CN215950567U - Water conservancy pipeline lays and uses draw gear - Google Patents

Water conservancy pipeline lays and uses draw gear Download PDF

Info

Publication number
CN215950567U
CN215950567U CN202122334854.1U CN202122334854U CN215950567U CN 215950567 U CN215950567 U CN 215950567U CN 202122334854 U CN202122334854 U CN 202122334854U CN 215950567 U CN215950567 U CN 215950567U
Authority
CN
China
Prior art keywords
water conservancy
sliding
shell
pipeline
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122334854.1U
Other languages
Chinese (zh)
Inventor
李腾飞
李佳晟
刘向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN202122334854.1U priority Critical patent/CN215950567U/en
Application granted granted Critical
Publication of CN215950567U publication Critical patent/CN215950567U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a traction device for laying a water conservancy pipeline, and relates to the field of water conservancy pipelines. The utility model provides a water conservancy pipeline lays and uses draw gear, includes the casing, the front side and the rear side at casing top all are provided with the fixed plate. The utility model provides a traction device for laying a water conservancy pipeline, wherein a pipeline is placed at the top of a shell, the pipeline is fixed through an arc-shaped clamping plate, two sides of the pipeline are protected again through an installation plate, the phenomenon that the pipeline shakes due to bumping in the traction process and falls off is avoided, and the traction effect of the traction device is influenced.

Description

Water conservancy pipeline lays and uses draw gear
Technical Field
The utility model relates to the field of water conservancy pipelines, in particular to a traction device for laying a water conservancy pipeline.
Background
The cement pipe that all is used when current a lot of water conservancy pipelines lay, the great ten minutes of weight of cement pipe are unfavorable for the staff to carry out loading transport and unload and bury underground, and the staff leans on the great waste physical power of manpower transport, and when drawing the cement pipe, has the condition of falling and takes place.
Water conservancy pipe is at the in-process of laying, need use draw gear, and traditional water conservancy pipeline lays and uses draw gear, and the protecting effect is poor, can't fix and protect not unidimensional pipeline, can cause the condition that the pipeline appears droing to take place, also can influence the traction efficiency of pipeline.
Therefore, it is necessary to provide a traction device for water conservancy pipeline laying to solve the technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a traction device for laying a water conservancy pipeline, which solves the technical problems that pipelines with different sizes cannot be fixed and protected due to poor protection effect, the pipelines fall off and the pipeline traction efficiency is influenced.
In order to solve the technical problem, the utility model provides a traction device for water conservancy pipeline laying, which comprises a shell, the front side and the rear side of the top of the shell are both provided with a fixed plate, the top and the bottom of the inner side of the fixed plate are both provided with an arc-shaped clamping plate, the bottom of the fixed plate penetrates into the inner cavity of the shell, the bottom of the fixed plate is provided with a sliding plate, the two sides of the outer side of the sliding plate are both provided with sliding columns, the inner sides of the sliding columns are provided with fixed seats, the tops of the fixed seats are connected with the top of the inner cavity of the shell, the bottom of the fixed seat is provided with a double-shaft electric push rod, the outer side of the double-shaft electric push rod is provided with a bracket, the inboard of support has the pulley through loose axle swing joint, the bottom of pulley contacts with the front side and the rear side of casing inner chamber bottom, the mounting panel is all installed to the both sides of casing top front side and the both sides of rear side.
Preferably, the inner side of the arc-shaped clamping plate is adhered with a rubber pad, the inner side of the mounting plate is adhered with a protection pad, and the protection pad is made of rubber.
Preferably, the outside of traveller passes through the screw and is connected with the front side and the rear side of casing inner chamber, the inboard on traveller surface is provided with the sliding sleeve, the inboard cover on traveller surface is equipped with expanding spring.
Preferably, the outer side of the telescopic spring is connected with the inner side of the sliding sleeve, and the inner side of the telescopic spring is connected with the outer side of the fixed seat.
Preferably, the slide blocks are installed on the front side and the rear side of the inner cavity of the shell, the slide grooves are formed in the inner sides of the slide blocks, and the inner cavities of the slide grooves are connected with the two sides of the slide plate through the slide seats.
Preferably, the welding has the mounting bracket all around of casing bottom, and the bottom of mounting bracket has the removal wheel through loose axle swing joint, the front side and the rear side on casing right side all have the welding to push away the post, the top welding of the inboard of pushing away the post has to push away the handle.
Compared with the prior art, the traction device for water conservancy pipeline laying provided by the utility model has the following beneficial effects:
the utility model provides a traction device for laying water conservancy pipelines, wherein the pipelines are placed at the top of a shell, the pipelines are fixed through arc-shaped clamping plates, two sides of the pipelines are protected again through an installation plate, the phenomenon that the pipelines shake due to bumping in the traction process and fall off is avoided, and the traction effect of the traction device is influenced.
The utility model provides a traction device for laying a water conservancy pipeline, which can prevent the pipeline from colliding with the surfaces of an arc-shaped clamping plate and an installation plate through the arrangement of a rubber pad and a protection pad, so that the pipeline is damaged, the later-stage use of the pipeline is influenced, and the traction working efficiency is influenced.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of a traction device for water conservancy pipeline laying according to the present invention;
FIG. 2 is a left side cross-sectional view of the housing construction of the present invention;
fig. 3 is a sectional view of the housing structure of the present invention.
Reference numbers in the figures: 1. a housing; 2. a fixing plate; 3. an arc-shaped clamping plate; 4. a slide plate; 5. a traveler; 6. a fixed seat; 7. a dual-axis electric push rod; 8. a support; 9. a pulley; 10. mounting a plate; 11. a sliding sleeve; 12. a tension spring; 13. a slider; 14. a chute; 15. a moving wheel; 16. and (5) pushing the column.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
The first embodiment is as follows:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a water conservancy pipeline lays and uses draw gear, which comprises a housin 1, the front side and the rear side at 1 top of casing all are provided with fixed plate 2, arc cardboard 3 is all installed to the top and the bottom of 2 inboards of fixed plate, the inner chamber to casing 1 is run through to the bottom of fixed plate 2, slide 4 is installed to the bottom of fixed plate 2, the both sides in the 4 outside of slide all are provided with traveller 5, fixing base 6 is installed to traveller 5's inboard, the top and the top of 1 inner chamber of casing of fixing base 6 are connected, biax electric putter 7 is installed to the bottom of fixing base 6, support 8 is installed in the outside of biax electric putter 7, there is pulley 9 in the inboard of support 8 through loose axle swing joint, pulley 9 is contacted with the front side and the rear side of 1 inner chamber bottom of casing in the bottom, mounting panel 10 is all installed to the both sides of 1 top front side and the both sides of rear side.
In this embodiment, place the pipeline at the top of casing 1, fix the pipeline through arc cardboard 3, setting through mounting panel 10, protect once more the both sides of pipeline, prevent that the in-process of traction from jolting and causing the pipeline to rock, the condition that causes the pipeline to appear droing takes place, influence the device's traction effect, when protecting not unidimensional pipeline, start biax electric putter 7 through external controller, biax electric putter 7 drives support 8 and pulley 9 and slides at the inner chamber of casing 1, support 8 drives slide 4 and removes, slide 4 passes through the setting of traveller 5, make its stability that can be more when removing, stability when having increased slide 4 and removing, slide 4 drives fixed plate 2 and the removal of arc cardboard 3 simultaneously, arc cardboard 3 can not unidimensional pipeline protect fixedly.
Example two:
referring to fig. 1-3, on the basis of the first embodiment, the present invention provides a technical solution: the inboard bonding of arc cardboard 3 has the rubber pad, the inboard bonding of mounting panel 10 has the protection pad, and the protection pad is the rubber material, the outside of traveller 5 is passed through the screw and is connected with the front side and the rear side of 1 inner chamber of casing, the inboard on traveller 5 surface is provided with sliding sleeve 11, the inboard cover on traveller 5 surface is equipped with expanding spring 12, expanding spring 12's the outside is connected with sliding sleeve 11's inboard, expanding spring 12 inboard is connected with the outside of fixing base 6, slider 13 is all installed to the front side and the rear side of 1 inner chamber of casing, spout 14 has been seted up to slider 13's inboard, the inner chamber of spout 14 passes through the slide and is connected with the both sides of slide 4, the welding all around of 1 bottom of casing has the mounting bracket, and there is removal wheel 15 bottom of mounting bracket through loose axle swing joint, the equal welding of front side and the rear side on 1 right side of casing has the post 16, the inboard top welding of post 16 has the handle that pushes away.
In this embodiment: through the setting of rubber pad and protection pad, prevent that the pipeline from appearing the collision with the surface of arc cardboard 3 and mounting panel 10, can lead to the pipeline damaged, can influence the use of later stage pipeline, also can influence towed work efficiency simultaneously, through the setting of spout 14 and slide, play spacing effect to slide 4, avoid slide 4 the phenomenon of slope to appear at the in-process that removes, through the setting of removing wheel 15 and mounting bracket, the device of being convenient for removes, stability when having increased the device and removing.
The working principle of the traction device for water conservancy pipeline laying provided by the utility model is as follows:
the first innovation point implementation step:
the first step is as follows: the pipeline is placed at the top of the shell 1, the pipeline is fixed through the arc-shaped clamping plate 3, and two sides of the pipeline are protected again through the installation plate 10, so that the situation that the pipeline shakes due to jolting in the traction process, the pipeline falls off and the traction effect of the device is influenced is prevented;
the second step is that: when pipelines with different sizes are protected, the double-shaft electric push rod 7 is started through the external controller, the double-shaft electric push rod 7 drives the support 8 and the pulley 9 to slide in the inner cavity of the shell 1, and the support 8 drives the sliding plate 4 to move;
the third step: slide 4 passes through the setting of traveller 5, makes its stability that can be more when removing, has increased the stability when slide 4 removes, and slide 4 drives fixed plate 2 and 3 removals of arc cardboard simultaneously, and arc cardboard 3 can not unidimensional pipeline protect fixedly.
The implementation step of the second innovation point:
the first step is as follows: through the arrangement of the rubber pad and the protection pad, the situation that the pipeline is damaged due to collision with the surfaces of the arc-shaped clamping plate 3 and the mounting plate 10, the use of the pipeline in the later period is influenced, and the traction working efficiency is also influenced is prevented;
the second step is that: through the setting of spout 14 and slide, play spacing effect to slide 4, avoid slide 4 to appear the phenomenon of slope at the in-process that removes, through the setting of removing wheel 15 and mounting bracket, the device of being convenient for removes, stability when having increased the device and removing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a water conservancy is draw gear for pipe laying, includes casing (1), its characterized in that: the front side and the rear side of the top of the shell (1) are both provided with a fixed plate (2), the top and the bottom of the inner side of the fixed plate (2) are both provided with an arc clamping plate (3), the bottom of the fixed plate (2) penetrates through the inner cavity of the shell (1), the bottom of the fixed plate (2) is provided with a sliding plate (4), the two sides of the outer side of the sliding plate (4) are both provided with sliding columns (5), the inner side of each sliding column (5) is provided with a fixed seat (6), the top of each fixed seat (6) is connected with the top of the inner cavity of the shell (1), the bottom of each fixed seat (6) is provided with a double-shaft electric push rod (7), the outer side of each double-shaft electric push rod (7) is provided with a support (8), the inner side of each support (8) is movably connected with a pulley (9) through a movable shaft, and the bottom of each pulley (9) is in contact with the front side and the rear side of the inner cavity bottom of the shell (1), the mounting plates (10) are mounted on the two sides of the front side and the two sides of the rear side of the top of the shell (1).
2. The traction device for water conservancy pipeline laying according to claim 1, wherein a rubber pad is bonded to the inner side of the arc-shaped clamping plate (3), and a protection pad is bonded to the inner side of the mounting plate (10), and the protection pad is made of rubber.
3. The traction device for water conservancy pipeline laying according to claim 1, wherein the outer side of the sliding column (5) is connected with the front side and the rear side of the inner cavity of the shell (1) through screws, a sliding sleeve (11) is arranged on the inner side of the surface of the sliding column (5), and a telescopic spring (12) is sleeved on the inner side of the surface of the sliding column (5).
4. The traction device for water conservancy pipeline laying according to claim 3, wherein the outer side of the expansion spring (12) is connected with the inner side of the sliding sleeve (11), and the inner side of the expansion spring (12) is connected with the outer side of the fixed seat (6).
5. The traction device for water conservancy pipeline laying according to claim 1, wherein sliding blocks (13) are mounted on the front side and the rear side of an inner cavity of the shell (1), sliding grooves (14) are formed in the inner sides of the sliding blocks (13), and inner cavities of the sliding grooves (14) are connected with two sides of the sliding plate (4) through sliding seats.
6. The traction device for water conservancy pipeline laying according to claim 1, characterized in that, the welding has the mounting bracket all around of casing (1) bottom, and there is removal wheel (15) bottom of mounting bracket through loose axle swing joint, the front side and the rear side on casing (1) right side have all welded push post (16), the top welding of the inboard of push post (16) has the handle that pushes away.
CN202122334854.1U 2021-09-26 2021-09-26 Water conservancy pipeline lays and uses draw gear Expired - Fee Related CN215950567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122334854.1U CN215950567U (en) 2021-09-26 2021-09-26 Water conservancy pipeline lays and uses draw gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122334854.1U CN215950567U (en) 2021-09-26 2021-09-26 Water conservancy pipeline lays and uses draw gear

Publications (1)

Publication Number Publication Date
CN215950567U true CN215950567U (en) 2022-03-04

Family

ID=80427877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122334854.1U Expired - Fee Related CN215950567U (en) 2021-09-26 2021-09-26 Water conservancy pipeline lays and uses draw gear

Country Status (1)

Country Link
CN (1) CN215950567U (en)

Similar Documents

Publication Publication Date Title
CN208629079U (en) A kind of computer information safe equipment processing unit (plant)
CN215950567U (en) Water conservancy pipeline lays and uses draw gear
CN206795442U (en) A kind of safety-type metal bucket apparatus for shaping
CN110729433B (en) Storage battery storage device with protection function for new energy automobile
CN210670923U (en) Vehicle-mounted charger protective housing
CN211951934U (en) Damping device for mechanical equipment transportation
CN217261634U (en) Protection device for transportation of marine power generation fan foundation member
CN112054420B (en) Mobile cable trench gap bridge for power transformation construction
CN212298265U (en) Device for moving computer teaching instrument
CN214013909U (en) Smart mobile phone charging case
CN111085803B (en) Cross arm processing equipment for electric power laying
CN210060796U (en) Part machining clamping equipment
CN212228097U (en) Underwater tunnel detection device for tunnel detection
CN211687845U (en) Traveling cable fixing device for freight elevator
CN209233326U (en) One kind being convenient for site operation comprehensive wiring drawing machine
CN210363825U (en) Scalable rail of taking of emergent sparse ramp device of fleing of rail transit vehicle
CN209925026U (en) Track type underground electromechanical equipment transportation device for mine
CN212297398U (en) Plasma degumming machine convenient to remove
CN221443557U (en) Central concentrated water supply line fixing device
CN111550651B (en) Simple and easy efficient water pollution treatment device's anticollision fender bracket
CN220678771U (en) Rust removal device for metal threading pipe
CN219857270U (en) Transfer device is used in electrical equipment production
CN219382549U (en) Control cabinet carrier
CN215000400U (en) Electromechanical device damping device
CN218017642U (en) Electronic product processingequipment of mechanized high accuracy

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220304