CN215965316U CN202122126869.9U CN202122126869U CN215965316U CN 215965316 U CN215965316 U CN 215965316U CN 202122126869 U CN202122126869 U CN 202122126869U CN 215965316 U CN215965316 U CN 215965316U
Authority
CN
China
Prior art keywords
fixedly connected
box body
water
fixed blocks
hydraulic engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122126869.9U
Other languages
Chinese (zh)
Inventor
王福民
王希鸿
凌伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Junpeng Municipal Garden Engineering Co ltd
Original Assignee
Ningxia Junpeng Municipal Garden Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Junpeng Municipal Garden Engineering Co ltd filed Critical Ningxia Junpeng Municipal Garden Engineering Co ltd
Priority to CN202122126869.9U priority Critical patent/CN215965316U/en
Application granted granted Critical
Publication of CN215965316U publication Critical patent/CN215965316U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of pipelines, in particular to a pipeline dredging device for hydraulic engineering construction, which comprises a box body, wherein the upper right side wall of the interior of the box body is provided with a motor, the output end of the motor is connected with a rotating shaft, the right end of the rotating shaft is connected with a mounting plate, the right end of the mounting plate is connected with a mounting block, the upper left side and the upper right side of the mounting block are both connected with first fixed blocks, one ends of the two first fixed blocks, which are far away from the mounting block, are both connected with first connecting plates, the right ends of the two first connecting plates are both connected with second fixed blocks, the right ends of the two fixed blocks are both connected with a cleaning device, through setting up electric putter, make electric putter drive cleaning device through first connecting plate, second connecting plate and third connecting plate and remove, make cleaning device's the outside and the inner wall laminating of pipeline, be convenient for clear up the inner wall of pipeline through cleaning device, improve and use convenience and usability.

Description

Pipeline dredging device for hydraulic engineering construction
Technical Field
The utility model relates to the technical field of pipelines, in particular to a pipeline dredging device for hydraulic engineering construction.
Background
A pipe is a device for conveying a gas, a liquid or a fluid with solid particles, which is formed by connecting pipes, pipe connectors, valves and the like, and generally, the fluid is pressurized by a blower, a compressor, a pump, a boiler and the like, flows from a high pressure position to a low pressure position of the pipe, and can also be conveyed by using the pressure or gravity of the fluid.
Pipeline that hydraulic engineering used is after long-term use, and the inner wall of pipeline can produce the dirt, avoids the too much pipeline jam that leads to of later stage dirt, need to continue the clearance to it, and current clearance mode needs clear up through the inside that the manual work got into the pipeline, uses convenience and practicality lower.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides the pipeline dredging device for hydraulic engineering construction, which can quickly clean the interior of a pipeline, avoid manual work entering the interior of the pipeline for cleaning, and improve the use convenience and practicability.
(II) technical scheme
In order to achieve the purpose, the utility model provides the following technical scheme: a pipeline dredging device for hydraulic engineering construction comprises a box body, wherein a motor is installed on the upper right side wall of the interior of the box body, a rotating shaft is fixedly connected with the output end of the motor, the right end of the rotating shaft penetrates through a right end fixedly connected with installation plate of the box body, a first transmission wheel is fixedly connected with the outer side of the rotating shaft, a worm is transversely and rotatably connected with the interior of the box body, a second transmission wheel is fixedly connected with the outer side of the worm, the second transmission wheel is connected with the first transmission wheel through belt transmission, a rotating rod is arranged below the worm, the front end and the rear end of the rotating rod both penetrate through the inner side wall of the box body and are fixedly connected with a first roller wheel, a turbine is fixedly connected with the outer side of the rotating rod and is meshed with the worm, a second roller wheel is fixedly connected with the right front side and the right rear side of the bottom end of the box body, an installation block is fixedly connected with an installation block, and is provided with a through groove which penetrates left and right, an electric push rod is arranged inside the through groove, the left end of the electric push rod is fixedly connected with the right end of the mounting plate, the upper left side and the upper right side of the mounting block are both fixedly connected with first fixed blocks, the ends, far away from the mounting block, of the two first fixed blocks are both rotatably connected with first connecting plates through shafts, the right ends of the two first connecting plates are both rotatably connected with second fixed blocks through shafts, the right ends of the two fixed blocks are both fixedly connected with cleaning devices, the ends, far away from the mounting block, of the two first fixed blocks are both fixedly connected with third fixed blocks, the ends, far away from the two third fixed blocks, of the two second connecting plates are both rotatably connected with second connecting plates through shafts, the ends, far away from the two third fixed blocks, of the two second connecting plates are both rotatably connected with fourth fixed blocks through shafts, the ends, far away from the two second connecting plates, of the two fourth fixed blocks are both fixedly connected with the mounting block, and an adjusting plate is fixedly connected with the right end of the electric push rod, the top end and the bottom end of the adjusting plate are both rotatably connected with third connecting plates through shafts, one ends, far away from the adjusting plate, of the two third connecting plates are both rotatably connected with fifth fixing blocks through shafts, and one ends, far away from the two third connecting plates, of the two fifth fixing blocks are fixedly connected with the two second connecting plates respectively.
Further, the top fixedly connected with water tank of box, the water pump is installed to the last left side wall of the inside of box, the first water pipe of input fixedly connected with of water pump, and the top of box and the bottom intercommunication of water tank are passed to the one end that the water pump was kept away from to first water pipe, the output end fixedly connected with second water pipe of water pump, the left end fixedly connected with shower nozzle that the box was passed to the one end that the water pump was kept away from to the second water pipe.
Furthermore, the upper left side of water tank is provided with the water filling port that runs through about, and the inside fixedly connected with water injection pipe of water filling port, the left end fixedly connected with valve of water injection pipe.
Further, cleaning device includes the connecting block, the even fixedly connected with a plurality of brushes in the outside of connecting block.
Furthermore, an observation strip is arranged at the front end of the water tank.
Furthermore, the front end and the rear end of the box body are fixedly connected with handles.
(III) advantageous effects
Compared with the prior art, the utility model provides a pipeline dredging device for hydraulic engineering construction, which has the following beneficial effects:
1. this pipeline desilting device for hydraulic engineering construction through setting up electric putter, makes electric putter drive cleaning device through first connecting plate, second connecting plate and third connecting plate and removes, makes cleaning device's the outside and the inner wall laminating of pipeline, is convenient for clear up the inner wall of pipeline through cleaning device, improves and uses convenience and usability.
2. This pipeline desilting device for hydraulic engineering construction through setting up the motor, makes the motor rotate and drives two cleaning device and rotate in the inside of pipeline, makes its inner wall to the pipeline evenly clear up, improves the practicality.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1A;
FIG. 3 is a left side view of the present invention.
In the figure: 1. a box body; 2. a motor; 3. mounting a plate; 4. a first drive pulley; 5. a worm; 6. a second transmission wheel; 7. a belt; 8. a rotating rod; 9. a first roller; 10. a turbine; 11. a second roller; 12. mounting blocks; 13. an electric push rod; 14. a first fixed block; 15. a first connecting plate; 16. a second fixed block; 17. a cleaning device; 18. a third fixed block; 19. a second connecting plate; 20. a fourth fixed block; 21. an adjusting plate; 22. a third connecting plate; 23. a fifth fixed block; 24. a water tank; 25. a water pump; 26. a first water pipe; 27. a second water pipe; 28. a spray head; 29. a water injection pipe; 30. a valve; 31. connecting blocks; 32. a brush; 33. an observation strip; 34. a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-3, a pipeline dredging device for hydraulic engineering construction comprises a box body 1, a motor 2 is installed on the upper right side wall inside the box body 1, a rotating shaft is fixedly connected to the output end of the motor 2, a mounting plate 3 is fixedly connected to the right end of the rotating shaft, which penetrates through the right end of the box body 1, a first driving wheel 4 is fixedly connected to the outer side of the rotating shaft, a worm 5 is transversely and rotatably connected inside the box body 1, a second driving wheel 6 is fixedly connected to the outer side of the worm 5, the second driving wheel 6 is in transmission connection with the first driving wheel 4 through a belt 7, a rotating rod 8 is arranged below the worm 5, a first roller 9 is fixedly connected to the inner side wall of the box body 1, a turbine 10 is fixedly connected to the outer side of the rotating rod 8, the turbine 10 is meshed with the worm 5, the turbine 10 is driven by the worm 5 to rotate, so that the turbine 10 drives the two first rollers 9 to rotate through the rotating rod 8, the device is moved, a second roller 11 is fixedly connected to the right front side and the right rear side of the bottom end of the box body 1, a mounting block 12 is fixedly connected to the right end of the mounting plate 3, a through groove which penetrates through the right and left sides is arranged on the mounting block 12, an electric push rod 13 is arranged inside the through groove, the left end of the electric push rod 13 is fixedly connected with the right end of the mounting plate 3, first fixing blocks 14 are fixedly connected to the upper left side and the upper right side of the mounting block 12, one ends of the two first fixing blocks 14 far away from the mounting block 12 are both rotatably connected with first connecting plates 15 through shafts, the right ends of the two first connecting plates 15 are both rotatably connected with second fixing blocks 16 through shafts, cleaning devices 17 are both fixedly connected to the right ends of the two fixing blocks, a third fixing block 18 is both fixedly connected to the opposite ends of the two cleaning devices 17, a second connecting plate 19 is both rotatably connected to the opposite ends of the two third fixing blocks 18 through shafts, one ends of the two second connecting plates 19 far away from the two third fixing blocks 18 are both rotatably connected with a fourth fixing block 20 through a shaft, one ends of the two fourth fixing blocks 20 far away from the two second connecting plates 19 are both fixedly connected with the mounting block 12, the right end of the electric push rod 13 is fixedly connected with an adjusting plate 21, the top end and the bottom end of the adjusting plate 21 are both rotatably connected with a third connecting plate 22 through a shaft, one ends of the two third connecting plates 22 far away from the adjusting plate 21 are both rotatably connected with a fifth fixing block 23 through a shaft, one ends of the two fifth fixing blocks 23 far away from the two third connecting plates 22 are respectively fixedly connected with the two second connecting plates 19, through the arrangement, the electric push rod 13 drives the cleaning device 17 to move through the first connecting plate 15, the second connecting plates 19 and the third connecting plates 22, so that the outer side of the cleaning device 17 is attached to the inner wall of the pipeline, and the cleaning device 17 is convenient for cleaning the inner wall of the pipeline, the use convenience and the usability are improved.
It should be further noted that, a water tank 24 is fixedly connected to the top end of the box body 1, a water pump 25 is installed on the upper left side wall inside the box body 1, an input end of the water pump 25 is fixedly connected with a first water pipe 26, one end of the first water pipe 26 far away from the water pump 25 passes through the top end of the box body 1 and is communicated with the bottom end of the water tank 24, an output end of the water pump 25 is fixedly connected with a second water pipe 27, one end of the second water pipe 27 far away from the water pump 25 passes through the left end of the box body 1 and is fixedly connected with a spray head 28, water is sprayed into the inside of the pipeline through the spray head 28 to dilute dirt inside the pipeline, so as to facilitate cleaning and improve use reliability, a water injection port penetrating from left to right is arranged on the left upper side of the water tank 24, a water injection pipe 29 is fixedly connected to the inside of the water injection port, a valve 30 is fixedly connected to the left end of the water injection pipe 29, the cleaning device 17 includes a connecting block 31, and a plurality of brushes 32 are uniformly and fixedly connected to the outside of the connecting block 31, the front end of water tank 24 is provided with observation strip 33, is convenient for observe the inside water level of water tank 24 through observation strip 33, improves the convenience of use, the equal fixedly connected with handle 34 in front end and the rear end of box 1.
In this embodiment, the model of the motor 2 is selected as follows: y90s-2, the model of the electric push rod 13 is selected as follows: the ANT-52 and the water pump 25 are 150QJ10-50/7, and the motor 2, the water pump 25 and the electric push rod 13 are all devices directly purchased from the market and known by persons skilled in the art, and here, we only use them, and do not improve them in structure and function, and we will not describe here in detail.
To sum up, this pipeline desilting device for hydraulic engineering construction's theory of operation and working process do, when using, at first place the inside of the pipeline of required clearance with the device, then open electric putter 13, make electric putter 13 drive cleaning device 17 through first connecting plate 15, second connecting plate 19 and third connecting plate 22 and remove, make the outside of cleaning device 17 and the inner wall laminating of pipeline, open water pump 25, make it pass through shower nozzle 28 with the water of water tank 24 and spill the inside of pipeline, make it dilute the inside spot of pipeline, then open motor 2, make motor 2 rotate and drive two cleaning device 17 and rotate in the inside of pipeline, make it evenly clear up the inner wall of pipeline, drive two first gyro wheels 9 through motor 2 simultaneously and rotate, make the device remove the washing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pipeline desilting device for hydraulic engineering construction, includes box (1), its characterized in that: the upper right side wall of the interior of the box body (1) is provided with a motor (2), the output end of the motor (2) is fixedly connected with a rotating shaft, the right end of the rotating shaft penetrates through a right end fixedly connected with mounting plate (3) of the box body (1), the outer side of the rotating shaft is fixedly connected with a first driving wheel (4), the interior of the box body (1) is transversely rotatably connected with a worm (5), the outer side of the worm (5) is fixedly connected with a second driving wheel (6), the second driving wheel (6) is in transmission connection with the first driving wheel (4) through a belt (7), a rotating rod (8) is arranged below the worm (5), the front end and the rear end of the rotating rod (8) both penetrate through a first idler wheel (9) fixedly connected with the inner side wall of the box body (1), the outer side of the rotating rod (8) is fixedly connected with a turbine (10), the turbine (10) is meshed with the worm (5), the right front side and the right rear side of the bottom end of the box body (1) are both fixedly connected with a second idler wheel (11), the right end of the mounting plate (3) is fixedly connected with a mounting block (12), the mounting block (12) is provided with a through groove which penetrates through the left and right, an electric push rod (13) is arranged in the through groove, the left end of the electric push rod (13) is fixedly connected with the right end of the mounting plate (3), the upper left side and the upper right side of the mounting block (12) are respectively and fixedly connected with a first fixed block (14), one ends of the two first fixed blocks (14) far away from the mounting block (12) are respectively and rotatably connected with a first connecting plate (15) through shafts, the right ends of the two first connecting plates (15) are respectively and rotatably connected with a second fixed block (16) through shafts, the right ends of the two fixed blocks are respectively and fixedly connected with cleaning devices (17), the opposite ends of the two cleaning devices (17) are respectively and fixedly connected with a third fixed block (18), and the opposite ends of the two third fixed blocks (18) are respectively and rotatably connected with a second connecting plate (19) through shafts, the end, far away from two third fixed blocks (18), of two second connecting plates (19) is connected with a fourth fixed block (20) through axle rotation, the end, far away from two second connecting plates (19), of two fourth fixed blocks (20) is connected with an installation block (12) fixedly, the right-hand member fixedly connected with regulating plate (21) of electric putter (13), the top and the bottom of regulating plate (21) are connected with a third connecting plate (22) through axle rotation, the end, far away from regulating plate (21), of two third connecting plates (22) is connected with a fifth fixed block (23) through axle rotation, and the end, far away from two third connecting plates (22), of two fifth fixed blocks (23) is connected with two second connecting plates (19) fixedly respectively.
2. The pipeline dredging device for hydraulic engineering construction according to claim 1, characterized in that: the utility model discloses a water pump, including box (1), the top fixedly connected with water tank (24) of box (1), water pump (25) are installed to the last left side wall of the inside of box (1), the first water pipe (26) of input fixedly connected with of water pump (25), and the top of box (1) and the bottom intercommunication of water tank (24) are passed to the one end that water pump (25) were kept away from in first water pipe (26), the output fixedly connected with second water pipe (27) of water pump (25), and the left end fixedly connected with shower nozzle (28) of box (1) are passed to the one end that water pump (25) were kept away from in second water pipe (27).
3. The pipeline dredging device for hydraulic engineering construction according to claim 2, characterized in that: the water tank is characterized in that a water injection port penetrating left and right is formed in the upper left side of the water tank (24), a water injection pipe (29) is fixedly connected to the inside of the water injection port, and a valve (30) is fixedly connected to the left end of the water injection pipe (29).
4. The pipeline dredging device for hydraulic engineering construction according to claim 3, wherein: cleaning device (17) are including connecting block (31), and the even fixedly connected with a plurality of brushes (32) in the outside of connecting block (31).
5. The pipeline dredging device for hydraulic engineering construction according to claim 4, wherein: an observation strip (33) is arranged at the front end of the water tank (24).
6. The pipeline dredging device for hydraulic engineering construction according to claim 5, wherein: the front end and the rear end of the box body (1) are fixedly connected with handles (34).
CN202122126869.9U 2021-09-03 2021-09-03 Pipeline dredging device for hydraulic engineering construction Expired - Fee Related CN215965316U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122126869.9U CN215965316U (en) 2021-09-03 2021-09-03 Pipeline dredging device for hydraulic engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122126869.9U CN215965316U (en) 2021-09-03 2021-09-03 Pipeline dredging device for hydraulic engineering construction

Publications (1)

Publication Number Publication Date
CN215965316U true CN215965316U (en) 2022-03-08

Family

ID=80582955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122126869.9U Expired - Fee Related CN215965316U (en) 2021-09-03 2021-09-03 Pipeline dredging device for hydraulic engineering construction

Country Status (1)

Country Link
CN (1) CN215965316U (en)

Similar Documents

Publication Publication Date Title
CN213349428U (en) Intelligent robot for derusting and spraying in pipeline
CN207438029U (en) Silt device is removed inside a kind of water pipeline
CN107838098B (en) Automobile parts gear belt cleaning device
CN112705532B (en) Pipeline inner wall cleaning device for water conservancy construction
CN107667876A (en) A kind of pig farm excrement cleaning plant
CN207055853U (en) A kind of basketball Rapid Cleaning drying plant
CN215559093U (en) A equalizing basin for sewage treatment
CN213409690U (en) Coal pipeline cleaning device under boiler
CN215965316U (en) Pipeline dredging device for hydraulic engineering construction
CN210597434U (en) Hydraulic engineering desilting device
CN112337910A (en) Automatic cleaning robot for oil smoke pipeline
CN217919502U (en) Inside clearance structure of oil storage tank
CN215759531U (en) Pipeline pull throughs for municipal works
CN204996037U (en) Fire control area belt cleaning device
CN207476577U (en) A kind of pig farm excrement cleaning plant
CN217070005U (en) Self-propelled pipeline internal cleaning device
CN213871316U (en) Valve with self-cleaning and self-cleaning functions
CN213409687U (en) Pipeline cleaning device for natural gas pipeline transportation
CN212824180U (en) High-efficient belt cleaning device of digit control machine tool
CN213268296U (en) Dredging equipment for municipal pipeline
CN217888935U (en) Pipeline is scale removal robot under water
CN220477534U (en) Concrete surface cleaning device
CN111622341A (en) Dredging device for hydraulic engineering
CN115143339B (en) Repairing device and method for urban underground drainage pipeline
CN217094829U (en) Petroleum pipeline cleaning equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220308

CF01 Termination of patent right due to non-payment of annual fee