CN215990117U - Wisdom building site embedded pipe mounting structure - Google Patents

Wisdom building site embedded pipe mounting structure Download PDF

Info

Publication number
CN215990117U
CN215990117U CN202122230410.3U CN202122230410U CN215990117U CN 215990117 U CN215990117 U CN 215990117U CN 202122230410 U CN202122230410 U CN 202122230410U CN 215990117 U CN215990117 U CN 215990117U
Authority
CN
China
Prior art keywords
wall
handle
block
groove
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122230410.3U
Other languages
Chinese (zh)
Inventor
李锋
陈卫冠
王浩
洪为兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122230410.3U priority Critical patent/CN215990117U/en
Application granted granted Critical
Publication of CN215990117U publication Critical patent/CN215990117U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses an intelligent construction site embedded pipe installation structure, which relates to the field of embedded pipe installation and comprises the following components: the guard plate is used for installing the embedded pipe; the handle is arranged at the top end of the guard plate; the supporting legs are fixedly connected to the outer wall of the guard plate; the mounting mechanism is arranged between the guard plate and the handle and is used for rapidly mounting and dismounting the handle; and the connecting mechanism is arranged between the two support legs. According to the handle, the installation mechanism is arranged, when the handle is installed, the installation block is inserted into the installation groove until the fixed block moves under the elastic force of the fixed spring and enters the fixed groove, so that the handle is fixed, when the handle is dismantled, the rotating column is rotated, the rotating column rotates to drive the movable screw rod to rotate, the movable screw rod rotates to drive the movable frame to move, the movable frame moves to drive the fixed block to move out of the fixed groove, the handle is not fixed, and the handle and the protection plate are conveniently and quickly connected and dismantled.

Description

Wisdom building site embedded pipe mounting structure
Technical Field
The utility model relates to the field of embedded pipe installation, in particular to an intelligent construction site embedded pipe installation structure.
Background
The embedded pipe is a pipeline which is embedded in advance for subsequent structure and process construction in building engineering, a building structure generally has few pipelines to be clearly moved, a general cast-in-place structure fixes a wire pipe on a template and a reinforcing steel bar when the reinforcing steel bar is bound, the pipe is in a structural member after concrete is poured, embedding is carried out before concrete is poured as well as is convenient for subsequent threading, but the existing embedded pipe almost has no fixing device, and the fixing is not firm enough during installation, so that the embedded pipe is easy to damage.
According to chinese patent No. CN212412691U, a wisdom building site embedded pipe mounting structure is provided, relates to wisdom building site field, fixes not firm problem inadequately when solving the embedded installation of embedded pipe among the prior art. First L-shaped connecting legs and first lower supporting blocks are installed on one sides of the first protection plates respectively, first upper supporting blocks are arranged on one sides of the first protection plates, first fixing screws and first fixing nuts are arranged on the other sides of the first upper supporting blocks respectively, first connecting legs are installed above the first protection plates, a first handle is installed above the first connecting legs, first supporting legs are arranged below the first connecting legs, second L-shaped connecting legs and second lower supporting blocks are installed on one sides of the second protection plates respectively, second upper supporting blocks are arranged on one sides of the second protection plates, second fixing screws and second fixing nuts are arranged on the other sides of the second protection plates respectively, and second connecting legs are installed above the second protection plates.
Above-mentioned patent is through first last supporting shoe, first bottom suspension shoe, the setting of supporting shoe and second bottom suspension shoe on the second, make buried pipe all around to respond to the atress all the same, thereby clip buried pipe in advance, and fix buried pipe in advance, thereby solve the fixed not firm problem inadequately when pre-buried installation buried pipe in advance, thereby avoid buried pipe easy damage in advance, but when connecting backplate and handle, the operation is comparatively complicated, need have the structure to carry out quick connection and demolish backplate and handle, when docking the connecting leg simultaneously, fix through the bolt, when using the bolt to fix, it is easy not hard up, need have the structure to carry out quick connection and demolish the connecting leg.
SUMMERY OF THE UTILITY MODEL
The utility model aims to: in order to solve the problem that there is the structure to backplate and handle dismouting and need have the structure to carry out the dismouting to connecting the leg, provide a pre-buried pipe mounting structure in wisdom building site.
In order to achieve the purpose, the utility model provides the following technical scheme: an wisdom building site embedded pipe mounting structure includes:
the guard plate is used for installing the embedded pipe;
the handle is arranged at the top end of the guard plate;
the supporting legs are fixedly connected to the outer wall of the guard plate;
the mounting mechanism is arranged between the guard plate and the handle and is used for rapidly mounting and dismounting the handle;
and the connecting mechanism is arranged between the two support legs and used for quickly connecting and detaching the two support legs.
As a still further scheme of the utility model: installation mechanism includes mounting groove, installation piece and fixed block, the mounting groove sets up in the top of backplate, installation piece fixed connection is in the bottom of handle, fixed block sliding connection is in the outer wall of installation piece, the inner wall of mounting groove is provided with the fixed slot, the outer wall of handle rotates and is connected with the rotation post, the bottom fixedly connected with activity lead screw of rotation post, the outer wall connection of activity lead screw has the adjustable shelf, be connected with fixed spring between fixed block and the installation piece.
As a still further scheme of the utility model: the connecting mechanism comprises a connecting groove, a connecting rod and a limiting plate, the connecting groove is formed in the outer wall of the supporting leg, the connecting rod is connected to the inner wall of the connecting groove in a sliding mode, the limiting plate is fixedly connected to one end of the connecting rod, the other end of the connecting rod is connected with a limiting block in a rotating mode, one end of the limiting plate is connected with a connecting column in a sliding mode, the other end of the connecting column is fixedly connected with a sliding block, a reset spring is connected between the sliding block and the connecting rod, and the inner wall of the sliding block is connected with a connecting screw rod.
As a still further scheme of the utility model: the inner wall of mounting groove and the outer wall of installation piece are laminated mutually, the outer wall of fixed block and the inner wall of fixed slot are laminated mutually, the one end of fixed block is the inclined plane.
As a still further scheme of the utility model: the inner wall of adjustable shelf is provided with the internal thread, the external screw thread of activity lead screw is laminated with the internal thread of adjustable shelf mutually, the bottom of adjustable shelf is provided with the inclined plane, the inclined plane and the fixed block of adjustable shelf contact.
As a still further scheme of the utility model: the inner wall of spread groove and the outer wall of connecting rod laminate mutually, the inner wall of connecting rod is provided with the spout, the inner wall of spout and the outer wall of slider laminate mutually.
As a still further scheme of the utility model: the inner wall of slider is provided with the internal thread, the external screw thread of connecting screw and the internal thread of slider are laminated mutually, connecting screw and stopper fixed connection.
Compared with the prior art, the utility model has the beneficial effects that:
1. by arranging the mounting mechanism, when the handle is mounted, the mounting block is inserted into the mounting groove until the fixed block is displaced under the elastic force of the fixed spring to enter the fixed groove, so that the handle is fixed;
2. through setting up coupling mechanism, when connecting two landing legs, promote the spliced pole and drive the stopper and rotate, the stopper rotates the outer wall laminating with the connecting rod, insert two spread grooves with the connecting rod in proper order, until limiting plate and landing leg laminating, loosen the spliced pole, the slider is reset by reset spring elastic action, thereby drive the stopper and rotate and the spread groove dislocation, simultaneously with the landing leg laminating, fix two landing legs, when demolising the landing leg, promote the spliced pole and drive the outer wall laminating of stopper and connecting rod, take out the connecting rod, the cancellation is to the fixed of landing leg, be convenient for carry out quick connection and demolish to two landing legs.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an exploded view of the present invention;
FIG. 3 is a cross-sectional view of the mounting block of the present invention;
fig. 4 is a cross-sectional view of a connecting rod of the present invention.
In the figure: 1. a guard plate; 2. a handle; 5. a support leg; 3. an installation mechanism; 301. mounting grooves; 302. mounting blocks; 303. a fixed block; 304. fixing grooves; 305. rotating the column; 306. a movable screw rod; 307. a movable frame; 308. fixing the spring; 4. a connecting mechanism; 401. connecting grooves; 402. a connecting rod; 403. a limiting plate; 404. a limiting block; 405. connecting columns; 406. a slider; 407. a return spring; 408. and connecting the screw rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art. The following describes an embodiment of the present invention based on its overall structure.
Referring to fig. 1 to 4, in an embodiment of the present invention, an intelligent construction site embedded pipe installation structure includes:
a guard plate 1 for installing the embedded pipe;
a handle 2 mounted on the top end of the guard plate 1;
the supporting legs 5 are fixedly connected to the outer wall of the guard plate 1;
the mounting mechanism 3 is arranged between the guard plate 1 and the handle 2 and is used for rapidly mounting and dismounting the handle 2;
and the connecting mechanism 4 is arranged between the two support legs 5 and is used for quickly connecting and disconnecting the two support legs 5.
Please refer to fig. 1-3, the mounting mechanism 3 includes a mounting groove 301, a mounting block 302 and a fixing block 303, the mounting groove 301 is disposed at the top end of the protection plate 1, the mounting block 302 is fixedly connected to the bottom end of the handle 2, the fixing block 303 is slidably connected to the outer wall of the mounting block 302, the inner wall of the mounting groove 301 is provided with a fixing groove 304, the outer wall of the handle 2 is rotatably connected with a rotating column 305, the bottom end of the rotating column 305 is fixedly connected with a movable screw 306, the outer wall of the movable screw 306 is connected with a movable frame 307, and a fixing spring 308 is connected between the fixing block 303 and the mounting block 302, so as to facilitate rapid mounting and dismounting of the handle 2.
Please refer to fig. 1, fig. 2 and fig. 4 heavily, the connecting mechanism 4 includes a connecting groove 401, a connecting rod 402 and a limiting plate 403, the connecting groove 401 is disposed on the outer wall of the leg 5, the connecting rod 402 is slidably connected to the inner wall of the connecting groove 401, the limiting plate 403 is fixedly connected to one end of the connecting rod 402, the other end of the connecting rod 402 is rotatably connected to a limiting block 404, one end of the limiting plate 403 is slidably connected to a connecting post 405, the other end of the connecting post 405 is fixedly connected to a sliding block 406, a return spring 407 is connected between the sliding block 406 and the connecting rod 402, and the inner wall of the sliding block 406 is connected to a connecting screw 408, which facilitates quick connection and detachment of the two legs 5.
Referring to fig. 1-3, the inner wall of the mounting groove 301 is attached to the outer wall of the mounting block 302 to facilitate the mounting block 302 to move into the mounting groove 301, the outer wall of the fixing block 303 is attached to the inner wall of the fixing groove 304 to facilitate the fixing block 303 to move into the fixing groove 304, and one end of the fixing block 303 is an inclined surface to facilitate the fixing block 303 to move when being stressed.
Referring to fig. 1-3, the inner wall of the movable frame 307 is provided with an internal thread, the external thread of the movable screw 306 is engaged with the internal thread of the movable frame 307, so that the movable screw 306 rotates to drive the movable frame 307 to displace, the bottom end of the movable frame 307 is provided with an inclined surface, the inclined surface of the movable frame 307 is in contact with the fixed block 303, so that the movable frame 307 displaces to drive the fixed block 303 to displace.
Please refer to fig. 1, fig. 2 and fig. 4, the inner wall of the connecting groove 401 is attached to the outer wall of the connecting rod 402 for the connecting rod 402 to slide on the inner wall of the connecting groove 401, the inner wall of the connecting rod 402 is provided with a sliding groove, the inner wall of the sliding groove is attached to the outer wall of the sliding block 406 for the sliding block 406 to slide in the sliding groove.
Please refer to fig. 1, fig. 2 and fig. 4, the inner wall of the sliding block 406 is provided with an internal thread, the external thread of the connecting screw 408 is attached to the internal thread of the sliding block 406, the connecting screw 408 is fixedly connected to the limiting block 404, so that the sliding block 406 is displaced to drive the connecting screw 408 to rotate, and the connecting screw 408 rotates to drive the limiting block 404 to rotate.
The working principle of the utility model is as follows: firstly, when the handle 2 is installed, the installation block 302 is inserted into the installation groove 301 until the fixed block 303 is displaced into the fixed groove 304 by the elastic force of the fixed spring 308, thereby fixing the handle 2, when the handle 2 is removed, the rotating column 305 is rotated, the rotating column 305 rotates to drive the movable screw rod 306 to rotate, the movable screw rod 306 rotates to drive the movable frame 307 to displace, the movable frame 307 displaces to drive the fixed block 303 to displace out of the fixed groove 304, the fixing of the handle 2 is cancelled, thereby facilitating the rapid connection and removal of the handle 2 and the guard plate 1, when the two support legs 5 are connected, the connecting column 405 is pushed to displace, the connecting column 405 displaces to drive the sliding block 406 to displace, the sliding block 406 displaces to drive the connecting screw rod 408 to rotate, the connecting screw rod 408 rotates to drive the limiting block 404 to rotate, the limiting block 404 rotates to be attached to the outer wall of the connecting rod 402, insert two spread groove 401 with connecting rod 402 in proper order, until limiting plate 403 and the laminating of landing leg 5, loosen the spliced pole 405, slider 406 receives reset spring 407 spring effect to reset, thereby drive stopper 404 and rotate and spread groove 401 dislocation, laminate with landing leg 5 simultaneously, fix two landing legs 5, when demolising landing leg 5, promote spliced pole 405 and drive the laminating of the outer wall of stopper 404 with connecting rod 402, take out connecting rod 402, the cancellation is to the fixed of landing leg 5, be convenient for carry out quick connection and demolish to two landing legs 5.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the scope of the present invention, and the technical solutions and the utility model concepts of the present invention are equivalent to or changed within the scope of the present invention.

Claims (7)

1. The utility model provides a wisdom building site embedded pipe mounting structure which characterized in that includes:
the protecting plate (1) is used for installing the embedded pipe;
a handle (2) mounted on the top end of the guard plate (1);
the supporting legs (5) are fixedly connected to the outer wall of the guard plate (1);
the mounting mechanism (3) is arranged between the guard plate (1) and the handle (2) and is used for rapidly mounting and dismounting the handle (2);
and the connecting mechanism (4) is arranged between the two support legs (5) and is used for quickly connecting and detaching the two support legs (5).
2. The intelligent building site embedded pipe installation structure is characterized in that the installation mechanism (3) comprises an installation groove (301), an installation block (302) and a fixed block (303), the installation groove (301) is arranged at the top end of the protection plate (1), the installation block (302) is fixedly connected to the bottom end of the handle (2), the fixed block (303) is slidably connected to the outer wall of the installation block (302), the inner wall of the installation groove (301) is provided with a fixed groove (304), the outer wall of the handle (2) is rotatably connected with a rotating column (305), the bottom end of the rotating column (305) is fixedly connected with a movable lead screw (306), the outer wall of the movable lead screw (306) is connected with a movable frame (307), and a fixed spring (308) is connected between the fixed block (303) and the installation block (302).
3. The intelligent building site embedded pipe mounting structure is characterized in that the connecting mechanism (4) comprises a connecting groove (401), a connecting rod (402) and a limiting plate (403), the connecting groove (401) is arranged on the outer wall of the supporting leg (5), the connecting rod (402) is slidably connected to the inner wall of the connecting groove (401), the limiting plate (403) is fixedly connected to one end of the connecting rod (402), the other end of the connecting rod (402) is rotatably connected with a limiting block (404), one end of the limiting plate (403) is slidably connected with a connecting column (405), the other end of the connecting column (405) is fixedly connected with a sliding block (406), a reset spring (407) is connected between the sliding block (406) and the connecting rod (402), and the inner wall of the sliding block (406) is connected with a connecting screw rod (408).
4. The intelligent building site embedded pipe installation structure is characterized in that the inner wall of the installation groove (301) is attached to the outer wall of the installation block (302), the outer wall of the fixing block (303) is attached to the inner wall of the fixing groove (304), and one end of the fixing block (303) is an inclined surface.
5. The intelligent construction site embedded pipe installation structure as claimed in claim 2, wherein the inner wall of the movable frame (307) is provided with an internal thread, the external thread of the movable screw rod (306) is attached to the internal thread of the movable frame (307), the bottom end of the movable frame (307) is provided with an inclined surface, and the inclined surface of the movable frame (307) is in contact with the fixed block (303).
6. The intelligent construction site embedded pipe installation structure as claimed in claim 3, wherein the inner wall of the connecting groove (401) is attached to the outer wall of the connecting rod (402), the inner wall of the connecting rod (402) is provided with a sliding groove, and the inner wall of the sliding groove is attached to the outer wall of the sliding block (406).
7. The intelligent building site embedded pipe installation structure is characterized in that an inner wall of the sliding block (406) is provided with an inner thread, an outer thread of the connecting screw rod (408) is attached to the inner thread of the sliding block (406), and the connecting screw rod (408) is fixedly connected with the limiting block (404).
CN202122230410.3U 2021-09-15 2021-09-15 Wisdom building site embedded pipe mounting structure Active CN215990117U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122230410.3U CN215990117U (en) 2021-09-15 2021-09-15 Wisdom building site embedded pipe mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122230410.3U CN215990117U (en) 2021-09-15 2021-09-15 Wisdom building site embedded pipe mounting structure

Publications (1)

Publication Number Publication Date
CN215990117U true CN215990117U (en) 2022-03-08

Family

ID=80467096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122230410.3U Active CN215990117U (en) 2021-09-15 2021-09-15 Wisdom building site embedded pipe mounting structure

Country Status (1)

Country Link
CN (1) CN215990117U (en)

Similar Documents

Publication Publication Date Title
CN205464056U (en) Get and put more convenient angle bender of reinforcing bar
CN215990117U (en) Wisdom building site embedded pipe mounting structure
CN214835386U (en) Construction guardrail
CN214064335U (en) Novel safety tool adapter
CN213420463U (en) Support convenient to dismantle and installation
CN211197087U (en) House engineering building detects uses pipeline rack
CN211176217U (en) Intelligent transportation camera convenient to disassemble and assemble
CN210194985U (en) Building curtain wall mounting and fixing support
CN210214596U (en) Support suitable for installing large-scale electric cabinet of hoist
CN210007291U (en) special cable anti-seismic support for pipe gallery
CN210421872U (en) Laminated slab overhanging scaffold I-steel embedded pipe
CN219431541U (en) Face limit guardrail fixed column
CN215977832U (en) Fireproof metal grid
CN219177418U (en) Audio player convenient to installation
CN219280926U (en) Connecting piece for steel structure combination
CN215484647U (en) Template fixing device is used in civil engineering of transformer substation
CN219571384U (en) Intelligent monitoring equipment convenient to installation and dismantlement
CN216713804U (en) Steel pipe scaffold three-way fastener for building construction
CN218118881U (en) Pipeline fixing frame for water supply engineering
CN214311603U (en) Spliced computer case
CN210898355U (en) Do benefit to cable testing bridge antidetonation supporting structure of installation
CN215564694U (en) Reinforcing device for engineering structure
CN211818247U (en) Building sliding device
CN217985667U (en) Firm outdoor communication cabinet strutting arrangement
CN213204758U (en) Embedded part for connecting assembled building handrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant