CN215978392U - Heightening device for connection of climbing frame and building structure - Google Patents
Heightening device for connection of climbing frame and building structure Download PDFInfo
- Publication number
- CN215978392U CN215978392U CN202121510386.2U CN202121510386U CN215978392U CN 215978392 U CN215978392 U CN 215978392U CN 202121510386 U CN202121510386 U CN 202121510386U CN 215978392 U CN215978392 U CN 215978392U
- Authority
- CN
- China
- Prior art keywords
- square
- plate
- fixedly connected
- building structure
- heightening device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model belongs to the field of building auxiliary equipment, in particular to a heightening device for connecting a climbing frame and a building structure, which aims at solving the problems that when the existing workers perform painting operation on the outer wall of a building in a frame body, the painting operation is required to be carried out by holding a paint bucket, time and labor are wasted, and the working efficiency of the building workers is reduced. The paint bucket height adjusting device does not need to hold the paint bucket for painting, can adjust the height of the paint bucket according to requirements, is time-saving and labor-saving, and improves the working efficiency.
Description
Technical Field
The utility model relates to the technical field of building auxiliary equipment, in particular to a heightening device for connecting a climbing frame with a building structure.
Background
The climbing frame is also called a lifting frame, and can be classified into hydraulic, electric, manual and hand-pulling types according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can climb up or down along the building.
At present, the climbing frame heightening device is not limited by the height of a building, manpower and material buildings are greatly saved, when workers paint the outer wall of the building in a frame body, the workers need to hold a paint bucket to paint, time and labor are wasted, and the working efficiency of the building workers is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects that in the prior art, when workers paint the outer wall of a building in a frame body, the painting operation needs to be carried out by holding a paint bucket, time and labor are wasted, and the working efficiency of the building workers is reduced, and provides a heightening device for connecting a climbing frame and a building structure.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a heightening device for connection of a climbing frame and a building structure comprises a slide rail fixedly arranged on a building body, wherein two slide blocks are arranged on the slide rail in a sliding manner, one side of each slide block is fixedly connected with the same frame body, the top of the slide rail is fixedly connected with a supporting plate, a motor is fixedly connected onto the supporting plate, a winding wheel is connected onto an output shaft of the motor, a steel cable is wound on the winding wheel and is fixedly connected with the upper slide block, a vertical moving groove is formed in the inner wall of one side of the frame body, a vertical moving plate is vertically and slidably arranged in the vertical moving groove, a placing box is fixedly connected onto one side of the vertical moving plate, a paint bucket is clamped in the placing box, two square block holes are formed in one side of the placing box, square blocks are slidably arranged in the square holes, two groups of square grooves are formed in the inner wall of one side of the frame body, and are clamped with one square groove, one side fixedly connected with of two square boards is same curb plate, one side fixedly connected with clamp plate of curb plate, the bottom of clamp plate contacts with the top of paint kettle, the top fixedly connected with riser of square board, the riser with place the welding between the box and have the spring.
Preferably, the vertical shifting groove is positioned between the two sets of square grooves.
Preferably, a plurality of square block grooves in the same group are arranged at equal intervals along the vertical direction.
Preferably, the other side of the side plate is fixedly connected with a pull rod.
Preferably, one side of the side plate is in contact with the placing box.
Preferably, the square plate is located below the vertical moving plate.
In the utility model, the heightening device for connecting the climbing frame and the building structure,
the paint bucket can be placed in the placing box through the vertically moving plate, the vertically moving groove, the placing box and the paint bucket, the paint bucket does not need to be held by hands, time and labor are saved, the working efficiency is improved, the paint bucket can be conveniently adjusted to a proper height according to the use requirement, and the operation is simple;
through clamp plate, curb plate, square plate, riser, spring and the square groove that sets up, when loosening the pull rod, can carry out spacing processing to collecting the box to be convenient for compress tightly spacingly to the paint kettle.
Drawings
Fig. 1 is a schematic structural view of a heightening device for connecting a climbing frame with a building structure according to the present invention;
fig. 2 is a schematic cross-sectional view of a heightening device for connecting a climbing frame with a building structure according to the present invention;
fig. 3 is a schematic structural view of a portion a in fig. 2.
In the figure: 1. a slide rail; 2. a slider; 3. a frame body; 4. a support plate; 5. a motor; 6. a reel; 7. a wire rope; 8. vertically moving the plate; 9. vertically moving the groove; 10. pressing a plate; 11. a square groove; 12. placing the box; 13. a paint bucket; 14. a square plate; 15. a vertical plate; 16. a spring; 17. side plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
The utility model provides a technical scheme of a heightening device for connecting a climbing frame and a building structure, which comprises the following steps:
according to the drawings of fig. 2 and 3, the device comprises a slide rail 1 fixedly installed on a building body, two slide blocks 2 are slidably installed on the slide rail 1, one side of each slide block 2 is fixedly connected with a same frame body 3, the top of the slide rail 1 is fixedly connected with a support plate 4, a motor 5 is fixedly connected with the support plate 4, an output shaft of the motor 5 is connected with a reel 6, a steel cable 7 is wound on the reel 6, the steel cable 7 is fixedly connected with the upper slide block 2, a vertical moving groove 9 is formed in the inner wall of one side of the frame body 3, a vertical moving plate 8 is vertically slidably installed in the vertical moving groove 9, a placing box 12 is fixedly connected with one side of the vertical moving plate 8, a paint bucket 13 is clamped in the placing box 12, two square block holes are formed in one side of the placing box 12, square plates 14 are slidably installed in the square holes, two sets of square grooves 11 are formed in the inner wall of one side of the frame body 3, and the square plates 14 are clamped with one square groove 11, the same curb plate 17 of one side fixedly connected with of two square plates 14, one side fixedly connected with clamp plate 10 of curb plate 17, the bottom of clamp plate 10 contacts with the top of paint kettle 13, the top fixedly connected with riser 15 of square plate 14, riser 15 and place and have spring 16 between the box 12, can place paint kettle 13 in placing box 12, need not hand paint kettle 13, and can highly adjust paint kettle 13, can compress tightly spacingly paint kettle 13 after the regulation is accomplished, make things convenient for the staff to use, and work efficiency is improved.
According to fig. 3, the vertical moving grooves 9 are formed between two sets of square grooves 11, the square grooves 11 in the same set are vertically arranged at equal intervals, the placing boxes 12 can be fixed at different heights, and the square plates 14 are located below the vertical moving plates 8.
According to the illustration in fig. 3, the other side of the side plate 17 is fixedly connected with a pull rod, the pull rod drives the side plate 17 to move, one side of the side plate 17 is in contact with the placing box 12, and the side plate 17 is limited.
In the utility model, when the paint spraying device is used, the pull rod is pulled, the pull rod drives the side plate 17 to move, the side plate 17 drives the pressing plate 10 and the square plate 14 to move, the square plate 14 drives the vertical plate 15 to move, the vertical plate 15 extrudes the spring 16, the square plate 14 moves out of the square groove 11, then the paint bucket 13 is placed in the placing box 12, the placing box 12 is pushed, the placing box 12 drives the vertical moving plate 8 to move, the vertical moving plate 8 slides in the vertical moving groove 9, the paint bucket 13 is adjusted to a proper height according to the height of a worker, then the pull rod is loosened, at the moment, the spring 16 drives the vertical plate 15 to move due to the elasticity of the spring, the square plate 14 can be clamped into the square groove 11 on the same horizontal axis with the square plate, the pressing plate 10 can limit the paint bucket 13, and the use of the worker is facilitated.
While there have been shown and described what are at present considered the fundamental principles and essential features of the utility model and its advantages, it will be apparent to those skilled in the art that the utility model is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (6)
1. The heightening device comprises a slide rail (1) fixedly installed on a building body, and is characterized in that two slide blocks (2) are installed on the slide rail (1) in a sliding mode, one side of each slide block (2) is fixedly connected with the same frame body (3), a supporting plate (4) is fixedly connected to the top of the slide rail (1), a motor (5) is fixedly connected to the supporting plate (4), a winding wheel (6) is connected to an output shaft of the motor (5), a steel cable (7) is wound on the winding wheel (6), the steel cable (7) is fixedly connected with the slide block (2) above the steel cable, a vertical moving groove (9) is formed in the inner wall of one side of the frame body (3), a vertical moving plate (8) is installed in the vertical moving groove (9) in a sliding mode, and a box (12) is placed in one side of the vertical moving plate (8), place box (12) inside callipers and be equipped with paint kettle (13), two square holes have been seted up to the one side of placing box (12), square hole slidable mounting has square board (14), two sets of square groove (11) have been seted up on the one side inner wall of support body (3), square board (14) clamp with a square groove (11) mutually, the same curb plate (17) of one side fixedly connected with of two square boards (14), one side fixedly connected with clamp plate (10) of curb plate (17), the bottom of clamp plate (10) contacts with the top of paint kettle (13), the top fixedly connected with riser (15) of square board (14), riser (15) and place the welding between box (12) have spring (16).
2. A ladder to building structure connection heightening device according to claim 1, wherein said vertically moving slots (9) are located between two sets of square slots (11).
3. A ladder frame and building structure coupling heightening device as set forth in claim 1, wherein a plurality of block grooves (11) in the same group are vertically provided at equal intervals.
4. A heightening device for connecting a climbing frame with a building structure according to claim 1, wherein a pull rod is fixedly connected to the other side of said side plate (17).
5. A ladder to building structure heightening device in accordance with claim 1, wherein one side of said side plate (17) is in contact with the placing case (12).
6. A creeper and building structure coupling heightening device as claimed in claim 1, in which said square plates (14) are located below the riser plates (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121510386.2U CN215978392U (en) | 2021-07-05 | 2021-07-05 | Heightening device for connection of climbing frame and building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121510386.2U CN215978392U (en) | 2021-07-05 | 2021-07-05 | Heightening device for connection of climbing frame and building structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215978392U true CN215978392U (en) | 2022-03-08 |
Family
ID=80579003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121510386.2U Active CN215978392U (en) | 2021-07-05 | 2021-07-05 | Heightening device for connection of climbing frame and building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215978392U (en) |
-
2021
- 2021-07-05 CN CN202121510386.2U patent/CN215978392U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215978392U (en) | Heightening device for connection of climbing frame and building structure | |
CN110844821B (en) | Multifunctional construction operation platform for comprehensive pipe rack | |
CN211255050U (en) | Cable lifting device | |
CN209876328U (en) | Height increasing bracket for jack | |
CN215626554U (en) | Temporary slideway convenient to hoist and mount | |
CN216472014U (en) | Plate hoisting device for building | |
CN214162879U (en) | General type hydraulic turbine servomotor fast overhaul platform | |
CN210885022U (en) | Building material lifting device | |
CN111809845A (en) | Scaffold based on movable platform | |
CN112982936B (en) | Creeping formwork structure with movable climbing workbench | |
CN112177295A (en) | Wall scraping device for building construction | |
CN217808643U (en) | Construction safety hanging basket for electric power engineering | |
CN214531893U (en) | Creeping formwork mechanism adopting lifting type operating platform | |
CN213979835U (en) | Scaffold convenient to remove | |
CN218117168U (en) | Lifting hanging basket for construction | |
CN214925867U (en) | Concrete top drilling equipment | |
CN211126813U (en) | Wire drawing device for power cable | |
CN216329057U (en) | Surface collecting platform of tube sheet independent curing kiln and curing kiln | |
CN217998841U (en) | Concrete pouring workbench for house construction | |
CN216879966U (en) | Crawler board coating equipment of crawler crane | |
CN218234401U (en) | Steel construction wallboard installation construction equipment | |
CN218668469U (en) | Aluminum alloy guide rail for climbing frame | |
CN218375346U (en) | Intelligent control device for high-altitude operation | |
CN211530576U (en) | Electric power that can multi-angle use was adjusted overhauls frame structure | |
CN210620093U (en) | A hoist device for curtain installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |