CN215907366U - Building construction pipe fitting centre gripping suspended structure - Google Patents

Building construction pipe fitting centre gripping suspended structure Download PDF

Info

Publication number
CN215907366U
CN215907366U CN202121850325.0U CN202121850325U CN215907366U CN 215907366 U CN215907366 U CN 215907366U CN 202121850325 U CN202121850325 U CN 202121850325U CN 215907366 U CN215907366 U CN 215907366U
Authority
CN
China
Prior art keywords
grip block
fixed
clamping
clamping plate
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121850325.0U
Other languages
Chinese (zh)
Inventor
赵凯丽
秦观兴
张振国
何荣梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Dejiang
Xi Suyalatu
Xu Xiangjun
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121850325.0U priority Critical patent/CN215907366U/en
Application granted granted Critical
Publication of CN215907366U publication Critical patent/CN215907366U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a building construction pipe clamping and hanging structure, and relates to the technical field of pipe clamping and hanging. The pipe fitting clamping device is reasonable in design structure, a pipe fitting of a scaffold can be placed between the first clamping plate and the second clamping plate through the matching design of the mounting block, the first clamping plate, the second clamping plate, the fixing mechanism, the rotary telescopic mechanism and the hanging mechanism, when the pressing rod is loosened, the telescopic piece is reset and extended to drive the first clamping plate and the second clamping plate to reset, the pipe fitting can be clamped, the limiting fixing rod is clamped inside the limiting clamping groove to limit the movable limiting plate, the material can be conveniently hung through the hanging hook body, the material can be conveniently hung on the pipe fitting of the scaffold by a constructor, the material can be conveniently moved to different pipe fittings, the working strength of the constructor is reduced, and the use requirements of the constructor can be met.

Description

Building construction pipe fitting centre gripping suspended structure
Technical Field
The utility model relates to the technical field of pipe fitting clamping and hanging, in particular to a pipe fitting clamping and hanging structure for building construction.
Background
At present, during building construction, due to the fact that constructors need to operate at different heights, the configuration of materials also needs to be changed along with the construction height, and therefore a pipe fitting used for a building is increasingly needed after a hanging section is added; when current carry out the construction, mainly through the scaffold that the pipe fitting was set up, constructor carries out the operation on the scaffold, is under construction to the wall, when carrying out the material configuration, and the material is all placed on the scaffold.
Patent No. CN 208668919U discloses a structure for supporting vertical pipe fitting, using material dead weight as traction force to clamp the pipe fitting, further suspending and fixing the material, with simple structure, convenience and practicality, matching construction position and improving construction efficiency, characterized in that the fixing arm is arc-shaped, one end of the fixing arm is provided with a slot, the slot is open slot, one end of the clamping arm is arranged in the slot and hinged with one end of the fixing arm through a hinge shaft, the clamping arm is arc-shaped, the inner arc-shaped concave surface is opposite to the inner arc-shaped concave surface of the fixing arm, the length of the clamping arm is less than that of the fixing arm, the inner concave arc-shaped surface of the fixing arm is provided with a main rubber pad, the inner concave arc-shaped surface of the clamping arm is provided with an auxiliary rubber pad, one end of the arc-shaped rod is arranged at the inner side of the clamping arm, the other end passes through the slot and is arranged at the inner side of the fixing arm, the arc-shaped rod is provided with a sliding groove, the limiting pin is arranged in the sliding groove, and two ends of the limiting pin are respectively connected with two side walls of the clamping groove.
When a building construction worker needs to carry materials on a scaffold for construction, the materials need to be hung on different pipe fittings, but the clamping arm and the pipe fittings are difficult to separate, the operation intensity of the worker is high, and the use requirement of the worker is difficult to meet; therefore, the clamping and hanging structure for the building construction pipe fitting solves the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to make up the defects of the prior art and provides a clamping and hanging structure for a building construction pipe fitting.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a construction pipe fitting centre gripping suspended structure, includes the installation piece, the inside of installation piece is rotated and is connected with grip block one and grip block two, the upper portion of grip block one and grip block outer surface is equipped with fixed establishment, the below of grip block one and grip block two is equipped with rotatory telescopic machanism, rotatory telescopic machanism's below is equipped with suspension mechanism.
Further, fixed establishment includes adaptation groove body one and adaptation groove body two, the surface at grip block one is seted up to adaptation groove body one, the surface at grip block two is seted up to adaptation groove body two.
Further, the inner wall fixedly connected with of adaptation cell body one is spacing dead lever, the inside of adaptation cell body two is rotated and is connected with movable limiting plate, movable limiting plate is close to the side of grip block two and has been seted up spacing draw-in groove, spacing draw-in groove and spacing dead lever looks adaptation, movable limiting plate has been close to the one end of grip block one and has been seted up and pull the groove.
Furthermore, rotatory telescopic machanism includes the set casing and two symmetrical press bars, set casing fixed connection is in the bottom surface of installation piece, the middle part fixedly connected with fixed connection strip of set casing.
Further, the surface of fixed connection strip articulates there is the hinge bar, the inside sliding connection of hinge bar has movable slide bar, the activity slide bar is located the inside one end fixedly connected with extensible member of hinge bar, the one end that the movable slide bar was kept away from to the extensible member is fixed mutually with the inner wall of hinge bar.
Furthermore, the two pressing rods are respectively fixed on the outer surfaces of the first clamping plate and the second clamping plate, and one ends, far away from the hinge rod, of the two movable sliding rods are respectively hinged with the two pressing rods.
Further, hang the mechanism and include the spliced pole, the spliced pole is fixed in the bottom surface of set casing, rotatory spherical shell is installed to the bottom of spliced pole, the external fixed surface of rotatory spherical shell is connected with hangs the coupler body.
Compared with the prior art, this construction pipe fitting centre gripping suspended structure possesses following beneficial effect:
the building construction pipe clamping and hanging structure has the advantages that through the matching design of the mounting block, the first clamping plate, the second clamping plate, the fixing mechanism, the rotary telescopic mechanism and the hanging mechanism, the movable slide rod can be extruded towards the middle part by pressing the two pressing rods, the telescopic piece is extruded by the movable slide rod at the moment, the telescopic piece is contracted, the first clamping plate and the second clamping plate can be mutually separated, the pipe of a scaffold is placed between the first clamping plate and the second clamping plate, when the pressing rods are loosened, the telescopic piece is reset and extended to drive the first clamping plate and the second clamping plate to reset, the pipe can be clamped, the limiting fixed rod is clamped in the limiting clamping groove to limit the movable limiting plate, the material can be conveniently hung through the hanging hook body, a constructor can conveniently hang the material on the pipe of the scaffold, the material can be conveniently moved to different pipes, and the working strength of the constructor is reduced, can meet the use requirements of workers.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic perspective view of a suspension mechanism according to the present invention;
FIG. 3 is a perspective view of a top view of the securing mechanism of the present invention;
figure 4 is a cross-sectional view of a movable slide bar and a hinge bar of the present invention.
In the figure: 1. mounting blocks; 2. a first clamping plate; 3. a second clamping plate; 4. a fixing mechanism; 41. a first adaptive groove body; 42. a second adaptive groove body; 43. a movable limit plate; 44. a limiting clamping groove; 45. pulling the groove; 46. a limiting fixing rod; 5. a rotary telescoping mechanism; 51. a stationary case; 52. fixing the connecting strip; 53. a movable slide bar; 54. a telescoping member; 55. a hinged lever; 56. a pressing rod 6 and a hanging mechanism; 61. connecting columns; 62. rotating the spherical shell; 63. the hook body is hung.
Detailed Description
The principles and features of this invention are described below in conjunction with the following drawings, which are set forth by way of illustration only and are not intended to limit the scope of the utility model.
This embodiment provides a construction pipe fitting centre gripping suspended structure, and the device makes things convenient for the staff to hang and remove the material, has reduced staff's working strength greatly, can satisfy staff's user demand.
Referring to fig. 1, a building construction pipe clamping suspension structure comprises an installation block 1, wherein a first clamping plate 2 and a second clamping plate 3 are hinged on the inner wall of the installation block 1.
Furthermore, the first clamping plate 2 and the second clamping plate 3 can rotate on the inner wall of the mounting block 1, and the pipe fitting is conveniently clamped.
Referring to fig. 1 and 3, the fixing mechanism 4 is disposed on the upper portions of the first clamping plate 2 and the second clamping plate 3, and the fixing mechanism 4 includes a first adaptive slot 41 and a second adaptive slot 42.
Preferably, the first adapter groove body 41 and the second adapter groove body 42 are both arranged at the upper parts of the first clamping plate 2 and the second clamping plate 3.
In this embodiment, the inner wall of the first adaptive slot 41 is fixed with a limiting fixing rod 46, and the limiting fixing rod 46 is cylindrical.
In this scheme, the inside of the first adapter groove body 42 is rotatably provided with a movable limiting plate 43, the movable limiting plate 43 is arc-shaped, and the movable limiting plate 43 is adapted to the first adapter groove body 41 and the second adapter groove body 42.
Here, the rotation of the movement restriction plate 43 makes the movement restriction plate 43 rotate inside the first and second fitting grooves 41 and 42.
Preferably, the limiting clamping groove 44 is formed in one side surface of the movable limiting plate 43 close to the second clamping plate 3, and the limiting clamping groove 44 is matched with the limiting fixing rod 46.
After the movable limiting plate 43 rotates to the inside of the first adaptation groove body 41 and the second adaptation groove body 42, the limiting fixing rod 46 can be clamped into the limiting clamping groove 44, and the movable limiting plate 43 is conveniently fixed.
Further, pull groove 45 and set up in the one end that activity limiting plate 43 is close to grip block one 2, pull the setting of groove 45 and conveniently detain activity limiting plate 43, rotate activity limiting plate 43.
Referring to fig. 1, 2 and 4, the rotary telescopic mechanism 5 is disposed below the first clamping plate 2 and the second clamping plate 3, and the fixed housing 51 is fixed to the bottom surface of the mounting block 1.
In this embodiment, a fixing connecting strip 52 is fixed to the inner wall of the fixing shell 51, and the fixing connecting strip 52 may be square or cylindrical.
In the present embodiment, it is preferable that the fixed connection strip 52 is cylindrical, and the hinge rod 55 is hinged to the fixed connection strip 52, and the hinge rod 55 can rotate around the fixed connection strip 52.
Preferably, the movable sliding rod 53 is slidably connected inside the fixed connecting bar 52, and a telescopic member 54 is installed between the fixed connecting bar 52 and the movable sliding rod 53.
Here, the telescopic member 54 is a spring, and the telescopic member 54 is installed inside the hinge lever 55.
The movable sliding rod 53 can slide inside the hinge rod 55 by the arrangement of the telescopic member 54, and can support the movable sliding rod 53.
Wherein, two pressing rods 56 are respectively fixed on the outer surfaces of the first clamping plate 2 and the second clamping plate 3.
Further, the end of the movable sliding rod 53 away from the hinge rod 55 is hinged by a pressing rod 56.
Referring to fig. 1, a suspension mechanism 6 is disposed below the rotary telescopic mechanism 5, and the suspension mechanism 6 includes a connection column 61, and the connection column 61 is fixed on the bottom surface of the fixed casing 51.
In this embodiment, a ball is fixed at the bottom end of the connecting column 61, a rotating ball shell 62 is arranged on the outer surface of the ball, and the inner wall of the rotating ball shell 62 slides on the outer surface of the ball.
In this scheme, the hanging hook body 63 is fixed on the outer surface of the rotating spherical shell 62, and the hanging hook body 63 is arranged to facilitate hanging of materials.
The working principle is as follows: when the scaffold is used and materials need to be hung, firstly, the two pressing rods 56 are pressed, the two pressing rods 56 extrude the movable sliding rod 53 towards the middle part, the movable sliding rod 53 extrudes the telescopic piece 54, the telescopic piece 54 contracts, at the moment, the first clamping plate 2 and the second clamping plate 3 are far away from each other, the pipe fittings of the scaffold are placed between the first clamping plate 2 and the second clamping plate 3, then, the pressing rods 56 are loosened, the telescopic piece 54 is reset and extended to drive the first clamping plate 2 and the second clamping plate 3 to reset, so that the pipe fittings can be clamped, then, the limiting fixing rod 46 is clamped inside the limiting clamping groove 44 to limit the movable limiting plate 43, the materials are hung conveniently through the hanging hook body 63, so that constructors can hang the materials on the pipe fittings of the scaffold conveniently, the first clamping plate 2 and the second clamping plate 3 are separated from the pipe fittings conveniently, and move the materials, the working strength of workers is reduced, and the use requirements of the workers can be met.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (7)

1. The utility model provides a construction pipe fitting centre gripping suspended structure, includes installation piece (1), its characterized in that: the inside of installation piece (1) is rotated and is connected with grip block one (2) and grip block two (3), the upper portion of grip block one (2) and grip block two (3) surfaces is equipped with fixed establishment (4), the below of grip block one (2) and grip block two (3) is equipped with rotatory telescopic machanism (5), the below of rotatory telescopic machanism (5) is equipped with hangs mechanism (6).
2. The building construction pipe clamping and hanging structure as claimed in claim 1, wherein: fixed establishment (4) include adaptation groove body (41) and adaptation groove body two (42), the surface at grip block one (2) is seted up in adaptation groove body one (41), the surface at grip block two (3) is seted up in adaptation groove body two (42).
3. The building construction pipe clamping and hanging structure as claimed in claim 2, wherein: the inner wall fixedly connected with of adaptation groove body (41) is spacing dead lever (46), the inside rotation of adaptation groove body two (42) is connected with activity limiting plate (43), activity limiting plate (43) are close to a side of grip block two (3) and have seted up spacing draw-in groove (44), spacing draw-in groove (44) and spacing dead lever (46) looks adaptation, the one end that activity limiting plate (43) are close to grip block one (2) has been seted up and has been pulled groove (45).
4. The building construction pipe clamping and hanging structure as claimed in claim 1, wherein: the rotary telescopic mechanism (5) comprises a fixed shell (51) and two symmetrical pressing rods (56), the fixed shell (51) is fixedly connected to the bottom surface of the mounting block (1), and a fixed connecting strip (52) is fixedly connected to the middle of the fixed shell (51).
5. The building construction pipe clamping and hanging structure as claimed in claim 4, wherein: the surface of fixed connection strip (52) articulates there is articulated rod (55), the inside sliding connection of articulated rod (55) has movable slide bar (53), movable slide bar (53) are located the inside one end fixedly connected with extensible member (54) of articulated rod (55), the one end that movable slide bar (53) were kept away from in extensible member (54) is fixed mutually with the inner wall of articulated rod (55).
6. The building construction pipe clamping and hanging structure as claimed in claim 5, wherein: the two pressing rods (56) are respectively fixed on the outer surfaces of the first clamping plate (2) and the second clamping plate (3), and one ends, far away from the hinge rod (55), of the two movable sliding rods (53) are respectively hinged with the two pressing rods (56).
7. The building construction pipe clamping and hanging structure as claimed in claim 1, wherein: hang mechanism (6) including spliced pole (61), the bottom surface at set casing (51) is fixed in spliced pole (61), rotatory spherical shell (62) are installed to the bottom of spliced pole (61), the outer fixed surface of rotatory spherical shell (62) is connected with hangs coupler body (63).
CN202121850325.0U 2021-08-09 2021-08-09 Building construction pipe fitting centre gripping suspended structure Active CN215907366U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121850325.0U CN215907366U (en) 2021-08-09 2021-08-09 Building construction pipe fitting centre gripping suspended structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121850325.0U CN215907366U (en) 2021-08-09 2021-08-09 Building construction pipe fitting centre gripping suspended structure

Publications (1)

Publication Number Publication Date
CN215907366U true CN215907366U (en) 2022-02-25

Family

ID=80291055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121850325.0U Active CN215907366U (en) 2021-08-09 2021-08-09 Building construction pipe fitting centre gripping suspended structure

Country Status (1)

Country Link
CN (1) CN215907366U (en)

Similar Documents

Publication Publication Date Title
CN215907366U (en) Building construction pipe fitting centre gripping suspended structure
CN113708295B (en) Cable maintenance framework among electric power system
CN211813035U (en) Novel cantilever crane
CN111362136A (en) But multi-functional cantilever crane of anchor clamps puts
CN208989147U (en) A kind of electronic Dual-arm crane tower of operating room gas supply
CN110271976A (en) A kind of hanging apparatus for moved seat
CN215443034U (en) All-steel climbing frame convenient to attach to wall
CN214301326U (en) A basket is hung in construction for building municipal works
CN214855704U (en) Hanging device for exhibition picture for education and teaching
CN217301918U (en) Device convenient to a gallows installation adjustment
CN212832373U (en) Interim power consumption construction lifting device
CN212982231U (en) Steel construction section bar hoist device
CN211971294U (en) Pay-off rack for construction site of building construction
CN220908869U (en) Aluminum square tube unit connecting mechanism
CN210278006U (en) Escape frame framework
CN209113378U (en) A kind of novel on-vehicle hanging apparatus
CN216277098U (en) Anti-deviation aluminum template supporting device
CN218337870U (en) Umbrella capable of being erected
CN219057434U (en) Brick lifting clamp convenient to control
CN205034887U (en) Portable electric power multiplexer utensil linkage
CN201202949Y (en) Rotating telescopic hanging rod
CN214828540U (en) Suspension bracket for high-altitude operation hanging basket
CN216489498U (en) Improved portable pipeline hook
CN212763521U (en) Manipulator for vertical rod
CN219200278U (en) Measuring tool for construction engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230919

Address after: 1-3 Wu'ai Street, Shenhe District, Shenyang City, Liaoning Province 110000

Patentee after: Xu Xiangjun

Patentee after: Li Dejiang

Patentee after: Xi Suyalatu

Address before: 050000 No. 36, natural street, Qiaodong District, Shijiazhuang City, Hebei Province

Patentee before: He Rongmei

TR01 Transfer of patent right