CN215993110U - Constructional engineering budget drawing device - Google Patents
Constructional engineering budget drawing device Download PDFInfo
- Publication number
- CN215993110U CN215993110U CN202121943494.9U CN202121943494U CN215993110U CN 215993110 U CN215993110 U CN 215993110U CN 202121943494 U CN202121943494 U CN 202121943494U CN 215993110 U CN215993110 U CN 215993110U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- drawing board
- groove
- base
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims description 3
- 238000007790 scraping Methods 0.000 abstract description 17
- 238000000034 method Methods 0.000 description 4
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Abstract
The utility model discloses a constructional engineering budget drawing device which comprises a base, wherein a supporting rod is fixedly connected to the upper end of the base, a drawing board is fixedly connected to the upper end of the supporting rod, connecting grooves are formed in two sides of the upper end surface of the drawing board, a connecting plate is connected to the connecting grooves in a clamping mode, a scraping plate is fixedly connected to the upper end of the connecting plate, a clamping groove is formed in one end of the inner side of each connecting groove, and a buffer groove is formed in one end of each connecting plate. Through the base that sets up, bracing piece and drawing board can be better place the drawing paper on the drawing board, then can be better fix the drawing paper through the scraping plate that sets up on the drawing board, thereby make drawing paper more level and smooth, then can be better fix the scraping plate through the joint piece that sets up and joint groove, thereby can make the hanging plate carry out the fixed of different positions, make can fix the drawing paper of equidimension not, thereby the availability factor of drawing board has been improved.
Description
Technical Field
The utility model belongs to the technical field of constructional engineering, and particularly relates to a constructional engineering budget drawing device.
Background
The drawing device for budget drawing of the existing building engineering can not well fix the drawing when in use, so that the drawing can be moved everywhere when in drawing, the drawn graphic marked line is inaccurate, and a large error is caused.
SUMMERY OF THE UTILITY MODEL
Aiming at the problems in the prior art, the utility model provides a construction engineering budget drawing device, which can better place drawing paper on a drawing board through a base, a connecting rod and the drawing board, can better fix the drawing paper through a scraping plate arranged on the drawing board, so that the drawing paper is smoother, and can better fix the scraping plate through a clamping block and a clamping groove, so that the hanging plate can be fixed at different positions, the drawing paper with different sizes can be fixed, and the use efficiency of the drawing board is improved.
The multifunctional drawing board comprises a base, wherein a supporting rod is fixedly connected to the upper end of the base, a drawing board is fixedly connected to the upper end of the supporting rod, connecting grooves are formed in two sides of the upper end face of the drawing board, a connecting plate is connected to the connecting grooves in a clamped mode, a scraping plate is fixedly connected to the upper end of the connecting plate, a clamping groove is formed in one end of the inner side of each connecting groove, a buffer groove is formed in one end of the connecting plate, a buffer spring is fixedly connected to the buffer groove, and a clamping block is fixedly connected to one end of the buffer spring.
Preferably, the clamping block is clamped in the clamping groove, and one end of the clamping block is of an arc structure.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, the drawing paper can be better placed on the drawing board through the arranged base, the connecting rod and the drawing board, then the drawing paper can be better fixed through the scraping plate arranged on the drawing board, so that the drawing paper is smoother, and then the scraping plate can be better fixed through the arranged clamping block and the clamping groove, so that the hanging plate can be fixed at different positions, so that the drawing paper with different sizes can be fixed, and therefore, the use efficiency of the drawing board is improved.
2. According to the utility model, through the clamping block and the clamping groove, the clamping block is clamped in the clamping groove, and then one end of the clamping block is set to be of the arc structure, so that the drawing paper can be better fixed through the scraping plate, the two ends of the scraping plate can be better fixed, and the drawing paper is prevented from moving on the drawing plate.
Drawings
FIG. 1 is a schematic diagram of a structure provided by an embodiment of the present invention;
FIG. 2 is a cross-sectional view of a structure provided by an embodiment of the present invention;
fig. 3 is an enlarged view of a portion a in fig. 2 according to an embodiment of the present invention.
In the figure: 1. a base; 2. a support bar; 3. drawing boards; 4. connecting grooves; 5. a connecting plate; 6. scraping the plate; 7. a buffer tank; 8. a clamping groove; 9. a buffer spring; 10. and a clamping block.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1 to 3, the construction budget drawing device provided in an embodiment of the present invention includes a base 1, a support rod 2 is fixedly connected to an upper end of the base 1, a drawing board 3 is fixedly connected to an upper end of the support rod 2, two sides of an upper end surface of the drawing board 3 are provided with connecting grooves 4, a connecting plate 5 is clamped in the connecting grooves 4, an upper end of the connecting plate 5 is fixedly connected with a scraping plate 6, one end of an inner side of the connecting groove 4 is provided with a clamping groove 8, one end of the connecting plate 5 is provided with a buffer groove 7, a buffer spring 9 is fixedly connected in the buffer groove 7, and one end of the buffer spring 9 is fixedly connected with a clamping block 10.
Referring to fig. 3, the catching block 10 is caught in the catching groove 8, and one end of the catching block 10 has a circular arc structure.
Adopt above-mentioned scheme: through the joint piece 10 and the joint groove 8 that set up, through with joint piece 10 joint in joint groove 8, then set up the one end of joint piece 10 into the circular arc structure in order to fix the drawing paper through scraping that flat 6 is better to can be better fix the both ends of scraping flat 6, thereby avoid the drawing paper to remove on drawing board 3.
The working principle of the utility model is as follows:
when using, at first place the device in the position of needs, then base 1 through setting up, bracing piece 2 and drawing board 3 can be better place the drawing paper on drawing board 3, then can be better fix the drawing paper through scraping plate 6 that sets up on drawing board 3, thereby make more level and smooth of drawing paper, then can be better fix scraping plate 6 through the joint piece 10 and the joint groove 8 that set up, thereby can make scraping plate 6 carry out the fixed of different positions, make can fix the drawing paper of equidimension not, thereby the availability factor of drawing board 3 has been improved.
In summary, the following steps: this constructional engineering budgets drawing device, base 1 through setting up, bracing piece 2, drawing board 3, spread groove 4, connecting plate 5, screed 6, buffer slot 7, joint groove 8, buffer spring 9 and joint piece 10's cooperation is used, it can not be fine fix the drawing to have solved current constructional engineering budgets drawing device when using, thereby make and lead to the drawing to move everywhere when drawing, thereby make the figure marking of drawing inaccurate enough, thereby cause the problem of great error.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (2)
1. The utility model provides a building engineering budget drawing device, includes base (1), its characterized in that: the upper end fixedly connected with bracing piece (2) of base (1), upper end fixedly connected with drawing board (3) of bracing piece (2), spread groove (4) have been seted up to the up end both sides of drawing board (3), the joint has connecting plate (5) in spread groove (4), the upper end fixedly connected with of connecting plate (5) scrapes flat board (6), joint groove (8) have been seted up to the inboard one end of spread groove (4), buffer slot (7) have been seted up to the one end of connecting plate (5), fixedly connected with buffer spring (9) in buffer slot (7), the one end fixedly connected with joint piece (10) of buffer spring (9).
2. The construction budget drawing device according to claim 1, characterized in that: the clamping block (10) is clamped in the clamping groove (8), and one end of the clamping block (10) is of an arc structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121943494.9U CN215993110U (en) | 2021-08-19 | 2021-08-19 | Constructional engineering budget drawing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121943494.9U CN215993110U (en) | 2021-08-19 | 2021-08-19 | Constructional engineering budget drawing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215993110U true CN215993110U (en) | 2022-03-11 |
Family
ID=80594166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121943494.9U Expired - Fee Related CN215993110U (en) | 2021-08-19 | 2021-08-19 | Constructional engineering budget drawing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215993110U (en) |
-
2021
- 2021-08-19 CN CN202121943494.9U patent/CN215993110U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206869728U (en) | A kind of material positioning clamping device | |
CN208379985U (en) | A kind of mating groove aluminium sheet | |
CN215993110U (en) | Constructional engineering budget drawing device | |
CN205088920U (en) | Grey trowel for building novel | |
CN106734395A (en) | A kind of bending device for metal plates with double follow-up system | |
CN207172687U (en) | One kind is used for SCR denitration extrusion die damping stabilising arrangement | |
CN214556885U (en) | Section steel expansion material pushing frame | |
CN211499758U (en) | Plastic building template for concrete | |
CN211889588U (en) | Auxiliary positioning device for welding of cabinet wall plate | |
CN204585528U (en) | A kind of hook connecting production for building aerating sheet material | |
CN209718616U (en) | A kind of traffic sign reflective membrane laminator | |
CN208390730U (en) | A kind of efficient pipe bending mechanism | |
CN206877792U (en) | The mounting structure of transformer core | |
CN206898832U (en) | A kind of fixing device for bread board punching | |
CN207700635U (en) | A kind of inner corner trim trowel | |
CN214078925U (en) | Positioning tool for sheet metal machining | |
CN218720138U (en) | Wall-mounted multimedia player with small installation error | |
CN211438477U (en) | Electronic temperature control welding equipment | |
CN209924322U (en) | Detachable corner background plate | |
CN214770509U (en) | 5G basic station filter reference hole location numerical control adds clamping apparatus | |
CN213177346U (en) | Energy-saving cylindrical steel structure support | |
CN207521455U (en) | A kind of flattening device for steel bar processing | |
CN215562377U (en) | Ecological slope protection bearing structure for hydraulic engineering | |
CN213671607U (en) | Reinforcing bar cutting equipment for building | |
CN214721307U (en) | Corrosion-resistant and oxidation-resistant wave-soldering operation table |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220311 |