CN215900820U - Comprehensive simulation training device - Google Patents
Comprehensive simulation training device Download PDFInfo
- Publication number
- CN215900820U CN215900820U CN202121821839.3U CN202121821839U CN215900820U CN 215900820 U CN215900820 U CN 215900820U CN 202121821839 U CN202121821839 U CN 202121821839U CN 215900820 U CN215900820 U CN 215900820U
- Authority
- CN
- China
- Prior art keywords
- training
- rescue
- tower crane
- support
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a comprehensive simulation training device which comprises at least one of a training support, a tower crane rescue training structure, a climbing structure, a narrow space rescue training structure, a deep well rescue training structure, a lifting rescue training structure and a cliff rescue training structure; the tower crane rescue training structure is arranged at the top of the training support; the climbing structure is arranged on the training support and extends to the outgoing end of the tower crane rescue training structure along the bottom of the training support; the training support is all located to at least one of narrow and small space rescue training structure, deep well rescue training structure, lift rescue training structure, cliff rescue training structure. The technical scheme of the utility model provides a comprehensive simulation training device with a tower crane rescue training function, so as to make up for functional loss of tower crane rescue training.
Description
Technical Field
The utility model relates to the technical field of rescue training equipment, in particular to a comprehensive simulation training device.
Background
Traditional comprehensive simulation training device only possesses functions such as narrow and small space rescue training, heavy burden climbing rescue training, deep well rescue training usually, does not possess the function of tower crane rescue training generally, leads to the function disappearance of tower crane rescue training.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide a comprehensive simulation training device, and aims to provide a comprehensive simulation training device with a tower crane rescue training function so as to make up for functional loss of tower crane rescue training.
In order to achieve the above object, the present invention provides a comprehensive simulation training device, comprising:
training a bracket;
the tower crane rescue training structure is arranged at the top of the training support;
the climbing structure is arranged on the training support and extends to an outgoing end of the tower crane rescue training structure along the bottom of the training support; and
at least one of a narrow space rescue training structure, a deep well rescue training structure, a lifting rescue training structure and a cliff rescue training structure is arranged on the training support.
In an embodiment of the present invention, the tower crane rescue training connection structure includes:
the tower crane arm is arranged at the top of the training support and extends along the length direction of the training support, and a rotary tower of the tower crane arm is provided with the outgoing end; and
a connector connecting the tower boom and the training support.
In an embodiment of the utility model, the top of the tower crane boom is provided with a mandril extending along the length direction of the tower crane boom, and the mandril is used for binding a safety rope during tower crane rescue training.
In one embodiment of the utility model, a plurality of hooks arranged at intervals are arranged at the bottom of the ejector rod and used for hanging safety ropes when tower crane rescue training is carried out.
In an embodiment of the present invention, the connecting member includes a first connecting frame and a second connecting frame, the first connecting frame and the second connecting frame are respectively connected to two sides of the tower boom, the first connecting frame and the second connecting frame are arranged along a width direction of the tower boom, and both the first connecting frame and the second connecting frame are connected to a top of the training support.
In an embodiment of the utility model, the connecting member has a fixing plate, the fixing plate is provided with a first fixing hole, the top of the training support is provided with a second fixing hole, and the tower crane rescue training structure further includes a fixing member, the fixing member is inserted into the first fixing hole and the second fixing hole, so as to lock the fixing plate on the top of the training support.
In an embodiment of the present invention, the length of the tower boom is defined as L, and the following condition is satisfied: l is more than or equal to 12m and less than or equal to 15 m.
In an embodiment of the present invention, a suspension channel penetrating to the bottom of the training support is disposed at the top of the training support; the tower crane rescue training structure is located above the suspension channel.
In an embodiment of the utility model, the climbing structure comprises:
the ladder stand is arranged on one side of the training support and extends to the outgoing end of the tower crane rescue training structure along the bottom of the training support; and
the connecting structure is connected with the crawling ladder and the training support.
In an embodiment of the utility model, the connecting structure includes a first connecting rod and a second connecting rod, the first connecting rod and the second connecting rod are respectively connected to two sides of the ladder stand, and one end of the first connecting rod away from the ladder stand and one end of the second connecting rod away from the ladder stand are both connected to the training support.
In an embodiment of the present invention, the connecting structures are provided in a plurality, and the connecting structures are arranged at intervals along an extending direction of the ladder stand.
The comprehensive simulation training device comprises a training support, a tower crane rescue training structure arranged on the training support, and at least one of a narrow space rescue training structure, a deep well rescue training structure, a lifting rescue training structure and a cliff rescue training structure arranged on the training support; therefore, the comprehensive simulation training device not only has at least one function of narrow space rescue training, deep well rescue training, lifting rescue training and cliff rescue training, but also has the function of tower crane rescue training, thereby making up the functional deficiency of tower crane rescue training.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
FIG. 1 is a schematic structural diagram of an embodiment of the integrated simulation training apparatus of the present invention;
FIG. 2 is a side view of an embodiment of the integrated simulated exercise apparatus of the present invention;
FIG. 3 is a schematic structural diagram of a tower crane rescue training structure in an embodiment of the comprehensive simulation training device of the utility model;
FIG. 4 is a front view of a tower crane rescue training structure in an embodiment of the comprehensive simulation training device of the utility model;
FIG. 5 is a schematic structural diagram of a climbing structure in an embodiment of the integrated simulation training apparatus of the present invention.
The reference numbers illustrate:
reference numerals | Name (R) | Reference numerals | Name (R) |
100 | Comprehensive |
30 | |
10 | |
31 | Ladder stand |
11 | Suspended |
32 | |
20 | Tower crane |
321 | First connecting |
21 | |
322 | Second connecting |
211 | |
40 | |
212 | |
50 | Rescue training structure in |
2121 | Hook for hanging |
60 | Deep well |
22 | Connecting |
70 | Lifting |
221 | First connecting |
80 | Cliff |
222 | Second connecting frame |
The implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that, if directional indications (such as up, down, left, right, front, and back … …) are involved in the embodiment of the present invention, the directional indications are only used to explain the relative positional relationship between the components, the movement situation, and the like in a specific posture (as shown in the drawing), and if the specific posture is changed, the directional indications are changed accordingly.
In addition, if there is a description of "first", "second", etc. in an embodiment of the present invention, the description of "first", "second", etc. is for descriptive purposes only and is not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, technical solutions between various embodiments may be combined with each other, but must be realized by a person skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
The utility model provides a comprehensive simulation training device 100, and aims to provide the comprehensive simulation training device 100 with a tower crane rescue training function so as to make up for functional loss of tower crane rescue training.
The following will describe a specific structure of the integrated simulation training apparatus 100 according to the present invention, and will describe the integrated simulation training apparatus 100 as a horizontal example:
referring to fig. 1 and 2 in combination, in an embodiment of the integrated simulated training device 100 of the present invention, the integrated simulated training device 100 comprises:
a training support 10;
the tower crane rescue training structure 20 is arranged at the top of the training support 10, and the tower crane rescue training structure 20 is arranged at the top of the training support 10;
the climbing structure 30 is arranged on the training support 10, and extends to the starting end 211 of the tower crane rescue training structure 20 along the bottom of the training support 10; and
at least one of a narrow space rescue training structure 50, a deep well rescue training structure 60, a lifting rescue training structure 70 and a cliff rescue training structure 80, wherein at least one of the narrow space rescue training structure 50, the deep well rescue training structure 60, the lifting rescue training structure 70 and the cliff rescue training structure 80 is arranged on the training support 10.
It can be understood that the comprehensive simulation training device 100 of the present invention comprises a training support 10, a tower crane rescue training structure 20 disposed on the training support 10, and at least one of a narrow space rescue training structure 50, a deep well rescue training structure 60, a lifting rescue training structure 70, and a cliff rescue training structure 80 disposed on the training support 10; therefore, the comprehensive simulation training device 100 of the utility model not only has at least one function of narrow space rescue training, deep well rescue training, lifting rescue training and cliff rescue training, but also has the function of tower crane rescue training, thereby making up the functional deficiency of tower crane rescue training.
In this embodiment, through with the direct fixed mounting of tower crane rescue training structure 20 on training support 10, alright direct regard as the support with training support 10 to through the slewing bearing in the actual tower crane of training support 10 simulation, and need not to set up balance arm, tower cap, standard festival, the jacket frame isotructure that rises of tower crane. In the training process, the trainer can climb to the outgoing end 211 of the tower crane rescue training structure 20 from the bottom of the climbing structure 30, and then can start from the outgoing end 211 of the tower crane rescue training structure 20 to perform tower crane rescue training, so that the trainer can be well guided and trained in ordinary training.
Specifically, the training support 10 may include a first floor (ground floor) framework, a second floor framework and a third floor framework arranged from bottom to top; the simulated narrow space rescue training structure 50 is arranged on a ground floor, and can be used for training without climbing to an upper layer; lifting rescue training structure 70 and cliff rescue training structure 80 preferably set up in the third layer framework outside and do not influence the inside various training of training support 10, tower crane rescue training structure 20 sets up in the third layer framework, shaft rescue structure preferably extends to the ground floor from the third layer framework downwards, thereby realize lengthening the height of these rescue structures as far as possible in limited height space in order to improve the lifelike effect of simulation, therefore, three layers of framework of ingenious reasonable utilization have held multiple rescue simulation structures, compromise the characteristic demand of each project to space, height, really accomplished to create very big training possibility in limited space.
Referring to fig. 3 and 4 in combination, in an embodiment of the comprehensive simulation training device 100 of the present invention, the tower crane rescue training connection structure includes a tower boom 21 and a connecting member 22; the tower crane jib 21 is arranged at the top of the training support 10 and extends along the length direction of the training support 10, and the rotary tower of the tower crane jib 21 is provided with the outgoing end 211; the connecting piece 22 connects the tower boom 21 and the training stand 10.
So set up, alright through connecting piece 22 with tower davit 21 fixed mounting at the top of training support 10 to guarantee tower davit 21's installation stability, and then ensure trainer's safety.
Specifically, the specific structural shape of the tower boom 21 is consistent with the structural shape of the tower boom 21 actually used, so as to simulate a rescue scene in an actual rescue process.
Further, referring to fig. 4, in an embodiment of the comprehensive simulation training device 100 of the present invention, the length of the tower boom 21 is defined as L, and the following condition is satisfied: l is more than or equal to 12m and less than or equal to 15 m. The length of the tower boom 21 is preferably 13.4m, that is, the length of the tower boom 21 is shorter than the length of the tower boom 21 in practical application, and a trainer can realize the rescue training function of the tower crane by reciprocating the starting end 211 and the tail end of the tower boom 21, so that the length of the tower boom 21 can be shortened, the length of the training support 10 can be shortened, and the occupied space of the training support 10 can be further reduced; in addition, the width, height and angle of the tower boom 21 are kept the same as for the tower boom 21 in practice.
Further, referring to fig. 3 in combination, in an embodiment of the comprehensive simulation training device 100 of the present invention, the top of the tower boom 21 has a top rod 212 extending along the length direction of the tower boom 21, and the top rod 212 is used for binding a safety rope during the tower crane rescue training. So set up, when the training person is carrying out the tower crane rescue training, in order to guarantee training person's safety, can bind the one end of safety rope on training person's body to bind the other end of safety rope on tower davit 21's ejector pin 212.
Further, referring to fig. 4, in an embodiment of the comprehensive simulation training device 100 of the present invention, a plurality of hooks 2121 are disposed at intervals at the bottom of the top rod 212, and the hooks 2121 are used for hanging a safety rope during tower crane rescue training. So set up, when the training person is carrying out the tower crane rescue training, in order to guarantee training person's safety, except can binding the safety rope on ejector pin 212, still can hang the safety rope and establish on the couple 2121 of ejector pin 212.
Further, referring to fig. 3 in combination, in an embodiment of the comprehensive simulated training device 100 of the present invention, the connecting member 22 includes a first connecting frame 221 and a second connecting frame 222, the first connecting frame 221 and the second connecting frame 222 are respectively connected to two sides of the tower boom 21, the first connecting frame 221 and the second connecting frame 222 are disposed along the width direction of the tower boom 21, and both the first connecting frame 221 and the second connecting frame 222 are connected to the top of the training frame 10.
So set up, through using first linking frame 221 and second linking frame 222 with tower davit 21 fixed mounting at the top of training support 10, and then fully guarantee tower davit 21's installation stability, still can guarantee tower davit 21's installation balance to avoid the condition that the trainer takes place to rock at tower davit 21 in carrying out the training process.
Further, referring to fig. 3, in an embodiment of the comprehensive simulation training device 100 of the present invention, the connecting member 22 has a fixing plate, the fixing plate has a first fixing hole, the top of the training support 10 has a second fixing hole, and the tower crane rescue training structure 20 further includes a fixing member, the fixing member is inserted into the first fixing hole and the second fixing hole, so as to lock the fixing plate on the top of the training support 10. So configured, the fastening member is engaged with the first fastening hole and the second fastening hole to lock the connecting member 22 on the top of the training frame 10 via the fastening plate.
Specifically, the fasteners may be screws, pins, or like attachment structures 32.
Referring to fig. 1, in an embodiment of the comprehensive simulation training device 100 of the present invention, a suspension channel 11 penetrating to the bottom of the training frame 10 is disposed at the top of the training frame 10; the tower crane rescue training structure 20 is located above the suspension channel 11.
So set up, because at the in-process of carrying out actual tower crane rescue, tower davit 21 is unsettled in the mid-air usually, consequently, for the lifelike effect that improves simulation rescue to guarantee rescue training's validity, thereby set up tower crane rescue training structure 20 in the top of unsettled passageway 11, with the unsettled scene in the mid-air of simulation tower davit 21.
In order to prevent the training person from falling through the hanging channel 11 during training other items, a guard rail 40 may be disposed around the outer circumference of the hanging channel 11.
Referring to fig. 5 in combination, in one embodiment of the integrated simulated training device 100 of the present invention, the climbing structure 30 comprises a ladder 31 and a connecting structure 32; the ladder stand 31 is arranged on one side of the training support 10 and extends to the starting end 211 of the tower crane rescue training structure 20 along the bottom of the training support 10; the connecting structure 32 connects the ladder 31 and the training stand 10. So set up, alright through connection structure 32 with cat ladder 31 fixed mounting in one side of training support 10 to guarantee cat ladder 31's installation stability, and then guarantee the security of trainer at the climbing in-process.
Further, referring to fig. 5 in combination, in an embodiment of the comprehensive simulated training device 100 of the present invention, the connecting structure 32 includes a first connecting rod 321 and a second connecting rod 322, the first connecting rod 321 and the second connecting rod 322 are respectively connected to two sides of the ladder 31, and an end of the first connecting rod 321 away from the ladder 31 and an end of the second connecting rod 322 away from the ladder 31 are both connected to the training frame 10.
So set up, through using head rod 321 and second connecting rod 322 with cat ladder 31 fixed mounting in one side of training support 10, and then fully guarantee cat ladder 31's installation stability, still can guarantee cat ladder 31's installation balance to avoid the trainer to scramble in-process cat ladder 31 and take place to rock, the circumstances of influence safety such as slope.
Specifically, the first connecting rod 321 and the second connecting rod 322 may each have a substantially bent rod structure.
Further, in order to further improve the installation stability of the ladder 31, a plurality of the connection structures 32 may be provided, and the plurality of the connection structures 32 may be spaced apart from each other in the extending direction of the ladder 31.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention, and all modifications and equivalents of the present invention, which are made by the contents of the present specification and the accompanying drawings, or directly/indirectly applied to other related technical fields, are included in the scope of the present invention.
Claims (10)
1. An integrated simulated training device, comprising:
training a bracket;
the tower crane rescue training structure is arranged at the top of the training support;
the climbing structure is arranged on the training support and extends to an outgoing end of the tower crane rescue training structure along the bottom of the training support; and
at least one of a narrow space rescue training structure, a deep well rescue training structure, a lifting rescue training structure and a cliff rescue training structure is arranged on the training support.
2. The integrated simulation training device of claim 1, wherein the tower crane rescue training structure comprises:
the tower crane arm is arranged at the top of the training support and extends along the length direction of the training support, and a rotary tower of the tower crane arm is provided with the outgoing end; and
a connector connecting the tower boom and the training support.
3. The integrated simulation training device of claim 2, wherein the top of the tower boom is provided with a top rod extending along the length direction of the tower boom, and the top rod is used for binding a safety rope during the tower crane rescue training.
4. The comprehensive simulation training device of claim 3, wherein a plurality of hooks are arranged at intervals at the bottom of the ejector rod, and the hooks are used for hanging safety ropes when tower crane rescue training is carried out.
5. The integrated simulation training device of claim 2, wherein the connecting member comprises a first connecting frame and a second connecting frame, the first connecting frame and the second connecting frame are respectively connected to both sides of the tower boom, and the first connecting frame and the second connecting frame are arranged along the width direction of the tower boom, and both the first connecting frame and the second connecting frame are connected to the top of the training frame.
6. The comprehensive simulation training device of claim 2, wherein the connecting member has a fixing plate, the fixing plate has a first fixing hole, the top of the training support has a second fixing hole, the tower crane rescue training structure further comprises a fixing member, the fixing member is inserted into the first fixing hole and the second fixing hole, so as to lock the fixing plate to the top of the training support;
and/or, defining the length of the tower boom to be L, and satisfying the condition: l is more than or equal to 12m and less than or equal to 15 m.
7. The integrated simulation training device of claim 1, wherein the top of the training support is provided with a hanging channel that runs through to the bottom of the training support; the tower crane rescue training structure is located above the suspension channel.
8. The integrated simulated training apparatus of claim 1 wherein said climbing structure comprises:
the ladder stand is arranged on one side of the training support and extends to the outgoing end of the tower crane rescue training structure along the bottom of the training support; and
the connecting structure is connected with the crawling ladder and the training support.
9. The integrated simulated training apparatus of claim 8 wherein said connecting structure comprises a first connecting rod and a second connecting rod, said first connecting rod and said second connecting rod are respectively connected to both sides of said ladder, and the end of said first connecting rod remote from said ladder and the end of said second connecting rod remote from said ladder are both connected to said training frame.
10. The integrated simulated training apparatus of claim 8 wherein said connecting structure is provided in a plurality of spaced apart relation along the direction of extension of said ladder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121821839.3U CN215900820U (en) | 2021-08-05 | 2021-08-05 | Comprehensive simulation training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121821839.3U CN215900820U (en) | 2021-08-05 | 2021-08-05 | Comprehensive simulation training device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215900820U true CN215900820U (en) | 2022-02-25 |
Family
ID=80290766
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121821839.3U Active CN215900820U (en) | 2021-08-05 | 2021-08-05 | Comprehensive simulation training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215900820U (en) |
-
2021
- 2021-08-05 CN CN202121821839.3U patent/CN215900820U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107265329B (en) | Dedicated guide pulley of unmanned aerial vehicle | |
CN103523683B (en) | Construction method for dismantling tower crane by use of small hoisting equipment | |
CN215900820U (en) | Comprehensive simulation training device | |
CN206769361U (en) | A kind of attachment means of the plug-in expanded metal lath of adhering lifting integral-scaffold | |
CN214379737U (en) | Distribution lines steps on pole operation auxiliary platform | |
CN103977512B (en) | One is climbed building and is sued and laboured car | |
CN207158597U (en) | A kind of suspender for being used to assemble front loading type forklift gantry | |
CN206376731U (en) | A kind of underground construction extension ladder | |
CN207890940U (en) | A kind of derrick tower based on engineering mechanics | |
CN208749208U (en) | Communicate shaft tower | |
CN211499686U (en) | Improve lamp pole bill-board installation of security and use on-vehicle scaffold | |
CN211473336U (en) | Attached lifting scaffold with stable stress | |
CN206955587U (en) | Cooling tower Hydraulic Lifting-up Level Bridge attachment device | |
CN206615944U (en) | A kind of tower crane driver climbing protector | |
CN206069247U (en) | Tower crane | |
CN207392709U (en) | A kind of ladder cage formula combined scaffold | |
CN205076619U (en) | Single hoisting point double -deck elevator hanging flower basket | |
CN206535060U (en) | Safe barbell flat bench | |
CA2813795A1 (en) | Man basket | |
CN206285367U (en) | A kind of slow drop type safety belt | |
CN220036560U (en) | Suspension type cage ladder | |
CN216038334U (en) | Tower crane structure with good wind resistance | |
CN208008345U (en) | Shipping protector for putlock | |
CN220098465U (en) | But height-adjusting's operation platform | |
CN212336778U (en) | Attached lifting horizontal screen |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |