CN216042583U - A building templates for building engineering's composite erection of being convenient for - Google Patents

A building templates for building engineering's composite erection of being convenient for Download PDF

Info

Publication number
CN216042583U
CN216042583U CN202122065697.9U CN202122065697U CN216042583U CN 216042583 U CN216042583 U CN 216042583U CN 202122065697 U CN202122065697 U CN 202122065697U CN 216042583 U CN216042583 U CN 216042583U
Authority
CN
China
Prior art keywords
template
building
templates
groove
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122065697.9U
Other languages
Chinese (zh)
Inventor
贾森
王申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Longhui Construction Group Co ltd
Original Assignee
Huainan Longhui Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Longhui Construction Group Co ltd filed Critical Huainan Longhui Construction Group Co ltd
Priority to CN202122065697.9U priority Critical patent/CN216042583U/en
Application granted granted Critical
Publication of CN216042583U publication Critical patent/CN216042583U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building template convenient to assemble and install for building engineering, which comprises four first templates and four second connecting structures, wherein the second templates are arranged between the adjacent first templates, the first connecting structures are arranged between the first templates and the second templates, the two linkage structures are arranged in the first templates, the first templates are L-shaped, and the two ends of each first template are provided with sealing structures. The utility model discloses a under first connection structure and second connection structure's effect, can realize the quick installation of first template and second template, reduce the degree of difficulty of connecting, the in-process of first connection structure connection can utilize linkage structure to drive seal structure operation simultaneously, realizes the sealed operation between first template and the second template, improves concrete placement's quality.

Description

A building templates for building engineering's composite erection of being convenient for
Technical Field
The utility model belongs to the technical field of building templates, and particularly relates to a building template which is used for building engineering and convenient to assemble and install.
Background
The building template is a tool commonly used in the building industry, is a template used for pouring reinforced concrete on site and building construction, and the combined template used in the existing building market comprises a combined steel mould, a plastic combined template, a steel-wood combined template and the like.
At present, the traditional building template is inconvenient to use when the templates are connected, the required time is long, gaps are easy to appear in the combined templates, and the quality of poured concrete is influenced, so that technical personnel in the field provide the building template which is used for building engineering and convenient to assemble and install, and the problems in the background art are solved.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model aims to provide a building template which is used for building engineering and is convenient to assemble and install, under the action of a first connecting structure and a second connecting structure, the first template and the second template can be quickly installed, the connecting difficulty is reduced, meanwhile, a linkage structure can be utilized to drive a sealing structure to operate in the connecting process of the first connecting structure, the sealing operation between the first template and the second template is realized, and the concrete pouring quality is improved.
In order to achieve the purpose, the utility model provides the following technical scheme:
a building template convenient to assemble and install for building engineering comprises four first templates and four second connecting structures, wherein the second templates are arranged between every two adjacent first templates, the first connecting structures are arranged between the first templates and the second templates, two linkage structures are arranged inside the first templates, the first templates are L-shaped, and sealing structures are arranged at two ends of each first template;
through above-mentioned technical scheme, utilize first connection structure, can realize the quick installation of first template and second template, the in-process that first connection structure connects simultaneously can utilize linkage structure to drive seal structure operation, realizes the sealed operation between first template and the second template, improves concrete placement's quality, and after accomplishing a set of template installation, quick installation between two sets of templates is accomplished to usable second connection structure.
Furthermore, the first connecting structure comprises a clamping plate which is T-shaped, and clamping grooves matched with the clamping plate are formed in two ends of the first template;
through above-mentioned technical scheme, with the second template from last to moving down, the joint board goes into to the joint inslot, and the effect of the mutual joint in T shape joint board and joint groove is good, can accomplish first template and the quick installation of second template, reduces the degree of difficulty of installation template.
Further, the linkage structure comprises a spring, an air storage groove communicated with the clamping groove is formed in the first template, the bottom end of the spring is fixedly connected to the inner bottom wall of the air storage groove, the top end of the spring is fixedly connected with a piston plate in close contact with the inner wall of the air storage groove, and the bottom end of the clamping plate is fixedly connected with a vertical rod;
through above-mentioned technical scheme, the joint board is when the lapse, and the montant can synchronous lapse, and the montant can drive piston plate lapse, and the spring atress is crooked, and the piston plate extrudees the gas in the gas storage tank, for seal structure's operation provides power, accomplishes sealed operation when can realizing carrying out the installation operation.
Further, the sealing structure comprises a corrosion-resistant rubber air bag, mounting grooves are formed in two ends of the first template, the corrosion-resistant rubber air bag is arranged on the inner wall of the mounting groove, and a gas conveying pipe is arranged between the corrosion-resistant rubber air bag and the gas storage groove;
through above-mentioned technical scheme, gas in the gas storage tank utilizes the gas-supply pipe to carry to corrosion-resistant rubber gasbag in, and corrosion-resistant rubber gasbag receives the atmospheric pressure to influence and takes place the inflation, runs through out the mounting groove, carries out sealing operation to the joint line of first template and second template, improves later stage concrete placement's quality.
Further, the second connecting structure comprises a bar-shaped rod, the bottom end of the bar-shaped rod is fixedly connected to the top end of the first template, and a bar-shaped groove matched with the bar-shaped rod is formed in the bottom end of the first template;
through above-mentioned technical scheme, when two sets of templates need install each other, carry the bar pole to the bar inslot, can accomplish the group relatively fast and organize the installation between the group.
Further, a first fixing bolt is arranged at the lower end of the surface of the first template, and the end part of the first fixing bolt penetrates through the strip-shaped groove and extends into the strip-shaped rod;
through above-mentioned technical scheme, fixed mounting between first template and the bar pole can be accomplished to first fixing bolt, avoids the template to produce the clearance in the in-process of production.
Furthermore, a second fixing bolt is arranged at the upper end of the surface of the first template, and the end part of the second fixing bolt penetrates through the clamping groove and extends into the clamping plate;
through above-mentioned technical scheme, second fixing bolt can strengthen the joint board and the joint between the groove to play the effect of fastening first template and second template.
In conclusion, the utility model has the following beneficial effects:
1. by arranging the first connecting structure, the second template is moved downwards from top to bottom, the clamping plate enters the clamping groove, the T-shaped clamping plate and the clamping groove are clamped with each other effectively, the first template and the second template can be quickly installed, and the difficulty in installing the templates is reduced; through setting up second connection structure, when two sets of templates need install each other, carry the bar pole to the bar inslot, can accomplish the group relatively fast and organize the installation between.
2. Through setting up linkage structure and seal structure, the joint board is when the downstream, the montant can be synchronous downstream, the montant can drive piston plate downstream, the spring atress is crooked, the piston plate extrudees the gas in the gas storage tank, gas in the gas storage tank utilizes the gas-supply pipe to carry to corrosion-resistant rubber air bag in, corrosion-resistant rubber air bag receives the atmospheric pressure to influence and takes place the inflation, run through out the mounting groove, the operation of sealing up is carried out to the joint seam of first template and second template, can realize accomplishing sealed operation when installing the operation.
Drawings
FIG. 1 is a perspective view of the present embodiment;
FIG. 2 is a bottom perspective view of the present embodiment;
FIG. 3 is an exploded view of the present embodiment;
FIG. 4 is a cross-sectional view of a first template of the present embodiment;
fig. 5 is an enlarged view of a portion a in fig. 3.
Description of reference numerals: 1. a first template; 101. an air storage tank; 102. mounting grooves; 2. a second template; 3. a first connecting structure; 301. a clamping and connecting plate; 302. a clamping groove; 4. a linkage structure; 401. a spring; 402. a piston plate; 403. a vertical rod; 5. a sealing structure; 501. a corrosion-resistant rubber airbag; 502. a gas delivery pipe; 6. a second connecting structure; 601. a bar-shaped rod; 602. a strip-shaped groove; 7. a first fixing bolt; 8. and a second fixing bolt.
Detailed Description
Example (b):
the present invention is described in further detail below with reference to figures 1-5.
A building template convenient for combination and installation for building engineering comprises four first templates 1 and four second connecting structures 6, wherein a second template 2 is arranged between the adjacent first templates 1, a first connecting structure 3 is arranged between the first templates 1 and the second templates 2, two linkage structures 4 are arranged inside the first templates 1, the first templates 1 are L-shaped, two ends of each first template 1 are respectively provided with a sealing structure 5, the first connecting structures 3 can realize the quick installation of the first templates 1 and the second templates 2, simultaneously, the process that the first connecting structures 3 are connected can utilize the linkage structures 4 to drive the sealing structures 5 to operate, so that the sealing operation between the first template 1 and the second template 2 is realized, the concrete pouring quality is improved, and after a group of templates are installed, the quick installation between two groups of templates can be completed by utilizing the second connecting structures 6.
First connecting structure 3 includes joint plate 301, and joint plate 301 is the T font, and first template 1's both ends all seted up with joint plate 301 assorted joint groove 302, with second template 2 from last to moving down, joint plate 301 goes into to joint groove 302 in, and the effect of the mutual joint in T shape joint plate 301 and joint groove 302 is good, can accomplish first template 1 and the quick installation of second template 2, reduces the degree of difficulty of installation template. Linkage structure 4 includes spring 401, the gas storage tank 101 that is linked together with joint groove 302 is seted up to the inside of first template 1, spring 401's bottom fixed connection is in the interior diapire of gas storage tank 101, spring 401's top fixedly connected with and gas storage tank 101 inner wall in close contact with's piston board 402, joint board 301's bottom fixedly connected with montant 403, joint board 301 is when the downstream, montant 403 can synchronous downstream, montant 403 can drive piston board 402 downstream, spring 401 atress is crooked, piston board 402 extrudees the gas in the gas storage tank 101, provide power for seal structure 5's operation, can realize accomplishing sealed operation when carrying out the installation operation. Seal structure 5 includes corrosion-resistant rubber gasbag 501, mounting groove 102 has all been seted up at first template 1's both ends, corrosion-resistant rubber gasbag 501 sets up and establishes in the inner wall of mounting groove 102, be provided with gas-supply pipe 502 between corrosion-resistant rubber gasbag 501 and the gas storage tank 101, gas in the gas storage tank 101 utilizes gas-supply pipe 502 to carry to corrosion-resistant rubber gasbag 501, corrosion-resistant rubber gasbag 501 receives the atmospheric pressure to influence and takes place the inflation, run through out mounting groove 102, the operation of sealing up is carried out to the joint seam of first template 1 and second template 2, the quality of later stage concrete placement is improved.
Second connection structure 6 includes bar 601, bar 601's bottom fixed connection in first template 1's top, first template 1's bottom seted up with bar 601 assorted bar groove 602, when two sets of templates need the mutual installation, carry bar 601 to bar groove 602 in, can accomplish the installation between group and the group relatively fast. The surperficial lower extreme of first template 1 is provided with first fixing bolt 7, and in the tip of first fixing bolt 7 run through bar groove 602 and extend to bar 601, fixed mounting between first template 1 and the bar 601 can be accomplished to first fixing bolt 7, avoids the template to produce the clearance in the in-process of production. First template 1's surperficial upper end is provided with second fixing bolt 8, and in joint groove 302 and the extension to joint board 301 were run through to the tip of second fixing bolt 8, joint board 301 and the connection between the joint groove 302 can be strengthened to second fixing bolt 8 to play the effect of fastening first template 1 and second template 2.
The working principle is as follows: the second template 2 is moved downwards from top to bottom by utilizing the first connecting structure 3, the clamping plate 301 is inserted into the clamping groove 302, so that the first template 1 and the second template 2 are quickly installed, meanwhile, when the clamping plate 301 moves downwards, the vertical rod 403 can synchronously move downwards, the vertical rod 403 can drive the piston plate 402 to move downwards, the spring 401 is stressed and bent, the piston plate 402 extrudes the gas in the gas storage groove 101, the gas in the gas storage groove 101 is conveyed into the corrosion-resistant rubber airbag 501 by utilizing the gas conveying pipe 502, the corrosion-resistant rubber airbag 501 expands under the influence of the gas pressure and penetrates out of the installation groove 102, the connection joint of the first template 1 and the second template 2 is sealed, the quality of concrete pouring is improved, and the whole set of templates are sequentially installed according to the sequence; when two sets of templates need to be installed each other, carry bar-shaped rod 601 to bar groove 602 in, can accomplish the installation between the group relatively fast.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.

Claims (7)

1. The utility model provides a building templates for building engineering's composite set of being convenient for, includes that quantity is first template (1) and second connection structure (6) of four, its characterized in that: it is adjacent be provided with second template (2) between first template (1), be provided with first connection structure (3) between first template (1) and second template (2), the inside of first template (1) is provided with linkage structure (4) that quantity is two, first template (1) is L shape, the both ends of first template (1) all are provided with seal structure (5).
2. A building panel for construction engineering facilitating assembly installation according to claim 1, wherein: first connection structure (3) are including joint board (301), joint board (301) are the T font, the both ends of first template (1) all seted up with joint board (301) assorted joint groove (302).
3. A building panel for constructional engineering facilitating assembly and installation according to claim 2, wherein: linkage structure (4) include spring (401), gas receiver (101) that are linked together with joint groove (302) are seted up to the inside of first template (1), the bottom fixed connection of spring (401) is in the inner diapire of gas receiver (101), the top fixedly connected with of spring (401) and gas receiver (101) inner wall in close contact with's piston plate (402), the bottom fixedly connected with montant (403) of joint board (301).
4. A building panel for constructional engineering facilitating assembly and installation according to claim 3 wherein: sealing structure (5) are including corrosion-resistant rubber gasbag (501), mounting groove (102) have all been seted up at the both ends of first template (1), corrosion-resistant rubber gasbag (501) set up to establish in the inner wall of mounting groove (102), be provided with gas pipe (502) between corrosion-resistant rubber gasbag (501) and gas storage tank (101).
5. A building panel for construction engineering facilitating assembly installation according to claim 1, wherein: second connection structure (6) are including bar pole (601), the bottom fixed connection of bar pole (601) is in the top of first template (1), bar groove (602) with bar pole (601) assorted have been seted up to the bottom of first template (1).
6. A building template for building engineering facilitating assembly installation according to claim 5, wherein: the surface lower extreme of first template (1) is provided with first fixing bolt (7), the tip of first fixing bolt (7) runs through bar groove (602) and extends to in bar pole (601).
7. A building panel for construction engineering facilitating assembly installation according to claim 1, wherein: the surface upper end of first template (1) is provided with second fixing bolt (8), the tip of second fixing bolt (8) runs through joint groove (302) and extends to in joint board (301).
CN202122065697.9U 2021-08-30 2021-08-30 A building templates for building engineering's composite erection of being convenient for Active CN216042583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122065697.9U CN216042583U (en) 2021-08-30 2021-08-30 A building templates for building engineering's composite erection of being convenient for

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122065697.9U CN216042583U (en) 2021-08-30 2021-08-30 A building templates for building engineering's composite erection of being convenient for

Publications (1)

Publication Number Publication Date
CN216042583U true CN216042583U (en) 2022-03-15

Family

ID=80622735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122065697.9U Active CN216042583U (en) 2021-08-30 2021-08-30 A building templates for building engineering's composite erection of being convenient for

Country Status (1)

Country Link
CN (1) CN216042583U (en)

Similar Documents

Publication Publication Date Title
CN110253303A (en) The processing of plate flange blast pipe and its mounting process altogether
CN216042583U (en) A building templates for building engineering's composite erection of being convenient for
CN111441473B (en) Construction method of light steel keel energy-saving building
CN101906858B (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN109629715A (en) Structure is built in noise reduction building site room
CN108972842A (en) A kind of rollover hot-die platform system and its application method
CN102587665B (en) Pouring method of coupled shear wall structure
CN117127767A (en) Wall surface curved surface structure and construction method thereof
CN111576618A (en) Assembled concrete building connected node
CN201695548U (en) Large steam lightweight aerated concrete panel
CN215564369U (en) Civil engineering construction support that stability is good
CN203111475U (en) Anchor platform structure manufactured through integral manufacturing process of drilling-ship anchor platform
CN113468652B (en) Design method of large-curvature cable membrane structure
CN210732757U (en) Interior gliding style high leakproofness prefabricated staircase mould
CN201362892Y (en) Connecting strip as well as connecting body, sectional material and wallboard provided with same
CN201099930Y (en) Collapsible type purifying partition wall
CN209854949U (en) Deformation joint waterproof structure
CN211774770U (en) Building system with composite non-dismantling formwork
CN207829225U (en) A kind of prefabricated steel tube shear connection structure of service-strong
CN206636029U (en) A kind of horizontal card plug-in unit
CN105370048A (en) Construction method of ultrahigh ultralong steam pressing lightweight aerated concrete panel wall
CN220416371U (en) Pneumatic valve for oxygenerator convenient to dismantle
CN219863342U (en) Small-span roof structure that encorbelments based on steel construction
CN2383906Y (en) Special steel forming plate for bridge