CN215926482U - Prefabricated column for steel structure - Google Patents

Prefabricated column for steel structure Download PDF

Info

Publication number
CN215926482U
CN215926482U CN202122265561.2U CN202122265561U CN215926482U CN 215926482 U CN215926482 U CN 215926482U CN 202122265561 U CN202122265561 U CN 202122265561U CN 215926482 U CN215926482 U CN 215926482U
Authority
CN
China
Prior art keywords
steel
column body
column
notch
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122265561.2U
Other languages
Chinese (zh)
Inventor
田若瑜
常彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202122265561.2U priority Critical patent/CN215926482U/en
Application granted granted Critical
Publication of CN215926482U publication Critical patent/CN215926482U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to the field of steel structures, in particular to a prefabricated column for a steel structure. The concrete column comprises a column body with an I-shaped cross section, notches are formed in two sides of the column body, a steel reinforcement net cage is arranged in each notch along the column body, and the column body and the steel reinforcement net cage are poured in the concrete column body. The utility model realizes the batch prefabrication of steel structure cylinders, reduces the whole weight of the component while meeting the stress requirement, is convenient to install, avoids secondary construction, reduces the construction cost, saves the using amount of concrete tank cars, templates and the like, and saves resources such as tower cranes and the like.

Description

Prefabricated column for steel structure
Technical Field
The utility model relates to the field of steel structures, in particular to a prefabricated column for a steel structure.
Background
In steel structure building construction, after a steel frame is built, secondary construction is carried out, so that working procedures, labor and construction period are increased; the traditional construction method comprises the following steps: the steel structure column is transported to a field for installation after being manufactured in a factory, and reinforcing steel bars are bound and a formwork is erected for secondary construction in a reconstruction field after the installation is finished.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems, and provides a prefabricated column for a steel structure, which realizes the batch prefabrication of steel structure columns, reduces the whole weight of a component while meeting the stress requirement, is convenient to install and avoids secondary construction.
The utility model solves the problems and adopts the technical scheme that:
the utility model provides a prefabricated post for steel construction, includes that the cross section is the cylinder of "worker" font, and the both sides of cylinder have the notch, are equipped with the reinforcing bar cylinder mould along the cylinder in each notch, and cylinder, reinforcing bar cylinder mould are pour in concrete column body.
Compared with the prior art, the utility model adopting the technical scheme has the outstanding characteristics that:
the utility model realizes the batch prefabrication of steel structure cylinders, reduces the whole weight of the component while meeting the stress requirement, is convenient to install, avoids secondary construction, reduces the construction cost, saves the using amount of concrete tank cars, templates and the like, and saves resources such as tower cranes and the like.
Preferably, the further technical scheme of the utility model is as follows:
the steel bar net cage is formed by rolling and binding steel bar net sheets, and the size of the steel bar net cage is matched with that of the notch on the column body.
The concave bottom of the notch is welded with a stud, and the steel mesh cage is fixed in the notch of the column body through the stud.
Drawings
FIG. 1 is a schematic diagram of a front view configuration of an embodiment of the present invention;
FIG. 2 is a first schematic view of a construction process according to an embodiment of the present invention;
FIG. 3 is a schematic view of a second construction process according to an embodiment of the present invention;
in the figure: 1. a cylinder; 2. a steel bar net cage; 3. a concrete column; 4. a stud; 5. and (5) a steel die.
Detailed Description
The utility model will be better understood by the following description of embodiments thereof, but the applicant's specific embodiments are not intended to limit the utility model to the particular embodiments shown, and any changes in the definition of parts or features and/or in the overall structure, not essential changes, are intended to define the scope of the utility model.
Referring to fig. 1 to 3, the technical solution of the present invention is as follows:
the utility model provides a prefabricated post for steel construction, including the cylinder 1 of transversal personally submitting "worker" font, the main part adopts H shaped steel post, the both sides of cylinder 1 have the notch, place along cylinder 1 in each notch and roll up the ligature by reinforcing bar net piece and form reinforcing bar cylinder mould 2, the size of reinforcing bar cylinder mould 2 and the notch size looks adaptation on the cylinder 1, the welding of the depressed center department of notch has a peg 4, reinforcing bar cylinder mould 2 passes through peg 4 to be fixed in the notch of cylinder 1, reinforcing bar cylinder mould 2 and peg 4 are pour in concrete column 31.
The preparation method comprises the following steps: manufacturing a steel mould 5 according to the overall dimension of a prefabricated column in a design drawing, placing a column body 1 with an I-shaped cross section in the steel mould 5, welding studs 4 at intervals along the length of the column body 1 in each notch of the column body 1, placing a reinforcement cage 2 formed by binding in the notch of the column body 1, fixing the reinforcement cage 2 through the studs 4 and pouring concrete; after the strength of the concrete meets the requirement, the steel mould 5 is dismantled, the member is turned over, the side to be constructed is upward, and the operation is repeated to fill the concrete; and when the concrete strength of the construction side meets the requirement, the steel die 5 is removed.
The utility model realizes the batch prefabrication of the steel structure column body 1, reduces the whole weight of the component while meeting the stress requirement, is convenient to install, avoids secondary construction, reduces the construction cost, saves the using amount of concrete tank cars, templates and the like, and saves resources such as tower cranes and the like.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the scope of the present invention, which is defined in the appended claims.

Claims (3)

1. The utility model provides a prefabricated post for steel construction which characterized in that: the concrete column comprises a column body with an I-shaped cross section, notches are formed in two sides of the column body, a steel reinforcement net cage is arranged in each notch along the column body, and the column body and the steel reinforcement net cage are poured in the concrete column body.
2. The precast column for a steel structure according to claim 1, characterized in that: the steel bar net cage is formed by rolling and binding steel bar net sheets, and the size of the steel bar net cage is matched with that of the notch on the column body.
3. The precast column for a steel structure according to claim 1, characterized in that: the concave bottom of the notch is welded with a stud, and the steel mesh cage is fixed in the notch of the column body through the stud.
CN202122265561.2U 2021-09-18 2021-09-18 Prefabricated column for steel structure Active CN215926482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122265561.2U CN215926482U (en) 2021-09-18 2021-09-18 Prefabricated column for steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122265561.2U CN215926482U (en) 2021-09-18 2021-09-18 Prefabricated column for steel structure

Publications (1)

Publication Number Publication Date
CN215926482U true CN215926482U (en) 2022-03-01

Family

ID=80417356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122265561.2U Active CN215926482U (en) 2021-09-18 2021-09-18 Prefabricated column for steel structure

Country Status (1)

Country Link
CN (1) CN215926482U (en)

Similar Documents

Publication Publication Date Title
CN103498533A (en) Prestressed H-shaped steel reinforced concrete superposed beam
CN108252457A (en) A kind of steel core concrete column and manufacturing method
CN102704406A (en) Roadbed slab non-tensile stress construction method based on combined channel girder
CN103498531A (en) Long-span pre-stressing I-shaped steel reinforced concrete superposed beam
CN110512800A (en) A kind of steel and concrete combined structure system and construction method
CN203547019U (en) Prestressed H-shaped steel reinforced concrete superposed beam
CN215926482U (en) Prefabricated column for steel structure
CN219219503U (en) Steel bar net truss superimposed sheet
CN216446340U (en) Assembled reinforced concrete beam structure
CN215484082U (en) Formed steel reinforcement framework, floor slab using same, flat slab and pile foundation bearing platform
CN115741985A (en) Production method of pier column containing shear keys
CN115354782A (en) Assembled prestressed corrugated steel plate composite shear wall and construction method thereof
CN215802633U (en) Laminated shear wall with steel constraint component
CN211621554U (en) Prestressed concrete prefabricated square pile
CN114250913A (en) Cast-in-place reinforced concrete arc-shaped side beam and construction method
CN211640368U (en) Hollow slab template suitable for ultra-wide pedestal
CN112627436A (en) Truss type steel reinforced concrete Z-shaped column partially prefabricated and assembled
CN113216519B (en) Steel reinforcement framework and application thereof in floor slab, flat slab and pile foundation bearing platform
CN118528397B (en) Ribbed laminated plate and manufacturing method thereof
CN216999269U (en) Semi-fabricated ultra-high performance concrete constraint steel reinforced concrete pier column
CN219909361U (en) Pulling-on piece formula connecting piece and antidetonation coincide wall
CN218990374U (en) Diversion tunnel reinforced concrete structure
CN213837352U (en) Integral stirrup of integration of concrete column
CN212802535U (en) Hollow frame column mould shell
CN220035941U (en) Steel pipe truss prestressing force stair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant