CN215859003U - Middle sleeve two-end node assembled suspension bracket - Google Patents
Middle sleeve two-end node assembled suspension bracket Download PDFInfo
- Publication number
- CN215859003U CN215859003U CN202023213541.2U CN202023213541U CN215859003U CN 215859003 U CN215859003 U CN 215859003U CN 202023213541 U CN202023213541 U CN 202023213541U CN 215859003 U CN215859003 U CN 215859003U
- Authority
- CN
- China
- Prior art keywords
- middle sleeve
- screw
- end node
- upper chord
- suspension bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 10
- 239000010959 steel Substances 0.000 claims abstract description 10
- 238000007789 sealing Methods 0.000 claims description 7
- 238000010276 construction Methods 0.000 description 5
- 230000008878 coupling Effects 0.000 description 4
- 238000010168 coupling process Methods 0.000 description 4
- 238000005859 coupling reaction Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 238000009434 installation Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Elevator Door Apparatuses (AREA)
Abstract
The utility model discloses a two-end-node assembled suspension frame of an intermediate sleeve, which comprises two symmetrical triangular rigid frames, wherein each triangular rigid frame comprises an upper chord and a lower chord, the upper chord is fixedly connected with a root vertical rod and an end vertical rod, the upper chord, the root vertical rod and the end vertical rod form a bayonet, the bayonet is placed on a parapet wall, so that a space stable structure is formed, two ends of the lower chord are respectively and fixedly connected with the upper chord and the root vertical rod, and a fixing component for fixing is arranged on the end vertical rod; the two triangular rigid frames are connected through a middle sleeve connecting piece. The two triangular steel plates are detachably connected through the middle sleeve connecting piece, so that the triangular steel plates can be conveniently transported to a roof through an elevator, and the problem of unchanged transportation is avoided; the hanging bracket is fixed on the parapet wall through the fixing component and the bayonets. The quick mounting device is convenient for quick mounting of the two triangular rigid frames through the arranged middle sleeve connecting piece structure.
Description
Technical Field
The utility model relates to the technical field of assembly type buildings, in particular to an assembly type suspension bracket with two end nodes of a middle sleeve.
Background
Hanging baskets are increasingly widely used in building construction, such as construction of exterior wall materials, installation, cleaning, maintenance of curtain walls and the like. The construction method has the advantages of economy, practicality, safety, reliability, convenient operation, lower cost and the like, and is a commonly adopted mode for the construction of the external wall materials of the high-rise buildings at present. At present, common hanging basket construction equipment usually needs to arrange a counterweight on a top floor, and a waterproof coiled material and the like on the top floor can be constructed after an outer wall material is constructed and the counterweight is withdrawn, so that the construction period is prolonged. And the parapet thickness of each building is also not uniform. Therefore, the development of the hanging basket high-speed operation equipment which is free of balance weight, flexible and convenient has important engineering significance.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an intermediate sleeve two-end-node assembled suspension bracket, which solves the problems.
The utility model provides an intermediate sleeve two-end node assembled mounted frame, includes the triangle rigid frame of two symmetries, the triangle rigid frame includes upper chord and lower chord, upper chord fixedly connected with root montant and tip montant, upper chord, root montant and tip montant form the bayonet socket, and the bayonet socket is placed on the parapet to form space stable structure, lower chord both ends difference fixed connection upper chord and root montant, be provided with the fixed subassembly that plays the fixed action on the tip montant, two connect through intermediate sleeve connecting piece between the triangle rigid frame.
Further optimally, fixed subassembly includes adjusting screw, with adjusting screw threaded connection's outside adjusting nut and inboard adjusting nut, outside adjusting nut and inboard adjusting nut set up the both sides at the tip montant respectively.
Further optimally, a fastening base plate is further arranged on the adjusting screw rod.
Further optimally, the middle sleeve connecting piece comprises a supporting rod, supporting rod sealing plates are fixed to two sides of the supporting rod, second screws are fixed to the supporting rod sealing plates, first screws are fixed to the triangular rigid frame, and the first screws and the second screws are connected through connecting sleeves.
Further optimally, the length of the first screw is twice that of the second screw.
Further optimally, a group of steel wire through holes are formed in the triangular rigid frame.
Further optimally, middle vertical rods are arranged in the middle of the upper chord and the lower chord.
Compared with the prior art, the technical scheme provided by the embodiment of the utility model has the following technical effects:
the two triangular steel plates are detachably connected through the middle sleeve connecting piece, so that the triangular steel plates can be conveniently transported to a roof through an elevator, and the problem of unchanged transportation is avoided; the hanging bracket is fixed on the parapet wall through the fixing component and the bayonets. The quick mounting device is convenient for quick mounting of the two triangular rigid frames through the arranged middle sleeve connecting piece structure.
Drawings
FIG. 1 is a schematic elevation view of the overall structure;
FIG. 2 is a schematic perspective view of the overall structure;
FIG. 3 is an assembled view of the overall structure;
FIG. 4 is a schematic view of a triangular rigid frame;
FIG. 5 is a schematic view of a support bar;
FIG. 6 is a schematic view of an adjustment screw;
FIG. 7 is a schematic view of a coupling sleeve;
description of reference numerals: 1-parapet wall, 2-triangular rigid frame, 3-middle sleeve connecting piece, 4-fixing component, 5-connecting sleeve, 6-upper chord, 7-lower chord, 8-root vertical bar, 9-middle vertical bar, 10-first screw, 11-end vertical bar, 12-steel wire perforation, 13 a-supporting bar, 13-supporting bar sealing plate, 14-second screw, 15-adjusting screw, 16-outer adjusting screw, 17-inner adjusting screw, 18-fastening backing plate and 19-connecting sleeve.
Detailed Description
The following specific embodiments are specifically and clearly described in the technical solutions of the present application with reference to the drawings provided in the present specification. The drawings in the specification are for clarity of presentation of the technical solutions of the present application, and do not represent shapes or sizes in actual production or use, and reference numerals of the drawings are not limited to the claims involved.
In addition, in the description of the present application, terms used should be construed broadly, and specific meanings of the terms may be understood by those skilled in the art according to actual situations. For example, the terms "disposed" and "disposed," as used herein, may be defined as either a contact or a non-contact arrangement, etc.; the terms "connected" and "coupled" may be defined as mechanically connected, either fixedly or movably, such as by welding, riveting, threading, etc., or electrically connected, etc.; the terms "first", "second", and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated; all the terms of orientation used are used with reference to the drawings or are based on the direction defined by the actual situation and the common general knowledge.
As shown in fig. 1-3, an intermediate sleeve two-end-node assembled suspension bracket comprises two symmetrical triangular rigid frames 2, wherein each triangular rigid frame 2 comprises an upper chord 6 and a lower chord 7, the upper chord 6 is fixedly connected with a root vertical rod 8 and an end vertical rod 11, the upper chord 6, the root vertical rod 8 and the end vertical rod 11 form a bayonet, the bayonet is placed on a parapet 1 so as to form a space stable structure, the triangular rigid frame 2 is placed on the parapet 1, two ends of the lower chord 7 are respectively fixedly connected with the upper chord 6 and the root vertical rod, and the end vertical rod 11 is provided with a fixing component 4 for fixing; the two triangular rigid frames 2 are connected through an intermediate sleeve connecting piece 3. The two triangular steel plates 2 are detachably connected through the middle sleeve connecting piece 3, so that the triangular steel plates can be conveniently transported to a roof through an elevator, and the problem of unchanged transportation is avoided; the present invention secures the hanger to the parapet wall 1 by means of the securing assembly 4 and the bayonet.
As shown in fig. 6, the fixing assembly 4 includes an adjusting screw 15, an outer adjusting nut 16 and an inner adjusting nut 17, which are connected to the adjusting screw 15 by screw threads, and the outer adjusting nut 16 and the inner adjusting nut 17 are respectively disposed on two sides of the end vertical rod 11. The adjusting screw 15 is further provided with a fastening backing plate 18.
As shown in fig. 4-5, the middle sleeve connecting pieces 3 are provided with three sets, each middle sleeve connecting piece 3 includes a supporting rod 13a, supporting rod sealing plates 13 are fixed on two sides of each supporting rod 13a, each supporting rod sealing plate 13 is fixed with a second screw 14, the triangular rigid frame 2 is fixed with a first screw 10, and the first screw 10 and the second screw 14 are connected through a connecting sleeve 19. Further, the first screw 10 is twice as long as the second screw 14.
As shown in fig. 4, 6 and 7, in the installation process of the intermediate sleeve coupler 3, the coupling sleeve 19 is first screwed onto the first screw bar 10, the second screw bar 14 is aligned with the first screw bar 10, the coupling sleeve 19 is rotated in the reverse direction to screw-couple the coupling sleeve 19 with the second screw bar 14, and the first screw bar and the second screw bar are fixed. Since the length of the first screw 10 is twice that of the second screw 14, the contact point of the first screw 10 and the second screw 14 is located at the middle of the connecting sleeve 19.
As shown in fig. 4, the triangular rigid frame 2 is provided with a set of wire perforations 13. The installation of the steel wire of being convenient for, upper chord 6 and lower chord middle part 7 are provided with middle part montant 9. The strength of the suspension bracket is enhanced.
It should be noted that the above embodiments are only specific and clear descriptions of technical solutions and technical features of the present application. However, to those skilled in the art, aspects or features that are part of the prior art or common general knowledge are not described in detail in the above embodiments.
In addition, the technical solutions of the present application are not limited to the above-described embodiments, and those skilled in the art should take the description as a whole, and the technical solutions in the embodiments may be appropriately combined, so that other embodiments that can be understood by those skilled in the art may be formed.
Claims (7)
1. The utility model provides an intermediate sleeve two-end node assembled mounted frame, includes the triangle rigid frame of two symmetries, the triangle rigid frame includes upper chord and lower chord, upper chord fixedly connected with root montant and tip montant, upper chord, root montant and tip montant form the bayonet socket, and the bayonet socket is placed on the parapet to form space stable structure, lower chord both ends difference fixed connection upper chord and root montant, be provided with the fixed subassembly that plays the fixed action on the tip montant, its characterized in that: the two triangular rigid frames are connected through a middle sleeve connecting piece.
2. The middle sleeve two-end node assembled suspension bracket as claimed in claim 1, wherein: the fixed subassembly includes adjusting screw, the outside adjusting nut and the inboard adjusting nut of adjusting screw threaded connection, outside adjusting nut and inboard adjusting nut set up the both sides at the tip montant respectively.
3. The middle sleeve two-end node assembled suspension bracket as claimed in claim 2, wherein: and a fastening base plate is also arranged on the adjusting screw rod.
4. The middle sleeve two-end node assembled suspension bracket as claimed in claim 1, wherein: the middle sleeve connecting piece comprises a supporting rod, supporting rod sealing plates are fixed to two sides of the supporting rod, second screws are fixed to the supporting rod sealing plates, a first screw is fixed to the triangular rigid frame, and the first screw is connected with the second screws through connecting sleeves.
5. The middle sleeve two-end node assembled suspension bracket as claimed in claim 4, wherein: the first screw is twice as long as the second screw.
6. The middle sleeve two-end node assembled suspension bracket as claimed in claim 1, wherein: and a group of steel wire through holes are formed in the triangular rigid frame.
7. The middle sleeve two-end node assembled suspension bracket as claimed in claim 1, wherein: middle vertical rods are arranged in the middle of the upper chord and the lower chord.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023213541.2U CN215859003U (en) | 2020-12-28 | 2020-12-28 | Middle sleeve two-end node assembled suspension bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023213541.2U CN215859003U (en) | 2020-12-28 | 2020-12-28 | Middle sleeve two-end node assembled suspension bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215859003U true CN215859003U (en) | 2022-02-18 |
Family
ID=80237298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023213541.2U Expired - Fee Related CN215859003U (en) | 2020-12-28 | 2020-12-28 | Middle sleeve two-end node assembled suspension bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215859003U (en) |
-
2020
- 2020-12-28 CN CN202023213541.2U patent/CN215859003U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214531858U (en) | H-shaped node assembly type hanging basket suspension frame | |
CN215859003U (en) | Middle sleeve two-end node assembled suspension bracket | |
CN211080987U (en) | High-rise building external scaffolding fixed knot constructs | |
CN214531857U (en) | Sleeve node assembled mounted frame | |
CN212926602U (en) | Building curtain wall structure convenient to installation and dismantlement | |
CN212231011U (en) | Stable I-steel support hanger | |
CN216130553U (en) | Hanging flower basket device of adjustable length | |
CN217268277U (en) | Suspended ceiling keel frame device for interior decoration | |
CN210420233U (en) | Electroplating fixture for outer decorative strip of car door | |
CN217105778U (en) | Double-keel hanging piece for ceiling expansion joint | |
CN212935416U (en) | Tray type cable bridge | |
CN220504485U (en) | Length-adjustable cross bar suite of disc buckle type scaffold | |
CN212104719U (en) | Glass curtain wall connecting structure | |
CN211199378U (en) | Anti-winding device for galvanizing tank | |
CN220504314U (en) | Novel truss-like girder structure | |
CN219386965U (en) | Building board splicing device | |
CN214531842U (en) | Hanging basket sliding rail device capable of dismounting horizontal movement | |
CN215127047U (en) | Medical isolation curtain mounting mechanism | |
CN218176301U (en) | U-shaped aluminum square tube | |
CN214329488U (en) | Building outer curtain wall connection structure | |
CN217497562U (en) | Aluminum profile transportation hanging device | |
CN213450204U (en) | Multifunctional ladder for high-altitude construction and rescue | |
CN212435272U (en) | Anti-corrosion bridge | |
CN218386599U (en) | Reinforced H-type cable bridge | |
CN217934969U (en) | Large-span bridge support device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220218 |