CN215907564U - Guyed tower guyed pile embedded part fixing device - Google Patents

Guyed tower guyed pile embedded part fixing device Download PDF

Info

Publication number
CN215907564U
CN215907564U CN202121851734.2U CN202121851734U CN215907564U CN 215907564 U CN215907564 U CN 215907564U CN 202121851734 U CN202121851734 U CN 202121851734U CN 215907564 U CN215907564 U CN 215907564U
Authority
CN
China
Prior art keywords
embedded part
guyed
pile
splint
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121851734.2U
Other languages
Chinese (zh)
Inventor
董鲁平
杨官辉
邵国栋
曾广宇
赵金龙
刘洪文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO Electric Power Construction Co Ltd
Original Assignee
SEPCO Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO Electric Power Construction Co Ltd filed Critical SEPCO Electric Power Construction Co Ltd
Priority to CN202121851734.2U priority Critical patent/CN215907564U/en
Application granted granted Critical
Publication of CN215907564U publication Critical patent/CN215907564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to the power transmission line laying technology, in particular to a guyed pile embedded part fixing device of a guyed tower, which comprises a cylindrical pile die, a bracket and a clamp for clamping the embedded part at a specific angle; the support is of a cuboid frame structure, and the bottom surface of the support is horizontally and adjustably mounted on the top surface of the pile mould; the fixture is fixedly arranged on the support, the top of the embedded part is detachably arranged on the fixture, and the embedded part body inclines at a specific angle and penetrates through the pile mould barrel cavity.

Description

Guyed tower guyed pile embedded part fixing device
Technical Field
The utility model relates to a power transmission line laying technology, in particular to a guyed pile embedded part fixing device for a guyed tower.
Background
In the foundation construction of the power transmission line, the use proportion of the guyed tower is high, 4 guyed piles are used for each guyed tower, the installation precision of the guyed pile embedded parts is a key element for ensuring the construction quality of the guyed tower, and how to quickly position and fix the guyed pile embedded parts is also a key element for improving the construction efficiency. The diameter of the foundation of the bored pile is generally about 1m, and the installation inclination angle of the embedded part is 37.08 degrees and is consistent with the inclination angle of the stay wire. The deviation of the vertical inclination angle and the horizontal angle is controlled within +/-2 degrees, and the deviation of the position is controlled within +/-5 mm.
The fixing mode of the existing commonly used stay wire pile embedded part is a mode of binding and fixing by adopting a wooden bracket and a reinforcing steel bar binding wire. The method comprises the steps of firstly binding and fixing the embedded part and the wooden bracket, then aligning and fixing the wooden bracket and a steel formwork of the cast-in-situ bored pile, finally adjusting the vertical inclination angle of the embedded part, and then binding and fixing the bottom of the embedded part and a reinforcement cage of the cast-in-situ bored pile. The fixed adjustment in-process need be measured repeatedly, and is fixed many times, and the efficiency of construction is low, and is fast to wooden bracket is because the rigidity is not enough with the fixed mode of ligature silk, and the in-process of pouring and vibrating arouses easily to bury the change of an inclination and position, and construction quality is difficult to guarantee.
Disclosure of Invention
In order to solve the problems, the utility model provides a guyed pile embedded part fixing device for a guyed tower, which improves the adjusting and fixing speed of the guyed pile embedded part and shortens the construction time. The technical scheme adopted by the utility model is as follows:
a guyed pile embedded part fixing device for a guyed tower comprises a cylindrical pile die, a bracket and a clamp for clamping the embedded part; the support is of a cuboid frame structure, and the bottom surface of the support is horizontally and adjustably mounted on the top surface of the pile mould; the fixture is fixedly arranged on the support, the top of the embedded part is detachably arranged on the fixture, and the embedded part body obliquely penetrates through the pile mould barrel cavity.
Above-mentioned guy tower guy pile built-in fitting fixing device, anchor clamps include two L types that the shape is the same decide splint I and move splint II, decide splint I and be the state that the corner is up and set firmly in the support, a lateral surface of deciding splint I is the clamping face, the built-in fitting is located between the lateral surface of moving splint II and the clamping face of deciding splint I, wears to establish with the bolt in proper order and connects and move splint II, built-in fitting and decide splint I.
According to the fixing device for the embedded part of the guy wire pile of the guy wire tower, the embedded part is a U-shaped part formed by bending and integrally forming reinforcing steel bars, the top of the embedded part is an inverted V-shaped clamping head, the middle of the embedded part is a pair of straight bars, the tail end of the embedded part is a pair of U-shaped hooks bent outwards, two end heads of the clamping head are respectively connected with one straight bar, and the lower end of each straight bar is provided with the U-shaped hook.
The utility model has the beneficial effects that: the device can carry out accurate positioning to the inclination and the height of embedded part, can pour behind the fixed embedded part for need not many times retest for the construction progress, shortened the time limit for a project, circulated use practices thrift construction cost. The operation is simple, more measurement technicians are not needed, and the labor intensity is reduced.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic top view of an embodiment of the present invention;
FIG. 3 is a schematic side view of an embodiment of the present invention;
fig. 4 is a schematic view of an embedded part according to an embodiment of the utility model.
In the figure: the pile mould is 1, the support is 2, the fixed clamping plate is 3, the movable clamping plate is 4, the bolt is 5, the embedded part is 6, the clamping head is 7, the straight rod is 8, and the U-shaped hook is 9.
Detailed Description
The utility model is further explained below with reference to the drawings.
The embodiment is a guyed pile embedded part fixing device of a guyed tower, which comprises a cylindrical pile die 1, a bracket 2 and a clamp for clamping an embedded part 6, wherein the forming diameter of the pile die 1 of the device can be 0.8-1.5 m. The support 2 is of a cuboid frame structure, and the bottom surface of the support 2 is provided with a long hole to realize horizontal adjustable installation on the top surface of the pile mould 1; the fixture is fixedly arranged on the support 2, the top of the embedded part 6 is detachably arranged on the fixture, and the body of the embedded part 6 obliquely penetrates through the cylindrical cavity of the pile mould 1.
The angle steel of L type is adopted to fixed splint I3 and the movable clamp plate II 4 of anchor clamps, uses 5 connections of bolt to decide splint I3 and move splint II 4 and realize the centre gripping, and the rigidity is good, is favorable to ensureing construction quality. Decide splint I3 and be the state that the corner is up and set firmly in support 2, a lateral surface of deciding splint I3 is the clamping face, built-in fitting 6 is located between the clamping face of moving splint II 4 and deciding splint I3, bolt 5 wears to establish in proper order and connects and move splint II 4, built-in fitting 6 and decide splint I3.
The device is suitable for stay wire piles of U-shaped embedded parts 6 which are integrally formed by reinforcing steel bars. The top of the embedded part 6 is an inverted V-shaped mounting chuck 7, the middle of the embedded part is provided with a pair of straight rods 8, the tail end of the embedded part is provided with a pair of outward bent U-shaped hooks 9, two ends of the mounting chuck 7 are respectively connected with one straight rod 8, and the lower end of each straight rod 8 is provided with the U-shaped hook 9.
The lengths of the two side surfaces of the clamping plate I3 are adjusted, so that the inclination degree of the clamping surface is changed, and the adjustment of the installation angle of the embedded part 6 can be realized. The relative position of the embedded part 6 and the pile can be adjusted by adjusting the relative position of the bracket 2 on the pile mould 1. During construction, the embedded parts 6 are fixed by the fixed clamping plates I3 and the movable clamping plates II 4, and then the mounting positions of the brackets 2 are adjusted according to construction requirements, so that concrete can be poured. When the form is disassembled, the bolt 5 is firstly loosened, the movable clamping plate II 4 is taken down, then the whole device can be separated from the embedded part 6, and then the frame 2 and the pile form 1 are sequentially disassembled, so that the construction difficulty is greatly reduced, and the device can be repeatedly used.

Claims (3)

1. The utility model provides a guyed tower guyed pile built-in fitting fixing device which characterized in that: the device comprises a cylindrical pile die (1), a bracket (2) and a clamp for clamping an embedded part (6); the support (2) is of a cuboid frame structure, and the bottom surface of the support (2) is horizontally arranged on the top surface of the pile mould (1) in an adjustable manner; the fixture is fixedly arranged on the support (2), the top of the embedded part (6) is detachably arranged on the fixture, and the body of the embedded part (6) obliquely penetrates through the cylindrical cavity of the pile mould (1).
2. The guyed tower guyed pile embedded part fixing device of claim 1, wherein: anchor clamps include two L types that the shape is the same decide splint I (3) and move splint II (4), decide splint I (3) and be the state that the corner is up and set firmly in support (2), a lateral surface of deciding splint I (3) is the clamping face, built-in fitting (6) are located and are moved between the clamping face of a lateral surface of splint II (4) and decide splint I (3), wear to establish in proper order with bolt (5) and connect and move splint II (4), built-in fitting (6) and decide splint I (3).
3. The guyed tower guyed pile embedded part fixing device of claim 1, wherein: the embedded part (6) is a U-shaped part formed by bending and integrally forming reinforcing steel bars, the top of the embedded part (6) is provided with an inverted V-shaped clamping head (7), the middle of the embedded part is provided with a pair of straight rods (8), the tail end of the embedded part is provided with a pair of U-shaped hooks (9) bending outwards, two ends of the clamping head (7) are respectively connected with one straight rod (8), and the lower end of each straight rod (8) is provided with the U-shaped hook (9).
CN202121851734.2U 2021-08-10 2021-08-10 Guyed tower guyed pile embedded part fixing device Active CN215907564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121851734.2U CN215907564U (en) 2021-08-10 2021-08-10 Guyed tower guyed pile embedded part fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121851734.2U CN215907564U (en) 2021-08-10 2021-08-10 Guyed tower guyed pile embedded part fixing device

Publications (1)

Publication Number Publication Date
CN215907564U true CN215907564U (en) 2022-02-25

Family

ID=80291081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121851734.2U Active CN215907564U (en) 2021-08-10 2021-08-10 Guyed tower guyed pile embedded part fixing device

Country Status (1)

Country Link
CN (1) CN215907564U (en)

Similar Documents

Publication Publication Date Title
CN102294741B (en) Construction method for prefabricating hollow slab beams using hinged draw type steel internal mould
CN110847048B (en) Positioning construction method for corrugated steel web
CN215907564U (en) Guyed tower guyed pile embedded part fixing device
CN207327246U (en) A kind of precast beam molding die
CN110886199A (en) Template system suitable for hollow high pier and installation and construction method thereof
CN212002272U (en) Bidirectional adjustable frame beam template clamp structure
CN112096096B (en) Positioning device for embedded steel plate and construction method thereof
CN212375695U (en) Template system suitable for hollow high pier
CN212927858U (en) Concrete pouring device for shield starting base
CN207859100U (en) A kind of predetermined position mould of reinforcing bar for precast wall body installation
CN211541750U (en) Tubular pile mould clamp
CN218759936U (en) Tunnel auxiliary tunnel ditch rapid construction integrated die carrier
CN111058561A (en) Construction method for thin-wall square box rib-free accurate positioning hollow floor
CN216831478U (en) Vibration platform square pile mould
CN218970253U (en) Fixing device of pre-buried line box
CN215106610U (en) Side wall reinforcing bar row spacing and protective layer thickness control device
CN209937257U (en) Precast beam stirrup positioning tool
CN217195990U (en) Precast pile point manufacturing device
CN109732755A (en) A kind of casting platform of prefabricated panel
CN216372683U (en) Prefabricated box girder template
CN217581305U (en) Multifunctional fixing clamp for civil engineering foundation mold
CN213445839U (en) Hoisting mechanism and righting mechanism
CN221236435U (en) Tool for manufacturing building curtain wall embedded part
CN219509179U (en) Beam bottom surface formwork appurtenance
CN216041167U (en) Auxiliary construction device for stiff composite pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shandong Electric Power Construction Tiejun Construction Engineering Co.,Ltd.

Assignor: POWERCHINA SEPCO1 ELECTRIC POWER CONSTRUCTION Co.,Ltd.

Contract record no.: X2024980001829

Denomination of utility model: A fixed device for pre embedded parts of stay wire tower and stay wire pile

Granted publication date: 20220225

License type: Common License

Record date: 20240201