CN215950566U - Pipeline installation equipment for drinking water safety construction - Google Patents

Pipeline installation equipment for drinking water safety construction Download PDF

Info

Publication number
CN215950566U
CN215950566U CN202121809015.4U CN202121809015U CN215950566U CN 215950566 U CN215950566 U CN 215950566U CN 202121809015 U CN202121809015 U CN 202121809015U CN 215950566 U CN215950566 U CN 215950566U
Authority
CN
China
Prior art keywords
pipeline
equipment
bearing
drinking water
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121809015.4U
Other languages
Chinese (zh)
Inventor
夏志博
窦萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121809015.4U priority Critical patent/CN215950566U/en
Application granted granted Critical
Publication of CN215950566U publication Critical patent/CN215950566U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to pipeline installation equipment for drinking water safety construction, which belongs to the technical field of pipeline construction. According to the utility model, the hydraulic equipment and the bearing base which can stably lift the whole equipment are arranged, so that a regional pipeline which is difficult to construct by the hoisting equipment can slide into the inner wall of the arc-shaped plate through the controller and then is slowly placed into the inner wall of the tunnel through the hydraulic equipment and the bearing base, the pipeline cannot be damaged due to falling, the installation speed is accelerated, the connecting shaft and the hydraulic positioning rod are arranged on the outer wall of the connecting plate, the connecting plate can be subjected to angle adjustment through the extension and contraction of the hydraulic positioning rod under the switching action of the connecting shaft, the welding installation operation is convenient for workers, the arc-shaped plate which can be opened and closed is arranged, the equipment can be moved out from the top of the pipeline after the pipeline is installed, the pipeline installation efficiency is improved, and the manpower burden is reduced.

Description

Pipeline installation equipment for drinking water safety construction
Technical Field
The utility model relates to the technical field of pipeline construction, in particular to pipeline installation equipment for drinking water safety construction.
Background
A pipeline is a device for transporting a gas, liquid or fluid with solid particles, connected by pipes, pipe couplings, valves, etc. Generally, a fluid is pressurized by a blower, a compressor, a pump, a boiler, etc., and then flows from a high pressure portion to a low pressure portion of a pipe, or is transported by the pressure or gravity of the fluid itself. The use of pipelines is very widespread, mainly in water supply, drainage, heating, gas supply, long-distance oil and gas delivery, agricultural irrigation, hydraulic engineering and various industrial installations.
Along with the going on of urbanization, drinking water safety is more important, the burden of drinking water pipeline has also been increased when the demand of drinking water increases, resident's drinking water demand just can be guaranteed to the timely quick change of ageing pipeline, current pipeline needs lifting device or manpower when installing to bury the gallery underground with the pipeline immigration, be difficult to angle of adjustment when wasting time and energy, make the installation effectiveness relatively poor, and some regional lifting device are difficult to get into and make the piping erection be difficult to go on, influence the efficiency of construction.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pipeline installation device for drinking water safety construction, which solves the problems in the background technology.
The scheme for solving the technical problems is as follows: a pipeline installation device for drinking water safety construction comprises two groups of bearing plates, two groups of bearing plates are arranged in parallel, the bottoms of the two groups of bearing plates are fixedly provided with moving wheels, the back sides of the two groups of bearing plates are fixedly provided with hydraulic equipment, the hydraulic equipment is arranged into two groups, each group is three, the bottoms of the two groups of hydraulic equipment are respectively connected with a bearing base in a penetrating way, the opposite sides of the two groups of bearing plates are rotatably connected with a connecting shaft near the middle position, the opposite sides of the two groups of bearing plates are fixedly provided with hydraulic positioning rods near the edges of the two sides, one end of the hydraulic positioning rod, which is far away from the bearing plate, is rotatably connected with a connecting plate, the inner walls of the connecting plates at the two sides are fixedly connected through a steel rod, the bottom fixed mounting of connecting plate has the drive pivot, the bottom swivelling joint of drive pivot has the arc.
On the basis of the technical scheme, the utility model can be further improved as follows.
Further, the equal fixed mounting of inner wall of connecting plate and arc has buffer spring, buffer spring evenly arranges at the top of connecting plate and arc, just buffer spring's top fixed mounting has the buffer board.
Further, the top of left side bearing plate is close to left side edge swivelling joint and accepts the footboard, and the top of accepting the footboard is provided with anti-skidding decorative pattern.
Furthermore, a controller is fixedly arranged at the top of the right bearing plate.
Further, every group equal fixed mounting in adjacent one side of hydraulic equipment has the connecting rod, every group equal fixed mounting in one side of keeping away from the bearing plate of hydraulic equipment has control panel. And the two groups of control panels are connected in series through a wire.
Furthermore, the mounting groove with hydraulic pressure positioning rod looks adaptation is seted up to the inner wall both sides of bearing plate, and mounting groove inner wall and hydraulic pressure positioning rod fixed connection.
Further, the arc sets up to two sets ofly, and two sets of arc concatenations are a semicylindrical type, and the buffer board at its top is unanimous with the arc structure of bottom.
Further, the bottom of the bearing base is fixedly provided with a rectangular plate.
The utility model provides a pipeline installation device for drinking water safety construction, which has the following advantages:
set up hydraulic equipment and the bearing base that can lift up whole steadily with equipment, make the regional pipeline that lifting device is difficult to the construction can slowly put into the gallery inner wall by hydraulic equipment and bearing base again through the inner wall that the controller slipped into the arc, make the pipeline can not accelerate the installation rate because of falling impaired, set up connecting axle and hydraulic pressure positioning rod at the outer wall of connecting plate, make the connecting plate can carry out angle adjustment through the extension shrink of hydraulic pressure positioning rod under the switching effect of connecting axle, the staff of being convenient for carries out the welding installation operation, the arc that sets up to open and shut makes pipeline installation finish the back equipment can shift out by the pipeline top, when making obtaining improvement of pipeline installation efficiency, reduce manpower burden.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical solutions of the present invention more clearly understood and to implement them in accordance with the contents of the description, the following detailed description is given with reference to the preferred embodiments of the present invention and the accompanying drawings. The detailed description of the present invention is given in detail by the following examples and the accompanying drawings.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the utility model and together with the description serve to explain the utility model without limiting the utility model. In the drawings:
fig. 1 is a three-dimensional effect diagram of a pipeline installation device for drinking water safety construction according to an embodiment of the present invention;
FIG. 2 is a schematic structural view of a pipeline installation apparatus for drinking water safety construction according to an embodiment of the present invention;
FIG. 3 is a schematic structural view of an opened state of an arc-shaped plate in a pipeline installation device for drinking water safety construction according to an embodiment of the present invention;
fig. 4 is a schematic structural view of a load-bearing base in a pipeline installation device for drinking water safety construction according to an embodiment of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a bearing plate; 2. a moving wheel; 3. a hydraulic device; 4. a load-bearing base; 5. a connecting shaft; 6. a hydraulic positioning rod; 7. a connecting plate; 8. driving the rotating shaft; 9. an arc-shaped plate; 10. a buffer spring; 11. a buffer plate; 12. a pedal is received; 13. a controller; 14. a connecting rod; 15. a control panel.
Detailed Description
The principles and features of the present invention are described below in conjunction with the accompanying fig. 1-4, which are provided by way of example only to illustrate the present invention and not to limit the scope of the present invention. The utility model is described in more detail in the following paragraphs by way of example with reference to the accompanying drawings. Advantages and features of the present invention will become apparent from the following description and from the claims. It is to be noted that the drawings are in a very simplified form and are not to precise scale, which is merely for the purpose of facilitating and distinctly claiming the embodiments of the present invention.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When a component is referred to as being "connected" to another component, it can be directly connected to the other component or intervening components may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the utility model herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
As shown in figures 1-4, a pipeline installation device for drinking water safety construction comprises two groups of bearing plates 1, and two sets of parallel placement, the bottom fixed mounting of two sets of bearing plates 1 has removal wheel 2, the back of the body one side fixed mounting of two sets of bearing plates 1 has hydraulic equipment 3, hydraulic equipment 3 sets up to two sets of, every group sets up to three, the bottom of two sets of hydraulic equipment 3 all through connection has bearing base 4, the relative one side of two sets of bearing plates 1 is close to intermediate position swivelling joint and has connecting axle 5, the relative one side of two sets of bearing plates 1 is close to the equal fixed mounting in both sides edge and has hydraulic pressure positioning rod 6, the one end swivelling joint that bearing plate 1 was kept away from to hydraulic pressure positioning rod 6 has connecting plate 7, the inner wall of both sides connecting plate 7 passes through steel pole fixed connection, the bottom fixed mounting of connecting plate 7 has drive pivot 8, the bottom swivelling joint of drive pivot 8 has arc 9.
Preferably, the inner walls of the connecting plate 7 and the arc-shaped plate 9 are fixedly provided with buffer springs 10, the buffer springs 10 are evenly distributed at the tops of the connecting plate 7 and the arc-shaped plate 9, and the top of the buffer springs 10 is fixedly provided with a buffer plate 11, so that the pipeline can be stably placed at the top of the arc-shaped plate 9.
Preferably, the top of left side bearing plate 1 is close to left side edge swivelling joint and accepts footboard 12, and the top of accepting footboard 12 is provided with anti-skidding decorative pattern, and the staff of being convenient for moves about at the top of accepting footboard 12.
Preferably, the controller 13 is fixedly installed on the top of the right bearing plate 1.
Preferably, a connecting rod 14 is fixedly mounted on one adjacent side of each group of hydraulic equipment 3, and a control panel 15 is fixedly mounted on one side, far away from the bearing plate 1, of each group of hydraulic equipment 3. And the two groups of control panels 15 are connected in series through leads, so that the moving speed of each group of hydraulic equipment 3 is consistent.
Preferably, the mounting groove with 6 looks adaptations of hydraulic pressure positioning rod is seted up to the inner wall both sides of bearing plate 1, and mounting groove inner wall and 6 fixed connection of hydraulic pressure positioning rod for hydraulic pressure positioning rod 6 can be settled at the mounting groove inner wall stability.
Preferably, the arc plates 9 are arranged into two groups, the two groups of arc plates 9 are spliced into a semi-cylindrical shape, and the buffer plate 11 at the top of the semi-cylindrical shape is consistent with the arc plates 9 at the bottom of the semi-cylindrical shape in structure.
Preferably, the bottom fixed mounting of bearing base 4 has the rectangular plate, improves the area of contact on equipment and ground for equipment can be more stable.
The specific working principle and the using method of the utility model are as follows: the equipment is moved to a pipeline installation part by using the moving wheel 2, the hydraulic equipment 3 is started by the controller 13, the bearing base 4 jacks up the whole equipment, the bearing pedal 12 is lapped at the pit edge, the pipeline to be installed can slide into the inner wall of the arc-shaped plate 9 through the bearing pedal 12, the buffer plate 11 and the buffer spring 10 arranged at the top can relieve the buffer force of the pipeline, so that the falling process of the pipeline is more stable, after the pipeline is arranged at the top of the arc-shaped plate 9, the controller 13 controls the whole equipment to slowly descend, so that the pipeline to be installed can slowly descend on the inner wall of the arc-shaped plate 9, after the pipeline reaches the pipeline arrangement frame position, the hydraulic positioning rods 6 at the two sides of the connecting plate 7 are controlled to stretch out and draw back, so that the arc-shaped plate 9 can be subjected to angle adjustment under the connecting action of the connecting shaft 5, the angle of the pipeline is convenient to adjust, the installation efficiency is improved, after one section of pipeline is installed, the arc-shaped plate 9 is opened, the bearing base 4 is folded, and the moving wheel 2 is used for moving out from the bottom of the pipeline to the next pipeline installation position for next installation.
The foregoing is merely a preferred embodiment of the utility model and is not intended to limit the utility model in any manner; the present invention may be readily implemented by those of ordinary skill in the art as illustrated in the accompanying drawings and described above; however, those skilled in the art should appreciate that they can readily use the disclosed conception and specific embodiments as a basis for designing or modifying other structures for carrying out the same purposes of the present invention without departing from the scope of the utility model as defined by the appended claims; meanwhile, any changes, modifications, and evolutions of the equivalent changes of the above embodiments according to the actual techniques of the present invention are still within the protection scope of the technical solution of the present invention.

Claims (8)

1. The utility model provides a pipeline erection equipment of drinking water safety construction, includes bearing plate (1), its characterized in that: the bearing plates (1) are arranged into two groups, the two groups are placed in parallel, the bottom of each group of bearing plates (1) is fixedly provided with a moving wheel (2), the back side of each group of bearing plates (1) is fixedly provided with a hydraulic device (3), the two groups of hydraulic devices (3) are arranged into two groups, each group is three, the bottoms of the two groups of hydraulic devices (3) are respectively connected with a bearing base (4) in a penetrating way, the opposite sides of the two groups of bearing plates (1) are respectively and rotatably connected with a connecting shaft (5) close to the middle position, the opposite sides of the two groups of bearing plates (1) are respectively and fixedly provided with a hydraulic positioning rod (6) close to the edges of the two sides, one ends of the hydraulic positioning rods (6) far away from the bearing plates (1) are respectively and rotatably connected with a connecting plate (7), the inner walls of the connecting plates (7) on the two sides are fixedly connected through steel rods, the bottom of the connecting plates (7) is fixedly provided with a driving rotating shaft (8), the bottom of the driving rotating shaft (8) is rotatably connected with an arc-shaped plate (9).
2. The pipeline installation equipment for drinking water safety construction according to claim 1, wherein buffer springs (10) are fixedly installed on the inner walls of the connecting plate (7) and the arc-shaped plates (9), the buffer springs (10) are uniformly distributed on the tops of the connecting plate (7) and the arc-shaped plates (9), and buffer plates (11) are fixedly installed on the tops of the buffer springs (10).
3. The pipeline installation equipment for drinking water safety construction is characterized in that the top of the bearing plate (1) on the left side is rotatably connected with a bearing pedal (12) close to the edge of the left side, and anti-skid patterns are arranged on the top of the bearing pedal (12).
4. The drinking water safety construction pipeline installation equipment is characterized in that a controller (13) is fixedly installed at the top of the right bearing plate (1).
5. The pipeline installation equipment for drinking water safety construction according to claim 1, wherein a connecting rod (14) is fixedly installed on one adjacent side of each group of hydraulic equipment (3), a control panel (15) is fixedly installed on one side, far away from the bearing plate (1), of each group of hydraulic equipment (3), and the two groups of control panels (15) are connected in series through a conducting wire.
6. The pipeline installation equipment for drinking water safety construction according to claim 1, wherein mounting grooves matched with the hydraulic positioning rods (6) are formed in two sides of the inner wall of the bearing plate (1), and the inner walls of the mounting grooves are fixedly connected with the hydraulic positioning rods (6).
7. The equipment for installing the pipeline for safe drinking water construction as claimed in claim 2, wherein the arc-shaped plates (9) are arranged in two groups, the two groups of arc-shaped plates (9) are spliced into a semi-cylinder shape, and the buffer plate (11) at the top of the semi-cylinder shape is consistent with the arc-shaped plates (9) at the bottom of the semi-cylinder shape in structure.
8. The equipment for installing the pipeline for drinking water safety construction is characterized in that a rectangular plate is fixedly installed at the bottom of the bearing base (4).
CN202121809015.4U 2021-08-04 2021-08-04 Pipeline installation equipment for drinking water safety construction Active CN215950566U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121809015.4U CN215950566U (en) 2021-08-04 2021-08-04 Pipeline installation equipment for drinking water safety construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121809015.4U CN215950566U (en) 2021-08-04 2021-08-04 Pipeline installation equipment for drinking water safety construction

Publications (1)

Publication Number Publication Date
CN215950566U true CN215950566U (en) 2022-03-04

Family

ID=80435417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121809015.4U Active CN215950566U (en) 2021-08-04 2021-08-04 Pipeline installation equipment for drinking water safety construction

Country Status (1)

Country Link
CN (1) CN215950566U (en)

Similar Documents

Publication Publication Date Title
CN107191159A (en) Oil well tube rod moving tube bridge sewage collection system and oil well tube rod moving tube bridge dirt collection system
CN215950566U (en) Pipeline installation equipment for drinking water safety construction
CN212096104U (en) Pipeline mounting bracket
CN205916957U (en) Light piping erection hoisting frame
CN217394177U (en) Pipeline welding frame
CN206770872U (en) A kind of autonomous carriage of pipeline madial wall
CN107893649A (en) A kind of oil-field flooding simulation experiment platform
CN220845150U (en) Lifting hanger for building drainage pipeline installation
CN212129396U (en) Municipal works pipe-line installation device
CN108104863A (en) Subway undermines intelligent dust falling system and method in construction
CN206016776U (en) A kind of beam pumping unit hydraulically extensible counter-jib
CN205916958U (en) Heavy piping erection hoisting frame
CN219239137U (en) Heavy-calibre pipeline lifting trolley
CN208686100U (en) A kind of concreting distributing system suitable for multi-state
CN105380427A (en) Pipeline placement rack used in building
CN219925869U (en) Pipeline connecting equipment
CN210260965U (en) Jacking trolley of pipe gallery underground excavation two-lining structure
CN220910656U (en) Pipeline laying device
CN216662284U (en) Buried pipeline laying device
CN210530799U (en) Skid-mounted throttle manifold
CN217482126U (en) Smart city foundation pit construction is with burying pipeline support device
CN216967577U (en) Pipeline installation device
CN211520870U (en) Safe and rapid pipe withdrawing machine
CN218613703U (en) Auxiliary mounting structure for industrial building pipe
CN220379032U (en) Pipeline erection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant