CN215926650U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN215926650U
CN215926650U CN202122260024.9U CN202122260024U CN215926650U CN 215926650 U CN215926650 U CN 215926650U CN 202122260024 U CN202122260024 U CN 202122260024U CN 215926650 U CN215926650 U CN 215926650U
Authority
CN
China
Prior art keywords
scaffold
building construction
base
movable base
main support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122260024.9U
Other languages
Chinese (zh)
Inventor
王义山
解选本
李曦光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Kangtine Construction Group Co ltd
Original Assignee
Qingdao Kangtine Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Kangtine Construction Group Co ltd filed Critical Qingdao Kangtine Construction Group Co ltd
Priority to CN202122260024.9U priority Critical patent/CN215926650U/en
Application granted granted Critical
Publication of CN215926650U publication Critical patent/CN215926650U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold for building construction, relates to the technical field of building construction equipment, and particularly relates to a scaffold for building construction. This scaffold frame for building construction based on, cooperation through supporting base and movable base and screw thread stake and main support is used, make this scaffold frame for building construction based on can set up the scaffold frame and finish the back rotatory movable base, screw thread through between movable base and the screw thread stake drives the screw thread stake and rises, then change the height of main support, thereby make the height of construction platform can follow the main support and change, make this scaffold frame for building construction based on still can carry out high regulation after accomplishing to set up, the adaptation scope based on scaffold frame for building construction has been promoted.

Description

Scaffold for building construction
Technical Field
The utility model relates to the technical field of building construction equipment, in particular to a scaffold for building construction.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out, and is divided into an outer scaffold and an inner scaffold according to the erected position; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; divide into pole setting formula scaffold, bridge type scaffold, gate-type scaffold, suspension type scaffold, hanging scaffold, choose formula scaffold, climb formula scaffold according to the structural style, can help constructor better carry out construction.
But common scaffold frame still has certain not enough when using on the market, common scaffold frame is many to pass through the transverse fixing pole and supports the main support, and it is fixed with main support and transverse fixing pole through screw etc. make to have certain distance between the main support and take the facility workstation, though the stability after the scaffold frame is set up is very strong, but be difficult to continue to adjust the height of scaffold frame, probably there is certain inconvenience at some construction work time, for this reason, we have designed one kind and have solved above-mentioned problem based on scaffold frame for the construction.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides a scaffold for building construction, which solves the problems in the background technology.
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides a scaffold frame for construction, includes two sets of support bases and main support, the top movable sleeve that supports the base is equipped with movable base, the fixed cover in bottom of main support is equipped with the screw pile, and the top of main support is provided with the construction table, screw pile screw thread cup joints in movable base's inside, the equal fixed mounting in outside of supporting base and main support has the spud pile, the outside movable sleeve of spud pile is equipped with the cover and connects the ring, and the outside screw thread of spud pile has cup jointed the screw thread lid, the horizontal dead lever of fixedly connected with between the cover connects the ring.
Furthermore, a support rod is fixedly connected between the main brackets, and the main brackets and the support rod are both made of metal.
Furthermore, the outside of activity base is provided with evenly distributed's anti-skidding line, and the fixed cover in bottom of activity base is equipped with spacing pipe.
Furthermore, the external thread of the limiting pipe is sleeved with a fastening screw, and a fixing hole matched with the fastening screw is formed in the outer portion of the supporting base.
Furthermore, the outside of the construction table is provided with through meshes which are uniformly distributed.
Furthermore, the inner diameter value of the limiting pipe is larger than the outer diameter value of the supporting base, and a rubber base is fixedly sleeved at the bottom of the supporting base.
The utility model provides a scaffold for building construction, which has the following beneficial effects:
1. this scaffold frame for building construction based on, cooperation through supporting base and movable base and screw thread stake and main support is used, make this scaffold frame for building construction based on can set up the scaffold frame and finish the back rotatory movable base, screw thread through between movable base and the screw thread stake drives the screw thread stake and rises, then change the height of main support, thereby make the height of construction platform can follow the main support and change, make this scaffold frame for building construction based on still can carry out high regulation after accomplishing to set up, the adaptation scope based on scaffold frame for building construction has been promoted.
2. This scaffold frame for building construction based on, cooperation through spacing pipe and fastening screw and fixed orifices is used, make this scaffold frame for building construction based on can follow the activity base when rotatory activity base spacing pipe and fastening screw rotatory together, after the activity base rotates to suitable position, the staff can rotate fastening screw makes the inside of fastening screw's terminal embedding fixed orifices, then with activity base fixed stability, avoid the activity base to continue to take place to rotate, thereby guarantee this scaffold frame for building construction based on the stability of adjusting the height.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic exterior view of a main support according to the present invention;
FIG. 3 is a schematic structural view of a screw pile and a movable base according to the present invention;
FIG. 4 is a schematic structural view of the movable base and the support base of the present invention;
fig. 5 is a schematic structural view of the limiting tube of the present invention.
In the figure: 1. a support base; 2. a transverse fixing rod; 3. a support bar; 4. a sleeving connection ring; 5. a threaded cap; 6. a movable base; 7. a screw pile; 8. a main support; 9. a construction table; 10. a limiting pipe; 11. fastening screws; 12. fixing the pile; 13. and (7) fixing holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a scaffold for building construction comprises two groups of supporting bases 1 and main supports 8, wherein a movable base 6 is movably sleeved above the supporting bases 1, threaded piles 7 are fixedly sleeved at the bottom of each main support 8, a construction table 9 is arranged at the top of each main support 8, a supporting rod 3 is fixedly connected between the main supports 8, the main supports 8 and the supporting rod 3 are made of metal, the main supports 8 mainly support the construction table 9, the construction table 9 is mainly used for providing a standing position for constructors, therefore, the main supports 8 need to have strong bearing capacity, the supporting rods 3 are fixedly connected between the main supports 8 in the same group, the structural strength of the main supports 8 and the construction table 9 is enhanced through the supporting rods 3, the bearing capacity of the main supports 8 and the supporting rods 3 is ensured through metal materials, and through meshes which are uniformly distributed are arranged outside the construction table 9, the construction table 9 is mainly used for providing a standing position for constructors, in order to reduce the weight of the construction table 9, through meshes which are uniformly distributed are arranged outside the construction table 9, so that the weight of the scaffold is reduced, the scaffold is convenient to disassemble and carry, the threaded piles 7 are in threaded sleeve connection with the inside of the movable base 6, anti-skid lines which are uniformly distributed are arranged outside the movable base 6, the bottom of the movable base 6 is fixedly sleeved with a limiting pipe 10, the movable base 6 is rotated, after the scaffold is erected, a worker can rotate the movable base 6, the threaded piles 7 are driven to ascend through threads between the movable base 6 and the threaded piles 7, the height of the main support 8 is changed, so that the height of the construction table 9 is changed along with the main support 8, the height adjustment work of the scaffold is more convenient, the fixed piles 12 are fixedly arranged outside the support base 1 and the main support 8, the outside movable sleeve of spud pile 12 is equipped with cup joint ring 4, and the outside screw thread of spud pile 12 has cup jointed screw cap 5, cup joints the horizontal dead lever 2 of fixedly connected with between the ring 4, and the support that horizontal dead lever 2 can assist between two sets of support bases 1 and the main support 8 is fixed to guarantee the stability after the scaffold frame is set up.
Referring to fig. 4 to 5, the external thread of the limiting tube 10 is sleeved with a fastening screw 11, the supporting base 1 is externally provided with a fixing hole 13 matched with the fastening screw 11, when the movable base 6 is rotated, the limiting tube 10 and the fastening screw 11 can rotate along with the movable base 6, when the movable base 6 rotates to a proper position, a worker can rotate the fastening screw 11 to enable the tail end of the fastening screw 11 to be embedded into the fixing hole 13, so as to fix and stabilize the movable base 6, thereby preventing the movable base 6 from continuing to rotate, the inner diameter value of the limiting tube 10 is larger than the outer diameter value of the supporting base 1, the bottom of the supporting base 1 is fixedly sleeved with a rubber base, the inner diameter value of the limiting tube 10 is larger than the outer diameter value of the supporting base 1, so that a certain gap exists between the limiting tube 10 and the supporting base 1, and the movement of the tail end position of the fastening screw 11 is facilitated, the friction between the tail end of the fastening screw 11 and the outside of the supporting base 1 when the limiting pipe 10 rotates along with the movable base 6 is avoided.
In conclusion, when the scaffold for building construction is used, two groups of supporting bases 1 and main brackets 8 are taken out and placed at intervals, the transverse fixing rod 2 is taken out, the sleeve rings 4 at two ends of the transverse fixing rod 2 are sleeved on the fixing piles 12 outside the supporting bases 1 and the main brackets 8, the threaded covers 5 are sleeved outside the fixing piles 12 and rotate until the threaded covers 5 fixedly lock the sleeve rings 4, the construction platform 9 is arranged at the top of the main brackets 8, the movable base 6 is rotated, the threaded piles 7 are driven to ascend through threads between the movable base 6 and the threaded piles 7, the height of the main brackets 8 is changed, the height of the construction platform 9 is changed along with the main brackets 8, after the height of the construction platform 9 is adjusted to a proper position, the fastening screws 11 are rotated to enable the tail ends of the fastening screws 11 to be embedded into the fixing holes 13, and then the movable base 6 is fixed stably, the movable base 6 is prevented from continuing to rotate, and the whole building process based on the scaffold for building construction is completed.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a scaffold frame for construction, includes two sets of support bases (1) and main support (8), its characterized in that: the top movable sleeve that supports base (1) is equipped with movable base (6), the fixed cover in bottom of main support (8) is equipped with screw pile (7), and the top of main support (8) is provided with construction platform (9), screw pile (7) screw thread cup joints in the inside of movable base (6), the equal fixed mounting in outside of supporting base (1) and main support (8) has spud pile (12), the outside movable sleeve of spud pile (12) is equipped with cup joint ring (4), and the outside screw thread of spud pile (12) has cup jointed screw cap (5), fixedly connected with transverse fixing pole (2) between cup joint ring (4).
2. The scaffold for building construction according to claim 1, wherein: the support rods (3) are fixedly connected between the main supports (8), and the main supports (8) and the support rods (3) are both made of metal.
3. The scaffold for building construction according to claim 1, wherein: the anti-skidding lines which are uniformly distributed are arranged outside the movable base (6), and the bottom of the movable base (6) is fixedly sleeved with a limiting pipe (10).
4. The scaffold for building construction according to claim 3, wherein: the external thread of the limiting pipe (10) is sleeved with a fastening screw (11), and a fixing hole (13) matched with the fastening screw (11) is formed in the outer portion of the supporting base (1).
5. The scaffold for building construction according to claim 1, wherein: and through meshes which are uniformly distributed are arranged outside the construction table (9).
6. The scaffold for building construction according to claim 4, wherein: the inner diameter value of the limiting pipe (10) is larger than the outer diameter value of the supporting base (1), and a rubber base is fixedly sleeved at the bottom of the supporting base (1).
CN202122260024.9U 2021-09-17 2021-09-17 Scaffold for building construction Expired - Fee Related CN215926650U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122260024.9U CN215926650U (en) 2021-09-17 2021-09-17 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122260024.9U CN215926650U (en) 2021-09-17 2021-09-17 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN215926650U true CN215926650U (en) 2022-03-01

Family

ID=80417298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122260024.9U Expired - Fee Related CN215926650U (en) 2021-09-17 2021-09-17 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN215926650U (en)

Similar Documents

Publication Publication Date Title
CN215926650U (en) Scaffold for building construction
CN212897621U (en) Reinforcing structure for correcting verticality of cylindrical template
CN206723614U (en) A kind of supporting structure for steel construction
CN212802720U (en) Temporary support capable of being adjusted in multiple directions
CN206289963U (en) For the climbing form system of section Core tube construction
CN207267793U (en) A kind of placing device of tower crane leg
CN215520129U (en) Template support structure for building construction
CN113653313B (en) Outer wall scaffold support device for building curtain wall
CN210947143U (en) Steel structure for building
CN115233676A (en) Underground pile network construction device
CN210202666U (en) Single greenhouse
CN209783577U (en) Level gauge for engineering survey
CN209428967U (en) A kind of bridge construction formwork support device
CN216277016U (en) Aligning and leveling assembly for assembling transfer beam
CN216475016U (en) Supporting device
CN213143861U (en) Length-adjustable cross rod
CN213143831U (en) Stable and reliable building construction auxiliary tool
CN215484494U (en) Height-adjustable's scaffold frame for building
CN110707626B (en) Cable hanging rack convenient to adjust
CN209689623U (en) A kind of level bracket suitable for narrow space
CN210214681U (en) Fuselage bracket
CN213975465U (en) PE storage tank convenient to overhaul
CN211547725U (en) Self-adjusting steel pipe pile guide frame
CN210524960U (en) Improved street lamp pole mounting tool
CN214942262U (en) Foldable supporting tripod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220301