102) and penetrates through the vertical beam body, and a fastening bolt (2) matched with the bolt hole (3).
2. The multifunctional positioning and fixing device for the construction template for beam column pouring according to claim 1 is characterized in that a joint connected between a cross beam (101) and a vertical beam (102) of the positioning structure component (1) is an angle-adjustable instant locking structure, the variable angle is 90 +/-45 degrees, and an angle indicating mark (13) is arranged on the side surface; the instant locking structure is a toothed pin structure, namely a through hole (11) is formed in a connecting joint between a cross beam (101) and a vertical beam (102), tooth sockets of the through hole parallel to the axis of the through hole are uniformly distributed on the inner circumferential edge of the through hole (11), the through hole (11) is matched with a through pin (12), and the through pin (12) is provided with tooth sockets matched with the tooth sockets of the through hole.
3. The multifunctional positioning and fixing device for the construction template for beam column pouring according to claim 1 or 2 is characterized in that a rotating pin hole (5) is further formed in the cross beam (101), a clamping lock catch (4) is arranged in the rotating pin hole (5), the clamping lock catch (4) is of a swing lug clamping structure, and the cross beams are locked together by the two cross beams (101) which are mutually abutted through the clamping lock catch (4).
4. The multifunctional positioning and fixing device for the construction template for pouring the beam column as claimed in claim 1 or 2, wherein the cross beam (101) is longitudinally provided with at least one through type fixing bolt hole (3) perpendicular to the cross beam (101) and matched with the fastening bolt (2); and a jacking plate (6) is arranged at the front end of the fastening bolt (2).
5. The multifunctional positioning and fixing device for the construction template for pouring the beam column as claimed in claim 1 or 2, wherein the bolt holes (3) on the vertical beam (102) comprise an upper hole and a lower hole, and fastening bolts (2) which are matched with the upper hole and apply force inwards are correspondingly arranged; the lower end of the vertical beam (102) is provided with an extending support leg (8), and a fixing nail hole (9) is arranged on the extending support leg.
6. The multifunctional positioning and fixing device for the construction template for beam column pouring according to claim 1 or 2 is characterized in that a top push plate (6) is arranged at the front end of a fastening bolt (2) arranged on the vertical beam (102), and a cushion pad (7) is arranged on the working surface of the top push plate (6); the buffer pad (7) is made of wear-resistant weak elastic material.
7. The multifunctional positioning and fixing device for the construction template for beam column pouring according to claim 1, wherein the fastening bolt (2) is a quick-locking structure bolt, and a bolt hole on the corresponding cross beam (101) is a quick-locking structure threaded hole matched with the bolt hole; the quick-locking structure threaded hole is internally provided with a multi-head female thread, and the corresponding quick-locking structure bolt is provided with a multi-head male thread matched with the quick-locking structure bolt.
8. The multifunctional positioning and fixing device for the construction template for beam column pouring according to claim 1 is characterized in that the fastening bolt (2) is a quick-locking structure bolt, and a bolt hole on the corresponding vertical beam (102) is a quick-locking structure threaded hole matched with the bolt hole; the quick-locking structure threaded hole is internally provided with a multi-head female thread, and the corresponding quick-locking structure bolt is provided with a multi-head male thread matched with the quick-locking structure bolt.
CN202121570379.1U 2021-07-12 2021-07-12 Beam column pours with solid type device of multi-functional location of construction templates Active CN216042616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121570379.1U CN216042616U (en) 2021-07-12 2021-07-12 Beam column pours with solid type device of multi-functional location of construction templates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121570379.1U CN216042616U (en) 2021-07-12 2021-07-12 Beam column pours with solid type device of multi-functional location of construction templates

Publications (1)

Publication Number Publication Date
CN216042616U true CN216042616U (en) 2022-03-15

Family

ID=80617010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121570379.1U Active CN216042616U (en) 2021-07-12 2021-07-12 Beam column pours with solid type device of multi-functional location of construction templates

Country Status (1)

Country Link
CN (1) CN216042616U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463912A (en) * 2021-07-12 2021-10-01 建丰建筑科技有限公司 Beam column pours with solid type device of multi-functional location of construction templates

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463912A (en) * 2021-07-12 2021-10-01 建丰建筑科技有限公司 Beam column pours with solid type device of multi-functional location of construction templates

Similar Documents

Publication Publication Date Title
CN216042616U (en) Beam column pours with solid type device of multi-functional location of construction templates
CN205036064U (en) Profile steel cantilever scaffold structure
CN211286667U (en) Universal fixing support for inclined strut of bowl buckle type formwork support frame
CN113463912A (en) Beam column pours with solid type device of multi-functional location of construction templates
CN103758342A (en) Tool-type top form for buildings
CN213573018U (en) Template clamp for building
CN203603450U (en) Clamping slot type steel pipe scaffold
CN213449446U (en) Assembled multi-functional type outrigger combination basis
CN210482949U (en) Novel plug-in type scaffold
CN110725543B (en) Quick fixing support for diagonal bracing of bowl-buckle type template support frame and manufacturing method thereof
CN110212843B (en) Reinforcing device of photovoltaic support template and positioning method thereof
CN209799003U (en) house steel structure supporting structure
CN209837658U (en) Special fastener for outer rod of cross brace of fastener type steel pipe scaffold
CN203640271U (en) Tool-type top die for buildings
CN209129226U (en) A kind of novel corner fastener structure
CN112127515A (en) Connecting device for precast concrete external wall panels
CN216406151U (en) Prevention of seepage water wall form structure is under construction to building engineering
CN219840204U (en) Steel connection structure
CN210976582U (en) Aluminum alloy template for building construction
CN221256226U (en) Building engineering construction is with facing limit protection strutting arrangement
CN215859016U (en) Rotary connection fastener device
CN214833533U (en) Limiting device of steel structure truss
CN212956660U (en) Steel pipe micro pile underpins and consolidates deviation correcting device with basis
CN211473350U (en) Safe connecting device of frame shear structure outer scaffold and shear wall
CN221053112U (en) Adjustable wheel-buckling scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant