CN215976901U - Supporting platform for maintaining and reinforcing arch bridge - Google Patents

Supporting platform for maintaining and reinforcing arch bridge Download PDF

Info

Publication number
CN215976901U
CN215976901U CN202121673756.4U CN202121673756U CN215976901U CN 215976901 U CN215976901 U CN 215976901U CN 202121673756 U CN202121673756 U CN 202121673756U CN 215976901 U CN215976901 U CN 215976901U
Authority
CN
China
Prior art keywords
template
arc
flotation tank
operation platform
tank operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121673756.4U
Other languages
Chinese (zh)
Inventor
邵文康
宋志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiujian Reinforcing Technology Co ltd
Original Assignee
Shanghai Jiujian Reinforcing Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiujian Reinforcing Technology Co ltd filed Critical Shanghai Jiujian Reinforcing Technology Co ltd
Priority to CN202121673756.4U priority Critical patent/CN215976901U/en
Application granted granted Critical
Publication of CN215976901U publication Critical patent/CN215976901U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a supporting platform for maintaining and reinforcing an arch bridge, and belongs to the technical field of maintaining and reinforcing the arch bridge. It includes flotation tank operation platform, founds template and arc template, flotation tank operation platform establishes on the surface of water at arched bridge hole place, and the top intermediate position of pier is equipped with the stand, the bottom fixed mounting of founding the template is on the pier at arched bridge place, and founds one side of template and the lateral wall of stand and fix mutually, arc template fixed mounting is on arched bridge hole, just the both ends of arc template are fixed mutually with founding the template respectively, just flotation tank operation platform is located the arc template under. This device sets up flotation tank operation platform on the surface of water at arched bridge opening to need not to consider the depth of water, in addition, founds template and arc template and establishes on the pier, thereby can save the time of building the scaffold frame, labour saving and time saving, and the application is wide, is worth promoting.

Description

Supporting platform for maintaining and reinforcing arch bridge
Technical Field
The utility model relates to a supporting platform for maintaining and reinforcing an arch bridge, and belongs to the technical field of maintenance and reinforcement of arch bridges.
Background
At present, to the reinforcement of arched bridge opening, mainly insert the scaffold in the water of bridge opening bottom, then install operation platform on the scaffold, make the people can stand and construct on the operation platform of scaffold, still install the template on the scaffold in addition, the purpose is to consolidate the maintenance to arched bridge opening, but adopt above-mentioned method, waste time and energy when setting up the scaffold, thereby lead to the time extension of maintenance reinforcement, on the other hand, because the scaffold is soaked in water, need consider the depth of water, design an arched bridge maintenance for reinforcement and solve above-mentioned problem for this.
Disclosure of Invention
The present invention is implemented by the following technical solutions in view of the technical problems mentioned in the background art:
the utility model provides an arch bridge maintenance consolidates and uses supporting platform, includes flotation tank operation platform, founds template and arc template, flotation tank operation platform establishes on the surface of water at arch bridge hole place, and the top intermediate position of pier is equipped with the stand, the bottom fixed mounting of founding the template is on the pier at arch bridge place, and just one side of founding the template is fixed mutually with the lateral wall of stand, arc template fixed mounting is on arch bridge hole, just the both ends of arc template are fixed mutually with founding the template respectively, just flotation tank operation platform is located the arc template under.
As a preferred example, the arc-shaped formwork and the vertical formwork are integrally formed.
As a preferred example, the material of the arc-shaped template and the material of the vertical template are both the shaping rigid mold.
The utility model has the beneficial effects that: this device sets up flotation tank operation platform on the surface of water at arched bridge opening to need not to consider the depth of water, in addition, founds template and arc template and establishes on the pier, thereby can save the time of building the scaffold frame, labour saving and time saving, and the application is wide, is worth promoting.
Drawings
FIG. 1 is a schematic structural view of the present invention;
in the figure: pier 1, upright template 2, arc template 3, stand 4, flotation tank operation platform 5.
Detailed Description
In order to make the technical means, the original characteristics, the achieved purpose and the efficacy of the utility model easy to understand, the utility model is further described with reference to the specific drawings.
As shown in fig. 1, an arch bridge maintains and consolidates and uses supporting platform, including flotation tank operation platform 5, founds template 2 and arc template 3, flotation tank operation platform 5 is established on the surface of water at arch bridge hole place, the top intermediate position of pier 1 is equipped with stand 4, the bottom fixed mounting of founding template 2 is on pier 1 at arch bridge place, and one side of founding template 2 is fixed mutually with the lateral wall of stand 4, 3 fixed mounting of arc template are on arch bridge hole, and the both ends of arc template 3 are fixed mutually with founding template 2 respectively, and flotation tank operation platform 5 is located arc template 3 under.
The arc-shaped template 3 and the vertical template 2 are integrally formed.
The arc-shaped template 3 and the vertical template 2 are both formed rigid moulds.
The working principle is as follows: this device sets up flotation tank operation platform 5 on the surface of water at arched bridge opening to need not to consider the depth of water, in addition, founds template 2 and arc template 3 and establishes on pier 1, thereby can save the time of building the scaffold, labour saving and time saving, and the application is wide, is worth promoting.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and that various changes and modifications may be made without departing from the spirit and scope of the utility model as defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (3)

1. The utility model provides an arch bridge maintains and consolidates uses supporting platform which characterized in that: including flotation tank operation platform (5), founding template (2) and arc template (3), establish on the surface of water at arched bridge hole place flotation tank operation platform (5), the top intermediate position of pier (1) is equipped with stand (4), the bottom fixed mounting of founding template (2) is on pier (1) at arched bridge place, and one side of founding template (2) is fixed mutually with the lateral wall of stand (4), arc template (3) fixed mounting is on arched bridge hole, just the both ends of arc template (3) are fixed mutually with founding template (2) respectively, just flotation tank operation platform (5) are located arc template (3) under.
2. The supporting platform for repairing and reinforcing an arch bridge according to claim 1, wherein: the arc-shaped template (3) and the vertical template (2) are integrally formed.
3. The supporting platform for repairing and reinforcing an arch bridge according to claim 1, wherein: the arc-shaped template (3) and the vertical template (2) are both formed rigid molds.
CN202121673756.4U 2021-07-22 2021-07-22 Supporting platform for maintaining and reinforcing arch bridge Active CN215976901U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121673756.4U CN215976901U (en) 2021-07-22 2021-07-22 Supporting platform for maintaining and reinforcing arch bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121673756.4U CN215976901U (en) 2021-07-22 2021-07-22 Supporting platform for maintaining and reinforcing arch bridge

Publications (1)

Publication Number Publication Date
CN215976901U true CN215976901U (en) 2022-03-08

Family

ID=80577863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121673756.4U Active CN215976901U (en) 2021-07-22 2021-07-22 Supporting platform for maintaining and reinforcing arch bridge

Country Status (1)

Country Link
CN (1) CN215976901U (en)

Similar Documents

Publication Publication Date Title
CN101324057B (en) Subway unballasted track ditch construction method and used formwork
CN111677275A (en) Adjustable column template
CN215976901U (en) Supporting platform for maintaining and reinforcing arch bridge
CN206123903U (en) Prefabricated assembled concrete stairway mould
CN216689076U (en) A prefabricated apron that is used for hollow mound top to pour construction
CN211250563U (en) Pouring die for bearing wall board
CN205382505U (en) Board -like concrete air cooling platform basis of rib is erected in area
CN209687504U (en) A kind of tunnel inverted arch one-time-concreting molding machine
CN209412687U (en) A kind of concrete cast template system for large-scale aqueduct
CN211137559U (en) Building cement pouring fabricated model
CN208202342U (en) A kind of frame column root exempt from dabbing construction
CN210152282U (en) Device for controlling thickness of cast-in-situ reinforced concrete floor
CN205445133U (en) Assembled is combination formula anti -wind post structure for enclosure
CN112376569B (en) Structure for pouring bottom plate by using abandoned dewatering well as string barrel
CN214696840U (en) Template system for foundation pit construction
CN206736950U (en) A kind of special-shaped anchor ear applied to glass steel formwork
CN213951952U (en) Device is assembled in pouring of bridge template
CN211850843U (en) Integrally-formed stair mounting beam template
CN217967529U (en) Cement pouring template for hydraulic engineering construction
CN215702755U (en) Prefabricated concrete steel template inverted-insertion type fishback fixing device
CN2386102Y (en) External mould type sandwich cement form board
CN221321051U (en) Novel prefabricated inspection shaft apron of preventing shifting
CN218521603U (en) UHPC-PC combined bent cap without support construction
CN217997986U (en) Mountain style of calligraphy template reinforcing apparatus
CN210164020U (en) Flat plate type vibrating device for pouring side wall of ditch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant