CN216010250U - Management progress monitoring device for construction cost - Google Patents

Management progress monitoring device for construction cost Download PDF

Info

Publication number
CN216010250U
CN216010250U CN202122047782.2U CN202122047782U CN216010250U CN 216010250 U CN216010250 U CN 216010250U CN 202122047782 U CN202122047782 U CN 202122047782U CN 216010250 U CN216010250 U CN 216010250U
Authority
CN
China
Prior art keywords
monitoring device
motor
progress monitoring
block
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122047782.2U
Other languages
Chinese (zh)
Inventor
吴焕名
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Wujian Construction Group Co ltd
Original Assignee
Shenzhen Wujian Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Wujian Construction Group Co ltd filed Critical Shenzhen Wujian Construction Group Co ltd
Priority to CN202122047782.2U priority Critical patent/CN216010250U/en
Application granted granted Critical
Publication of CN216010250U publication Critical patent/CN216010250U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Studio Devices (AREA)

Abstract

The utility model relates to the technical field of management progress monitoring, in particular to a management progress monitoring device for construction cost of building engineering. According to the utility model, the first motor is arranged, when the maintenance and the replacement of internal parts are needed, the first motor is turned on, the first motor drives the threaded rod to rotate, the threaded rod drives the sliding block to move downwards through the internal threads, the sliding block drives the moving block to slide downwards through the connecting block, and the moving block drives the rotating block and the camera to move downwards, so that the height of the camera is reduced, and a worker can stand to maintain the camera without climbing to a high place.

Description

Management progress monitoring device for construction cost
Technical Field
The utility model relates to the technical field of management progress monitoring, in particular to a management progress monitoring device for construction cost of building engineering.
Background
With the development of society, many construction projects can use monitoring to observe the overall progress and the environmental conditions of construction when carrying out construction management.
The monitoring device of partial management progress does not possess the function of automatic rising, and it is very troublesome to need climb the eminence to maintain and trade with inside part when monitoring device appears damaging or need to change inside RAM card, therefore needs urgent need to design a management progress monitoring device that building engineering cost used.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a management progress monitoring device for construction cost of building engineering, which solves the problem of inconvenient maintenance of the monitoring device in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a management progress monitoring device for construction cost comprises a progress monitoring device body, a first motor, a second motor, a camera and a solar panel, wherein the bottom end of the progress monitoring device body is fixedly connected with a base, the first motor is fixedly arranged inside the progress monitoring device body, the top end of the progress monitoring device body is fixedly connected with a shielding plate, and a moving block is arranged on the surface of the progress monitoring device body;
the inner side of the moving block is provided with a rotating block, the inner side of the moving block is fixedly connected with a connecting block, the inner side of the connecting block is fixedly connected with a sliding block, and a second motor is fixedly arranged inside the moving block.
Preferably, the first motor comprises a threaded rod, and the output end of the first motor is fixedly connected with the threaded rod.
Preferably, the sliding block includes an internal thread, and the internal thread is provided on the inner side of the sliding block.
Preferably, the second motor comprises a gear, and the output end of the second motor is fixedly connected with the gear.
Preferably, the rotating block comprises a rack and a camera, the rack is arranged on the inner side of the rotating block, and the camera is fixedly connected to the surface of the rotating block.
Preferably, the shielding plate comprises a solar panel, and the surface of the shielding plate is fixedly provided with the solar panel.
Preferably, the rack is meshed with the gear, and the gear and the rack form a rotary structure.
Compared with the prior art, the utility model has the beneficial effects that:
1. through being provided with first motor, when needs maintain and change internals, open first motor, make first motor drive the threaded rod and rotate, the threaded rod drives the sliding block downstream through the internal thread, and the sliding block passes through the connecting block and takes the movable block to slide downwards, makes the movable block drive rotating block and camera downstream to reduce the height of camera, the staff of being convenient for can stand and maintain it and need not climb to the eminence.
Drawings
FIG. 1 is a perspective view of the structure of the present invention;
FIG. 2 is a schematic cross-sectional view of a structure of the present invention;
FIG. 3 is a schematic top view of the traveling block of the present invention;
FIG. 4 is a side view of the gear of the present invention.
In the figure: 1. a progress monitoring device body; 2. a base; 3. a first motor; 301. a threaded rod; 4. a slider; 401. an internal thread; 5. connecting blocks; 6. a second motor; 601. a gear; 7. rotating the block; 701. a rack; 702. a camera; 8. a moving block; 9. a shielding plate; 901. a solar panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, an embodiment of the present invention is shown:
a management progress monitoring device for construction cost of building engineering comprises a progress monitoring device body 1, a first motor 3, a second motor 6, a camera 702 and a solar panel 901, wherein the bottom end of the progress monitoring device body 1 is fixedly connected with a base 2, the first motor 3 is fixedly installed inside the progress monitoring device body 1, the top end of the progress monitoring device body 1 is fixedly connected with a shielding plate 9, and a moving block 8 is installed on the surface of the progress monitoring device body 1;
the inner side of the moving block 8 is provided with a rotating block 7, the inner side of the moving block 8 is fixedly connected with a connecting block 5, the inner side of the connecting block 5 is fixedly connected with a sliding block 4, and the inner part of the moving block 8 is fixedly provided with a second motor 6.
Further, first motor 3 includes threaded rod 301, the output end fixedly connected with threaded rod 301 of first motor 3, and first motor 3 of being convenient for drives threaded rod 301 and rotates.
Further, the sliding block 4 comprises an internal thread 401, and the internal thread 401 is formed on the inner side of the sliding block 4, so that the threaded rod 301 can drive the sliding block 4 to move through the internal thread 401.
Further, the second motor 6 includes a gear 601, and the output end of the second motor 6 is fixedly connected with the gear 601, so that the second motor 6 drives the gear 601 to rotate.
Further, the turning block 7 comprises a rack 701 and a camera 702, the rack 701 is arranged on the inner side of the turning block 7, and the camera 702 is fixedly connected to the surface of the turning block 7, so that the turning block 7 can rotate by driving the camera 702 conveniently.
Further, the shielding plate 9 includes a solar panel 901, and the surface of the shielding plate 9 is fixedly mounted with the solar panel 901, so that the shielding plate 9 can convert solar energy through the solar panel 901.
Further, the rack 701 and the gear 601 are meshed with each other, and the gear 601 and the rack 701 form a rotating structure, so that the gear 601 can drive the rotating block 7 to rotate through the rack 701.
The working principle is as follows: when a worker uses the device and needs to maintain and replace internal parts, the first motor 3 is turned on, the first motor 3 drives the threaded rod 301 to rotate, the threaded rod 301 drives the sliding block 4 to move downwards through the internal threads 401, the sliding block 4 drives the moving block 8 to slide downwards through the connecting block 5, the moving block 8 drives the rotating block 7 and the camera 702 to move downwards, the height of the camera 702 is convenient to reduce, the camera is convenient to maintain and maintain, the second motor 6 is turned on, the second motor 6 drives the gear 601 to rotate, the gear 601 drives the rotating block 7 to rotate on the inner side of the moving block 8 through the rack 701, the rotating block 7 drives the camera 702 to rotate, and the surrounding conditions are convenient to observe at any time, solar energy can be converted into electric energy through the shielding plate 9 and the solar panel 901 at the top end, and some sunlight and rainwater can be shielded for the moving block 8.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a management progress monitoring device that building engineering cost was used, includes progress monitoring device body (1), first motor (3), second motor (6), camera (702) and solar panel (901), its characterized in that: the bottom end of the progress monitoring device body (1) is fixedly connected with a base (2), a first motor (3) is fixedly installed inside the progress monitoring device body (1), the top end of the progress monitoring device body (1) is fixedly connected with a baffle plate (9), and a moving block (8) is arranged on the surface of the progress monitoring device body (1);
the inner side of the moving block (8) is provided with a rotating block (7), the inner side of the moving block (8) is fixedly connected with a connecting block (5), the inner side of the connecting block (5) is fixedly connected with a sliding block (4), and the inner part of the moving block (8) is fixedly provided with a second motor (6).
2. The management progress monitoring device for construction cost according to claim 1, characterized in that: the first motor (3) comprises a threaded rod (301), and the output end of the first motor (3) is fixedly connected with the threaded rod (301).
3. The management progress monitoring device for construction cost according to claim 1, characterized in that: the sliding block (4) comprises an internal thread (401), and the internal thread (401) is formed in the inner side of the sliding block (4).
4. The management progress monitoring device for construction cost according to claim 1, characterized in that: the second motor (6) comprises a gear (601), and the output end of the second motor (6) is fixedly connected with the gear (601).
5. The management progress monitoring device for construction cost according to claim 4, wherein: the rotating block (7) comprises a rack (701) and a camera (702), the rack (701) is arranged on the inner side of the rotating block (7), and the camera (702) is fixedly connected to the surface of the rotating block (7).
6. The management progress monitoring device for construction cost according to claim 1, characterized in that: the shielding plate (9) comprises a solar panel (901), and the surface of the shielding plate (9) is fixedly provided with the solar panel (901).
7. The management progress monitoring device for construction cost according to claim 5, wherein: the rack (701) is meshed with the gear (601), and the gear (601) and the rack (701) form a rotary structure.
CN202122047782.2U 2021-08-28 2021-08-28 Management progress monitoring device for construction cost Active CN216010250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122047782.2U CN216010250U (en) 2021-08-28 2021-08-28 Management progress monitoring device for construction cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122047782.2U CN216010250U (en) 2021-08-28 2021-08-28 Management progress monitoring device for construction cost

Publications (1)

Publication Number Publication Date
CN216010250U true CN216010250U (en) 2022-03-11

Family

ID=80533788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122047782.2U Active CN216010250U (en) 2021-08-28 2021-08-28 Management progress monitoring device for construction cost

Country Status (1)

Country Link
CN (1) CN216010250U (en)

Similar Documents

Publication Publication Date Title
CN115199904A (en) Photovoltaic power plant monitoring device with angle regulation function
CN216010250U (en) Management progress monitoring device for construction cost
CN113223816B (en) Transformer with wiring anti-drop mechanism
CN212965107U (en) Ammeter case convenient to installation overhauls and checks meter
CN204691992U (en) A kind of wind power solar mixed power generation unit
CN213272422U (en) Street lamp convenient to adjust illumination angle of LED lamp
CN213513644U (en) Solar street lamp
CN214744728U (en) A wisdom building site thing networking collection terminal for based on high in clouds network
CN214895461U (en) Guide rail type three-phase cost control intelligent electric energy meter capable of being matched with circuit breaker for use
CN211262267U (en) Energy-saving environment monitoring device
CN209690476U (en) A kind of accumulator electric-quantity monitoring device of the intelligent traffic control system convenient for fixation
CN213625632U (en) Slope protection device for hydraulic and hydroelectric engineering
CN204613759U (en) A kind of disc type photovoltaic tracking device
CN210218593U (en) Space-saving mechanism for improving speed reduction efficiency
CN213749951U (en) Electric power meter with installation mechanism of being convenient for
CN217684271U (en) Power station auxiliary monitoring device convenient to adjust
CN213213601U (en) Wind-powered electricity generation field construction supervision device based on BIM technique
CN215910422U (en) Air quality gridding real-time monitoring equipment
CN220746641U (en) Hydraulic engineering construction management safety warning equipment
CN220082697U (en) Electric power safety monitoring device
CN221298730U (en) Outdoor solar energy environment monitoring equipment
CN213028333U (en) Highway removes supervisory equipment with along automatic function that moves of highway guardrail
CN215104871U (en) Safety warning device for electric power engineering
CN217950591U (en) Fault early warning device for wind power station
CN215895000U (en) Wind rod structure for meteorological observation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant