CN215978390U - Typhoon device is prevented to scaffold frame for construction - Google Patents

Typhoon device is prevented to scaffold frame for construction Download PDF

Info

Publication number
CN215978390U
CN215978390U CN202121390947.XU CN202121390947U CN215978390U CN 215978390 U CN215978390 U CN 215978390U CN 202121390947 U CN202121390947 U CN 202121390947U CN 215978390 U CN215978390 U CN 215978390U
Authority
CN
China
Prior art keywords
side wall
fixing
screw
slot
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121390947.XU
Other languages
Chinese (zh)
Inventor
邹挺
李宝泉
王伟贺
姬建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Construction Engineering Co Ltd of China Railway Electrification Engineering Group Co Ltd
Original Assignee
Beijing Construction Engineering Co Ltd of China Railway Electrification Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Construction Engineering Co Ltd of China Railway Electrification Engineering Group Co Ltd filed Critical Beijing Construction Engineering Co Ltd of China Railway Electrification Engineering Group Co Ltd
Priority to CN202121390947.XU priority Critical patent/CN215978390U/en
Application granted granted Critical
Publication of CN215978390U publication Critical patent/CN215978390U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a typhoon prevention device of a scaffold for building construction, which relates to the field of scaffolds for building construction and comprises a C-shaped hook, a fixing component and a connecting component for connecting the C-shaped hook and the fixing component; the fixing component comprises a connecting plate fixedly connected to one end side wall of the connecting component, the side walls of the two ends of the connecting plate are respectively and fixedly connected with a first fixing band and a second fixing band, the tail end of the first fixing band is fixedly connected with a clamping sleeve, a slot is formed in the side wall of the clamping sleeve in a penetrating mode, the tail end of the second fixing band penetrates into the slot and extends to the outside of the slot, the second fixing band and the side wall of the slot can slide relatively, and a plurality of clamping teeth are fixedly arranged on the side wall of the second fixing band.

Description

Typhoon device is prevented to scaffold frame for construction
Technical Field
The utility model relates to the field of scaffolds for building construction, in particular to a typhoon-proof device of a scaffold for building construction.
Background
The scaffold is a temporary building tool which is erected for workers to operate and solve vertical and horizontal transportation on a construction site, is mainly used for outer walls, interior decoration or places with higher floor height and incapable of direct construction, and is mainly used for the up-and-down dry work of constructors or maintenance of peripheral safety nets, high-altitude installation components and the like;
in the installation of scaffold frame, the scaffold frame is fixed on building wall's support post through connecting the member mostly, wherein, to typhoon stormy weather, for preventing that the scaffold frame from collapsing, guarantee construction environment safety, need consolidate the scaffold frame before typhoon stormy rain comes, traditional reinforcement mode is generally through a plurality of connecting rods and corresponding connection fastener, consolidate between scaffold frame and building wall's the support post, and the connecting rod can't carry out corresponding regulation, the support post position is also relatively fixed, make and to consolidate to certain fixed position of scaffold frame, can't carry out horizontal multiple spot fixed, and the dismouting of connecting rod is also comparatively inconvenient, for this reason we have proposed a scaffold frame for construction and have prevented the typhoon device, solve above problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defect that the scaffold in the prior art is inconvenient to reinforce, and provides a scaffold typhoon-preventing device for building construction.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a typhoon-preventing device of a scaffold for building construction comprises a C-shaped hook, a fixing component and a connecting component for connecting the C-shaped hook and the fixing component;
wherein the fixing component comprises a connecting plate fixedly connected on the side wall of one end of the connecting component, the side walls of the two ends of the connecting plate are respectively and fixedly connected with a first fixing belt and a second fixing belt, the tail end of the first fixing strap is fixedly connected with a cutting sleeve, the side wall of the cutting sleeve is provided with a slot in a penetrating way, the tail end of the second fixing strap penetrates into the slot and extends to the outside of the slot, the second fixing strap and the side wall of the slot can slide relatively, a plurality of latch teeth are fixedly arranged on the side wall of the second fixing belt, the side wall of the slot close to one side of the latch teeth is provided with an insertion hole in a penetrating way, the inner side wall of the jack is movably connected with a fixed bolt, the tail end of the fixed bolt extends to the outside of the cutting sleeve, and the fixing bolt can slide on the inner side wall of the jack, the tail end of the fixing bolt is fixedly connected with a spring, and the tail end of the spring is fixedly connected to the opposite side wall of the clamping sleeve.
Preferably, the fixing bolt is arranged on the inclined plane near the side wall of one end of the second fixing band, and the fixing bolt is clamped on the side wall of the opposite clamping tooth near the end of the second fixing band.
Preferably, coupling assembling include with connecting plate fixed connection's fixed foot, swing joint has the second screw rod on the lateral wall of fixed foot, the second screw rod can rotate on the lateral wall of fixed foot, threaded connection has the internal thread pipe on the lateral wall of second screw rod, just threaded connection has first screw rod on the inside wall that the second screw rod was kept away from to the internal thread pipe, C shape couple fixed connection is at the end of first screw rod.
Preferably, the screw threads on the side walls of the first screw and the second screw are opposite in direction.
Preferably, the outer side wall of the internal thread pipe is fixedly provided with anti-skid threads.
Preferably, the second screw rod is connected with the side wall of the fixing foot through a shaft pin, and the second screw rod can rotate by taking the shaft pin as a shaft.
The utility model has the beneficial effects that: according to the utility model, through the matched use of the C-shaped hook, the connecting assembly and the fixing assembly, the C-shaped hook is hung on a scaffold, the first fixing belt and the second fixing belt are fixed on the supporting upright post of the building wall, the internal thread pipe is rotated to enable the first screw rod and the second screw rod to move relatively, so that the connecting assembly is tensioned, the scaffold can be quickly reinforced, and the connecting assembly and the fixing foot can rotate relatively, so that the device can obliquely fix other positions of the scaffold, and is convenient, quick and easy to disassemble;
through the cooperation use between first fixed band, second fixed band, cutting ferrule, latch, the fixing bolt, through the inside with the second fixed band insert cutting ferrule, the fixed parcel scope of adjusting first fixed band and second fixed band that brings of pull second can adjust, fix on different cross sectional dimensions's support post, and application scope is wide, comparatively nimble.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a structural cross-sectional view of the present invention;
FIG. 3 is an enlarged view of portion A of FIG. 2 in accordance with the present invention;
fig. 4 is a schematic view of the installation reinforcement of the present invention.
Reference numbers in the figures: 1. c-shaped hooks; 2. a first screw; 3. a second screw; 4. an internally threaded tube; 5. a fixing leg; 6. a connecting plate; 7. a first securing strap; 8. a second securing strap; 9. a card sleeve; 10. a jack; 11. clamping teeth; 12. fixing the bolt; 13. a spring; 14. a slot; 15. and (4) anti-skid lines.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1 to 4, a scaffold typhoon prevention device for building construction includes a C-shaped hook 1, a fixing assembly and a connecting assembly for connecting the C-shaped hook 1 and the fixing assembly;
wherein, the fixing component comprises a connecting plate 6 fixedly connected on the side wall of one end of the connecting component, the side walls of the two ends of the connecting plate 6 are respectively fixedly connected with a first fixing band 7 and a second fixing band 8, the end of the first fixing band 7 is fixedly connected with a cutting sleeve 9, the side wall of the cutting sleeve 9 is provided with a slot 14 in a penetrating way, the end of the second fixing band 8 penetrates into the slot 14 and extends to the outside of the slot 14, the side walls of the second fixing band 8 and the slot 14 can slide relatively, the side wall of the second fixing band 8 is fixedly provided with a plurality of latch teeth 11, the side wall of one side of the slot 14 close to the latch teeth 11 is provided with a jack 10 in a penetrating way, the inner side wall of the jack 10 is movably connected with a fixing bolt 12, the end of the fixing bolt 12 extends to the outside of the cutting sleeve 9, the fixing bolt 12 can slide on the inner side wall of the jack 10, the end of the fixing bolt 12 is fixedly connected with a spring 13, the end of the cutting sleeve 13 is fixedly connected on the opposite side wall of the cutting sleeve 9, ensuring that the fixed bolt 12 abuts against the side wall of the latch 11;
the fixing bolt 12 is arranged in an inclined plane near the side wall of one end of the second fixing strap 8, and the end of the fixing bolt 12 near the second fixing strap 8 is clamped on the side wall of the corresponding latch 11, so that the second fixing strap 8 can be directly pulled to reduce the wrapping range of the first fixing strap 7 and the second fixing strap 8, thereby facilitating quick fixing, otherwise, the fixing bolt 12 is pulled outwards to separate the end from the side wall of the latch 11, and the second fixing strap 8 can be pulled out from the clamping sleeve 9;
the connecting assembly comprises a fixing foot 5 fixedly connected with a connecting plate 6, a second screw 3 is movably connected to the side wall of the fixing foot 5, the second screw 3 can rotate on the side wall of the fixing foot 5, an internal threaded pipe 4 is in threaded connection with the side wall of the second screw 3, a first screw 2 is in threaded connection with the inner side wall, far away from the second screw 3, of the internal threaded pipe 4, and a C-shaped hook 1 is fixedly connected to the tail end of the first screw 2;
the screw thread directions on the side walls of the first screw rod 2 and the second screw rod 3 are opposite;
the outer side wall of the internal thread pipe 4 is fixedly provided with anti-skid threads 15, so that the internal thread pipe 4 can be conveniently rotated;
the second screw rod 3 is connected with the side wall of the fixing pin 5 through a shaft pin, and the second screw rod 3 can rotate by taking the shaft pin as a shaft;
the working principle is as follows: when the fixing device is used, the C-shaped hook 1 and the internal thread pipe 4 are fixed in advance, the first screw rod 2 and the second screw rod 3 move in the internal thread pipe 4 in a face-to-face or back-to-back mode (due to the fact that threads on the side walls of the first screw rod 2 and the second screw rod 3 are opposite in a reverse direction) by rotating the internal thread pipe 4, the effective total length of the first screw rod 2, the second screw rod 3 and the internal thread pipe 4 is adjusted, then the C-shaped hook 1 is buckled on a scaffold rod piece, the first fixing belt 7 and the second fixing belt 8 are tied on a supporting upright post of a building wall, the second fixing belt 8 penetrates through a slot 14 in the clamping sleeve 9, a fixing bolt 12 is made to clamp a clamping tooth 11 on the side wall of the second fixing belt 8, relative fixing between the second fixing belt 8 and the clamping sleeve 9 can be carried out, and the whole fixing assembly is fixed on the supporting upright post by tightening the second fixing belt 8;
internal thread pipe 4 is rotated to the back, makes first screw rod 2 and second screw rod 3 move in opposite directions in the inside of internal thread pipe 4 (C shape couple 1 hangs on the scaffold frame and connecting plate 6 fixes on the stand, and the two all can't rotate along with internal thread pipe 4 together), reduces first screw rod 2, second screw rod 3, internal thread pipe 4's effective total length, and then makes coupling assembling wholly carry out the tensioning to this comes to consolidate fast the scaffold frame.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the equipment or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (6)

1. A scaffold typhoon-preventing device for building construction is characterized by comprising a C-shaped hook (1), a fixing component and a connecting component for connecting the C-shaped hook (1) and the fixing component;
wherein, the fixing component comprises a connecting plate (6) fixedly connected on the side wall of one end of the connecting component, the side walls of the two ends of the connecting plate (6) are respectively and fixedly connected with a first fixing band (7) and a second fixing band (8), the tail end of the first fixing band (7) is fixedly connected with a cutting sleeve (9), a slot (14) is arranged on the side wall of the cutting sleeve (9) in a penetrating way, the tail end of the second fixing band (8) penetrates into the slot (14) and extends to the outside of the slot (14), the second fixing band (8) and the side wall of the slot (14) can slide relatively, a plurality of clamping teeth (11) are fixedly arranged on the side wall of the second fixing band (8), a jack (10) is arranged on the side wall of one side, close to the clamping teeth (11), of the slot (14), a fixing bolt (12) is movably connected on the inner side wall of the jack (10), the end of fixing bolt (12) extends to the outside of cutting ferrule (9), just fixing bolt (12) can slide on the inside wall of jack (10), the end fixedly connected with spring (13) of fixing bolt (12), the terminal fixed connection of spring (13) is on the relative lateral wall of cutting ferrule (9).
2. The scaffold typhoon prevention device for the building construction according to claim 1, wherein the fixing bolt (12) is obliquely arranged at the end part side wall close to the second fixing band (8), and the end part of the fixing bolt (12) close to the second fixing band (8) is clamped on the opposite clamping tooth (11) side wall.
3. The scaffold typhoon prevention device for the building construction according to claim 1, wherein the connection assembly comprises a fixing foot (5) fixedly connected with the connection plate (6), a second screw (3) is movably connected to the side wall of the fixing foot (5), the second screw (3) can rotate on the side wall of the fixing foot (5), an internal thread pipe (4) is in threaded connection with the side wall of the second screw (3), a first screw (2) is in threaded connection with the inner side wall of the internal thread pipe (4) far away from the second screw (3), and the C-shaped hook (1) is fixedly connected to the tail end of the first screw (2).
4. The scaffold typhoon prevention device for building construction according to claim 3, wherein the first screw (2) and the second screw (3) have opposite thread directions on the side wall.
5. The scaffold typhoon prevention device for building construction according to claim 3, wherein the outer side wall of the internally threaded tube (4) is fixedly provided with anti-slip threads (15).
6. The scaffold typhoon prevention device for building construction according to claim 3, wherein the second screw (3) is connected with the side wall of the fixing leg (5) through a shaft pin, and the second screw (3) can rotate with the shaft pin as an axis.
CN202121390947.XU 2021-06-22 2021-06-22 Typhoon device is prevented to scaffold frame for construction Active CN215978390U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121390947.XU CN215978390U (en) 2021-06-22 2021-06-22 Typhoon device is prevented to scaffold frame for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121390947.XU CN215978390U (en) 2021-06-22 2021-06-22 Typhoon device is prevented to scaffold frame for construction

Publications (1)

Publication Number Publication Date
CN215978390U true CN215978390U (en) 2022-03-08

Family

ID=80578409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121390947.XU Active CN215978390U (en) 2021-06-22 2021-06-22 Typhoon device is prevented to scaffold frame for construction

Country Status (1)

Country Link
CN (1) CN215978390U (en)

Similar Documents

Publication Publication Date Title
US7637351B2 (en) Scaffold safety apparatus
EP2378032B1 (en) Soft net containment
CN215978390U (en) Typhoon device is prevented to scaffold frame for construction
CN210659348U (en) Safety protection structure that building support set up
KR100925539B1 (en) Piton for wall and falling preventer for wall thereby
CN110714603A (en) Steel pipe and steel rope composite scaffold system and construction method thereof
CN109441093A (en) Casing wall-through pull rod formula connects wall fixed Combination device and its construction method of installation
CN202324585U (en) Connecting tube of holistic inserted lift scaffold with steel frame structure for high-rise buildings
CN210342875U (en) Outdoor tent support structure
CN207406026U (en) A kind of plug-in protective device of assembled architecture
CN209413271U (en) Casing wall-through pull rod formula connects wall fixed Combination device
KR200172587Y1 (en) Supporting struture of a net for hanging
CN206110643U (en) Scaffold frame perpendicular fixed knot construct
CN210105250U (en) Scaffold frame for construction that can splice
JPH0122852Y2 (en)
CN220100611U (en) Rapid step installation device for scaffold
CN218522201U (en) Hanging basket supporting platform at high parapet wall
CN214170001U (en) Safety protection system for disassembling and assembling external scaffold
CN220336419U (en) Structure of climbing frame net buckle
CN220247563U (en) Pre-buried steel plate type full concrete outer wall connecting piece
CN214531861U (en) Protective net connecting device
CN218714937U (en) Climb frame and prevent wind drawknot device
CN214302797U (en) Flower basket pull rod type overhanging scaffold
CN210370142U (en) Outdoor portable fence
CN219219716U (en) Anti-falling scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant