CN215964990U - Safety device for building engineering project management - Google Patents

Safety device for building engineering project management Download PDF

Info

Publication number
CN215964990U
CN215964990U CN202122453849.2U CN202122453849U CN215964990U CN 215964990 U CN215964990 U CN 215964990U CN 202122453849 U CN202122453849 U CN 202122453849U CN 215964990 U CN215964990 U CN 215964990U
Authority
CN
China
Prior art keywords
wall
box
clearance board
clearance
top surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122453849.2U
Other languages
Chinese (zh)
Inventor
郭文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122453849.2U priority Critical patent/CN215964990U/en
Application granted granted Critical
Publication of CN215964990U publication Critical patent/CN215964990U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a safety protection device for building engineering project management, and belongs to the technical field of building engineering project management devices. The utility model provides a safety device of building engineering project management, including the equipment principal, equipment principal left side is connected with places the box, place and install the camera in the box, place box middle part top surface fixedly connected with water tank, it has electric push rod to place box front end top surface through connection, the electric push rod lower extreme passes and places box top surface and extend to inside and be connected with the clearance board, clearance board rear side inner wall is linear structure and is equipped with a plurality of sealing plugs, it is connected with the pivot to place box front end downside inner wall rotation, the pivot rear side is equipped with the stripper plate, through setting up the clearance board, utilize the electric push rod can drive the clearance board to move down, carry out automatic clearance, replace artifical clearance, time saving and labor saving, realize the automation, utilize the sealing plug, can go out water when contacting with the camera, thereby make the clearance effect improve greatly.

Description

Safety device for building engineering project management
Technical Field
The utility model relates to the technical field of constructional engineering project management devices, in particular to a safety protection device for constructional engineering project management.
Background
The construction project comprises an engineering construction project, a single project, a unit project, a subsection project and a sub project. The construction project is an engineering construction project which has a design task book and an overall design, is economically subjected to independent accounting and has an independent organization form in management. A construction project often comprises one or several individual projects, project management utilizes the show board to demonstrate, prior art CN213871865U discloses a safety device of construction project management, through setting up the motor, carousel and telescopic link, in the device course of operation, the motor drives the carousel and rotates, and then make it drive the camera and rotate, can make the camera carry out comprehensive making a video recording to the job site, the administrator of being convenient for carries out whole management to the job site, simultaneously when the discovery picture of making a video recording is not clear, reduce the height of camera through the telescopic link, then clear up the dust on camera surface through the manual work, and then guarantee the definition of camera picture, improve the device practicality. However, the device still has the disadvantages that when the device is used, the camera needs to be cleaned manually, which is troublesome and poor in automation, and meanwhile, because the camera in the device is directly exposed outside, the protection effect is poor, the construction site environment is poor, the service life of the camera can be shortened.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
The utility model aims to provide a safety protection device for building engineering project management, which aims to solve the problems in the background technology.
2. Technical scheme
The utility model provides a safety device of building engineering project management, includes the equipment principal, the equipment principal left side is connected with places the box, place and install the camera in the box, place box middle part top surface fixedly connected with water tank, it has electric push rod to place box front end top surface through connection, electric push rod lower extreme passes places the box top surface and extends to inside and be connected with the clearance board, clearance board rear side inner wall is linear structure and is equipped with a plurality of sealing plugs, it is connected with the pivot to place box front end downside inner wall rotation, the pivot rear side is equipped with the stripper plate.
Preferably, clearance inboard portion is the hollow structure setting, clearance inboard middle part top surface through connection has the hose, hose upper end and water tank intercommunication, clearance inboard right-hand member bottom surface is connected with the rack, the wall is connected with the sponge cover behind the clearance board, sponge cover and camera antetheca frictional contact, the wall is linear structure behind the clearance board and has seted up a plurality of bell mouths.
Preferably, the sealing plug is arranged in a conical structure, the outer wall of the rear end of the sealing plug is in close contact with the inner wall of the conical hole, and the front wall of the sealing plug is fixedly connected with the inner wall of the front end of the cleaning plate through a spring.
Preferably, the left end and the right end of the rotating shaft are rotatably connected with the inner wall of the front end of the placing box, the outer wall of the right end of the rotating shaft is sleeved with a gear, the gear and the rack are in meshing transmission, and the outer wall of the left end of the rotating shaft is provided with a groove in an annular structure.
Preferably, the antetheca is connected with the lug under the stripper plate, lug outer wall and recess inner wall sliding fit, stripper plate rear end outer wall and the spout inner wall sliding fit who sets up in placing box front end inner wall, stripper plate upper end antetheca and sponge cover extrusion contact.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages that:
1. through setting up the clearance board, utilize the electric putter can drive the clearance board and move down, carry out automatic clearance, replace artifical clearance, labour saving and time saving realizes automaticly, utilize the sealing plug, can go out water when contacting with the camera, thereby make the clearance effect improve greatly, replace artifical clearance, avoided artifical clearance untimely, influence the detection effect greatly, thereby can influence whether the potential safety hazard that construction exists correctly and safety to the construction workman and monitor.
2. Through setting up the stripper plate, when the stripper plate clearance was good to be removed the downside, can drive the pivot for the stripper plate removes, thereby extrudees the sponge cover that is stained with the dust, makes the dirty water that has the filth fall down, realizes the clearance of sponge cover, places the box simultaneously and has played the protection to the camera, avoids receiving the collision in the monitoring process and leads to damaging, thereby influences the safety protection monitoring of engineering project construction progress.
Drawings
FIG. 1 is a front side schematic view of the overall structure of the present invention;
FIG. 2 is a schematic left front side view of the structure on the rest box of the present invention;
FIG. 3 is a partially sectioned expanded view of the front left side of the structure of the present invention;
FIG. 4 is a partially sectioned expanded view of the right side of the internal structure of the cleaning plate of the present invention;
the reference numbers in the figures illustrate: 1. an apparatus main body; 2. placing the box; 3. a camera; 4. a water tank; 5. an electric push rod; 6. cleaning the plate; 7. a sealing plug; 8. a rotating shaft; 9. a pressing plate; 601. a hose; 602. a rack; 603. a sponge sleeve; 604. a tapered hole; 701. a spring; 801. a gear; 802. a groove; 901. and (4) a bump.
Detailed Description
Referring to fig. 1-4, the present invention provides a technical solution:
the utility model provides a safety device of building engineering project management, including equipment principal 1, 1 left side of equipment principal is connected with places box 2, place and install camera 3 in the box 2, place 2 middle part top surface fixedly connected with water tanks 4 of box, it has electric push rod 5 to place 2 front end top surfaces through connection of box, 5 lower extremes of electric push rod pass place 2 top surfaces of box extend to inside and be connected with clearance board 6, 6 rear side inner walls of clearance board are linear structure and are equipped with a plurality of sealing plugs 7, it is connected with pivot 8 to place 2 front end downside inner walls of box rotation, 8 rear sides in pivot are equipped with stripper plate 9.
Specifically, clearance plate 6 is inside to be hollow structure setting, and clearance plate 6 middle part top surface through connection has hose 601, hose 601 upper end and 4 intercommunications of water tank, and 6 right-hand members bottom surfaces of clearance plate are connected with rack 602, and 6 back walls of clearance plate are connected with sponge cover 603, and sponge cover 603 and 3 antetheca frictional contact of camera, 6 back walls of clearance plate are linear structure and have seted up a plurality of bell mouth 604.
Further, the sealing plug 7 is arranged in a conical structure, the outer wall of the rear end of the sealing plug 7 is in close contact with the inner wall of the conical hole 604, and the front wall of the sealing plug 7 is fixedly connected with the inner wall of the front end of the cleaning plate 6 through a spring 701.
Furthermore, the left end and the right end of the rotating shaft 8 are rotatably connected with the inner wall of the front end of the placing box 2, the outer wall of the right end of the rotating shaft 8 is sleeved with a gear 801, the gear 801 is in meshing transmission with the rack 602, and the outer wall of the left end of the rotating shaft 8 is in an annular structure and is provided with a groove 802.
In addition, the antetheca is connected with lug 901 under the stripper plate 9, and lug 901 outer wall and recess 802 inner wall sliding fit, stripper plate 9 rear end outer wall and the spout inner wall sliding fit who sets up in placing box 2 front end inner wall, stripper plate 9 upper end antetheca and sponge cover 603 extrusion contact.
The working principle is as follows: when needs clear up camera 3, utilize electric putter 5 to drive clearance board 6 of connection and move down, thereby make sponge cover 603 and the contact of camera 3 on the clearance board 6, then sealing plug 7 rear end and camera 3 contact, can make sealing plug 7 withdraw in clearance board 6, thereby make hose 601 pour into the water in the water tank 4 into clearance board 6 inside through bell mouth 604 flow to sponge cover 603 on, thereby clear up, rack 602 can drive gear 801 rotation when clearance board 6 clearance finishes removing to the downside, thereby make pivot 8 rotate, then under the drive of recess 802, make the stripper plate 9 that lug 901 connects remove to the left side, thereby extrude sponge cover 603, will thereby extrude the filth from sponge cover 603, accomplish the clearance of sponge cover 603.

Claims (5)

1. A safety device for building engineering project management comprises an equipment main body (1), and is characterized in that: equipment main part (1) left side is connected with places box (2), place and install camera (3) in box (2), place box (2) middle part top surface fixedly connected with water tank (4), it has electric push rod (5) to place box (2) front end top surface through connection, electric push rod (5) lower extreme passes and places box (2) top surface and extends to inside and be connected with clearance board (6), clearance board (6) rear side inner wall is linear structure and is equipped with a plurality of sealing plugs (7), it is connected with pivot (8) to place box (2) front end downside inner wall and rotate, pivot (8) rear side is equipped with stripper plate (9).
2. A safety device for the management of construction engineering projects according to claim 1, characterized in that: clearance board (6) inside is hollow structure setting, clearance board (6) middle part top surface through connection has hose (601), hose (601) upper end and water tank (4) intercommunication, clearance board (6) right-hand member bottom surface is connected with rack (602), wall connection has sponge cover (603) behind clearance board (6), sponge cover (603) and camera (3) antetheca frictional contact, wall is linear structure behind clearance board (6) and has seted up a plurality of bell mouth (604).
3. A safety device for the management of construction engineering projects according to claim 1, characterized in that: the sealing plug (7) is arranged in a conical structure, the outer wall of the rear end of the sealing plug (7) is in close contact with the inner wall of the conical hole (604), and the front wall of the sealing plug (7) is fixedly connected with the inner wall of the front end of the cleaning plate (6) through a spring (701).
4. A safety device for the management of construction engineering projects according to claim 1, characterized in that: both ends rotate with placing box (2) front end inner wall about pivot (8) and be connected, pivot (8) right-hand member outer wall has cup jointed gear (801), gear (801) and rack (602) meshing transmission, pivot (8) left end outer wall is the loop configuration and sets up fluted (802).
5. A safety device for the management of construction engineering projects according to claim 1, characterized in that: the front wall of the lower end of the extrusion plate (9) is connected with a convex block (901), the outer wall of the convex block (901) is in sliding fit with the inner wall of the groove (802), the outer wall of the rear end of the extrusion plate (9) is in sliding fit with the inner wall of a sliding groove formed in the inner wall of the front end of the placing box (2), and the front wall of the upper end of the extrusion plate (9) is in extrusion contact with the sponge sleeve (603).
CN202122453849.2U 2021-10-12 2021-10-12 Safety device for building engineering project management Active CN215964990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122453849.2U CN215964990U (en) 2021-10-12 2021-10-12 Safety device for building engineering project management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122453849.2U CN215964990U (en) 2021-10-12 2021-10-12 Safety device for building engineering project management

Publications (1)

Publication Number Publication Date
CN215964990U true CN215964990U (en) 2022-03-08

Family

ID=80507739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122453849.2U Active CN215964990U (en) 2021-10-12 2021-10-12 Safety device for building engineering project management

Country Status (1)

Country Link
CN (1) CN215964990U (en)

Similar Documents

Publication Publication Date Title
CN114308826B (en) Cleaning device for repairing coal mine machinery based on environment protection
CN110974084B (en) Handheld glass cleaner
CN111359941A (en) Full-automatic valve maintenance device and use method thereof
CN113100676A (en) Cleaning device for floor tiles
CN215964990U (en) Safety device for building engineering project management
CN210925207U (en) Modeling device for architectural design
CN109889710B (en) Photographic device capable of automatically cleaning camera
CN111366636A (en) Working method of full-automatic valve maintenance device
CN116748189A (en) Power supply facility cleaning mechanism
CN112056983B (en) Door and window frame body gap cleaning device
CN113208513A (en) Cleaning system
CN117284344A (en) Automatic inspection device and method based on Internet of things audio and video equipment
CN216460468U (en) Electromechanical maintenance device that maintains of highway
CN203991375U (en) Multipurpose automatic cleaning equipment
CN214481009U (en) AR high altitude eagle eye supervisory equipment based on many pictures concatenation technique
CN210362988U (en) Digital jet printing color group cleaning device
CN212660225U (en) Mining intrinsic safety type camera of spherical holder
CN212428165U (en) Intelligent building dust collector
CN210164501U (en) Monitoring facilities is used in colliery control that dustproof effectual
CN209255290U (en) Surface cleaning apparatus is used in a kind of processing of board production
CN220781535U (en) Automatic cleaning device for highway monitoring probe
CN217486549U (en) Underground visual maintenance monitoring device
CN216728541U (en) Water paint production facility cleaning equipment
CN218575476U (en) Pressing shaft assembling equipment for gear of gear box
CN117128216B (en) Waste oil recovery device of port portal crane rotating device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Heilongjiang Qicheng Construction Engineering Co.,Ltd.

Assignor: Guo Wenlong

Contract record no.: X2024230000008

Denomination of utility model: A safety protection device for construction project management

Granted publication date: 20220308

License type: Exclusive License

Record date: 20240422