CN216012198U - Building settlement and inclination integrated monitoring equipment - Google Patents

Building settlement and inclination integrated monitoring equipment Download PDF

Info

Publication number
CN216012198U
CN216012198U CN202121876653.8U CN202121876653U CN216012198U CN 216012198 U CN216012198 U CN 216012198U CN 202121876653 U CN202121876653 U CN 202121876653U CN 216012198 U CN216012198 U CN 216012198U
Authority
CN
China
Prior art keywords
supporting box
building
inclination
settlement
integrated monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121876653.8U
Other languages
Chinese (zh)
Inventor
段绍忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Zhongyuan Construction Municipal Engineering Design Co ltd
Original Assignee
Jilin Zhongyuan Construction Municipal Engineering Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Zhongyuan Construction Municipal Engineering Design Co ltd filed Critical Jilin Zhongyuan Construction Municipal Engineering Design Co ltd
Priority to CN202121876653.8U priority Critical patent/CN216012198U/en
Application granted granted Critical
Publication of CN216012198U publication Critical patent/CN216012198U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building settlement and inclination integrated monitoring device which comprises a supporting box body, wherein a device body is fixedly arranged at the top of the supporting box body, adjusting screw rods are rotatably arranged on two sides in the supporting box body, a motor is fixedly arranged on one side of the device body at the top of the supporting box body, and a transmission mechanism is arranged between the two adjusting screw rods. This building settlement slope integration monitoring facilities, this practicality is used through the support box, the equipment body, the fixed sleeve, the universal wheel, the buffer beam, the buffer block, the cooperation of spring and spacing groove, through the rolling contact of universal wheel with ground, only need one to two people alright promote whole equipment, need not too much manpower or use other machinery to assist the transport, unusual convenience is simultaneously at the in-process of transport, when the ground of some unevennesses, elastic deformation through the spring, can cushion the reaction force that ground gave.

Description

Building settlement and inclination integrated monitoring equipment
Technical Field
The utility model relates to the technical field of buildings, in particular to a building settlement and inclination integrated monitoring device.
Background
The construction process of some engineering projects such as subways, tunnels and the like generally causes stratum movement and ground surface subsidence, and further causes surrounding buildings to generate subsidence and inclination, so that the subsidence values and the inclination values of the surrounding buildings are monitored, the current subsidence and inclination conditions of the building to be detected are accurately and timely acquired, and judgment on the quality and the safety of the building is very necessary.
However, the traditional integrated monitoring equipment for building settlement and inclination in the market at present is large in size and heavy, and when the integrated monitoring equipment is moved, excessive manpower and material resources are consumed, so that the integrated monitoring equipment is very inconvenient to use.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a building settlement and inclination integrated monitoring device to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a building subsides slope integration monitoring facilities, includes the supporting box, the top fixed mounting of supporting box has the equipment body, the inside both sides of supporting box all rotate and install accommodate the lead screw, one side fixed mounting that the top of supporting box is the equipment body has the motor, two be provided with drive mechanism between the accommodate the lead screw, the slide opening has all been seted up to the both sides of supporting box bottom, the cover is equipped with the fly leaf on accommodate the lead screw's the outer wall, the bottom fixed mounting of fly leaf has the fixed sleeve corresponding with slide opening quantity, position, the bottom of fixed sleeve is provided with the universal wheel.
As a further scheme of the utility model: the supporting box body is characterized in that threaded columns corresponding to the sliding hole positions and the number are fixedly mounted on two sides of the bottom of the supporting box body, a movable sleeve is sleeved on the outer wall of each threaded column in a threaded mode, a pressing plate is rotatably mounted at the bottom end of the movable sleeve, an annular rotating handle is fixedly sleeved on the outer wall of the movable sleeve, and a plurality of cones are welded at the bottom of the pressing plate.
As a still further scheme of the utility model: the limiting groove has been seted up on fixed sleeve's the inner wall, fixed sleeve has the buffer block through limiting groove slidable mounting, the bottom fixed mounting of buffer block has the buffer beam, the top fixed mounting of buffer block has the spring.
As a still further scheme of the utility model: the supporting box is characterized in that limiting rods are fixedly mounted on two sides of the top of the inner wall of the supporting box body, and annular clamping blocks are fixedly sleeved on the upper side of the outer wall of each limiting rod.
As a still further scheme of the utility model: threaded holes matched with the adjusting screw rods are formed in the two sides of the tops of the movable plates, and the movable plates are in threaded connection with the adjusting screw rods through the threaded holes formed in the tops of the movable plates.
As a still further scheme of the utility model: the transmission mechanism is composed of a driving wheel, a driven wheel and a belt, and the driving wheel and the driven wheel are in transmission connection through the belt.
Compared with the prior art, the utility model has the beneficial effects that:
1. the utility model discloses a supporting box, the equipment body, the fixed sleeve, the universal wheel, the buffer beam, the buffer block, the cooperation of spring and spacing groove is used, rolling contact through universal wheel and ground, only need one to two people alright promote whole equipment, need not too much manpower or use other machinery to assist the transport, unusual convenience, simultaneously at the in-process of transport, when the ground of some unevennesses, elastic deformation through the spring, can cushion the reaction force that ground gave, avoid whole equipment, receive the vibration, make equipment at the in-process that removes, keep high stability, avoid subaerial the removal at the unevenness, cause the frequent vibration of equipment, make the phenomenon that the inside spare part of equipment damaged.
2. The utility model discloses a motor, the gag lever post, the annular fixture block, drive mechanism, the fly leaf, the clamp plate, the annular is changeed the handle, the movable sleeve, the slide opening, accommodate the lead screw, the cooperation of screw post and cone is used, make clamp plate and ground contact, make equipment by the rolling contact on universal wheel and ground, become the rigid contact through clamp plate and ground, and at the in-process of clamp plate and ground contact, under the action of gravity of equipment self, the cone of clamp plate bottom, can imbed the inside on ground, firmly grasp with ground, guarantee the stability that the equipment fixed point was placed, every clamp plate can carry out the independent control, thereby can make corresponding clamp plate and ground carry out firm contact, ensure the stability that the equipment fixed point was placed, be convenient for developing of follow-up operation.
Drawings
FIG. 1 is a schematic structural diagram of an integrated monitoring device for settlement and inclination of a building;
FIG. 2 is a front view of an integrated monitoring device for settlement and inclination of a building;
fig. 3 is an enlarged schematic structural diagram of a building settlement and inclination integrated monitoring device at a position A in fig. 1.
In the figure: the device comprises a supporting box body 1, a device body 2, a motor 3, a limiting rod 4, an annular clamping block 5, a transmission mechanism 6, a movable plate 7, a fixed sleeve 8, a universal wheel 9, a pressing plate 10, an annular rotating handle 11, a movable sleeve 12, a buffering rod 13, a buffering block 14, a spring 15, a limiting groove 16, a sliding hole 17, an adjusting screw rod 18, a threaded column 19 and a cone 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 3, in an embodiment of the present invention, a building settlement and inclination integrated monitoring device includes a supporting box 1, a device body 2 is fixedly installed on the top of the supporting box 1, adjusting screws 18 are rotatably installed on both sides of the inside of the supporting box 1, a motor 3 is fixedly installed on one side of the device body 2 on the top of the supporting box 1, a driving end of the motor 3 penetrates through the top of the supporting box 1 and is fixedly connected with the top end of one adjusting screw 18, a transmission mechanism 6 is disposed between the two adjusting screws 18, sliding holes 17 are formed on both sides of the bottom of the supporting box 1, the number of the sliding holes 17 is four, four sliding holes 17 are equally divided into two groups, the two groups of the sliding holes 17 are equidistantly distributed on both sides of the bottom of the supporting box 1, a movable plate 7 is sleeved on the outer wall of the adjusting screw 18, the number of the sliding holes 17 is fixedly installed on the bottom of the movable plate 7, and the number of the sliding holes 17 is equal to that of the movable plate, The fixed sleeve 8 is arranged in a corresponding position, the bottom end of the fixed sleeve 8 penetrates through the inside of the sliding hole 17 and extends to the lower portion of the bottom of the supporting box body 1, and the universal wheel 9 is arranged at the bottom of the fixed sleeve 8.
Referring to fig. 1 and 3, in the application, threaded columns 19 corresponding to the positions and the number of the sliding holes 17 are fixedly installed on two sides of the bottom of the supporting box body 1, a movable sleeve 12 is sleeved on the outer wall of each threaded column 19 in a threaded manner, a pressing plate 10 is rotatably installed at the bottom end of each movable sleeve 12, an annular rotating handle 11 is fixedly sleeved on the outer wall of each movable sleeve 12, and a plurality of cones 20 are welded at the bottom of each pressing plate 10.
Referring to fig. 1 and 3, in this application, the spacing groove 16 has been seted up on the inner wall of fixing sleeve 8, and fixing sleeve 8 has buffer block 14 through spacing groove 16 slidable mounting, and the bottom fixed mounting of buffer block 14 has buffer rod 13, and the bottom of buffer rod 13 run through the top of universal wheel 9 inner wall and with universal wheel 9 fixed connection, and the top fixed mounting of buffer block 14 has spring 15.
Referring to fig. 1, in this application, the equal fixed mounting in both sides at supporting box 1 inner wall top has gag lever post 4, and the bottom of gag lever post 4 runs through the top of fly leaf 7 and the bottom fixed connection of supporting box 1 inner wall, and the upside on the gag lever post 4 outer wall is fixed to be cup jointed annular fixture block 5, and annular fixture block 5 can carry out spacingly to the vertical shift position of fly leaf 7, avoids the fly leaf 7 to rise highly too high, contacts with drive mechanism 6, causes the damage to drive mechanism 6.
Referring to fig. 1, in the present application, threaded holes adapted to the adjusting screw rods 18 are formed in both sides of the top of the movable plate 7, and the movable plate 7 is in threaded connection with the adjusting screw rods 18 through the threaded holes formed in the top of the movable plate.
Referring to fig. 1, in this application, drive mechanism 6 comprises the action wheel, follows driving wheel and belt, and the action wheel with follow the driving wheel and pass through the belt transmission and connect, the positive one side fixed mounting switch of supporting box 1, switch and motor 3 all have the power through wire electric connection, and the switch passes through wire and motor 3 electric connection.
The working principle of the utility model is as follows:
referring to fig. 1 to 3, when the equipment needs to be moved, the whole equipment can be pushed by only one or two persons through the rolling contact of the universal wheel 9 and the ground without excessive manpower or other machinery for assisting in carrying, which is very convenient, meanwhile, in the carrying process, when the equipment passes through some uneven ground, the ground can give a reaction force to the universal wheel 9, the universal wheel 9 can drive the buffer rod 13 to slide towards the inside of the fixed sleeve 8, the buffer rod 13 can move to drive the buffer block 14 to slide on the limit groove 16, the spring 15 can be extruded by the movement of the limit groove 16, the elastic deformation of the spring 15 is caused, the reaction force given by the ground can be buffered through the elastic deformation of the spring 15, the whole equipment is prevented from being vibrated, so that the equipment can maintain high stability and is prevented from moving on the uneven ground in the moving process, causing frequent vibration of the equipment and damaging the internal parts of the equipment.
Referring to fig. 1 to 3, in use, after the device moves to a designated position, the device needs to be fixed, at this time, the motor 3 is controlled by the switch to start working, the motor 3 is a forward and reverse motor, and the model of the motor 3 is Y250M-2, the motor 3 drives the adjusting screw rod 18 on the right side to rotate, through the transmission action of the transmission mechanism 6, the adjusting screw rod 18 on the right side drives the adjusting screw rod 18 on the left side to rotate, so that the two adjusting screw rods 18 rotate simultaneously, through the screw transmission between the adjusting screw rod 18 and the movable plate 7 and the sliding relationship between the movable plate 7 and the limit rod 4, the movable plate 7 performs stable vertical movement, the movement of the movable plate 7 drives the fixed sleeve 8 to slide on the slide hole 17, the fixed sleeve 8 drives the universal wheel 9 to move through the cooperation of the buffer block 14 and the buffer rod 13, when the movable plate 7 moves upwards, the fixed sleeve 8 moves towards the inside of the supporting box body 1, at the moment, the whole equipment is in a descending state under the action of self gravity, along with the continuous movement of the movable plate 7, finally the universal wheel 9 is separated from the contact with the ground, the pressing plate 10 is in contact with the ground, the equipment is changed into rigid contact with the ground through the pressing plate 10 by the rolling contact of the universal wheel 9 and the ground, in the contact process of the pressing plate 10 and the ground, under the action of the gravity of the equipment, the cone 20 at the bottom of the pressing plate 10 can be embedded into the inside of the ground and firmly clamped with the ground, the stability of fixed-point placement of the equipment is ensured, meanwhile, in the placement process, if the ground is uneven, the four pressing plates 10 cannot be in complete contact with the ground, the equipment can shake, at the moment, the corresponding annular rotating handle 11 can be rotated, the rotation of the annular rotating handle 11 drives the movable sleeve 12 to rotate, through the screw drive of activity sleeve 12 and screw thread post 19, make activity sleeve 12 carry out vertical removal, clamp plate 10 follows activity sleeve 12 and moves, and every clamp plate 10 can be adjusted alone to can make corresponding clamp plate 10 and ground carry out firm contact, ensure the stability that the equipment fixed point was placed, the development of the follow-up operation of being convenient for.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the utility model can be made, and equivalents and modifications of some features of the utility model can be made without departing from the spirit and scope of the utility model.

Claims (6)

1. The utility model provides a building settlement slope integration monitoring facilities, includes supporting box (1), its characterized in that: the top fixed mounting of supporting box (1) has equipment body (2), the inside both sides of supporting box (1) are all rotated and are installed accommodate the lead screw (18), one side fixed mounting that the top of supporting box (1) is equipment body (2) has motor (3), two be provided with drive mechanism (6) between accommodate the lead screw (18), slide opening (17) have all been seted up to the both sides of supporting box (1) bottom, the cover is equipped with fly leaf (7) on the outer wall of accommodate the lead screw (18), the bottom fixed mounting of fly leaf (7) has fixed sleeve (8) corresponding with slide opening (17) quantity, position, the bottom of fixed sleeve (8) is provided with universal wheel (9).
2. The integrated monitoring device for the settlement and inclination of the building as claimed in claim 1, wherein: the supporting box body is characterized in that threaded columns (19) corresponding to sliding holes (17) in position and quantity are fixedly mounted on two sides of the bottom of the supporting box body (1), movable sleeves (12) are sleeved on the outer walls of the threaded columns (19) in a threaded mode, pressing plates (10) are installed at the bottom ends of the movable sleeves (12) in a rotating mode, annular rotating handles (11) are fixedly sleeved on the outer walls of the movable sleeves (12), and a plurality of cones (20) are welded at the bottoms of the pressing plates (10).
3. The integrated monitoring device for the settlement and inclination of the building as claimed in claim 1, wherein: spacing groove (16) have been seted up on the inner wall of fixed sleeve (8), fixed sleeve (8) have buffer block (14) through spacing groove (16) slidable mounting, the bottom fixed mounting of buffer block (14) has buffer beam (13), the top fixed mounting of buffer block (14) has spring (15).
4. The integrated monitoring device for the settlement and inclination of the building as claimed in claim 1, wherein: the supporting box is characterized in that limiting rods (4) are fixedly mounted on two sides of the top of the inner wall of the supporting box body (1), and annular clamping blocks (5) are fixedly sleeved on the upper side of the outer wall of each limiting rod (4).
5. The integrated monitoring device for the settlement and inclination of the building as claimed in claim 1, wherein: threaded holes matched with the adjusting screw rods (18) are formed in the two sides of the top of the movable plate (7), and the movable plate (7) is in threaded connection with the adjusting screw rods (18) through the threaded holes formed in the top of the movable plate.
6. The integrated monitoring device for the settlement and inclination of the building as claimed in claim 1, wherein: the transmission mechanism (6) is composed of a driving wheel, a driven wheel and a belt, and the driving wheel and the driven wheel are in transmission connection through the belt.
CN202121876653.8U 2021-08-12 2021-08-12 Building settlement and inclination integrated monitoring equipment Expired - Fee Related CN216012198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121876653.8U CN216012198U (en) 2021-08-12 2021-08-12 Building settlement and inclination integrated monitoring equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121876653.8U CN216012198U (en) 2021-08-12 2021-08-12 Building settlement and inclination integrated monitoring equipment

Publications (1)

Publication Number Publication Date
CN216012198U true CN216012198U (en) 2022-03-11

Family

ID=80588588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121876653.8U Expired - Fee Related CN216012198U (en) 2021-08-12 2021-08-12 Building settlement and inclination integrated monitoring equipment

Country Status (1)

Country Link
CN (1) CN216012198U (en)

Similar Documents

Publication Publication Date Title
CN203808464U (en) Automatic microcomputer wall plastering machine
CN111152101B (en) Intelligent carbon sliding plate outer arc polishing equipment convenient to adjust and polishing method thereof
CN210704910U (en) A fixing device for industrial robot
CN109531027B (en) Welding machine for gas filling bottle
CN216012198U (en) Building settlement and inclination integrated monitoring equipment
CN211201251U (en) Novel building engineering supports device
CN212556354U (en) Gardens building ecological environment intelligent monitoring equipment
CN212044808U (en) Automatic industrial manipulator
CN210426614U (en) Tunnel detection device
CN109390832B (en) Power line welding auxiliary device
CN215003504U (en) Foundation pit displacement detection device
CN211714773U (en) Building engineering protective bracket
CN212714307U (en) Mobile track device of mobile welding trolley machine
CN212324228U (en) Early warning device for mine monitoring
CN210530287U (en) Carrying frame for house building construction
CN211900570U (en) Portable earth's surface sampling analysis device for mining exploration
CN211254833U (en) Cable reel fixing and supporting device
CN210840296U (en) Adjustable multi-directional monitoring split cabinet
CN207268094U (en) A kind of building-supporting frame of adjustment height
CN219311203U (en) Knocking hammer convenient to carry and transfer
CN217097479U (en) Aluminum product building structure assembly quality
CN210515671U (en) Multifunctional traffic light
CN213243584U (en) Wireless charging device for artificial intelligent robot
CN211709111U (en) Anchor clamps for building engineering
CN211960006U (en) Green shaddock is planted and is beaten hole machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220311

CF01 Termination of patent right due to non-payment of annual fee